Bomber_Armament_Tester_Bidder's_Library-Notice_to_Industry.pdf
PDF 332 KB Posted
- Attached to
- Bomber Armament Tester (BAT) Federal contract opportunity
- Solicitation number
- FA8533-16-R-0001
About this file
BAT Bidder's Library
View the file
Other files for this federal contract opportunity
Show all 50
Bomber Armament Tester (BAT) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE LIFE CYCLE MANAGEMENT CENTER
ROBINS AIR FORCE BASE GEORGIA
07 May 15
MEMORANDUM FOR INTERESTED SOURCES
FROM: AFLCMC/WNKABB
Major Programs Contracting 235 Byron St STE 19A Robins AFB GA 31098
SUBJECT: Bomber Armament Tester (BAT) Bidder’s Data Library List and Instructions
1) This notice is to inform interested sources of the establishment of a BAT Bidder’s Data library for the intended upcoming BAT Request for Proposal (RFP).
2) As of this date, we are only releasing the Instructions and the BAT Bidder’s Data Library List in order for all interested sources to obtain and review the data library of documents.
Further provided is the list of documents, that will be provided to the contractual award recipient upon contract award. This list is being provided for informational purposes only.
3) To request the BAT Data Library CD, please send an email to the undersigned with a completed DD FORM 2345, Militarily Critical Technical Data Agreement. To receive the BAT Data Library CD, all interested companies must be on the DoD Certified Contractor Access List. For further information see: http://www.dlis.dla.mil/jcp/
4) Additional documents are expected to be added in the future. As subsequent data becomes available, additional CD’s will be mailed to those that have already received prior CD’s.
5) Comments to this announcement are due no later than 29 May 2015, 12:00 PM EST and should be submitted electronically to the undersigned.
Sandra E. Harvey Contracting Officer Sandra.Harvey.2@us.af.mil
Attached:
BAT Bidder’s Data Library List, as of 7 May 15 BAT Documents Not Releasable Until Contract Award, as of 7 May 15
BAT Bidder’s Data Library List
BAT Bidder's Library List, B‐2, as of 7 May 15
A/C UUT Document # Document Title Rev Date
B‐2 BRU‐
05103.CACI.DO28‐
U‐0002
Software Requirement Specification for the BRU‐44B/A Bomb Ejector Rack Test Program Set
D 1‐Feb‐02
05103.CACI.DO28‐
U‐0002
Interface Requirements Specification for the BRU‐44B/A Bomb Ejector Rack Test Program Set
A 1‐Feb‐02
05562.CACI.DO09‐
U‐0021
IRS BRU‐44 B/A TPS 10‐Oct‐14
09438.CACI.DO00‐
U‐0157
TRD for BRU‐44 B/A TPS 10‐Oct‐14
05103.CACI.DO28‐
U‐0016
Software Product Specification for the BRU‐44B/A Bomb Ejector Rack Test Program Set
K 5‐Dec‐14
05103.CACI.DO28‐
U‐0003
Software Design Document for the BRU‐ 44B/A Bomb Ejector Rack Test Program Set
K 5‐Dec‐14
AEG03402250 BRU‐44B/A Test Program Set Drawing Package
G 12‐Mar‐
B‐2 BRU‐
DAA3529N001 Acceptance/Functional Test Procedure for Rack, Bomb, Aircraft BRU‐52/A37B‐15
D 10‐Oct‐96
05433.CACI.DO20‐
U‐0068
Test Requirements Document for the B‐2 Smart Bomb Rack Assembly (SBRA) Including the BRU‐52 and Junction Box Assembly
B 10‐Oct‐14
08518.CACI.DO00‐
U‐0060
Input Output Requirements for the Interface to the B‐2 Stores Management System Smart Bomb Rack Assembly Test Program Set
C 2‐Dec‐11
DAA3529A047 Rack, Bomb, Aircraft‐BRU‐52/A37B‐15 (Drawing)
N 12‐Dec‐
11B29‐3‐68‐3 Rack, Bomb, Aircraft‐BRU‐52/A37B‐15 (Overhaul w/IPB)
‐ 11‐Feb‐08
B‐2 SBRA 05433.CACI.DO20‐
U‐0068
Test Requirements Document for the B‐2 Smart Bomb Rack Assembly (SBRA) Including the BRU‐52 and Junction Box Assembly
B 10‐Oct‐14
08518.CACI.DO00‐
U‐0060
Input Output Requirements for the Interface to the B‐2 Stores Management System Smart Bomb Rack Assembly Test Program Set
‐ 22‐Nov‐
05433.CACI.DO20‐
U‐0060
Software Product Specification for the B‐ 2 Smart Bomb Rack Assembly (SBRA) Test Program Set (TPS)
K 10‐Oct‐14
05433.CACI.DO20‐
U‐0057
Software Design Document for the B‐2 Smart Bomb Rack Assembly (SBRA) Test Program Set (TPS)
K 28‐Oct‐14
AEG03802836 BRA Interface Box (BIB) Assembly (Drawing)
K 29‐Jan‐10
AEG03802835 Smart Bomb Rack Assembly Test Program Set (TPS) Kit (Drawing)
G 24‐May‐
11B29‐3‐66‐4 Bomb Rack Assembly A/A37B‐15 (IPB) Chg 1 15‐Apr‐06
08518.CACI.DO00‐
U‐0052
Software Product Specification for the B‐ 2 Stores Management System Common Organizational Level Tester On‐Aircraft Test Program Set Smart Bomb Rack Assembly
A 2‐Dec‐11
08518.CACI.DO00‐
U‐0053
Software Design Description for the B‐2 Stores Management System Common Organizational Level Tester On‐Aircraft Test Program Set Smart Bomb Rack Assembly
A 2‐Dec‐11
08518.CACI.DO00‐
U‐0069
System Specification for the B‐2 Stores Management System Common Organizational Level Tester On‐Aircraft Test Program Sets Rotary Launcher Assembly and Smart Bomb Rack Assembly
D 16‐Mar‐
08518.CACI.DO00‐
U‐0081
Test Taxonomy Matrix for the B‐2 Stores Management System Smart Bomb Rack Assembly Test Program Set
A 14‐Feb‐11
B‐2 SBRC 05433.CACI.DO20‐
U‐0070
Test Requirements Document for the B‐2 Smart Bomb Rack Controller (SBRC)
D 5‐Dec‐14
B‐2 RLA 07325.CACI.DO03‐
U‐0040 ‐ 0044
Test Requirements Document (TRD) for Empty Launcher Assembly (ELA)
E 27‐Mar‐
05562.CACI.DO09‐
U‐0021
Interface Requirements Specification (IRS) for the B‐2 Rotary Launcher Assembly (RLA) Empty Launcher Test Program Set (TPS)
C 27‐Mar‐
AEG03402171 B‐2 RLA Test Program Set Drawing Package
‐ 5‐Feb‐01
AEG03402205 RLA Interface Box (RIB) Assembly (Drawing)
K 12‐Sep‐04
11N‐T5008‐1 Test Program Set B‐2A Rotary Launcher Assembly (O&M w/IPB)
‐ 1‐May‐03
85J‐B2/SMS/RLA‐
U001‐00D
SMS RLA Test Program Set Rev
1‐Apr‐15
08518.CACI.DO00‐
U‐0069
System Specification for the B‐2 Stores Management System Common Organizational Level Tester On‐Aircraft Test Program Sets Rotary Launcher Assembly and Smart Bomb Rack Assembly
D 16‐Mar‐
B‐2 RLA 08518.CACI.DO00‐
U‐0072
Software Product Specification for the B‐ 2 Stores Management System Common Organizational Level Tester On‐Aircraft Test Program Set Rotary Launcher Assembly
A 31‐Jul‐12
08518.CACI.DO00‐
U‐0073
Software Design Description for the B‐2 Stores Management System Common Organizational Level Tester On‐Aircraft Test Program Set Rotary Launcher Assembly
A 31‐Jul‐12
08518.CACI.DO00‐
U‐0080
Input Ouptput Requirements for the Interface to the B‐2 Stores Management System Rotary Launcher Assembly Test Program Set
C 16‐Mar‐
08518.CACI.DO00‐
U‐0081
Test Taxonomy Matrix for the B‐2 Stores Management System Rotary Launcher Assembly Test Program Set
C 16‐Mar‐
81J‐A37K7/RLA/E‐
U001‐00D
B2 Empty Launcher Test Program Set (Test Program for B2 Empty Rotary Launcher Assembly) (ESTS‐C) (NG)
Rev
7‐Jan‐04
BAT Bidder's Data Library List, B‐1, as of 7 May 15
B‐1 Rack, Bomb Ejector 14 in
LL21219
Armament Ejector Rack Assembly & Test Specification (Performance Requirements, Acceptance Tests)
D 11‐Sep‐
6314202 Ejector Assembly, 14 Inch Suspension (Drawing)
B 21‐Jan‐94
L6314202PL
Ejector Assembly, 14 Inch Suspension (Parts List)
B 21‐Nov‐
B‐1 Rack, Bomb Ejector 30 in
(BRU‐56/A)
LL21220
Armament Ejector Rack Assembly & Test Specification (Performance Requirements, Acceptance Tests)
B 4‐Oct‐85
LL20217
Test Specification for the Electrical Harness & High Voltage Insulation Resistance Test Procedure for B‐1 Aircraft
G 5‐Jan‐96
LL20101 Electrical Bonding Test Requirements ‐ 5‐Sep‐96
CP2569A06A
Specification for Rack, Ejector, 30‐Inch (Performance, Design, Development, and Test Requirements)
15‐May‐
L6410301 Ejector Assembly, 30 Inch Suspension (Drawing)
N ‐
L6410301PL
Ejector Assembly, 30 Inch Suspension (Parts List)
N 18‐Sep‐
B‐1 Conventional
Bomb Module
L409C2040 Conventional Bomb Module Test Set Specification
B 29‐Sep‐
LL21677
B‐1B Empty MK‐82 Conventional Bomb Launcher Functional Checkout Requirements
B 26‐Apr‐86
LL21223
MK‐82, 180‐Inch Launcher, Assembly and Checkout
D 31‐Mar‐
B‐1 Conventional
Bomb Module
L446C2005 Transformer Rectifier (Performance and Verification Requirements)
E 9‐Nov‐84
L6317301 Launcher Assy, Weapons ‐ MK82 (Drawing) G 4‐Mar‐83
L6317301PL
Launcher Assy (Parts List)
G 15‐Sep‐
400‐10096 Station Logic Unit, Conventional MX‐ 10524/ASQ‐184 (Drawing)
K 8‐Aug‐83
11B29‐3‐59‐
Power Control Assembly Conventional Launcher (Maint Instructions w/IPB)
Chg 1 25‐May‐
B‐1 SECBM
L6317801 Launcher Assy, Weapons ‐ ACBM/SECBM (Drawing)
C 10‐Oct‐98
PL6317801
Launcher Assy, Weapons ‐ ACBM/SECBM (Parts List)
D 5‐Oct‐98
B‐1 MPRL CP2569A11
Specification for Launcher, Multipurpose Nuclear Weapons
15‐May‐
L6316202 Rotary Launcher ‐ Composite Structure, Assy of (Drawing)
J 10‐Mar‐
LL631620
Rotary Launcher ‐ Composite Structure, Assy of (Parts List)
J 28‐Jan‐08
B‐1 CWIU
400‐17170 Functional Test Procedure ‐ Control Box, Electrical Armament System MAU‐208/A
(CWIU)
G 5‐Aug‐97
400‐17165 Control Box, Electrical, Armament System MAU‐208/A (Drawing)
J 19‐Dec‐
PL400‐17165
Control Box, Electrical, Armament System MAU‐208/A (Parts List)
R 28‐Feb‐
DL400‐
17165
Data List ‐ Control Box, Electrical, Armament System MAU‐208/A
A 13‐Oct‐98
B‐1 JBERTS
33D5‐53‐15‐
Junction Box Ejector Rack Test Set Chg 2 1‐Sep‐13
B‐1 CBMTS L409C2040
Conventional Bomb Module Test Set Specification
B 29‐Sep‐
B‐1 CBMTS
33D7‐33‐ 192‐1
Conventional Bomb Module Test Set (O&M) Chg 4 1‐May‐14
33D7‐33‐ 192‐14
Conventional Bomb Module Test Set (IPB) ‐ 1‐Sep‐09
750‐5 Test Set, Conventional Bomb Module (Drawing)
B 2‐Feb‐07
750128‐1 Electronics Unit A 12‐Apr‐00
750120‐3 Fixture Assembly, Ejector Rack (Qty 28) ‐
7501320‐2 Cable Set, CBM Interconnect
B 27‐Mar‐
7501340‐3 Cable Case, Stenciled, CWIU & MPRL/LRU Interconnect
‐ 19‐Apr‐99
7501330‐2 Cable Set, WBDP & MPRL Interconnect A 3‐Sep‐02
BAT Bidder's Data Library List, B‐52, as of 7 May 15
B‐52 CSRL
405‐10010 Functional Test Procedure Common Strategic Rotary Launcher
P 30‐Oct‐84
D405‐10079‐1 B‐1B CSRL Avionics/Wiring Checkout Test Procedure
1/84 15‐Nov‐85
405‐10003 Rotary Launcher‐Guided Missile and Bomb Aircraft A/A48K‐1 (Drawing)
V 23‐Jun‐92
B‐52 CSRL
PL405‐1000 Rotary Launcher‐Guided Missile and Bomb Aircraft A/A48K‐1 (Parts List)
AM 24‐Jul‐92
B‐52 SUU‐67/A
361‐12001 Pylon Instl ‐ AGM‐86 (Drawing) E 23‐Jun‐92
PL361‐12001 Pylon Installation ‐ AGM‐86 (Drawing)
L 21‐Jul‐87
B‐52
Bomb Release and Arming Control (R/H and L/H)
PL68J34000 Control, Bomb Release & Arming (Parts List R/H & L/H)
B 13‐Feb‐70
68J34000R‐01 is current PN used
Control, Bomb Release & Arming ‐ Right (Drawing) C 7‐Jan‐94
68J34000L‐01 is current PN used
Control, Bomb Release & Arming ‐ Right (Drawing) D 7‐Jan‐94
11B38‐2‐5‐1 Bomb Release and Arming Control Type A‐6 (Field Maintenance Overhaul w/IPB)
Chg
17‐May‐11
B‐52 Cluster Bomb Rack
(CBR)
5‐69557 Rack Installation Cluster (Drawing)
J 19‐Apr‐94
TESTER MUSTANG
85R‐
B52/MUSTANG‐
T001‐00A/00D
MULTI‐USE SYSTEM TESTER FOR
ARMAMENT/NEXT GENERATION
(MUSTANG) 2 9‐Nov‐09
BAT Documents Not Releasable Until Contract Award
BAT Documents Not Releasable Until Contract Award, B‐1, as of 7 May 15
B‐1 B‐1 AC LL21624 B‐1B Aircraft Stores Management System (SMS) Weapons Delivery Subsystem Functional Checkout Requirements
‐ 10‐Jun‐83
B‐1 Rack, Bomb Ejector 14 in
11B29‐3‐56‐11 14‐Inch Ejector Rack (O&M w/IPB)
Chg 6 26‐Sep‐14
B‐1 Rack, Bomb Ejector 30 in
(BRU‐56/A)
11N‐H5086‐2 Aircraft Ejector Bomb Rack (Ejectro Rack) BRU‐ 56/A (O&M w/IPB)
Chg 6 15‐Jan‐11
B‐1 Conventional Bomb Module
11B29‐3‐55‐1 General Purpose Bomb Module (O&M I/D Maintenance)
18‐Mar‐15
B‐1 MPRL 11N‐L5002‐2 Multi‐Purpose Launcher Assembly (O&M)
11N‐L5002‐4 Multi‐Purpose Launcher Assembly (IPB)
11N‐L5002‐8 Empty/Loaded Multi‐ Purpose Launcher (TPM)
BAT Documents Not Releasable Until Contract Award, B‐2, as of 7 May 15
B‐2 BRU‐44 11B29‐3‐70‐1 Bomb Ejector Rack Type BRU‐44B/A (O&M w/IPB)
Chg 2 16‐Sep‐12
11B29‐3‐70‐8‐1 Test Program Set (Bomb Ejector Rack BRU‐44B/A) (O&M w/IPB)
‐ 1‐Mar‐03
B‐2 SBRA 11B29‐3‐66‐1 Bomb Rack Assembly A/A37B‐15 (I‐Level Maintenace)
Chg 4 15‐Aug‐13
B‐2 SBRA 11B29‐3‐72‐8‐1 Test Program Sets Off Aircraft Testing ‐ On Aircraft Testing Involving External Power ‐ Smart Bomb Rack Assembly (SBRA) (O&M w/IPB)
‐ 28‐Aug‐13
B‐2 SBRC 11B29‐3‐72‐8‐1 Test Program Sets Off Aircraft Testing ‐ On Aircraft Testing Involving External Power ‐ Smart Bomb Rack Assembly (SBRA) (O&M w/IPB)
‐ 28‐Aug‐13
B‐2 RLA DAA7126P004 TPS Specification for EL Test Program Set (TPS)
PR‐75‐70‐000 Test Requirements Document for Empty Launcher
Rev B 21‐Jan‐93
B‐2 BSRA PR‐75‐32‐000 B‐2 BRA Test Requirements Document (ESTS‐C Level 3)
B‐2 MSRA PR‐75‐33‐000‐1/2 B‐2 MRA Test Requirements Document (ESTS‐C Level 3)
Rev A October
B‐2 ERA PR‐75‐34‐000 B‐2 ERA Test Requirements Document (ESTS‐C Level 3)
Rev C June 1992
B‐2 NWCM/NWIU PR‐75‐31‐000‐1/2 B‐2 NWIU Test Requirements Document (ESTS‐C Level 3)
Rev C June 1997
B‐2 TRU 11N‐T5178‐3 Unit Transformer Rectifier Chng
1‐Aug‐12
BAT Documents Not Releasable Until Contract Award, as of 7 May 15
B‐1 B‐1 AC LL21624 B‐1B Aircraft Stores Management System (SMS) Weapons Delivery Subsystem Functional Checkout Requirements
‐ 10‐Jun‐83
B‐1 Rack, Bomb Ejector 14 in
11B29‐3‐56‐11 14‐Inch Ejector Rack (O&M w/IPB)
Chg 6 26‐Sep‐14
B‐1 Rack, Bomb Ejector 30 in
(BRU‐56/A)
11N‐H5086‐2 Aircraft Ejector Bomb Rack (Ejectro Rack) BRU‐ 56/A (O&M w/IPB)
Chg 6 15‐Jan‐11
B‐1 Conventional Bomb Module
11B29‐3‐55‐1 General Purpose Bomb Module (O&M I/D Maintenance)
18‐Mar‐15
B‐1 MPRL 11N‐L5002‐2 Multi‐Purpose Launcher Assembly (O&M)
11N‐L5002‐4 Multi‐Purpose Launcher Assembly (IPB)
11N‐L5002‐8 Empty/Loaded Multi‐ Purpose Launcher (TPM)
| 2015-05-07T15:53:27-0400 | |
| HARVEY.SANDRA.ELIZABETH.1074566789 |
File details come from the government source that posted it. Updated .