Attachment 18 - Contract Data Requirements Lists - C001 thru C008
View the file
Other files for this federal contract opportunity
Show all 50
Bomber Armament Tester (BAT) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
data_item: C006 title: Configuration Audit Summary Report and Certification sub: N/A auth: DI-SESS-81022D ref: SOW Paragraphs 4.1.8, 5.1.6, 6.1.6 req_ofc: AFLCMC/WNAA dd250: DD appcode: A dist: BLK 16 freq: BLK 16 asof: BLK 16 firstsub: BLK 16 subsub: BLK 16 addressee1: AFLCMC/WNAA draft1:
reg1:
repro1:
addressee2: 235 Byron St. Ste 19A draft2:
reg2:
repro2:
addressee3: Robins AFB, GA draft3:
reg3:
repro3:
addressee4: 31098-1669 draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6: Program Manager draft6:
reg6:
repro6:
addressee7: AFLCMC/WNAA draft7:
reg7:
repro7:
addressee8: Digital draft8:
reg8: 1 repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10: Contracting Officer draft10:
reg10:
repro10:
addressee11: AFLCMC/WNK draft11:
reg11:
repro11:
addressee12: Digital draft12: 1 reg12: 1 repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14: Configuration Manager draft14:
reg14:
repro14:
addressee15: AFLCMC/WNAC draft15:
reg15:
repro15:
addressee16: Digital draft16: 1 reg16: 1 repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18: Engineer draft18:
reg18:
repro18:
addressee19: AFLCMC/WNA draft19:
reg19:
repro19:
addressee20: Digital draft20: 1 reg20: 1 repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 3 total_reg: 4 total_repro: 0 remarks: BLK 3: Subtitle shall be reflective of the item i.e. BAT Core Tester, B-2A TPSs, B-1B TPSs etc...
BLK 7: Wide Area Work Flow (WAWF) shall be utilized.
BLK 9: D. Reason: Administrative or Operational Use
Blocks 10/11/12/13: All configuration audit summary report and certification shall be delivered no later than ten (10) working days after PCA. The government shall have ten (10) working days to review the report(s) and certification(s). The contractor shall incorporate government comments and deliver updated configuration audit summary report and certifications within five (5) working days.
Note: See CDRL General Notes for further instructions.
group:
total_price:
prep_name:
line_item:
exhibit: C xtdp: Off xtm: Off othercat: X system: Bomber Armament Tester ctr_no:
contr:
remarksb: Intentionally left blank.
Page2: 2
Reset:
2016-03-16T16:59:05-0400
CATT.NATHANIAL.B.1407714802
prep_date: 16 Mar 16 app_by:
2016-03-17T14:49:07-0400
SLAY.DIMITRA.R.1067927644
app_date: 17 Mar 16
Page: 1 of_pages: 3 app: Adobe Professional 8.0
QMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704- 0188), Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
C TDP XXXX TM OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
Bomber Armament Test System
C007 PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81000E/T (SOW) PARA 3.9.3,4.1.10,5.1.7,6.1.7
AFLCMC/LZPEM
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED 10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION
DD QRTLY SEE BLK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF
SUBSEQUENT
FINAL
A SEE BLOCK
SEE BLK 16 Draft Reg Repro
16. REMARKS AFLCMC/LZPEM
285 Cochran Street
1. Air Force drawings 9626025 rev G, 9579776 rev M and 9579777 rev B (CAGE 98752) are a part of this CDRL ROBINS AFB, GA.
A copy of the drawings may be requested through the Procurement Contracting officer. 31098-1669
2. METADATA SHALL BE IN ACCORDANCE WITH 9579776 PARAGRAPH 10 OPTION
ONE
3. Please reference EDATS control number 2014-116 on all correspondence related to this effort.
PAPER COPY 1
SEE CONTINUATION SHEETS DIGITAL DATA 1
(CLASSIFIED)
Vendor Item Control Drawings shall be used to specify the requirements for purchased items when such items have been approved for use in the design and are used without alteration, selection or source qualification (testing of an item prior to procurement action to ensure that it satisfies the specified requirements). Reference paragraph 7.1 of DI-SESS-81000E.
DIGITAL 1
15. TOTAL 1 0 2
3/14/2016
X Harold J. Banks Harold J.Banks Engineering Data Manager Specialist Signed by: BANKS.HAROLD.J.1064810860
10 Mar 2016
DD Form 1423-1, Feb 2001 STRAWMAN Revision 8 Oct 2014 PAGE___1_ OF __7___ PAGES EDATS 2014-116
1067927644C
Typewritten Text
17 Mar 2016
CONTINUATION OF DD FORM 1423-1 (DI-SESS-81000E/T) Dtd 10 MAR 2016, EDATS 2014-116
BLOCK 4: DI-SESS-81000E is tailored as follows:
Requirements: (the below paragraph numbering corresponds with the numbering in the DID)
1. Reference Documents. Delete paragraph 1. in its entirety and replace with “1. Reference Documents. The documents apply as cited in the DD Form 1423-1 and continuation sheets. Unless otherwise noted, the latest revision of the ASME Standard at the time of solicitation shall apply.”
3. Format. Delete in its entirety and replace with “3. Format. Product Drawings/Models and
Associated Lists shall be in the format as specified on this DD Form 1423-1 and continuation sheets, and shall meet the requirements of ASME Y14.1."
4. Content. Delete in its entirety and replace with “4. Content. Product Drawings/Models and Associated Lists shall conform to the requirements of ASME Y14.100-2013, Appendix B, sections B6 through B9.1 and Appendices C,D, E, and F (F-3.5, F-3.6, F-3.7) in conjunction with ASME Y14.24-2012, ASME Y14.34, ASME Y14.35M and ASME Y14.41. They shall document directly or by reference the following (items a through q), as applicable:”
6. CAGE code. Delete “TDP Option Selection Work Sheet incorporated in the contract or purchase order.” and replace with “DD Form 1423-1 and continuation sheets.”
7. Selection of drawings. Delete “The TDP Option Selection Work Sheet incorporated in the contract or purchase order will specify whether the contractor or the Government is responsible for selecting the types of drawings and associated lists.” and replace with “The contractor shall comply with ASME Y14.24, Types and Applications of Engineering Drawings”.
BLOCK 7:
“D”—Inspection is at destination and is to ensure this product meets this CDRL and its tasking document.
Shipping list must accurately reflect the shipped product.
“D”—Acceptance is at destination. Acceptance of final data will be by approval of the Engineering Data Management Specialists.
BLOCK 9:
DISTRIBUTION STATEMENT. Distribution statements shall be in accordance with DoD Instruction
5230.24 and included on the first sheet of each drawing near the title block, and shall be as follows:
“DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DOD contractors only (Critical Technology) (4 February 2016). Other requests shall be referred to
(AFLCMC/WNA).”
EXPORT CONTROL WARNING LABEL. All engineering data shall be marked with Export Control Warning Labels in accordance with DoD Instruction 5230.24, dated August 23, 2012 as follows:
“WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
DESTRUCTION NOTICE. Mark documents with one of the following:
a. For unclassified limited documents: “DESTRUCTION NOTICE. Destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
b. For classified documents: “DESTRUCTION NOTICE. Follow the procedures in DoD 5220.22- M, National Industrial Security Program Operating Manual, Chapter 5, Section 7, or DoD 5200.1R, Information Security Program, Chapter 6.”
BLOCK 10: Revisions/changes to the final delivered data shall be furnished quarterly, commencing the first quarter after destination acceptance of the final reproducible data and continue until the contract is closed. Quarterly updates shall include an updated BOM, reference A.F. Drawing 9579776. Negative reports shall be submitted to AFLCMC/LZPEM.
BLOCK 11: 15 days before end of quarter.
BLOCKS 12 AND 13:
1. All data submittals shall contain a delivery letter and a shipping list. The letter shall contain at a minimum the contract number, delivery order, CLIN, and EDATS number (located on the bottom right corner of the DD Form 1423). The shipping list shall include as a minimum, the document number, revision level, and number of sheets/pages. The data delivered shall be in the same sequence as the shipping list.
Shipments of data must be for a complete Technical Data Package (TDP) that accurately depicts the final product as defined in the tasking document (SOW, PWS, etc.). Shipping list shall specify whether the shipment is updates, final or make-up.
2. Within 90 days after successful signed completion of Physical Configuration Audit (PCA), a Bill of Materials (BOM) in accordance with Air Force drawing 9579776 (CAGE 98752) shall be delivered.
3. Within 90 days after successful signed completion of final PCA, one set of paper copies of all “final reproducible data” (reference Block 14 of the DD 1423-1) shall be delivered. A letter of transmittal shall accompany submittal. Paper copy submittal will be reviewed within 120 days after receipt of data, unless additional time is required, at which time the contractor will be notified. When the submittal does not meet the contractual requirements a discrepancy letter will be submitted through Government Contracting Officer with a suspense date for the contractor to resubmit the TDP with corrections incorporated.
a. Submittal of programming files, in accordance with Air Force drawing 9579776 (CAGE 98752), Software and memory Device Data is not required for this paper submission.
b. Concurrent with the paper copies the contractor shall submit four (4) representative samples of each digital data format of data for this project in accordance with Air Force drawing 9579776 (CAGE 98752), (Native, Neutral, HPGL, Metadata Spreadsheet, Gerber, Software/memory Device Data, etc.).
4. Within 60 days after approval of paper copy, one set of all “final reproducible digital data” to include Native, Neutral, HPGL, Metadata Spreadsheet, Gerber, Software/Memory Device Data, etc. (reference Block 14 of the DD 1423-1) shall be delivered to AFLCMC/LZPEM, 285 Cochran Street, ROBINS AFB GA. 31098-1669. If changes have been required to the BOM since delivery in paragraph 3 above, resubmittal shall be required. The final digital submittal will be reviewed within 60 days after receipt of data, unless additional time is required, at which time the contractor will be notified. In the event the submittal does not meet the contractual requirements, a discrepancy letter will be submitted through the Government Contracting Officer with a suspense date for the contractor to resubmit the final digital TDP with corrections incorporated.
BLOCK 16:
1. Government Activity and Part Identification: The contractor shall comply with Air Force drawing 9626025 (CAGE 98752), titled “Air Force Drawing Requirement”. This requirement defines format requirements for the generation of Air Force drawings. The contractor shall use the Government activity identifier Commercial and Government Entity (CAGE) code and Air Force drawing numbers. The contractor shall contact the AFLCMC/LZPEM EDMS to obtain the drawing numbers.
1.1. Engineering Change Orders (ECOs): When an existing Air Force CAGE code drawing is revised, all
ECOs shall be incorporated prior to the paper submittal for review.
1.2. Concurrent with the final submittal, all ECO’s against existing Air Force CAGE code drawings shall be incorporated and a copy of the ECO shall be delivered for Air Force revision documentation.
2. Content, format, and media requirements for delivery of Digital Engineering Data: The contractor shall comply with Air Force drawing 9579776 (CAGE 98752).
3. Product Drawings/Models and Associated Lists: Product drawings/models and associated lists shall be prepared to provide the design, engineering, and manufacturing information necessary to enable the procurement or manufacture of an item essentially identical to the original item. The product shall be defined to the extent necessary for a competent manufacturer to produce an item, which duplicates the physical, interface, and functional characteristics of the original product, without additional design engineering effort or recourse to the current design activity. Product data shall reflect the approved, tested and accepted configuration of the defined delivered item. This includes but is not limited to special tooling, interface hardware, special test equipment, and support equipment.
4. Engineering Drawing Practices: The contractor shall use the practices described in ASME Y14.100- 2013. For clarification, the documents listed in section 2 of ASME Y14.100-2013 shall be considered first tier and shall apply. The contractor may find it useful to incorporate the concepts of MIL-HDBK-288 into the preparation of the TDP. MIL-HDBK-288 refers to Engineering Drawing Package (EDP); this term shall be considered synonymous with TDP. In instances where the ASME standards do not fully define requirements concerning preparation of engineering drawings, the contractor may use the guidance provided in the Drawing Requirements Manual (DRM) 11th Edition available from IHS, Inc. copyright 2008.
5. Control Drawings: Control drawings shall be created in accordance with DI-SESS-81000E and ASME Y14.24-2012 to depict engineering criteria used in selecting purchased or vendor developed items. Control drawings shall disclose engineering form, fit, function and performance requirements for the acquisition of interchangeable purchased items of existing designs, or of items specially developed by vendors to the control drawing requirements. When COTS/purchased items are used by the contractor and are part of this effort as defined in the tasking document (SOW, PWS, etc.), control drawings shall be developed and delivered. Control drawings not developed for this contract that are part of the deliverable TDP shall be updated, to show current information (i.e., performance/qualification requirements, vendors/sources names and part numbers.)
5.1. Control drawings are not required for items which are Government directed purchases or for Government Furnished Material/Government Furnished Equipment (GFM/GFE). Such items shall be identified using the GFE/GFM notation on the parts list, etc. The use of a flag note is acceptable.
6. Contract Numbers: When a TDP document is prepared under a Government contract, the Government contract number under which it is prepared shall appear on the first sheet of the document original. When a TDP document is delivered under a Government contract other than the one under which it was prepared, the Government contract number under which it is delivered shall also appear on the first sheet of each copy submitted. If the document is prepared and submitted under the same contract, only the entry for the contract under which it is prepared is required.
7. Application Data: All new and revised drawings shall contain Application Data. The Application Data is mandatory for all drawings. The Application Data shall show the “Next Assembly” and “Used On”. The application data shall be located near the title block on sheet 1, placed on a separate referenced document, or provided on a separate parts list. When the application data appears on a separate referenced document, a cross reference note shall be included on each parent drawing to indicate that a separate referenced document is available. When an item is used in more than three applications, the entry “general usage” may be entered in the “Used On” column.
8. Reference Documents: Documents referenced in a TDP shall be furnished as part of the TDP with the exception of those specified in referenced documents available in Acquisition Streamlining and Standardization Information System (ASSIST) and non-Government standardization documents available from the issuing non-Government standards body, such as the American Society of Mechanical Engineers (ASME). The following types of documents shall not be referenced in a TDP: technical manuals, procedural manuals, maintenance manuals, company drafting manuals, management plans, uncontrolled documents or unreleased documents. However, when information essential to meeting the content of a TDP (such as default surface texture values) is contained within such prohibited documents, that information shall be extracted from the reference document and included in the TDP.
8.1 Prohibited Documents, References, and Phrases: Technical Orders (TOs), Time Compliance Technical Orders (TCTO), pamphlets, recordings, National Stock Numbers (NSNs), To Be Determined (TBD), Statement of Work ((TASKING DOCUMENT)), Performance Work Statement (PWS), Statement of Objectives (SOO), and Contract Data Requirements List (CDRL), shall not be referenced within the TDP.
9. Traceability: The contractor shall prepare the TDP in such a manner to insure that all applicable documents and part or identifying numbers (PINS) i.e., Artwork, Schematics, Software/Programming Data, Test Criteria, etc., are referenced within the TDP for traceability.
9.1 If the contractor is the original equipment manufacturer (OEM), impacted engineering data that are part of the effort as defined in the tasking document (SOW, PWS, etc.) shall be revised to include changes to reflect the delivered item’s configuration.
9.2 If the contractor is not the OEM, the contractor shall ensure impacted engineering data that are part of the effort as defined in the tasking document (SOW, PWS, etc.) are updated and delivered to reflect the delivered items configuration.
10. Preparation Method: American English language shall be used in the preparation of this TDP.
Dimensioning and Tolerancing shall be Decimal Inch in accordance with ASME Y14.5-2009. Size and format of drawings shall be Decimal Inch per ASME Y14.1. All drawings shall be prepared using Third
Angle Orthographic Projection method of presentation. The symbol for angle of projection shall be delineated in the Title Block of newly prepared or revised engineering data. (ASME Y14.3-2003 figure 2)
11. TDP Validation: The contractor shall validate that the TDP conforms to the contractual requirements, and that they accurately depict the item(s) developed, modified, or produced under the contract.
12. Clarification of Detailed Test Criteria for Electrical and Avionics Items: Test criteria for items designed or developed with Government funds is an inherent part of the TDP. Test criteria shall be incorporated, either directly on each TDP document or by reference, for each end item, top assembly item, configured item, and lowest assembled item IAW Air Force drawing 9579777 (CAGE 98752), titled “Clarification of Detailed Test Criteria for Electrical and Avionics Items.”
13. Associated Lists: Parts Lists per ASME Y14.34 are required. Parts Lists are required at assembly level. Parts Lists for Contractor Activity identifier CAGE code may be an integral part of a document or it may be a separate document. The identification and quantity of parts shown on the assembly drawing shall agree with the parts list.
14. Marking: Drawings shall specify requirement for marking part number identification on items as required by MIL-STD-130 and other applicable documents referenced therein. Item unique identification (IUID) marking is mandatory for applicable items as determined by the Program Office. (See DFARS 252.211-7003 Item Identification and Valuation) The drawings shall identify the content, method of application, material and location of marking on the part.
15. Printed Board Artwork Master Drawing. The printed board artwork master drawing shall include images of all artwork required to manufacture the printed board. These images will serve as a reference to those images produced from the Gerber data files IAW Air Force drawing 9579776 (CAGE 98752) titled “Product Data Specification”. Also, this drawing shall reference a unique part or identifying number (PIN) with revision data for the digital file set which includes the Gerber, test, and drill data files. The PIN number format structure and characters shall meet the same requirements as for the part number. These requirements are in addition to those in ASME Y14.24 and other related standards.
16. Printed Board Artwork Master, Test, and Drill NC Data. The printed board artwork master, test, and NC drill data shall be delivered IAW Air Force drawing 9579776 (Cage 98752). These requirements are in addition to those in ASME Y14.24 and other related standards.
17. Legacy Stable Base Media (Mylars, undimensioned drawings, master patterns, etc.). Data originally produced on stable base drawing media that has been redrawn/converted/reproduced in a digital format or developed on a CAD platform shall be delivered.
18. Legibility and Reproducibility: All documents prepared or submitted shall meet the legibility and reproducibility requirements of the specification or standard controlling the media in which the data is to be delivered. As a minimum, all lines, symbols, letters, and numerals shall be readable.
19. Protecting Classified Information: TDPs or parts thereof, containing classified information shall be protected and marked in accordance with the Department of Defense National Industrial Security Program Operating Manual for Safeguarding Classified Information, DoD Manual 5220.22-M. When 3D TDP data is used, the solid models shall display classification marking clearly visible when the solid model is first opened.
20. Software and Memory Device Data: Software and Memory Device drawings shall be selected per ASME Y14.24 and CAD/CAM data files shall be delivered per Air Force drawing 9579776 (CAGE 98752).
21. Inspection of TDP: The TDP shall be inspected for the following:
a. Compliance with the requirements of this contract.
b. Inclusion of all documents, including sub-tier references, required to meet the design disclosure requirements of the TDP.
c. Accuracy of the assignment and identification of security markings, restriction statements (for example distribution statements), export control notices, rights-in-data legends, and other special markings.
d. Inclusion of contract numbers and contractor identifications.
e. Legibility and reproducibility.
f. TDP components have not been prepared for requirements, which could be met by existing standardization documents.
g. Completeness and accuracy of the TDP documents, including required quality assurance information, in describing design of the item, its subassemblies, and component parts. The design to be described by the TDP documents is that configuration of the item the Government has approved, tested, or accepted.
h. Both Type 2D and Type 3D TDPs shall open in the appropriate software without regeneration errors or warnings.
22. Source Control Drawing (SOCD) Approval Request. Source control drawing approval requests (as referenced in MIL-STD-31000A and corresponding Appendix A) shall be prepared and submitted to the requiring office in Block 6 of this DD Form 1423-1 prior to the preparation or use of a source control drawing. Each potential source control item shall be approved by the Air Force System Engineer prior to inclusion of the source control drawing in the TDP. SOCD approval requests are used to ensure that only valid source qualification requirements are included in the TDP. Under Public Law, the Government will actively seek multiple sources for any item for which source qualification is a requirement. Air Force engineering will evaluate each request and notice will be promptly given regarding approval/disapproval.
Requests shall be by letter and shall be prepared and submitted as follows:
a. Format - The Source Control Drawing Approval Request shall be in the contractor’s format.
b. Content - The request shall specify the following:
(1) Nomenclature and description of the item.
(2) The critical application(s) for which the item is to be used.
(3) Number of applications per end item.
(4) System performance requirements requiring source qualification.
(6) Procedures and criteria required to qualify a source.
(7) Sources of supply and manufacturers’ part numbers.
(8) Cost of the item involved.
(9) Estimated cost to qualify a source.
CONTRACT DATA REQUIREMENTS LIST
1. All data submittals shall contain a delivery letter and a shipping list. The letter shall contain at a minimum the contract number, delivery order, CLIN, and EDATS number (located on the bottom right corner of the DD Form 1423). The shipping lis...
2016-03-17T14:53:23-0400
SLAY.DIMITRA.R.1067927644
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED.
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
14. DISTRIBUTION
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
Page of Pages
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
data_item: C008 title: Technical Manual Contract Requirement (TMCR) sub: Technical Manuals auth: TM-86-01N ref: BLK 16 req_ofc: 406 SCMS/GUEE dd250: DD appcode: A dist: BLK 16 freq: BLK 16 asof: BLK 16 firstsub: BLK 16 subsub: BLK 16 addressee1: See TM-86-01N draft1:
reg1:
repro1:
addressee2: Section 2, Part B draft2:
reg2:
repro2:
addressee3: Delivery Matrix draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 0 total_repro: 0 remarks: BLK 2: (For AFMETCAL AFLCMC/WNMMN) The contractor shall include a calibration section as part of the operation and service manual furnished with the unit. The calibration procedure may be in contractor format to include a list of required calibration support equipment, by recommended part number, minimum performance specifications for all recommended test equipment connection diagram and step-by-step instructions to follow for completing the calibration.
BLK 4: General and specific Technical Manual requirements are contained in the
TM-86-01N
BLK 5: SOW Paragraphs 3.9.2.1, 3.9.2.3, 4.1.10, 5.1.7, 6.1.7
BLK 7: The Wide Area Workflow (WAWF) is to be used for final inspection and acceptance by the 406 SCMS/GUEE.
BLK 8: Approval IAW TM-86-01N, Para 16.
BLK 8: (For AFMETCAL AFLCMC/WNMMN) The Government has 30 calendar days to review the preliminary draft. The contractor has 10 calendar days after receipt of Government comments to prepare and deliver the final data. Criteria for approval shall meet the Government comments.
BLK 9: Distribution Statement provided in TM-86-01N, Paragraph 9 BLK 9: (For AFMETCAL AFLCMC/WNMMN) The following information shall be included on manual(s): DISTRIBUTION STATEMENT D: DoD and US DoD contractors only.
Blks 10 - 15: See TM 86-01N
BLK 12: (For AFMETCAL AFLCMC/WNMMN) The contractor shall furnish and deliver one preliminary draft no later than 30 days before delivery of test unit. Deliver draft manual to AFMETCAL /WNMMN, ATTN: Paul Najdowski, 813 Irving-Wick Dr. W, Bldg 2, Heath OH 43056-6116.
BLK 14: (For AFMETCAL AFLCMC/WNMMN) PACKUP DATA: Manual shall be submitted on CD ROM in Indexed Portable Document Format (iPDF).
group:
total_price:
prep_name: 406 SCMS/GUEE line_item:
exhibit: C xtdp: Off xtm: Yes othercat:
system: BOMBER ARMAMENT TESTER ctr_no:
contr:
remarksb: NOTE: TECHNICAL DATA SHALL NOT BE TRANSMITTED VIA EMAIL. ALL TRANSMISSION OF TECHNICAL DATA SHALL BE VIA MAIL OR EXPRESS DELIVERY SERVICES.
Data Call : GUEE 0092
NSN: 4920-01-649-0428KV
MIPR #:
Page2: 2
Reset:
2016-03-18T12:21:25-0400
BOLTON.HOLLY.LASHONE.1391826141
prep_date: 18 Mar 16 app_by:
2016-03-18T14:00:09-0400
SLAY.DIMITRA.R.1067927644
app_date:
Page: 1 of_pages: 3 app: Adobe Professional 8.0
TM-86-01N 1 April 2009 1 Data Call No: GUEE-0092
Prepared by Holly Bolton 406 SCMS/GUEE (478) 926-0141 1 Dec 14, 12 Jan 16
Air Force Technical Manual Contract Requirements (TMCR) for
BOMBER ARMAMENT TEST SET
NSN 4920-01-649-0428KV
1 December 2014
12 January 2016
ATTACHMENT , TO CDRL SEQUENCE NUMBER , EXHIBIT_________________
REQUEST FOR PROPOSAL/CONTRACT: _______________________________________________________
Technical Manual/Technical Order requirements contained herein have been cleared for use by OMB Paperwork
Reduction Project No. 0704-0188.
SECTION 1. TECHNICAL ORDER (TO) PROGRAM REQUIREMENTS
1. TMCR Tailoring (T). This TMCR document, including the associated tables, matrices and
Specification/Standard Interface Records (SIRs) have been tailored specifically, for the BOMBER
ARMAMENT TEST SET Program Requirements. Proposals shall be compatible with the Air Force infrastructure and support the BOMBER ARMAMENT TEST SET Program. Air Force TO
Acquisition procedures, including procedures for tailoring this document, are found in TO 00-5-3, AF
Technical Order Life Cycle Management. A copy is available upon request from the TO Manager. Any terms or procedures found in this document may be researched there.
2. TO Program Scope (T). The Offeror shall develop and deliver new AF technical manuals (Test Set
Operation and Maintenance Instructions Manual, Test Set Illustrated Part Breakdown (IPB) Manual, Unit
Under Test (UUT) Test Procedures Manuals, and Calibration Procedures) to support the BOMBER
ARMAMENT TEST SET program IAW Section 2, Table 1. The Offeror shall also identify change pages and provide source data updates to affected Line Replaceable Unit (LRU) Operations and
Maintenance Instructions technical manuals, and aircraft Job Guides IAW Section 2, Table 2. The
BOMBER ARMAMENT TEST SET program will follow three planned increments with Increment 1 for B-2A, Increment 2 for B-1B, and Increment 3 for B-52H. No tailoring shall be made to these requirements without prior approval of the TM Manager and Primary Contracting Officer (PCO).
3. Commercial Manuals (T). N/A
4. Technical Manual Specifications and Standards (TMSS) Tailoring. TMSS are tailored by selecting between options offered in paragraph 6.2 of each TMSS. The tailoring is recorded in SIRs and added to
Section 3 of this document for each TMSS required. NOTE: Tailoring must not change or delete man-datory requirements which are part of the Document Type Definition (DTD) structure.
4.1. (T). N/A.
4.2. (T). Questions concerning TMSS requirements may be resolved by written request and justified suggestions for resolution submitted through the Procuring Contracting Officer (PCO) and TO Man-ager (Holly Bolton, 406 SCMS/GUEE, 478-926-0141). Deficiencies and suggested improvements shall be submitted to the TMSS Preparing Activity (PA). Approved recommendations, corrections and clarifications will be maintained with contract documentation.
5. Subsequent TO/Data Requirements (T). Offeror shall propose a process for notifying the govern-ment when additional TO or source data requirements are identified subsequent to contract award. This process shall require government review and approval of recommended additional requirements prior to contractual approval. Contractor format is acceptable.
2 TM-86-01N 1 April 2009
6. TO Development (T). The Offeror shall development practices and procedures that ensure TOs and data are compatible with the BOMBER ARMAMENT TEST SET program objectives. In addition, TOs and source data shall be written to a scope and depth of coverage sufficient to support the operations and maintenance concepts, and to the Reading Grade Level (RGL) specified in MIL-STD-38784, Standard
Practice for Manuals, Technical: General Style and Format Requirements. See sample AFTO Form
124, Attachment 3, page 26.
6.1. Page-oriented Military Specification (MILSPEC) TOs shall be formatted with text, graphics and delivery according to the TMSS specified in Section 2. The contractor shall develop TO files
(tagged instances) using Standard Generalized Markup Language (SGML) according to the
DTDs referenced in the appendix to MIL-STD-38784 and each applicable military detail or performance specification (MIL-DTL or MIL-PRF). All deliveries of SGML data shall be in a single file instance. Multiple file instances are not authorized.
6.2 (T). SGML-tagged TO files shall include required illustration (graphics) files in an approved graphics exchange format. Illustration files developed and delivered for other purposes shall be used in lieu of developing special TM illustration files whenever possible. All delivered graphics shall conform to the approved graphic creation and format guidelines listed in Attachment 1, page 21.
6.3. (T). Source data shall be formatted with text/graphics and delivered according to the require-ments in paragraph 16 and as specified in Section 2.
6.4. (T). N/A.
6.5. (T). N/A.
7. TO Numbering (T). Offeror shall complete the TO Numbering, Attachment 2 to this document for each new manuals being developed. TO numbers are not required for manuals to be used exclusively by the Offeror’s own personnel. AF procedures for numbering TOs are described in TO 00-5-3 and TO 00-
5-18, AF Technical Order Numbering System. A copy is available upon request from TO Manager.
8. Data Rights (T). Offeror shall propose Unlimited Rights for all source data and TOs prepared specif-ically for the contract. Government rights in data are specified in the Defense Federal Acquisition
Regulation Supplement (DFARS), paragraphs 227-7102 through 227-7104.
8.1. (T). If some TOs or source data are copyrighted or contain proprietary data or procedures, the offeror may propose Limited Rights or Government Purpose Rights (GPR) only. Proposed commer-cial manuals should be provided with at least GPR or Limited Rights. Copyrights shall be according to DFARS paragraphs 227-7103, 7105 or 7106.
8.2. (T). Specifically, if Non-Government Standards (NGS) are proposed, the government shall be given unlimited rights for all business rules (tailoring and application methods and procedures) and documented business processes developed for use in TO development. Government data rights shall extend to the common source database, transformation style sheets, and other tools or products used to author or display NGS technical data.
9. Classification, Distribution, Destruction, Disclosure, and Export Control Notices (T). The Offeror shall use the below statements for each TO developed.
DISCLOSURE NOTICE - This information is furnished upon the condition that it will not be released to another nation without the specific authority of the Department of the Air Force of the United States, that it will be used for military purposes only, that individual or corporate rights originating in the information, whether patented or not, will be respected, that the recipient will report promptly to the United States, any known or suspected compromise, and that the information will be provided substantially the same degree of security afforded it by the Department of Defense of the United States.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .