Sec L-1 Attach 5 PWS Potential OCI matrix 13 oct 09.xls
XLS spreadsheet 66 KB Posted
- Attached to
- LRSW Systems Engineering & Integration
- Solicitation number
- FA8811-R-09-0002
About this file
L-1 Attachment 5 PWS Potential OCI matrix 13 Oct 09 (changes in Blue)
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover page
| 5-Oct-09 |
| Section L-1 |
| RFP FA8811-09-R-0002 |
| ATTACHMENT 5 |
| PWS TASKs with |
| Potential OCI |
Sheet1
| Potential OCI Areas | |||
| LOCATION | Task Area | Paragraph | OCI Issue |
| SMC | 1.2.1.1.1.4 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | |
| 1.2.1.2.2 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.2.3 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.3.4 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.3.5 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.3.6 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.4.1 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.4.1.1 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.4.2 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.4.4 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.5.1.5 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.5.1.6 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.5.5.1 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Possibility of bias if the SE&I contractor is also the LTRS contrator. | ||
| 1.2.1.5.5.2 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator | ||
| 1.2.1.6.1 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.1 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.2 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.3 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.4 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.5 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.6 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.7 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| 1.2.1.6.8 | Possibility of bias if the SE&I contractor is also the launch vehicle contrator. Includes all subparagraphs. | ||
| CCAFS | Facility Engineering | 1.3.2.2 | |
| 1.3.2.2.4 | Potential exisits if contractor responsible for verifying facility requirements shortfalls is one-in-the-same | ||
| 1.3.2.2.5 | |||
| 1.3.2.2.11 | The potential exists if contractor responsible for QA inspections is one-in-the-same | ||
| Software Engineering (RTL) | 1.3.2.3 | ||
| 1.3.2.3.2 | Potential exisits if contractor responsible for verifying system requirements is one-in-the-same | ||
| VAFB | 1.4.2.1.1.6 | Potential exists for OCI if the SE&I contractor responsible for verifying Space Vehicle Contractor (SVC) space flight readiness was one-in-the-same with the SVC. | |
| 1.4.2.1.1.13 | Potential exists for OCI if the SE&I contractor responsible for investigating and analyzing Space and Missile Launch Complexes/Launch Facilities, Missile/Booster/Spacecraft Processing Facilities, etc. with recommendations provided to the government are one-in-the same with the contractor's responsible for those facilities. |
Sheet2
| Functional Area Coordinator (FAC) | Mr. Scott Traxler, 45 LCG/TD |
| Functional Area Evaluator (FAE) | Capt. Joseph Hammes, 45 LCSS/LSMB |
| Contracting Officer's Technical Representative (COTR) | Mr. George MacEwn, 5 SLS/CE |
| Contracting Officer's Technical Representative (COTR) | Maj. Yan Zhu, 45 LCSS/LSG |
Sheet3
File details come from the government source that posted it. Updated .