Sec L-1 Attach 1 Pricing Format.xls
XLS spreadsheet 414 KB Posted
- Attached to
- LRSW Systems Engineering & Integration
- Solicitation number
- FA8811-R-09-0002
About this file
SEC L-1 Attach 1 Pricing Format
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER PAGE
| 30-May-09 |
| DRAFT |
| RFP FA8811-09-R-0002 |
| Section L-1 |
| Attachment 1 |
| SAMPLE FORMAT |
| FOR |
| SUBMISSION OF |
| PROPOSED PRICE |
| DATE: TBD |
Summary Proposal pricing base+3
| Sample Format for Submission of Proposed Price | ||||||||||||
| Cost Element | BASE YEAR (FY 2010) contract year 1 | Core option 1 contract year 2 | Core option 2 contract year 3 | Core option 3 contract year 4 | ||||||||
| (example - Offerors to use their estimating system) | ||||||||||||
| Hours/Base | Rate | Amount | Hours/Base | Rate | Amount | Hours/Base | Rate | Amount | Hours/Base | Rate | Amount | |
| CLIN 0010 (3020) | CLIN 0110 (3020) | CLIN 0210 (3020) | CLIN 0310 (3020) | |||||||||
| SMC Prime & Interdiv LABOR | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 |
| Overhead(s) (identify separately as appropriate to your accounting systems) | 0.00% | 0.00% | 0.00% | 0.00% | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | |||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | |||||||||
| SubTotal (Burdened Prime & Interdiv labor) | ||||||||||||
| ODC | ||||||||||||
| SMC Subcontract Labor | - 0 | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 |
| G&A | 0.00% | $0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| FCCOM (excluded from fee calculations) | ||||||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Fixed Fee (max 10%) | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | ||||
| Total Yearly CLIN Cost Plus Fixed Fee | $0.0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| CLIN 0020 (3020) | CLIN 0120 (3020) | CLIN 0220 (3020) | CLIN 0320 (3020) | |||||||||
| CCAFS Prime & Interdiv LABOR | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 |
| Overhead(s) (identify separately as appropriate to your accounting systems) | 0.00% | 0.00% | 0.00% | 0.00% | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | |||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | |||||||||
| SubTotal (Burdened Prime & Interdiv labor) | ||||||||||||
| ODC | ||||||||||||
| CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 |
| G&A | 0.00% | $0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| FCCOM (excluded from fee calculations) | ||||||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Fixed Fee (max 10%) | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | ||||
| Total Yearly CLIN Cost Plus Fixed Fee | $0.0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| CLIN 0030 (3400) | CLIN 0130 (3400) | CLIN 0230 (3400) | CLIN 0330 (3400) | |||||||||
| CCAFS Prime & Interdiv LABOR | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | - 0 | - 0 |
| Overhead(s) (identify separately as appropriate to your accounting systems) | 0.00% | 0.00% | 0.00% | 0.00% | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | |||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | |||||||||
| SubTotal (Burdened Prime & Interdiv labor) | ||||||||||||
| ODC | ||||||||||||
| CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | - 0 | - 0 |
| G&A | 0.00% | $0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| FCCOM (excluded from fee calculations) | ||||||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Fixed Fee (max 10%) | 0.0% | $ - 0 | 8.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | ||||
| Total Yearly CLIN Cost Plus Fixed Fee | $0.0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| CLIN 0040 (3020) | CLIN 0140 (3020) | CLIN 0240 (3020) | CLIN 0340 (3020) | |||||||||
| VAFB Prime & Interdiv Labor | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Overhead(s) (identify separately as appropriate to your accounting systems) | 0.00% | 0.00% | 0.00% | 0.00% | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | |||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | |||||||||
| SubTotal (Burdened Prime & Interdiv labor) | ||||||||||||
| ODC | ||||||||||||
| VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | - 0 | - 0 |
| G&A | 0.00% | $0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| FCCOM (excluded from fee calculations) | ||||||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Fixed Fee (max 10%) | 8.0% | $ - 0 | 8.0% | $ - 0 | 8.0% | $ - 0 | 8.0% | $ - 0 | ||||
| Total Yearly CLIN Cost Plus Fixed Fee | $0.0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| CLIN 0050 (3400) | CLIN 0150 (3400) | CLIN 0250 (3400) | CLIN 0350 (3400) | |||||||||
| VAFB Prime & Interdiv Labor | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Overhead(s) (identify separately as appropriate to your accounting systems) | 0.00% | 0.00% | 0.00% | 0.00% | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | |||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | |||||||||
| SubTotal (Burdened Prime & Interdiv labor) | ||||||||||||
| ODC | ||||||||||||
| VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| G&A | 0.00% | $0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| FCCOM (excluded from fee calculations) | ||||||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Fixed Fee (max 10%) | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | ||||
| Total Yearly CLIN Cost Plus Fixed Fee | $0.0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Total Annual Price | - 0 | - 0 | - 0 | - 0 | ||||||||
| Total contract price | $ - 0 | |||||||||||
| NOTE: | All amounts/rates are for illustrative purposes only -- The yellow highlighted cells require offeror inputs | |||||||||||
| INSTRUCTION NOTES: | ||||||||||||
| 1 - Company Name: Insert company name at Cell A2. | ||||||||||||
| 2 - Labor Overhead Rates: In Columns B through M, provide the labor overhead rates. If more than one Overhead rate is applied to labor costs, insert the additional overhead rates and formulas, as necessary. | ||||||||||||
| 3 - Overhead Costs: Tailor the worksheet, as necessary to reflect the application of Overhead rates to show the total labor Overhead costs. | ||||||||||||
| 4 - Subtotal for Prime & Interdivisional Labor Costs: Tailor the worksheet to calculate the subtotal for labor and overhead costs. | ||||||||||||
| 5 - Subtotals for Subcontracts <$1,000,000 anually: Provide subtotals for each Subcontractor used. Tailor this section of the model as required. | ||||||||||||
| 6 - Subcontracts > =$1,000,000 annually: For each Subcontract of $1,000,000 or over annually, provide the Subcontractor's Name in A2, and the annual amounts proposed in columns B through M. For each Subcontract of $1,000,000 or over annually, provide a separate rates schedule and cost model as supporting information. Copy the worksheets within this Cost Model and rename. | ||||||||||||
| 7 - G&A: If there is more than one application of G&A, identify and compute additional G&A rates as necessary. | ||||||||||||
| 8 Other Direct Costs. Include a brief rationale for all other direct costs priced for each location and describe the method of quoting. | ||||||||||||
| 9 - Facilities Capital Cost of Money: Insert any proposed FCCOM by GFY. |
&RSummary Proposal pricing Base+3
Summary Proposal pricing AT 1
| Sample Format for Submission of Proposed Price | |||||||||
| Cost Element | AT 1 option 1 contract year 5 | AT 1 option 2 contract year 6 | AT 1 option 3 contract year 7 | ||||||
| (example - Offerors to use their estimating system) | |||||||||
| Hours/Base | Rate | Amount | Hours/Base | Rate | Amount | Hours/Base | Rate | Amount | |
| CLIN 0410 (3020) | CLIN 0510 (3020) | CLIN 0610 (3020) | |||||||
| SMC Prime & Interdiv LABOR | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Overhead(s) (identify separately as appropriate to your accounting systems) | 0.00% | 0.00% | 0.00% | ||||||
| 0.00% | 0.00% | 0.00% | |||||||
| 0.00% | 0.00% | 0.00% | |||||||
| SubTotal (Burdened Prime & Interdiv labor) | |||||||||
| ODC | |||||||||
| SMC Subcontract Labor | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| G&A | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| FCCOM (excluded from fee calculations) | |||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | ||||||
| Fixed Fee (max 10%) | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | |||
| Total Yearly CLIN Cost Plus Fixed Fee | $ - 0 | $ - 0 | $ - 0 | ||||||
| CLIN 0020 (3020) | CLIN 0420 (3020) | CLIN 0520 (3020) | CLIN 0620 (3020) | ||||||
| CCAFS Prime & Interdiv LABOR | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Overhead(s) (identify separately as appropriate to your accounting systems) | 0.00% | 0.00% | 0.00% | ||||||
| 0.00% | 0.00% | 0.00% | |||||||
| 0.00% | 0.00% | 0.00% | |||||||
| SubTotal (Burdened Prime & Interdiv labor) | |||||||||
| ODC | |||||||||
| CCAFS Subcontract Labor | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| G&A | 0.00% | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| FCCOM (excluded from fee calculations) | |||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | ||||||
| Fixed Fee (max 10%) | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | |||
| Total Yearly CLIN Cost Plus Fixed Fee | $ - 0 | $ - 0 | $ - 0 | ||||||
| CLIN 0430 (3400) | CLIN 0530 (3400) | CLIN 0630 (3400) | |||||||
| CCAFS Prime & Interdiv LABOR | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Overhead(s) (identify separately as appropriate to your accounting systems) | 0.00% | 0.00% | 0.00% | ||||||
| 0.00% | 0.00% | 0.00% | |||||||
| 0.00% | 0.00% | 0.00% | |||||||
| SubTotal (Burdened Prime & Interdiv labor) | |||||||||
| ODC | |||||||||
| CCAFS Subcontract Labor | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| G&A | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| FCCOM (excluded from fee calculations) | |||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | ||||||
| Fixed Fee (max 10%) | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | |||
| Total Yearly CLIN Cost Plus Fixed Fee | $ - 0 | $ - 0 | $ - 0 | ||||||
| CLIN 0440 (3020) | CLIN 0540 (3020) | CLIN 0640 (3020) | |||||||
| VAFB Prime & Interdiv Labor | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Overhead(s) (identify separately as appropriate to your accounting systems) | 0.00% | 0.00% | 0.00% | ||||||
| 0.00% | 0.00% | 0.00% | |||||||
| 0.00% | 0.00% | 0.00% | |||||||
| SubTotal (Burdened Prime & Interdiv labor) | |||||||||
| ODC | |||||||||
| VAFB Subcontract Labor | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| G&A | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| FCCOM (excluded from fee calculations) | |||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | ||||||
| Fixed Fee (max 10%) | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | |||
| Total Yearly CLIN Cost Plus Fixed Fee | $ - 0 | $ - 0 | $ - 0 | ||||||
| CLIN 0450 (3400) | CLIN 0550 (3400) | CLIN 0650 (3400) | |||||||
| VAFB Prime & Interdiv Labor | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Overhead(s) (identify separately as appropriate to your accounting systems) | 0.0% | 0.00% | 0.00% | ||||||
| 0.0% | 0.00% | 0.00% | |||||||
| 0.0% | 0.00% | 0.00% | |||||||
| SubTotal (Burdened Prime & Interdiv labor) | |||||||||
| ODC | |||||||||
| VAFB Subcontract Labor | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| G&A | 0.0% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| FCCOM (excluded from fee calculations) | |||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | ||||||
| Fixed Fee (max 10%) | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | |||
| Total Yearly CLIN Cost Plus Fixed Fee | $ - 0 | $ - 0 | $ - 0 | ||||||
| Total Annual Price | - 0 | - 0 | - 0 | ||||||
| INSTRUCTION NOTES: | |||||||||
| 1 - Company Name: Insert company name at Cell A2. | |||||||||
| 2 - Labor Overhead Rates: In Columns B through M, provide the labor overhead rates. If more than one Overhead rate is applied to labor costs, insert the additional overhead rates and formulas, as necessary. | |||||||||
| 3 - Overhead Costs: Tailor the worksheet, as necessary to reflect the application of Overhead rates to show the total labor Overhead costs. | |||||||||
| 4 - Subtotal for Prime & Interdivisional Labor Costs: Tailor the worksheet to calculate the subtotal for labor and overhead costs. | |||||||||
| 5 - Subtotals for Subcontracts <$1,000,000 anually: Provide subtotals for each Subcontractor used. Tailor this section of the model as required. | |||||||||
| 6 - Subcontracts > =$1,000,000 annually: For each Subcontract of $1,000,000 or over annually, provide the Subcontractor's Name in A2, and the annual amounts proposed in columns B through M. For each Subcontract of $1,000,000 or over annually, provide a separate rates schedule and cost model as supporting information. Copy the worksheets within this Cost Model and rename. | |||||||||
| 7 - G&A: If there is more than one application of G&A, identify and compute additional G&A rates as necessary. | |||||||||
| 8 Other Direct Costs. Include a brief rationale for all other direct costs priced for each location and describe the method of quoting. | |||||||||
| 9 - Facilities Capital Cost of Money: Insert any proposed FCCOM by GFY. |
&RSummary Proposal pricing AT 1
Summary Proposal pricing AT 2
| Sample Format for Submission of Proposed Price | |||||||||
| Cost Element | AT 2 option 1 contract year 8 | AT 2 option 2 contract year 9 | AT 2 option 3 contract year 10 | ||||||
| (example - Offerors to use their estimating system) | |||||||||
| Hours/Base | Rate | Amount | Hours/Base | Rate | Amount | Hours/Base | Rate | Amount | |
| CLIN 0710 (3020) | CLIN 0810 (3020) | CLIN 0910 (3020) | |||||||
| SMC Prime & Interdiv LABOR | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Overhead(s) (identify separately as appropriate to your accounting systems) | 0.00% | 0.00% | 0.00% | ||||||
| 0.00% | 0.00% | 0.00% | |||||||
| 0.00% | 0.00% | 0.00% | |||||||
| SubTotal (Burdened Prime & Interdiv labor) | |||||||||
| ODC | |||||||||
| SMC Subcontract Labor | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| G&A | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| FCCOM (excluded from fee calculations) | |||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | ||||||
| Fixed Fee (max 10%) | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | |||
| Total Yearly CLIN Cost Plus Fixed Fee | $ - 0 | $ - 0 | $ - 0 | ||||||
| CLIN 0020 (3020) | CLIN 0720 (3020) | CLIN 0820 (3020) | CLIN 0920 (3020) | ||||||
| CCAFS Prime & Interdiv LABOR | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Overhead(s) (identify separately as appropriate to your accounting systems) | 0.00% | 0.00% | 0.00% | ||||||
| 0.00% | 0.00% | 0.00% | |||||||
| 0.00% | 0.00% | 0.00% | |||||||
| SubTotal (Burdened Prime & Interdiv labor) | |||||||||
| ODC | |||||||||
| CCAFS Subcontract Labor | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| G&A | 0.00% | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| FCCOM (excluded from fee calculations) | |||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | |||||||
| Fixed Fee (max 10%) | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | |||
| Total Yearly CLIN Cost Plus Fixed Fee | $ - 0 | $ - 0 | $ - 0 | ||||||
| CLIN 0730 (3400) | CLIN 0830 (3400) | CLIN 0930 (3400) | |||||||
| CCAFS Prime & Interdiv LABOR | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Overhead(s) (identify separately as appropriate to your accounting systems) | 0.00% | 0.00% | 0.00% | ||||||
| 0.00% | 0.00% | 0.00% | |||||||
| 0.00% | 0.00% | 0.00% | |||||||
| SubTotal (Burdened Prime & Interdiv labor) | |||||||||
| ODC | |||||||||
| CCAFS Subcontract Labor | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| G&A | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| FCCOM (excluded from fee calculations) | |||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | ||||||
| Fixed Fee (max 10%) | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | |||
| Total Yearly CLIN Cost Plus Fixed Fee | $ - 0 | $ - 0 | $ - 0 | ||||||
| CLIN 0740 (3020) | CLIN 0840 (3020) | CLIN 0940 (3020) | |||||||
| VAFB Prime & Interdiv Labor | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Overhead(s) (identify separately as appropriate to your accounting systems) | 0.00% | 0.00% | 0.00% | ||||||
| 0.00% | 0.00% | 0.00% | |||||||
| 0.00% | 0.00% | 0.00% | |||||||
| SubTotal (Burdened Prime & Interdiv labor) | |||||||||
| ODC | |||||||||
| VAFB Subcontract Labor | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| G&A | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| FCCOM (excluded from fee calculations) | |||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | ||||||
| Fixed Fee (max 10%) | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | |||
| Total Yearly CLIN Cost Plus Fixed Fee | $ - 0 | $ - 0 | $ - 0 | ||||||
| CLIN 0750 (3400) | CLIN 0850 (3400) | CLIN 0950 (3400) | |||||||
| VAFB Prime & Interdiv Labor | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Overhead(s) (identify separately as appropriate to your accounting systems) | 0.0% | 0.00% | 0.00% | ||||||
| 0.0% | 0.00% | 0.00% | |||||||
| 0.0% | 0.00% | 0.00% | |||||||
| SubTotal (Burdened Prime & Interdiv labor) | |||||||||
| ODC | |||||||||
| VAFB Subcontract Labor | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| G&A | 0.0% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| FCCOM (excluded from fee calculations) | |||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | ||||||
| Fixed Fee (max 10%) | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | |||
| Total Yearly CLIN Cost Plus Fixed Fee | $ - 0 | $ - 0 | $ - 0 | ||||||
| Total Annual Price | - 0 | - 0 | - 0 | ||||||
| INSTRUCTION NOTES: | |||||||||
| 1 - Company Name: Insert company name at Cell A2. | |||||||||
| 2 - Labor Overhead Rates: In Columns B through M, provide the labor overhead rates. If more than one Overhead rate is applied to labor costs, insert the additional overhead rates and formulas, as necessary. | |||||||||
| 3 - Overhead Costs: Tailor the worksheet, as necessary to reflect the application of Overhead rates to show the total labor Overhead costs. | |||||||||
| 4 - Subtotal for Prime & Interdivisional Labor Costs: Tailor the worksheet to calculate the subtotal for labor and overhead costs. | |||||||||
| 5 - Subtotals for Subcontracts <$1,000,000 anually: Provide subtotals for each Subcontractor used. Tailor this section of the model as required. | |||||||||
| 6 - Subcontracts > =$1,000,000 annually: For each Subcontract of $1,000,000 or over annually, provide the Subcontractor's Name in A2, and the annual amounts proposed in columns B through M. For each Subcontract of $1,000,000 or over annually, provide a separate rates schedule and cost model as supporting information. Copy the worksheets within this Cost Model and rename. | |||||||||
| 7 - G&A: If there is more than one application of G&A, identify and compute additional G&A rates as necessary. | |||||||||
| 8 Other Direct Costs. Include a brief rationale for all other direct costs priced for each location and describe the method of quoting. | |||||||||
| 9 - Facilities Capital Cost of Money: Insert any proposed FCCOM by GFY. |
&RSummary Proposal pricing AT 2 rates schedule
| FY 10 | FY 11 | FY 12 | FY 13 | FY 14 | FY 15 | FY 16 | FY 17 | FY 18 | FY 19 | |
| SMC | ||||||||||
| overhead 1 | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| overhead 2 | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| overhead 3 | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| G&A | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| CCAFS | ||||||||||
| overhead 1 | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| overhead 2 | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| overhead 3 | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| G&A | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| VAFB | ||||||||||
| overhead 1 | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| overhead 2 | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| overhead 3 | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| G&A | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| INSTRUCTION NOTES: | ||||||||||
| 1 - Company Name: Insert company name at Cell C2. | ||||||||||
| 2 - Labor Overhead Rates: In Columns D through M, provide the labor overhead rates, insert the additional overhead rates as necessary. | ||||||||||
| 3 - G&A: In Columns D through M, provide the G&A rate for each year. If there is more than one application of G&A, identify additional G&A rates as necessary and include as additional line item(s) on Summary Proposal Pricing spreadsheets. |
labor base year contract yr 1
| CLIN 0010 (3020) | |||||||
| Prime Contractor (Base Year contract yr 1) | Subcontractor (Base Year contract yr 1) | ||||||
| SMC | SMC | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total SMC Direct Labor | - 0 | $ - 0 | $ - 0 | Total SMC Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0020 (3020) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0030 (3400) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0040 (3020) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0050 (3400) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| Total Prime direct labor | - 0 | - 0 | - 0 | Total Subcontract | - 0 | - 0 | - 0 |
| NOTES: | 1. All amounts/rates are for illustrative purposes only -- The yellow highlighted cells require offeror inputs | ||||||
| 2. For subcontracts of $1,000,000 annually or over (including basic and option performance periods) use a separate Attachment to identify their respective unburdened costs and provide a separate summary Proposal pricing sheet. The Prime contractor shall place the total subcontract cost, on a separate line for each subcontract of $1,000,000 or over, in the Total Cost worksheet |
&Rlabor base year contract yr 1 labor Core opt 1 contract yr 2
| CLIN 0110 (3020) | |||||||
| Prime Contractor ( Core Option 1 contract yr 2) | Subcontractor (Core Option 1 contract yr 2) | ||||||
| SMC | SMC | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 | |
| Senior Engineer 3 | - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 | |
| Engineer 1 | - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | ||
| Engineer 2 | - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | ||
| Engineer 3 | - 0 | $ - 0 | |||||
| Techician | - 0 | $ - 0 | |||||
| etc | - 0 | $ - 0 | |||||
| Total SMC Direct Labor | - 0 | $ - 0 | $ - 0 | Total SMC Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0120 (3020) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0130 (3400) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0140 (3020) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0150 (3400) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| Total Prime direct labor | - 0 | - 0 | - 0 | Total Subcontract | - 0 | - 0 | - 0 |
| NOTES: | 1. All amounts/rates are for illustrative purposes only -- The yellow highlighted cells require offeror inputs | ||||||
| 2. For subcontracts of $1,000,000 annually or over (including basic and option performance periods) use a separate Attachment to identify their respective unburdened costs and provide a separate summary Proposal pricing sheet. The Prime contractor shall place the total subcontract cost, on a separate line for each subcontract of $1,000,000 or over, in the Total Cost worksheet |
&Rcore option 1 contract yr 2 labor Core opt 2 contract yr 3
| CLIN 0210 (3020) | |||||||
| Prime Contractor ( Core Option 2 contract yr 3) | Subcontractor (Core Option 2 contract yr 3) | ||||||
| SMC | SMC | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 | |
| Senior Engineer 3 | - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 | |
| Engineer 1 | - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | ||
| Engineer 2 | - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | ||
| Engineer 3 | - 0 | $ - 0 | |||||
| Techician | - 0 | $ - 0 | |||||
| etc | - 0 | $ - 0 | |||||
| Total SMC Direct Labor | - 0 | $ - 0 | $ - 0 | Total SMC Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0220 (3020) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0230 (3400) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0240 (3020) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ 240.00 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ 240.00 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ 240.00 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ 240.00 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ 240.00 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ 240.00 | $ - 0 | ||||
| Techician | - 0 | $ 240.00 | $ - 0 | ||||
| etc | - 0 | $ 240.00 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0250 (3400) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| Total Prime direct labor | - 0 | - 0 | - 0 | Total Subcontract | - 0 | - 0 | - 0 |
| NOTES: | 1. All amounts/rates are for illustrative purposes only -- The yellow highlighted cells require offeror inputs | ||||||
| 2. For subcontracts of $1,000,000 annually or over (including basic and option performance periods) use a separate Attachment to identify their respective unburdened costs and provide a separate summary Proposal pricing sheet. The Prime contractor shall place the total subcontract cost, on a separate line for each subcontract of $1,000,000 or over, in the Total Cost worksheet |
&RCore option2 contract year 3 labor Core opt 3 contract yr 4
| CLIN 0310 (3020) | |||||||
| Prime Contractor ( Core Option 3 contract yr 4) | Subcontractor (Core Option 3 contract yr 4) | ||||||
| SMC | SMC | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 | |
| Senior Engineer 3 | - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 | |
| Engineer 1 | - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | ||
| Engineer 2 | - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | ||
| Engineer 3 | - 0 | $ - 0 | |||||
| Techician | - 0 | $ - 0 | |||||
| etc | - 0 | $ - 0 | |||||
| Total SMC Direct Labor | - 0 | $ - 0 | $ - 0 | Total SMC Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0320 (3020) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0330 (3400) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0340 (3020) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0350 (3400) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| Total Prime direct labor | - 0 | - 0 | - 0 | Total Subcontract | - 0 | - 0 | - 0 |
| NOTES: | 1. All amounts/rates are for illustrative purposes only -- The yellow highlighted cells require offeror inputs | ||||||
| 2. For subcontracts of $1,000,000 annually or over (including basic and option performance periods) use a separate Attachment to identify their respective unburdened costs and provide a separate summary Proposal pricing sheet. The Prime contractor shall place the total subcontract cost, on a separate line for each subcontract of $1,000,000 or over, in the Total Cost worksheet |
&RCore Option 3 contract yr 4 labor AT 1 contract yr 5
| CLIN 0410 (3020) | |||||||
| Prime Contractor ( AT 1 Option 1 contract yr 5) | Subcontractor (AT 1 Option 1 contract yr 5) | ||||||
| SMC | SMC | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | $ - 0 | Subcontractor A | $ - 0 | ||||
| Senior Engineer 2 | - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 | |
| Senior Engineer 3 | - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 | |
| Engineer 1 | - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | ||
| Engineer 2 | - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | ||
| Engineer 3 | - 0 | $ - 0 | |||||
| Techician | - 0 | $ - 0 | |||||
| etc | - 0 | $ - 0 | |||||
| Total SMC Direct Labor | - 0 | $ - 0 | $ - 0 | Total SMC Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0420 (3020) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | $ - 0 | Subcontractor A | $ - 0 | ||||
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0430 (3400) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | $ - 0 | Subcontractor A | $ - 0 | ||||
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0440 (3020) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | $ - 0 | Subcontractor A | $ - 0 | ||||
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0450 (3400) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | $ - 0 | Subcontractor A | $ - 0 | ||||
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| Total Prime direct labor | - 0 | - 0 | - 0 | Total Subcontract | - 0 | - 0 | - 0 |
| NOTES: | 1. All amounts/rates are for illustrative purposes only -- The yellow highlighted cells require offeror inputs | ||||||
| 2. For subcontracts of $1,000,000 annually or over (including basic and option performance periods) use a separate Attachment to identify their respective unburdened costs and provide a separate summary Proposal pricing sheet. The Prime contractor shall place the total subcontract cost, on a separate line for each subcontract of $1,000,000 or over, in the Total Cost worksheet |
&RAT 1 contract yr 5 labor AT 1 contract yr 6
| CLIN 0510 (3020) | |||||||
| Prime Contractor ( AT 1 Option 2 contract yr 6) | Subcontractor (AT 1 Option 2 contract yr 6) | ||||||
| SMC | SMC | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | $ - 0 | Subcontractor A | $ - 0 | ||||
| Senior Engineer 2 | - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 | |
| Senior Engineer 3 | - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 | |
| Engineer 1 | - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | ||
| Engineer 2 | - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | ||
| Engineer 3 | - 0 | $ - 0 | |||||
| Techician | - 0 | $ - 0 | |||||
| etc | - 0 | $ - 0 | |||||
| Total SMC Direct Labor | - 0 | $ - 0 | $ - 0 | Total SMC Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0520 (3020) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0530 (3400) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0540 (3020) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0550 (3400) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| Total Prime direct labor | - 0 | - 0 | - 0 | Total Subcontract | - 0 | - 0 | - 0 |
| NOTES: | 1. All amounts/rates are for illustrative purposes only -- The yellow highlighted cells require offeror inputs | ||||||
| 2. For subcontracts of $1,000,000 annually or over (including basic and option performance periods) use a separate Attachment to identify their respective unburdened costs and provide a separate summary Proposal pricing sheet. The Prime contractor shall place the total subcontract cost, on a separate line for each subcontract of $1,000,000 or over, in the Total Cost worksheet |
&RAT 1 contract yr 6 labor AT 1 contract yr 7
| CLIN 0610 (3020) | |||||||
| Prime Contractor ( AT 1 Option 3 contract yr 7) | Subcontractor (AT 1 Option 3 contract yr 7) | ||||||
| SMC | SMC | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 | |
| Senior Engineer 3 | - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 | |
| Engineer 1 | - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | ||
| Engineer 2 | - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | ||
| Engineer 3 | - 0 | $ - 0 | |||||
| Techician | - 0 | $ - 0 | |||||
| etc | - 0 | $ - 0 | |||||
| Total SMC Direct Labor | - 0 | $ - 0 | $ - 0 | Total SMC Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0620 (3020) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0630 (3400) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0640 (3020) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0650 (3400) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| Total Prime direct labor | - 0 | - 0 | - 0 | Total Subcontract | - 0 | - 0 | - 0 |
| NOTES: | 1. All amounts/rates are for illustrative purposes only -- The yellow highlighted cells require offeror inputs | ||||||
| 2. For subcontracts of $1,000,000 annually or over (including basic and option performance periods) use a separate Attachment to identify their respective unburdened costs and provide a separate summary Proposal pricing sheet. The Prime contractor shall place the total subcontract cost, on a separate line for each subcontract of $1,000,000 or over, in the Total Cost worksheet |
&RAT 1 contract yr 7 labor AT 2 contract yr 8
| CLIN 0710 (3020) | |||||||
| Prime Contractor ( AT 2 Option 1 contract yr 8) | Subcontractor (AT 2 Option 1 contract yr 8) | ||||||
| SMC | SMC | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 | |
| Senior Engineer 3 | - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 | |
| Engineer 1 | - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | ||
| Engineer 2 | - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | ||
| Engineer 3 | - 0 | $ - 0 | |||||
| Techician | - 0 | $ - 0 | |||||
| etc | - 0 | $ - 0 | |||||
| Total SMC Direct Labor | - 0 | $ - 0 | $ - 0 | Total SMC Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0720 (3020) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0730 (3400) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0740 (3020) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0750 (3400) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| Total Prime direct labor | - 0 | - 0 | - 0 | Total Subcontract | - 0 | - 0 | - 0 |
| NOTES: | 1. All amounts/rates are for illustrative purposes only -- The yellow highlighted cells require offeror inputs | ||||||
| 2. For subcontracts of $1,000,000 annually or over (including basic and option performance periods) use a separate Attachment to identify their respective unburdened costs and provide a separate summary Proposal pricing sheet. The Prime contractor shall place the total subcontract cost, on a separate line for each subcontract of $1,000,000 or over, in the Total Cost worksheet |
&RAT 2 contract yr 8 labor AT 2 contract yr 9
| CLIN 0810 (3020) | |||||||
| Prime Contractor ( AT 2 Option 2 contract yr 9) | Subcontractor (AT 2 Option 2 contract yr 9) | ||||||
| SMC | SMC | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 | |
| Senior Engineer 3 | - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 | |
| Engineer 1 | - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | ||
| Engineer 2 | - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | ||
| Engineer 3 | - 0 | $ - 0 | |||||
| Techician | - 0 | $ - 0 | |||||
| etc | - 0 | $ - 0 | |||||
| Total SMC Direct Labor | - 0 | $ - 0 | $ - 0 | Total SMC Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0820 (3020) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0830 (3400) | |||||||
| CCAFS | CCAFS | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total CCAFS Direct Labor | - 0 | $ - 0 | $ - 0 | Total CCAFS Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0840 (3020) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| CLIN 0850 (3400) | |||||||
| VAFB | VAFB | ||||||
| Hours/Base | Rate | Amount | Hours | Wrapped rate | Amount | ||
| Direct Labor Category* | |||||||
| Senior Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor A | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor B | - 0 | $ - 0 | $ - 0 |
| Senior Engineer 3 | - 0 | $ - 0 | $ - 0 | Subcontractor C | - 0 | $ - 0 | $ - 0 |
| Engineer 1 | - 0 | $ - 0 | $ - 0 | Subcontractor D | - 0 | $ - 0 | |
| Engineer 2 | - 0 | $ - 0 | $ - 0 | Subcontractor E | - 0 | $ - 0 | |
| Engineer 3 | - 0 | $ - 0 | $ - 0 | ||||
| Techician | - 0 | $ - 0 | $ - 0 | ||||
| etc | - 0 | $ - 0 | $ - 0 | ||||
| Total VAFB Direct Labor | - 0 | $ - 0 | $ - 0 | Total VAFB Subcontract Labor | - 0 | $ - 0 | $ - 0 |
| Total Prime direct labor | - 0 | - 0 | - 0 | Total Subcontract | - 0 | - 0 | - 0 |
| NOTES: | 1. All amounts/rates are for illustrative purposes only -- The yellow highlighted cells require offeror inputs |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .