Attachment 11 - Total Resource Volume (WBS Breakdown)
View the file
Other files for this federal contract opportunity
Show all 50
Bomber Armament Tester (BAT) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOE Material Summary Offeror's are required to provide a Material BOE summary that clearly lists the types and quantities of material resources proposed regardless of source (prime and subcontractors) by the SOW and CWBS time phased by Government Fiscal Year. Since the Technical and Schedule Evaluators will be primarily concerned with soundness of an offeror’s approach, including the realism and reasonableness of the types & quantities of materials, proposed unit prices and extended cost should be a sanitized version of the Priced Bill of Material, which offerors must provide in Volume IV Cost/Price. This summary must be provided in Excel to simplify manipulation of the data during evaluation. Otherwise contractor format is acceptable.
SAMPLE-Labor Summary
| Employee Of: | Total All Government Fiscal Years | CWBS | Labor Category | BOE Reference | 3.0 General Requirements | ||||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 3.3 Nuclear Certification | 3.4 Reliability | 3.5 Program Protection | 3.6 System Safety | 3.8 Program Management Activities | 3.9 Logistics | |||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 3.3.1 Nuclear Certification Impact Statement (NCIS) | 3.3.2 Certification Requirements Plan (CRP) | 3.3.3 Nuclear Safety Analysis Report (NSAR) | 3.5.1 Program Protection Implementation Plan | 3.5.2 Inspection and Audit | 3.5.3 Cybersecurity | 3.5.4 Anti-Tamper | 3.5.5 Counterfeit Prevention | 3.6.1 Hazard Analysis and Risk Mitigation | 3.6.2 Environmental, Safety, and Occupational Health (ESOH) | 3.8.2 Earned Value Management | 3.8.3 Program Reviews and Conferences | 3.9.1 Government Furnished Equipment (GFE) | 3.9.2 Technical Order | 3.9.3 Engineering Data | 3.9.4 Familiarization | 3.9.5 Provisioning | 3.9.6 Configuration Management (CM) and Control | ||||||||||||||||||||||||||||
| 3.5.3.1 Cybersecurity Controls | 3.5.3.2 System Security Plan | 3.5.3.3 Cybersecurity Risk Management | 3.5.3.4 Authorizations System Level Plan of Action and Milestones (POA&M) | 3.5.3.5 Cyber-secure Development Environment | 3.8.2.1 Integrated Program Management Reporting | 3.8.2.2 Integrated Master Schedule (IMS) | 3.8.3.1 Support of Reviews and Meetings | 3.8.3.2 Meetings (Conferences) | 3.8.3.3 Technical Interchange Meetings (TIMs) | 3.9.2.1 Development | 3.9.2.2 Validation/Certification | 3.9.2.3 Verification Support | 3.9.3.1 In-Process Review of the TDP | 3.9.3.2 Relationship of Contractor with Subcontractors/vendors | 3.9.3.3 Engineering Data Updates and Revisions | 3.9.3.4 Data Accession List (DAL) | 3.9.6.1 Configuration Requirements | 3.9.6.2 Configuration Items (CIs) | 3.9.6.3 Engineering Change Proposal (ECP) / Notice of Revision (NOR) | 3.9.6.5 Signature Authorization | 3.9.6.7 Request for Variance (RFV) | 3.9.6.8 Item Unique Identification (IUID) | |||||||||||||||||||||||||||
| 3.9.2.1.1 Technical Order Library | 3.9.6.8.1 Marking | 3.9.6.8.2 IUID Marking Plan | 3.9.6.8.3 IUID Marking Activity and Verification Report | ||||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | 1.1 Total Hours | |||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | 1.1.1 Total Hours | |||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1 | 1.1.1.1 Total Hours | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.1.1.1 | Design | Senior Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.1.1.2 | Fabricate | Technician | ||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Junior Engineer | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Machinist | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Electrical Engineer | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.1.1.3 | Integrate | Senior Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Systems Engineer | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Technician | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.1.1.4 | Test | Senior Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Test Engineer | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.2 | CI 2…n | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.# | SIMILAR BREAKDOWN AS 1.1.1.1 EXAMPLE | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | 1.1.2 Total Hours | |||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1 | 1.1.2.1 Total Hours | |||||||||||||||||||||||||||||||||||||||||||||||
| Company B | 1.1.2.1.1 | Design | Senior Software Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| Company B | 1.1.2.1.2 | Code | Software Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| Company B | 1.1.2.1.3 | Integrate | Software Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| Company B | 1.1.2.1.4 | Test | Software Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.2 | CSCI 2…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.# | SIMILAR BREAKDOWN AS 1.1.2.1 EXAMPLE | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | 1.1.3 Total Hours | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.3.1 | B-2 UUT Test Requirements Analysis | Senior Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Electrical Engineer | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Technician | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.3.2 | B-1 UUT Test Requirements Analysis | Senior Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Electrical Engineer | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Junior Engineer | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Junior Engineer | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Technician | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.3.3 | B-52 UUT Test Requirements Analysis | Senior Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Electrical Engineer | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Junior Engineer | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Junior Engineer | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Technician | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.4 | Core Tester Data | Junior Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| Technical Writer | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | B-2A UUT TPSs | 1.2 Total Hours | |||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1 | B-2A TPS 1 | 1.2.1 Total Hours | |||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.1 | B-2A TPS 1 Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.2.1.1.1 | Design | Senior Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Electrical Engineer | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.2.1.1.2 | Code/Fabricate | Electrical Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Machinist | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.2.1.1.3 | Integrate | Systems Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Technician | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.2.1.1.4 | Test | Test Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2 | B-2A TPS 1 Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2.1 | Design | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2.2 | Code/Fabricate | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2.3 | Integrate | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2.4 | Test | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.3 | B-2A TPS Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.2 | B-2A TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.2.# | SIMILAR BREAKDOWN AS 1.2.1 EXAMPLE | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | B-1B UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1 | B-1B TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | B-52H UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1 | B-52H TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | Systems Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.1 | Cybersecurity | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.2 | Counterfeit Prevention | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Configuration Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Business/Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Contracts/Subcontracts Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Financial/Earned Value Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.4 | Travel | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.5 | Conferences/Reviews | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.6 | Logistics Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.7 | Data Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.8 | Audits | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Formal Test and Evaluation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Program Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Development Environment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Initial Spares | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Over and Above |
CLIN 0001 BOE Labor Summary
| Employee Of: | Total All Government Fiscal Years | Total of All Government Fiscal Years | Labor Category | BOE Reference | 3.0 General Requirements | ||||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 3.2 General Technical Requirements | 3.3 Nuclear Certification | 3.4 Reliability | 3.5 Program Protection | 3.6 System Safety | 3.8 Program Manager (PM) | 3.9 Logistics | ||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 3.2.4.6 Development Environments | 3.3.1 Nuclear Certification Impact Statement (NCIS) | 3.3.2 Certification Requirements Plan (CRP) | 3.3.3 Nuclear Safety Analysis Report (NSAR) | 3.5.1 Program Protection Implementation Plan | 3.5.2 Inspection and Audit | 3.5.3 Cybersecurity | 3.5.4 Anti-Tamper | 3.5.5 Counterfeit Prevention | 3.6.1 Hazard Analysis and Risk Mitigation | 3.6.2 Environmental, Safety, and Occupational Health (ESOH) | 3.8.1 Program Management Activities | 3.8.2 Earned Value Management | 3.8.3 Program Reviews and Conferences | 3.9.1 Acquired or Furnished Property | 3.9.2 Technical Order | 3.9.3 Engineering Data | 3.9.4 Familiarization | 3.9.5 Provisioning | 3.9.6 Configuration Management (CM) and Control | 3.9.7 Diminishing Manufacturing Sources and Material Shortages (DMSMS) | |||||||||||||||||||||||||
| Notional CWBS | 3.5.3.1 Cybersecurity Controls | 3.5.3.2 System Security Plan | 3.5.3.3 Cybersecurity Risk Management | 3.5.3.4 Authorizations System Level Plan of Action and Milestones (POA&M) | 3.5.3.5 Cyber-secure Development Environment | 3.8.2.1 Integrated Program Management Reporting | 3.8.3.1 Support of Reviews and Meetings | 3.8.3.2 Meetings (Conferences) | 3.8.3.3 Technical Interchange Meetings (TIMs) | 3.9.1.1 Government Furnished Property (GFP) | 3.9.2.1 Development | 3.9.2.2 Validation/Certification | 3.9.2.3 Verification | 3.9.3.1 Engineering Data Guidance Conference | 3.9.3.2 In-Process Review of the TDP | 3.9.3.4 Engineering Data Updates and Revisions | 3.9.6.1 Configuration Requirements | 3.9.6.2 Configuration Items (CIs) | 3.9.6.3 Engineering Change Proposal (ECP) / Notice of Revision (NOR) | 3.9.6.5 Request for Variance (RFV) | 3.9.6.6 Item Unique Identification (IUID) | ||||||||||||||||||||||||||||
| 3.9.2.1.1 Technical Order Library | 3.9.6.6.1 Marking | 3.9.6.6.2 IUID Marking Plan | 3.9.6.6.3 IUID Marking Activity and Verification Report | ||||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.1 | B-2 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.2 | B-1 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.3 | B-52 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4 | Core Tester Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | B-2A UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1 | B-2A TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.1 | B-2A TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2 | B-2A TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.3 | B-2A TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | B-1B UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1 | B-1B TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.1 | B-1B TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.2 | B-1B TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.3 | B-1B TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | B-52H UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1 | B-52H TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.1 | B-52H TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.2 | B-52H TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.3 | B-52H TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | Systems Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.1 | Cybersecurity | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.2 | Counterfeit Prevention | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Configuration Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Business/Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Contracts/Subcontracts Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Financial/Earned Value Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.4 | Travel | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.5 | Conferences | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.6 | Logistics Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.7 | Data Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.8 | Reviews | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.9 | Audits | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Formal Test and Evaluation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Program Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Development Environment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Initial Spares | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Over and Above | ||||||||||||||||||||||||||||||||||||||||||||||||
| Employee Of: | Total All Government Fiscal Years | Government Fiscal Year 1 | Labor Category | BOE Reference | 3.0 General Requirements | ||||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 3.2 General Technical Requirements | 3.3 Nuclear Certification | 3.4 Reliability | 3.5 Program Protection | 3.6 System Safety | 3.8 Program Manager (PM) | 3.9 Logistics | ||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 3.2.4.6 Development Environments | 3.3.1 Nuclear Certification Impact Statement (NCIS) | 3.3.2 Certification Requirements Plan (CRP) | 3.3.3 Nuclear Safety Analysis Report (NSAR) | 3.5.1 Program Protection Implementation Plan | 3.5.2 Inspection and Audit | 3.5.3 Cybersecurity | 3.5.4 Anti-Tamper | 3.5.5 Counterfeit Prevention | 3.6.1 Hazard Analysis and Risk Mitigation | 3.6.2 Environmental, Safety, and Occupational Health (ESOH) | 3.8.1 Program Management Activities | 3.8.2 Earned Value Management | 3.8.3 Program Reviews and Conferences | 3.9.1 Acquired or Furnished Property | 3.9.2 Technical Order | 3.9.3 Engineering Data | 3.9.4 Familiarization | 3.9.5 Provisioning | 3.9.6 Configuration Management (CM) and Control | 3.9.7 Diminishing Manufacturing Sources and Material Shortages (DMSMS) | |||||||||||||||||||||||||
| Notional CWBS | 3.5.3.1 Cybersecurity Controls | 3.5.3.2 System Security Plan | 3.5.3.3 Cybersecurity Risk Management | 3.5.3.4 Authorizations System Level Plan of Action and Milestones (POA&M) | 3.5.3.5 Cyber-secure Development Environment | 3.8.2.1 Integrated Program Management Reporting | 3.8.3.1 Support of Reviews and Meetings | 3.8.3.2 Meetings (Conferences) | 3.8.3.3 Technical Interchange Meetings (TIMs) | 3.9.1.1 Government Furnished Property (GFP) | 3.9.2.1 Development | 3.9.2.2 Validation/Certification | 3.9.2.3 Verification | 3.9.3.1 Engineering Data Guidance Conference | 3.9.3.2 In-Process Review of the TDP | 3.9.3.4 Engineering Data Updates and Revisions | 3.9.6.1 Configuration Requirements | 3.9.6.2 Configuration Items (CIs) | 3.9.6.3 Engineering Change Proposal (ECP) / Notice of Revision (NOR) | 3.9.6.5 Request for Variance (RFV) | 3.9.6.6 Item Unique Identification (IUID) | ||||||||||||||||||||||||||||
| 3.9.2.1.1 Technical Order Library | 3.9.6.6.1 Marking | 3.9.6.6.2 IUID Marking Plan | 3.9.6.6.3 IUID Marking Activity and Verification Report | ||||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.1 | B-2 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.2 | B-1 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.3 | B-52 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4 | Core Tester Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | B-2A UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1 | B-2A TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.1 | B-2A TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2 | B-2A TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.3 | B-2A TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | B-1B UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1 | B-1B TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.1 | B-1B TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.2 | B-1B TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.3 | B-1B TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | B-52H UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1 | B-52H TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.1 | B-52H TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.2 | B-52H TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.3 | B-52H TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | Systems Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.1 | Cybersecurity | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.2 | Counterfeit Prevention | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Configuration Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Business/Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Contracts/Subcontracts Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Financial/Earned Value Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.4 | Travel | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.5 | Conferences | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.6 | Logistics Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.7 | Data Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.8 | Reviews | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.9 | Audits | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Formal Test and Evaluation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Program Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Development Environment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Initial Spares | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Over and Above | ||||||||||||||||||||||||||||||||||||||||||||||||
| Employee Of: | Total All Government Fiscal Years | Government Fiscal Year 2 | Labor Category | BOE Reference | 3.0 General Requirements | ||||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 3.2 General Technical Requirements | 3.3 Nuclear Certification | 3.4 Reliability | 3.5 Program Protection | 3.6 System Safety | 3.8 Program Manager (PM) | 3.9 Logistics | ||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 3.2.4.6 Development Environments | 3.3.1 Nuclear Certification Impact Statement (NCIS) | 3.3.2 Certification Requirements Plan (CRP) | 3.3.3 Nuclear Safety Analysis Report (NSAR) | 3.5.1 Program Protection Implementation Plan | 3.5.2 Inspection and Audit | 3.5.3 Cybersecurity | 3.5.4 Anti-Tamper | 3.5.5 Counterfeit Prevention | 3.6.1 Hazard Analysis and Risk Mitigation | 3.6.2 Environmental, Safety, and Occupational Health (ESOH) | 3.8.1 Program Management Activities | 3.8.2 Earned Value Management | 3.8.3 Program Reviews and Conferences | 3.9.1 Acquired or Furnished Property | 3.9.2 Technical Order | 3.9.3 Engineering Data | 3.9.4 Familiarization | 3.9.5 Provisioning | 3.9.6 Configuration Management (CM) and Control | 3.9.7 Diminishing Manufacturing Sources and Material Shortages (DMSMS) | |||||||||||||||||||||||||
| Notional CWBS | 3.5.3.1 Cybersecurity Controls | 3.5.3.2 System Security Plan | 3.5.3.3 Cybersecurity Risk Management | 3.5.3.4 Authorizations System Level Plan of Action and Milestones (POA&M) | 3.5.3.5 Cyber-secure Development Environment | 3.8.2.1 Integrated Program Management Reporting | 3.8.3.1 Support of Reviews and Meetings | 3.8.3.2 Meetings (Conferences) | 3.8.3.3 Technical Interchange Meetings (TIMs) | 3.9.1.1 Government Furnished Property (GFP) | 3.9.2.1 Development | 3.9.2.2 Validation/Certification | 3.9.2.3 Verification | 3.9.3.1 Engineering Data Guidance Conference | 3.9.3.2 In-Process Review of the TDP | 3.9.3.4 Engineering Data Updates and Revisions | 3.9.6.1 Configuration Requirements | 3.9.6.2 Configuration Items (CIs) | 3.9.6.3 Engineering Change Proposal (ECP) / Notice of Revision (NOR) | 3.9.6.5 Request for Variance (RFV) | 3.9.6.6 Item Unique Identification (IUID) | ||||||||||||||||||||||||||||
| 3.9.2.1.1 Technical Order Library | 3.9.6.6.1 Marking | 3.9.6.6.2 IUID Marking Plan | 3.9.6.6.3 IUID Marking Activity and Verification Report | ||||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.1 | B-2 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.2 | B-1 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.3 | B-52 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4 | Core Tester Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | B-2A UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1 | B-2A TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.1 | B-2A TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2 | B-2A TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.3 | B-2A TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | B-1B UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1 | B-1B TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.1 | B-1B TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.2 | B-1B TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.3 | B-1B TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | B-52H UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1 | B-52H TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.1 | B-52H TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.2 | B-52H TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.3 | B-52H TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | Systems Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.1 | Cybersecurity | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.2 | Counterfeit Prevention | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Configuration Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Business/Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Contracts/Subcontracts Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Financial/Earned Value Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.4 | Travel | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.5 | Conferences | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.6 | Logistics Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.7 | Data Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.8 | Reviews | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.9 | Audits | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Formal Test and Evaluation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Program Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Development Environment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Initial Spares | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Over and Above | ||||||||||||||||||||||||||||||||||||||||||||||||
| Employee Of: | Total All Government Fiscal Years | Government Fiscal Year 3 | Labor Category | BOE Reference | 3.0 General Requirements | ||||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 3.2 General Technical Requirements | 3.3 Nuclear Certification | 3.4 Reliability | 3.5 Program Protection | 3.6 System Safety | 3.8 Program Manager (PM) | 3.9 Logistics | ||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 3.2.4.6 Development Environments | 3.3.1 Nuclear Certification Impact Statement (NCIS) | 3.3.2 Certification Requirements Plan (CRP) | 3.3.3 Nuclear Safety Analysis Report (NSAR) | 3.5.1 Program Protection Implementation Plan | 3.5.2 Inspection and Audit | 3.5.3 Cybersecurity | 3.5.4 Anti-Tamper | 3.5.5 Counterfeit Prevention | 3.6.1 Hazard Analysis and Risk Mitigation | 3.6.2 Environmental, Safety, and Occupational Health (ESOH) | 3.8.1 Program Management Activities | 3.8.2 Earned Value Management | 3.8.3 Program Reviews and Conferences | 3.9.1 Acquired or Furnished Property | 3.9.2 Technical Order | 3.9.3 Engineering Data | 3.9.4 Familiarization | 3.9.5 Provisioning | 3.9.6 Configuration Management (CM) and Control | 3.9.7 Diminishing Manufacturing Sources and Material Shortages (DMSMS) | |||||||||||||||||||||||||
| Notional CWBS | 3.5.3.1 Cybersecurity Controls | 3.5.3.2 System Security Plan | 3.5.3.3 Cybersecurity Risk Management | 3.5.3.4 Authorizations System Level Plan of Action and Milestones (POA&M) | 3.5.3.5 Cyber-secure Development Environment | 3.8.2.1 Integrated Program Management Reporting | 3.8.3.1 Support of Reviews and Meetings | 3.8.3.2 Meetings (Conferences) | 3.8.3.3 Technical Interchange Meetings (TIMs) | 3.9.1.1 Government Furnished Property (GFP) | 3.9.2.1 Development | 3.9.2.2 Validation/Certification | 3.9.2.3 Verification | 3.9.3.1 Engineering Data Guidance Conference | 3.9.3.2 In-Process Review of the TDP | 3.9.3.4 Engineering Data Updates and Revisions | 3.9.6.1 Configuration Requirements | 3.9.6.2 Configuration Items (CIs) | 3.9.6.3 Engineering Change Proposal (ECP) / Notice of Revision (NOR) | 3.9.6.5 Request for Variance (RFV) | 3.9.6.6 Item Unique Identification (IUID) | ||||||||||||||||||||||||||||
| 3.9.2.1.1 Technical Order Library | 3.9.6.6.1 Marking | 3.9.6.6.2 IUID Marking Plan | 3.9.6.6.3 IUID Marking Activity and Verification Report | ||||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.1 | B-2 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.2 | B-1 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.3 | B-52 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4 | Core Tester Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | B-2A UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1 | B-2A TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.1 | B-2A TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2 | B-2A TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.3 | B-2A TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | B-1B UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1 | B-1B TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.1 | B-1B TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.2 | B-1B TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.3 | B-1B TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | B-52H UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1 | B-52H TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.1 | B-52H TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.2 | B-52H TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.3 | B-52H TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | Systems Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.1 | Cybersecurity | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.2 | Counterfeit Prevention | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Configuration Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Business/Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Contracts/Subcontracts Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Financial/Earned Value Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.4 | Travel | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.5 | Conferences | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.6 | Logistics Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.7 | Data Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.8 | Reviews | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.9 | Audits | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Formal Test and Evaluation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Program Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Development Environment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Initial Spares | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Over and Above | ||||||||||||||||||||||||||||||||||||||||||||||||
| Employee Of: | Total All Government Fiscal Years | Government Fiscal Year 4 | Labor Category | BOE Reference | 3.0 General Requirements | ||||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 3.2 General Technical Requirements | 3.3 Nuclear Certification | 3.4 Reliability | 3.5 Program Protection | 3.6 System Safety | 3.8 Program Manager (PM) | 3.9 Logistics | ||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 3.2.4.6 Development Environments | 3.3.1 Nuclear Certification Impact Statement (NCIS) | 3.3.2 Certification Requirements Plan (CRP) | 3.3.3 Nuclear Safety Analysis Report (NSAR) | 3.5.1 Program Protection Implementation Plan | 3.5.2 Inspection and Audit | 3.5.3 Cybersecurity | 3.5.4 Anti-Tamper | 3.5.5 Counterfeit Prevention | 3.6.1 Hazard Analysis and Risk Mitigation | 3.6.2 Environmental, Safety, and Occupational Health (ESOH) | 3.8.1 Program Management Activities | 3.8.2 Earned Value Management | 3.8.3 Program Reviews and Conferences | 3.9.1 Acquired or Furnished Property | 3.9.2 Technical Order | 3.9.3 Engineering Data | 3.9.4 Familiarization | 3.9.5 Provisioning | 3.9.6 Configuration Management (CM) and Control | 3.9.7 Diminishing Manufacturing Sources and Material Shortages (DMSMS) | |||||||||||||||||||||||||
| Notional CWBS | 3.5.3.1 Cybersecurity Controls | 3.5.3.2 System Security Plan | 3.5.3.3 Cybersecurity Risk Management | 3.5.3.4 Authorizations System Level Plan of Action and Milestones (POA&M) | 3.5.3.5 Cyber-secure Development Environment | 3.8.2.1 Integrated Program Management Reporting | 3.8.3.1 Support of Reviews and Meetings | 3.8.3.2 Meetings (Conferences) | 3.8.3.3 Technical Interchange Meetings (TIMs) | 3.9.1.1 Government Furnished Property (GFP) | 3.9.2.1 Development | 3.9.2.2 Validation/Certification | 3.9.2.3 Verification | 3.9.3.1 Engineering Data Guidance Conference | 3.9.3.2 In-Process Review of the TDP | 3.9.3.4 Engineering Data Updates and Revisions | 3.9.6.1 Configuration Requirements | 3.9.6.2 Configuration Items (CIs) | 3.9.6.3 Engineering Change Proposal (ECP) / Notice of Revision (NOR) | 3.9.6.5 Request for Variance (RFV) | 3.9.6.6 Item Unique Identification (IUID) | ||||||||||||||||||||||||||||
| 3.9.2.1.1 Technical Order Library | 3.9.6.6.1 Marking | 3.9.6.6.2 IUID Marking Plan | 3.9.6.6.3 IUID Marking Activity and Verification Report | ||||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.1 | B-2 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.2 | B-1 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.3 | B-52 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4 | Core Tester Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | B-2A UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1 | B-2A TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.1 | B-2A TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2 | B-2A TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.3 | B-2A TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | B-1B UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1 | B-1B TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.1 | B-1B TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.2 | B-1B TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.3 | B-1B TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | B-52H UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1 | B-52H TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.1 | B-52H TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.2 | B-52H TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.3 | B-52H TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | Systems Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.1 | Cybersecurity | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.2 | Counterfeit Prevention | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Configuration Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Business/Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Contracts/Subcontracts Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Financial/Earned Value Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.4 | Travel | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.5 | Conferences | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.6 | Logistics Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.7 | Data Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.8 | Reviews | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.9 | Audits | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Formal Test and Evaluation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Program Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Development Environment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Initial Spares | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Over and Above | ||||||||||||||||||||||||||||||||||||||||||||||||
| Employee Of: | Total All Government Fiscal Years | Government Fiscal Year 5 | Labor Category | BOE Reference | 3.0 General Requirements | ||||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 3.2 General Technical Requirements | 3.3 Nuclear Certification | 3.4 Reliability | 3.5 Program Protection | 3.6 System Safety | 3.8 Program Manager (PM) | 3.9 Logistics | ||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 3.2.4.6 Development Environments | 3.3.1 Nuclear Certification Impact Statement (NCIS) | 3.3.2 Certification Requirements Plan (CRP) | 3.3.3 Nuclear Safety Analysis Report (NSAR) | 3.5.1 Program Protection Implementation Plan | 3.5.2 Inspection and Audit | 3.5.3 Cybersecurity | 3.5.4 Anti-Tamper | 3.5.5 Counterfeit Prevention | 3.6.1 Hazard Analysis and Risk Mitigation | 3.6.2 Environmental, Safety, and Occupational Health (ESOH) | 3.8.1 Program Management Activities | 3.8.2 Earned Value Management | 3.8.3 Program Reviews and Conferences | 3.9.1 Acquired or Furnished Property | 3.9.2 Technical Order | 3.9.3 Engineering Data | 3.9.4 Familiarization | 3.9.5 Provisioning | 3.9.6 Configuration Management (CM) and Control | 3.9.7 Diminishing Manufacturing Sources and Material Shortages (DMSMS) | |||||||||||||||||||||||||
| Notional CWBS | 3.5.3.1 Cybersecurity Controls | 3.5.3.2 System Security Plan | 3.5.3.3 Cybersecurity Risk Management | 3.5.3.4 Authorizations System Level Plan of Action and Milestones (POA&M) | 3.5.3.5 Cyber-secure Development Environment | 3.8.2.1 Integrated Program Management Reporting | 3.8.3.1 Support of Reviews and Meetings | 3.8.3.2 Meetings (Conferences) | 3.8.3.3 Technical Interchange Meetings (TIMs) | 3.9.1.1 Government Furnished Property (GFP) | 3.9.2.1 Development | 3.9.2.2 Validation/Certification | 3.9.2.3 Verification | 3.9.3.1 Engineering Data Guidance Conference | 3.9.3.2 In-Process Review of the TDP | 3.9.3.4 Engineering Data Updates and Revisions | 3.9.6.1 Configuration Requirements | 3.9.6.2 Configuration Items (CIs) | 3.9.6.3 Engineering Change Proposal (ECP) / Notice of Revision (NOR) | 3.9.6.5 Request for Variance (RFV) | 3.9.6.6 Item Unique Identification (IUID) | ||||||||||||||||||||||||||||
| 3.9.2.1.1 Technical Order Library | 3.9.6.6.1 Marking | 3.9.6.6.2 IUID Marking Plan | 3.9.6.6.3 IUID Marking Activity and Verification Report | ||||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.1 | B-2 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.2 | B-1 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.3 | B-52 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4 | Core Tester Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | B-2A UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1 | B-2A TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.1 | B-2A TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2 | B-2A TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.3 | B-2A TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | B-1B UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1 | B-1B TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.1 | B-1B TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.2 | B-1B TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.3 | B-1B TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | B-52H UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1 | B-52H TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.1 | B-52H TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.2 | B-52H TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.3 | B-52H TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | Systems Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.1 | Cybersecurity | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.2 | Counterfeit Prevention | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Configuration Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Business/Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Contracts/Subcontracts Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Financial/Earned Value Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.4 | Travel | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.5 | Conferences | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.6 | Logistics Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.7 | Data Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.8 | Reviews | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.9 | Audits | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Formal Test and Evaluation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Program Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Development Environment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Initial Spares | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Over and Above | ||||||||||||||||||||||||||||||||||||||||||||||||
| Employee Of: | Total All Government Fiscal Years | Government Fiscal Year 6 | Labor Category | BOE Reference | 3.0 General Requirements | ||||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 3.2 General Technical Requirements | 3.3 Nuclear Certification | 3.4 Reliability | 3.5 Program Protection | 3.6 System Safety | 3.8 Program Manager (PM) | 3.9 Logistics | ||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 3.2.4.6 Development Environments | 3.3.1 Nuclear Certification Impact Statement (NCIS) | 3.3.2 Certification Requirements Plan (CRP) | 3.3.3 Nuclear Safety Analysis Report (NSAR) | 3.5.1 Program Protection Implementation Plan | 3.5.2 Inspection and Audit | 3.5.3 Cybersecurity | 3.5.4 Anti-Tamper | 3.5.5 Counterfeit Prevention | 3.6.1 Hazard Analysis and Risk Mitigation | 3.6.2 Environmental, Safety, and Occupational Health (ESOH) | 3.8.1 Program Management Activities | 3.8.2 Earned Value Management | 3.8.3 Program Reviews and Conferences | 3.9.1 Acquired or Furnished Property | 3.9.2 Technical Order | 3.9.3 Engineering Data | 3.9.4 Familiarization | 3.9.5 Provisioning | 3.9.6 Configuration Management (CM) and Control | 3.9.7 Diminishing Manufacturing Sources and Material Shortages (DMSMS) | |||||||||||||||||||||||||
| Notional CWBS | 3.5.3.1 Cybersecurity Controls | 3.5.3.2 System Security Plan | 3.5.3.3 Cybersecurity Risk Management | 3.5.3.4 Authorizations System Level Plan of Action and Milestones (POA&M) | 3.5.3.5 Cyber-secure Development Environment | 3.8.2.1 Integrated Program Management Reporting | 3.8.3.1 Support of Reviews and Meetings | 3.8.3.2 Meetings (Conferences) | 3.8.3.3 Technical Interchange Meetings (TIMs) | 3.9.1.1 Government Furnished Property (GFP) | 3.9.2.1 Development | 3.9.2.2 Validation/Certification | 3.9.2.3 Verification | 3.9.3.1 Engineering Data Guidance Conference | 3.9.3.2 In-Process Review of the TDP | 3.9.3.4 Engineering Data Updates and Revisions | 3.9.6.1 Configuration Requirements | 3.9.6.2 Configuration Items (CIs) | 3.9.6.3 Engineering Change Proposal (ECP) / Notice of Revision (NOR) | 3.9.6.5 Request for Variance (RFV) | 3.9.6.6 Item Unique Identification (IUID) | ||||||||||||||||||||||||||||
| 3.9.2.1.1 Technical Order Library | 3.9.6.6.1 Marking | 3.9.6.6.2 IUID Marking Plan | 3.9.6.6.3 IUID Marking Activity and Verification Report | ||||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.1 | B-2 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.2 | B-1 UUT Test Requirements Analysis |