Sec L-1 Attach 5 PWS Potential OCI matrix.xls
XLS spreadsheet 58 KB Posted
- Attached to
- LRSW Systems Engineering & Integration
- Solicitation number
- FA8811-R-09-0002
About this file
SEC L-1 Attach 5 PWS Potential OCi matrix
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover page
| 27-May-09 |
| Section L-1 |
| RFP FA8811-09-R-0002 |
| ATTACHMENT 5 |
| PWS TASKs with |
| Potential OCI |
Sheet1
| Potential OCI Areas | |||
| LOCATION | Task Area | Paragraph | OCI Issue |
| SMC | 1.2.1.1.1.4 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | |
| 1.2.1.2.2 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.2.3 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.3.4 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.3.5 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.3.6 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.4.1 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.4.1.1 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.4.2 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.4.4 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.5.1.5 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.5.1.6 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.5.6.1 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Possibility of bias if the SE&I contractor is also the LTRS contrator. | ||
| 1.2.1.5.6.2 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.6.1 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.1 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.2 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.3 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.4 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.5 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.6 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.7 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.8 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| CCAFS | Facility Engineering | 1.3.2.2 | |
| 1.3.2.2.4 | Potential exisits if contractor responsible for verifying facility requirements shortfalls is one-in-the-same | ||
| 1.3.2.2.5 | |||
| 1.3.2.2.11 | The potential exists if contractor responsible for QA inspections is one-in-the-same | ||
| Software Engineering (RTL) | 1.3.2.3 | ||
| 1.3.2.3.2 | Potential exisits if contractor responsible for verifying system requirements is one-in-the-same | ||
| VAFB | 1.4.2.1.1.6 | Potential exists for OCI if the SE&I contractor responsible for verifying Space Vehicle Contractor (SVC) space flight readiness was one-in-the-same with the SVC. | |
| 1.4.2.1.1.13 | Potential exists for OCI if the SE&I contractor responsible for investigating and analyzing Space and Missile Launch Complexes/Launch Facilities, Missile/Booster/Spacecraft Processing Facilities, etc. with recommendations provided to the government are one-in-the same with the contractor's responsible for those facilities. | ||
| 1.4.2.1.4.1.6 | Potential exists for OCI if the SE&I contractor responsible for identifying Remote Launch Control Room (RLCR) upgrades based on user inputs is one-in-the same with the user. |
Sheet2
| Functional Area Coordinator (FAC) | Mr. Scott Traxler, 45 LCG/TD |
| Functional Area Evaluator (FAE) | Capt. Joseph Hammes, 45 LCSS/LSMB |
| Contracting Officer's Technical Representative (COTR) | Mr. George MacEwn, 5 SLS/CE |
| Contracting Officer's Technical Representative (COTR) | Maj. Yan Zhu, 45 LCSS/LSG |
Sheet3
File details come from the government source that posted it. Updated .