Attachment 8 - Relevancy Assessment
View the file
Other files for this federal contract opportunity
Show all 50
Bomber Armament Tester (BAT) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP FA8533-16-R-0001
ATTACHMENT 8
Relevancy Assessment
SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104
FOR OFFICIAL USE ONLY
RELEVANCY TABLE
(Complete with each effort submitted for evaluation)
This table will assist the PCO in evaluating the relevancy of the proposed effort to the BAT requirement.
The offeror shall enter information on each contract identified in its Past Performance Volume into the “Relevancy Table” as indicated below. Additional copies of this attachment may be produced for completion on contracts as necessary. Offeror shall only complete column two. Offeror’s answers are applicable only to the effort identified in paragraph B. above, not the offeror’s proposed solutions to the instant effort. * Use additional pages as needed to describe
RELEVANCY TABLE
This table is not all inclusive and offerors are encouraged to provide as much information as possible to enable the Government to correlate the submitted effort to one of the relevancy definitions.
Category
Contract/Effort_____________________
Circle all that apply
1. Nature of Business Area(s) Involved
Design
Development
Production
Sustainment
Other: ______________
2. Product effort
Armament Test System (automatic or manual)
Armament /Avionics Core Tester Armament Test System (automatic or manual)
Armament/Avionics Test Program Sets (TPS)
3. Application
USAF - Fighter or Bomber
DoD - Fighter
Other Aircraft (e.g. Helicopter, UAV, etc.)
Other Platform Armament (e.g. Tank, Naval Vessels, etc.)
4. Primary Operational Environment
Organizational Level (O-Level)
Intermediate Level (I-Level)
Depot Level (D-Level)
5. Is the product on the master nuclear certification list?
Yes
No
N/A
6. Were technical manuals or engineering drawings or other supporting technical documentation required in the work/contract effort?
Technical Manuals
Engineering Drawings
7. Were software documentation or test requirements documents required in the
Software Documentation
Test Requirements Documents
8. Was testing involved in the
Reliability
Environmental
Cybersecurity
9. Contract Type(s)
CPIF
FFP
FPIF
10. Contract Length (months, years, etc.)
11. Quantities produced (per month or year)
12. Did the effort include familiarization/training on product
Yes
No
13. Is the effort similar to the BAT program encompassed in this effort?
Similar*
Not Similar
* Describe in detail what makes it similar
14. Program Complexity
Complex*
Non-Complex
*Describe in detail how the program effort is of a similar complexity.
14. Present status of program effort
Complete
Not Complete
* Explain present status
SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104
FOR OFFICIAL USE ONLY