EXHIBIT A DRAFT CDRLs
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A To Attachment I
LRSW
Systems Engineering & Integration
(SE&I)
RFP # FA881 1 -09-R-0002
CONTRACT DATA
REQUIREMENTS LIST (CDRLs)
CDRL General Instructions CDRL Address List CDRL Distribution Matrix CDRLs A001 thru A003
This Exhibit A, including Cover Page, consists of 9 pages.
RFP # FA881 1-09-R-0002
CDRL GENERAL INSTRUCTIONS
This exhibit establishes the data to be delivered I deposited by the contractor for the submittal, inspection, approval, acceptance, and distribution requirements of all the CDRL items contained herein.
CONTRACT DATA REQUIREMENTS LlST (CDRL)
A list of data requirements authorized for this specific procurement and made a part of this contract.
The contractual method is the use of DD Form 1423s, Contract Data Requirement List (CDRL), which specifies the data which is required to be delivered to the government.
DATA ITEM DESCRIPTIONS (DIDs)
The DID is a specification for the preparation of data. The DlDs listed on the CDRLs were selected from DOD 5010.12-L, Acquisition Management Systems and Data Requirement Control List (AMSDL).
DID TAILORING
DID tailoring is made to either relax format requirements or to tailor the DID to be in consonance with the source document tailoring contained in the Statement of Work (SOW). Since contract data requirements are normally a by-product of some contract task, if the requirements of the DID are in conflict with the tailored application of the source document as reflected in the SOW, the latter takes precedence.
DATA DELIVERY DATES
For Soft Copies, delivery of data is to be construed as the date data is electronically sent to addressees.
If due date falls on weekend or government holiday, data shall be due on the next scheduled government workday.
LETTER OF TRANSMITTAL
A separate transmittal letter will be included for each CDRL item and will include, as a minimum, the contract number, CDRL sequence number, titlelsubtitle, date and have a program unique number.
The original (signed) transmittal letter and an electronic copy will be sent to the PCO. Data delivered with the letters of transmittal shall be collectively accounted for as required by the PCO.
Any correspondence related to request for data delivery deviations, amendment, additions or deletions shall be addressed to the PCO.
CDRL ADDRESS LlST AND DATA DISTRIBUTION MATRIX
Data shall be submitted electronically as an e-mail attachment unless otherwise stated. Email addresses will be provided after contract award. The Address List provides the complete mailing address for each addressee and a mailing code for hard copy correspondence.
The Data Distribution Matrix provides information regarding quantities for shipment (typically located in Blocks 14 & 15 of the CDRL) to each mailing code. Quantity of Hard deliverables and Soft deliverables will be indicated to the left and right of the "/", respectively. See CDRL for possible additional format or delivery instructions.
RFP # FA881 1 -09-R-0002
The contractor is not authorized to provide copies of any data item in the CDRL to any agency not listed in block 14 andlor 16 without specific written approval of the PCO.
CODES USED ON THE CDRL
The following codes may be used as described below.
a. Block 7: DD Form 250 requirements
CODE WHEN USED
LT Letter of Transmittal only
b. Block 8: Approval code
CODE WHEN USED
A Formal approval is required by Government on all submittals.
NIA Formal Approval is not required.
NOTE: All data are subject to Government approval.
c. Block 10: Frequency
CODE (Limit to five characters)
MTHLY Monthly QRTLY Quarterly ANNLY Annually
BI-MO Each two months ASREQ As required SEMlA Each six months
d. Blocks 12 & 13: Date of 1st and Subsequent Submissions
CA = Contract Award CO = Change Order CD = Calendar Days ATP = Authority to Proceed
IPR = In Process Review FCA = Functional Configuration Audit WD = Working Days DACA = Days After Contract Award
RFP # FA881 1-09-R-0002
CDRL ADDRESS LIST
1. HQ Space & Missile Systems Center (AFSPC) LRSW I - Launch & Range Systems Wing LRSWl(0FFICE SYMBOL) 483 North Aviation Blvd.
Los Angeles AFB El Segundo, CA 90245-2808
a. LRSWIEN
b. LRSWIPC
c. LRSWIPK
3. 30 LCSSITD
Note: E-mail addresses will be provided after contract award.
RFP # FA88 1 1 -09-R-0002
CDRL DISTRIBUTION MATRIX
* All reports shall be submitted to LRSWIEN and LRSWIPK.
CDRL
A001
A002
A003
**Additional electronic distribution will vary IAW the requirements of requesting office. Office Symbols listed are not all inclusive.
Note: Principal E-mail addresses will be provided after contract award. Additional E-mail addresses will be provided as required by requesting office.
TITLE & DID #
Program Progress Report
- Monthly Status Report
Dl-MGMT-80555A
Contract Funds Status Report
(CFSR)
Dl-MGMT-81468
Scientific and Technical Report
Dl-MISC-80711A
Exhibit A
RFP # FA881 1-09-R-0002
SOW Para
1 .O
1 .O
1 .O
OFFICE SYMBOL
*All submittals:
LRSWIEN
LRSWIPK
**As Required to:
45LCSSlLSMV
30 LCSSITD
4SLSlML
LRSWIPC
LRSWIEN
LRSWIPK
*All submittals:
LRSWIEN
LRSWIPK
**As Required to:
45LCSSlLSMV
30 LCSSITD
4SLSlML
QTY
HardlSoft
01 1
01 1 01 1 01 1
01 1 01 1
01 1 01 1
DD Form 1423-1, JUN 90 (Computer Generated)
CONTRACT DATA REQUIREMENTS LIST
Exhibit A
RFP FA881 1 -09-R-0002
CDRL A001, Page 1 of 2
Form Approved
OMB NO. 0704-0188
Public re orting burden for this collection of information is estimated to average 110 hours per response including the time for reviewing instructions searching existing Bata sources, gathering and maintaining the data needed, and completing and reviewing the coliection of ~nformation. Send comments regarbing this burden estimate or any other aspect of this collection of information, includ~n sug estions for reducing this burden, to Department of Defense. Washin ton Headquarters Services Directorate for Information Operations and Re orts 8215 Jefferson Davis Highway Suite 1204 Arlington. VA 22202-4302 and yo the Office of Management and ~udg'et . Paperwork Reduction Project 0704 0188), Aashjngton. DC 20503. Please DO F ~ O T R E T U R ~ your form to either of theke addresses, Send completed form to the Government Issuing Contract~nq bttice;for the ContractlPR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
D. SYSTEMllTEM LRSW Systems Engineering & Integration I. Data kern NO.
A001
4. Authority (Data Acqulatlon Document No.)
Dl-MGMT-80555M
B. EXHIBIT
A
E. CONTRACTIPR NO.
FA88 1 1-09-R-0002
C. CATEGORY TDP[ ] TM[ ] Other[X ]
F. CONTRACTOR
7. DD 250 Req
LT
8. ~ p p Code
NIA
2. Tltle: Program Progress Keport
3. Subtitle: Monthly Status Report
8. Dlst Statement Required
5. Contrect Reference
PWS Paragraph 1.0 and subparagraphs
16. Remarks
BLK 4:
a. Contractor's format is acceptable.
b. Separate reports shall be prepared for each location (i.e. LRSW, VAFB, Cape). All Recurring tasks shall be listed first, followed by all Non-Recurring tasks. (Sample attached)
c. The Status Report shall be itemized by tasks as defined in the PWS and shall contain:
(1) Office Symbol
(2) Task
(3) Date Assigned
(4) Projected Completion Date
(5) Actual Completion Date
(6) Status
(7) Description of progress during the reporting period
d. The report shall:
(1) Summarize accomplishments of the previous month
(2) Discuss major issues and concerns
(3) Discuss new support needs
e. The report shall contain open items only.
f. Closed items shall be included for one reporting period past the closing date.
BLKs 12 & 13:
a. The first report shall be submitted 15 CD after first calendar month end following contract award.
b. Subsequent reports shall be 15 CD after the end of each month.
BLK 14:
Data shall be submitted electronically as an e-mail attachment.
8. Requlrlng OfAce
LRSWIEN
10. Frequency
MTHLY
11. AS Of Date
G. PREPARED BY
12. Date Of Flrst Submlaalon
BLK 16
13. Date of Subsequent Submlsslon
BLK 16
H. DATE
14 (L 15. Dlatrlbutlon and Total
See Distribution Matrix
I. APPROVED BY J. DATE
MONTHLY STATUS REPORT
LOCATION: FOR THE MONTH OF:
Exhibit A
RFP FA881 1-09-R-0002
CDRL AOOI, Page 2 of 2
Status I Comments Actual End Date
Status I Comments
Ref #
Actual End Date
Task Title (Recurring) Off ice
Ref # Task Title (Non-Recurring) Office
Start Date Agreed End Date
Start Date Agreed End Date
Exhibit A
RFP FA881 1-09-R-0002
CDRL A002
Form Approved
OMB NO. 0704-0188
Public re orting burden for this collection of information is estimated to average 110 hours per response including the time for reviewing instructions searching existing i a t a sources, gathering and maintaining the data needed, and completing and reviewing the coliection of ~nformation. Send comments regarbing this burden estimate or any other aspect of this collection of information, includ~n sug estions for reducing this burden, to Department of Defense. Washin ton Headquarters Services, Directorate for Information Operations and Re orts ?215 fefferson Davis Highway. Suite 1204, Arlington. VA 22202-4302, and% the Office of Management and Budget. Paperwork Reduction Project 0704 0188), &ash/ngton, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contract~ng bffice;for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
D. SYSTEMIITEM
LRSW Systems Engineering & Integration I. ~ ~ t a 1tsm NO.
A002
4. Authority (Data Acqulstlon Document No.)
Dl-MGMT-81468ll
6. EXHIBIT
A
E. CONTRACTIPR NO.
FA88 1 1 -09-R-0002
C. CATEGORY TDP[ ] TM[ ] Other[X]
F. CONTRACTOR
7. DD 250 Req
LT
8. ~ p p Code
NIA
2. TIU~: Contract Funds Status Report
3. subt~t~s:
8. DIst Statement Requlred
5. Contract Reference
PWS Paragraph 1.0 and subparagraphs
16. Remads
BLK 4: (Block 10 of DID)
a. Para 10.2.1 1 .l - Delete
b. Para 10.2.1 1.4.1 - Delete
c. Para 10.2.1 1.5 - Delete
d. Para 10.2.1 1.6 - Delete
e. Para 10.2.1 1.8 - Delete
f. Para 10.2.12.3 - Delete
g. Delete all references to "open commitments"
BLK 11:
"As of Date" shall be the last day of the contractor's monthly accounting period.
BLK 12:
Date of lSt submission shall be no later than 28 calendar days (CD) after the end of the monthly accounting period nearest the end of the calendar quarter after contract award.
BLK 13:
Date of subsequent submissions shall be 28 CD after close of Dec, Mar, Jun, and Sep accounting periods.
BLK 14:
Data shall be submitted electronically as an e-mail attachment.
6. Requlrlng Office
LRSWIPC
10. Frequency
QRTLY
11. AS ot Date
BLK 16
G. PREPARED BY
12. Date Of F ln t Submlsslon
BLK 16
13. Date o f Subsequent Submlsalon
BLK 16
H. DATE
14 8 15. Dlstrlbution and Total
See Distribution Matrix
I. APPROVED BY J. DATE
Exhibit A
RFP FA881 1-09-R-0002
CDRL A003
Form Approved
OMB NO. 0704-0188
Public re orting burden for this coliection of,information Is estimated to average 110 hour= per response, including the time for reviewing instructions, searching existing f a t e sources, gather~ng end malntaln~ng the data needed, and completing and,rev~ewing the collection o f lnformation. Send comments regarding thls burden estimate or,any other aspect of this collection of informallon, ~ n c l u d ~ n sug estlons for reducing this burden, to Depertment of Defense, Weshington Heedquarters Serv~ces. D~rectorate for Information Operations end Re orts! R 1 5 Rf te rson D a v ~ s Highway. S u ~ t e 1204. Arlington. VA 22202-4302. and to the Office of Management and Budget, Paperwork Reduct~on Project 0704-0188). &ashlngton. DC 2!503., Please DO NOT RETURN your form to e~ ther of these addresses. Send completed form to the Government i ssu~ng Contract~ng 6ff icer for the Contract/PR No. llsted In Block E.
C. CATEGORY TDP[ ] TMI: ] Other[ X ]
F. CONTRACTOR
A. CON1 RACT LINE ITEM NO.
D. SYSTEMllT EM LRSW Systems Engineering & l ntegration
B. EXHIBIT
A
E. CONTRACVPR NO.
FA88 1 1 -09-R-0002
I. Data kern NO.
A003
4. Authority (Data Acqulstlon Document No.)
Dl-MGMT-80711AIT
2. TIU.: Scientific and Technical Reports
3. Subtitle:
5. Contract Reterenw
PWS Paragraph 1.0 and subparagraphs
6. Requlrlng M c e
LRSWIEN
14 (L 15. Dlstrlbutlon and Total
See Distribution Matrix
12. Date Ot F M Submlsslon
BLK 16
13. Date of Subsequent Submission
BLK 16
10. Frequency
ASREQ
11. A S O ~ ate
7. DD 250 Req
LT
8. ~ p p code
NIA
16. Remarks
BLK 4: (Block 10 of DID)
a. Contractor's format is acceptable.
b. Delete all references to DTIC.
c. To include, but not limited to:
(1 ) White Papers
(2) Technical Reports
(3) Briefings
BLK 10,12 8 13:
Shall be submitted as required or by PC0 direction.
BLK 14:
Data shall be submitted electronically as an e-mail attachment.
9. Dlst Statement Requlred
J. DATE I. APPROVED BY G. PREPARED BY H. DATE