19 oct SEI questions and responses.pdf

PDF 70 KB Posted

Attached to
LRSW Systems Engineering & Integration
Solicitation number
FA8811-R-09-0002
Issued by

About this file

Amendment 4 questions and responses

View the file

Other files

File Type Posted
L-1 Instructions to offerors 2 Nov 09.pdf PDF
FA881109R0002AssembledWORDVersion.DOC DOC document
offeror comment request 2 nov 09.pdf PDF
RFP Section L question and responses.pdf PDF
L-1 Instructions to offerors 30 Oct 09.pdf PDF
SEI DD254_1oct09 with cont sheet.pdf PDF
Summary of Amendment 4 changes to SEI.pdf PDF
45th LCG Base support plan.pdf PDF
30th SW base support plan.pdf PDF
L-1 Instructions to offerors 15 Oct 09.pdf PDF
SEI PWS 13 Oct 09.pdf PDF
questions and responses 9 Oct 09.pdf PDF
L-1 Instructions to offerors 13 Oct 09.pdf PDF
Summary of Amendment 2 changes to SEI.pdf PDF
SEC M002 13 Oct 09 update.pdf PDF
Sec L-1 Attach 5 PWS Potential OCI matrix 13 oct 09.xls XLS spreadsheet
LRSW SEI 28 Sep RFP questions and responses update.pdf PDF
SEI RFP 7 Oct 09 amend 1.pdf PDF
SEC M002 7 Oct 09 update.pdf PDF
Sec L-1 ATTACH 3 Past performance info 5 Oct 09.doc DOC document
L-1 Instructions to offerors 7 Oct 09.pdf PDF
Summary of Amendment 1 changes to SEI.pdf PDF
Sec L-1 Attach 5 PWS Potential OCI matrix oct 09.xls XLS spreadsheet
SEI PWS 5 Oct 09.pdf PDF
Sec L-1 Attach 1 Pricing Format 5 oct 09.xls XLS spreadsheet
SEI DD254_1Jul09 full.pdf PDF
CDRLs 11 Jun.pdf PDF
Sec L-1 Attach 1 Pricing Format.xls XLS spreadsheet
Performance Plan 27 May 09.doc DOC document
Sec L-1 Attach 5 PWS Potential OCI matrix.xls XLS spreadsheet
SEC L-1 Attach 2 FTE tasks matrix 30 may 09.xls XLS spreadsheet
Award Term Plan 24 Aug 09 signed 14 sep 09.pdf PDF
Sec L-1 Attach 4 OCI plan checklist.DOC DOC document
Sec L-1 ATTACH 3 Past performance info.doc DOC document
SEI RFP 25 Sep 09.pdf PDF
L-1 Instructions to offerors 28 Sep 09.pdf PDF
SEI PWS 22 Sep 09.doc DOC document
CDRLs 11 Jun.pdf PDF
SEI DD254_1Jul09 full.pdf PDF
PWS DOCS - bidders library unclass.zip ZIP file
Industry Day Draft RFP Questions20 apr.xls XLS spreadsheet
SEI Industry QAs 17 mar09 actual.ppt PPT presentation
SEI Industry Briefing - Master 17 Mar 09 actual.ppt PPT presentation
draft RFP 10 Mar 09.pdf PDF
SMC_OCI_Plan_Checklist__May_2007_.pdf PDF
Exhibit A CDRLs.pdf PDF
SE I Performance Plan.pdf PDF
contractor pricing spreadsheet - draft.xls XLS spreadsheet
PWS dated March 05 2009 - Master File .pdf PDF
SE I award term plan.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F04701‐09‐R‐0002 DD254 Questions

Block 10b (Restricted Data) is marked no. However, Page 1 of the DD254 continuation sheet (Ref Block 10b) states “the contractor is permitted access to RESTRICTED DATA.”

This is a direct conflict.

See revised DD254 attached to this amendment

Block 10d (Formerly Restricted Data) is marked NO. However, Page 1 of the DD254 continuation sheet (Ref Block 10d) states “the contractor is permitted access to FORMERLY RESTRICTED DATA (FRD).” This is a direct conflict.

See revised DD254 attached to this amendment

Block 10g (NATO) is marked NO. However, Page 3 of the DD254 continuation sheet (Ref Block 10g) states “the contractor is permitted access to NATO information.” This is a direct conflict.

See revised DD254 attached to this amendment Block 10h is marked NO. However, Page 3 of the DD254 continuation sheet (Ref Block 10h) states “the contractor is permitted access to Foreign Government Information.” This is a direct conflict.

See revised DD254 attached to this amendment

Ref Block 11a, Page 3 of the DD254 continuation sheet (Ref Block 10d) states “access to TS/SCI material will be performed at OSL or other approved location.” However, page 1 of the DD254 continuation sheet (Ref Block 10e(1)) states “access to SCI by the contractor will be provided at the Government site only (OSL) and SCI Facility clearance is not required and/or approved. This conflict should be resolved.

See revised DD254 attached to this amendment

Block 11c (Receive and Generate Classified Information) is marked NO. However, Page 3 of the DD254 continuation sheet (Ref Block 11b) states “…however, if any classified information is generated in performance of this contract, it shall be derivatively marked…” This is a direct conflict.

See revised DD254 attached to this amendment

Block 11d (Fabricate, Modify, or Store Classified Hardware) is marked NO. However, Page 3 of the DD254 continuation sheet (Ref Block 11d) states “The contractor must provide adequate storage for classified hardware at the appropriate level of classification.”

This is a direct conflict.

See revised DD254 attached to this amendment

Section J, on Page 57 of the RFP document lists attachments 8 and 9, ‘30th Base Support’ and ‘45th Base Support’ respectively. Additionally paragraph (f) of SMC 52.45‐3 SMC 52.45‐3 BASE SUPPORT ALT 1 (JUL 2009) in Section H indicates that “the Government support to be furnished under this contract is identified in CCAFS and VAFB Base Support agreements Sec J attachments.”

We are not able to locate these attachments on the FBO Website or as part of a document already placed on the FBO Website. Please advise or provide.

See 30th and 45th Base Support Plans provided with this amendment