DRAFT RFP for BAT Systems dated 14 Apr 16

View the file

Other files for this federal contract opportunity

Other files attached to Bomber Armament Tester (BAT), newest first.
File Type Posted
Updated_BAT_NEWS_dated_4_May_16.pdf PDF
DD_Form_2345 _Militarily_Critical_Technical_Data_Agreement.pdf PDF
AFGSC_Industry-Day_Brief-18Feb15.pdf PDF
Bomber_Armament_Tester_Bidder's_Library-Notice_to_Industry.pdf PDF
BAT_Pre-Proposal_Teleconference_Slides.pdf PDF
Updated_BAT_NEWS_dated_21_Apr_16.pdf PDF
Updated_BAT_NEWS_dated_19_Apr_16_(2).pdf PDF
Updated_BAT_NEWS_dated_18_Apr_16.pdf PDF
Updated_BAT_NEWS_dated_15_Apr_16.pdf PDF
Atch_16_Contract_Data_Requirements_List_B00U-B018.pdf PDF
Atch_18_Contract_Data_Requirements_List_C001-C008.pdf PDF
Atch_1_Cross_Reference_Martix.pdf PDF
Atch_22_SGFP_BAT_GFP_Form.pdf PDF
Atch_3_Past_Performance_Information_for_Offerors.pdf PDF
DRAFT_BAT_Section_M.pdf PDF
Atch_21_RGFP_BAT_GFP_Form.pdf PDF
Atch_15_Contract_Data_Requirements_List_A001-A00G.pdf PDF
Atch_19_CDRL_General_Notes.pdf PDF
DRAFT_BAT_Section_L.pdf PDF
Atch_6_Transmittal_Letter.pdf PDF
Atch_4_Client_Authorization_Letter.pdf PDF
Atch_26_AFMC_260.pdf PDF
Atch_11_Total_Resources_Volume_WBS_Breakdown.xlsx XLSX spreadsheet
Atch_2_Electronic_Format_for_All_Proposal_Volumes.pdf PDF
Responses_to_Draft_RFP_Questions.pdf PDF
Atch_17_Contract_Data_Requirements_List_B001-B00T.pdf PDF
Atch_24_AFMC_807.pdf PDF
Updated_BAT_NEWS_dated_14_Apr_16.pdf PDF
Atch_7_Past_Performance_Questionnaire.pdf PDF
Atch_14_Performance_Specification_Rev9.pdf PDF
Atch_5_Consent_Form.pdf PDF
Atch_20_TMCR_for_Bomber_Armament_Test_Set.pdf PDF
RFP_Incentive_Language.pdf PDF
Updated_BAT_NEWS_dated_22Mar16.pdf PDF
Updated_BAT_NEWS_dated_21Mar16.pdf PDF
Updated_BAT_NEWS_dated_17Mar16.pdf PDF
Contractor_Briefing_of_BAT_Incentives.pdf PDF
Contract_Data_Requirements_List_C_Portfolio.pdf PDF
Contract_Data_Requirements_List_A_Portfolio.pdf PDF
DRAFT_BAT_Performance_Specification _dated_8_Mar__16 _Rev_9.pdf PDF
DRFP_BAT_CDRLs_26_Jan_16.pdf PDF
Bomber_Armament_Tester_Bidder's_Library-Notice_to_Industry.pdf PDF
DRAFT_BAT_Section_L_-_As_of_5_Feb_16.pdf PDF
DRAFT_BAT_Performance_Specification _dated_26_Jan_16 _Rev_8.pdf PDF
DRAFT_FA8533-16-R-0001.pdf PDF
DRAFT_BAT_Statement_of_Work dated_21_Jan_16 _Rev_5.pdf PDF
Questions_and_Responses_ao_Jan_4_16.pptx PPTX presentation
DRAFT_BAT_APPENDIX_C_as_of_30_Oct_15.pdf PDF
Updated_BAT_NEWS_dated_5_Feb_16.pdf PDF
DRAFT_BAT_Section_M_-_As_of_5_Feb_16.pdf PDF
Show all 50

Bomber Armament Tester (BAT) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD FORM 1447 (2/2012)

Prescribed by GSA FAR (48 CFR) 53.215-1(d)

4. SOLICITATION NUMBER

FA8533-16-R-0001

X

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS CODE: 334515

8(A) SIZE STANDARD: 750

DATE SIGNED

28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ROUTINE

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 240 days.

NOTE: THIS IS A DRAFT SOLICITATION FOR YOUR INFORMATION ONLY. THE GOVERNMENT IS NOT REQUESTING

PROPOSALS BE SUBMITTED AT THIS TIME.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) ( ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *240

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

FA8533

2. CONTRACT NO.

CHECK IF REMITTANCE IS DIFFERENT

AND PUT SUCH ADDRESS IN OFFER

17.

ITEM NO.

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:B

NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER

24. AWARD AMOUNT (FOR GOVT USE ONLY)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAY DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)

SUPPLIES SERVICES Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals

9.

Offers will be received at the issuing office until the date and time specified below. All official United States Postal Service mail and classified material will be delivered to the address shown in block 7. Deliver all parcels to: 542 CBSG, ATTN: Buyer named above, 295 BYRON ST, BLDG 300

WW SOUTH END, BAY D DOOR 27A, ROBINS AFB GA 31098-1670.

-- 4:00PM

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

SUPPORT EQPT - MAJOR PROGRAMS, AFLCMC/WNKBBB

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 222 1902

ROBINS AFB GA 31098-1670

BUYER: Philip E. Earthly/WNKABB Philip.Earthly.1@robins.af.mil Phone: (478) 222- 7344 Fax: (478) 926-6578 No Collect Calls

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

J

SF 1447 (rev 2/2012) BACK

NO RESPONSE FOR THE REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

CANNOT COMPLY WITH SPECIFICATIONS

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

FOLD

FOLD

SOLICITATION NO. FA853316R0001

DUE: 4:00 PM

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Philip E Earthly/WNKABB

SUPPORT EQPT - MAJOR PROGRAMS, AFLCMC/WNKBBB

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 222 1902

ROBINS AFB GA 31098-1670

Request for Proposal FA8533-16-R-0001

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

A) OVERVIEW: The United States Air Force Automatic Test Systems and Support Equipment and Vehicles Contracting Branch (AFLCMC/WNKA), Warner Robins Air Logistics Complex, Georgia provides this Bomber Armament Tester (BAT) DRAFT Request for Proposal (DRFP) for the intended purpose of providing information and obtaining industry review, comment, and feedback, in conjunction with DRAFT Statement of Work (SOW) and DRAFT Performance Specification acquisition documents dated 14 Apr 2016, Rev 7, and 8 Mar 2016, Rev 9, respectively. Any information, comments, and responses submitted by respondent(s) is voluntary. The Government will not enter into any contractual agreement or commitment, either formally or informally, based upon this DRFP; nor will the Government reimburse any sources or responder.

B) BAT SYSTEM: A "BAT System" is defined as consisting of the Common Core Tester and all supporting Units Under Test (UUTs) Test Program Sets (TPSs) required to support respective B-2A, B-1B, and B-52H weapon systems. The Common Core Tester includes all hardware, operating system software, firmware, test executive software, power-on confidence test TPS, user-selectable self-test TPS, and a calibration TPS. The Common Core Tester configuration baseline will be used on all three weapon system platforms. A UUT TPS includes all cables, Interface Test Adapters (ITAs), software, and technical documentation required to test a UUT.

C) BAT PROGRAM STRUCTURE: The structure of the BAT Program will consist of three weapon system increments.

Each increment will include Engineering and Manufacturing Development (EMD), Production, and Interim Contractor Support (ICS).

Increment I: EMD will include design, development, integration, and testing of production representative articles of the BAT Core Tester (common to all platforms), all B-2A TPSs, the Multi-Purpose Rotary Launcher (MPRL) TPS for B-1B, and the SUU-67 Pylon Wing Disconnects TPS for B-52H. Production will be for the Common Core Tester and all of the B-2A weapon system TPSs. ICS will be for provided in conjunction with production of the Common Core Tester and all of the B-2A weapon system TPSs.

Increment II: EMD will include design, development, integration, and testing of the remaining B-1B weapon system TPSs and incorporation of the MPRL TPS. Production will be for the Common Core Tester and all of the B-1B weapon system TPSs. ICS will be for provided in conjunction with production of the Common Core Tester and all of the B-1B weapon system TPSs.

Increment III: EMD will include design, development, integration, and testing of the remaining B-52H weapon system TPSs and incorporation of the SUU-67 TPS. Production will be for the Common Core Tester and all of the B-52H weapon system TPSs. ICS will be for provided in conjunction with production of the Common Core Tester and all of the B-52H weapon system TPSs.

D) NATIONAL STOCK NUMBER (NSN): The number used is generic and for solicitation purposes only. An asset-specific NSN will be assigned subsequent to contract award. The Offeror shall identify the part number it intends to utilize for the Core Tester and each UUT TPS.

E) EMD INCENTIVE STRUCTURE: Structure and management of the EMD incentives will be as follows: The EMD incentives will be based on an overall proposed Target Fee (TF) of 9% which will be multiplied against the proposed EMD Target Cost (TC). The TF is then split into two different incentive pools—one for performance/schedule and the other for cost. The performance/schedule incentive is assigned 65% of the proposed TF and the cost incentive is assigned the remaining 35%.

In EMD Increment I, the percentage assigned to performance/schedule is further divided as follows: 20% may be earned at CDR, 30% at SVR, and 50% at PRR (see CLINs 0003AA - 0003AC). In EMD Increments II and III, SVR is not incentivized. Therefore, the percentages assigned are 30% at CDR and 70% at PRR (see CLINs 1003AA - 1003AB and 2003AA - 2003AB).

The performance/schedule incentives become firm-fixed price amounts upon contract award and are not subject to further adjustment, with the exception that they could be reduced to either 50% or 0%, as shown in Figure 1. The cost incentive portion of the TF will be subject to the conditions set forth in FAR Clause 52.216-10.

NOTE 1 (Target Fee): The total amount of the Target Fee for CLINs 0001, 1001, and 2001, when added to their corresponding performance/schedule incentive CLINs (i.e., 0003AA, 0003AB, and 0003AC, when added to the fee on CLIN 0001; 1003AA and 1003AC, when added to the fee on CLIN 1001, etc.), must equate to 9% of the Target Cost of CLINs 0001, 1001, and 2001, respectively.

NOTE 2 (CDR and SVR): Any contractor delay in the accomplishment of a required Entrance Criteria action prior to the Scheduled Event Date or a delay in the accomplishment of the Event itself on the date established in the contract will be reduced from the 30-calendar day post-event Exit Criteria accomplishment window on a day-for-day basis. The 30-day windows for completion of Exit Criteria actions will not be increased if an event should be accomplished prior to its scheduled date. Each 30-calendar day post-event window includes a 7-calendar day period for government review/approval of Exit Criteria submittals for each action item.

NOTE 3 (PRR Only): Any contractor delay in the accomplishment of a required PRR Entrance Criteria action prior to the Scheduled PRR Event Date, or a delay in the accomplishment of the PRR Event itself on the date established in the contract, will be reduced from the 30-calendar day post-PRR event Exit Criteria accomplishment window on a day-for-day basis. The 30-day window for completion of PRR Exit Criteria actions will not be increased if the PRR event should be accomplished prior to its scheduled date. The 30-calendar day post-event window includes a 7-calendar day period for government review/approval of Exit Criteria for each action item submitted.

In the event the PRR and required Exit Criteria are not accomplished within the 100% payment Incentive Window, the PRR completion schedule will be contractually re-baselined. If the PRR Exit Criteria are then successfully completed within the re-baselined schedule, the Contractor will earn 50% of the PRR incentive. If PRR Exit Criteria are still not completed within the re-baselined schedule, the PRR incentive will be reduced to 0%. The PRR schedule can be re-baselined only once in each EMD increment.

INCREMENT I

Engineering and Manufacturing Development Item No.

Cost Plus Incentive Fee Quantity U/I Est Target Cost Target Fee Total Estimated Cost

1 LO

Engineering and Manufacturing Development The Contractor shall design, develop, integrate, and test a common BAT Core Tester capable of testing all UUT TPSs listed in Appendix A of the SOW. During this increment, the Contractor shall also design, develop, integrate, and test all B-2A TPSs, the SUU-67 Pylon Wing Disconnects TPS for the B-52H, and the MPRL TPS for the B-1B.

Ref: SOW Paragraph 4.1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: 2-in-1 Invoice Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

AS9100 9100 27OCT2015 PD15WNAEBAT

Applicability: None ;

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

1 LO *27 Months

Proposed Period of Performance

1 LO

Contract Data Requirements Lists (CDRLs)

Data Item No.

Not Separately Priced Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

CDRLs A001, A002, A003, A004, A005, A006, A007, A008, A009, A00A, A00B, A00C, A00D, A00E, B001, B002, B003, B004, B005, B006, B007, B008, B009, B010, B011, B012, B013, B014, B015, B016, B017, B018, B00A, B00B, B00C, B00D, B00E, B00F, B00G, B00H, B00J, B00K, B00L, B00M, B00N, B00P, B00Q, B00R, B00S, B00T, B00U, B00V, B00W, B00X, B00Y, B00Z, C001, C002, C003, C004, C005, C006, C007, and C008.

Limitations of Liability: Other Than High Value Item

Contract Data Requirements Lists (CDRLs)

Data

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD Form 1423 Exhibit: A Quality Assurance: IAW DD Form 1423

INCREMENT I - EMD

Performance/Schedule Incentive Item No.

Schedule Incentive Fees The Contractor has the opportunity to earn schedule incentives at CDR, SVR, and PRR if the performance reviews are satisfactorily completed within the allotted timeframe. The system reviews must be scheduled and completed, with all action items closed and approved within 30 calendar days, to earn the full incentive amounts.

Applicability: None ;

INCREMENT I - EMD

Performance/Schedule Incentive Item No.

0003AA

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

CDR Schedule Incentive

INCREMENT I - EMD

Performance/Schedule Incentive Item No.

0003AB

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

SVR Schedule Incentive

INCREMENT I - EMD

Performance/Schedule Incentive Item No.

0003AC

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

PRR Schedule Incentive

B-2A WEAPON SYSTEM PRODUCTION

Option I - Production of BAT Systems - Common Core Testers and B-2A UUT TPSs

All supporting UUT TPSs shall be shipped together and delivered with a Common Core Tester as one 'BAT System'.

However, the Core Tester and UUT TPSs shall be signed for and accepted individually via their own separate DD Forms 250 when accepted by the Government.

Production of the Common Core Testers and UUT TPSs will be initiated as an Option at the discretion of the Government within 60 days after successful completion and documentation of PRR. An option is determined to have been exercised at the time the Government provides written notification to the Contractor. Interim Contractor Support shall be included with Production when Option 1 is exercised.

INCREMENT I

Production I (B-2A) Item No.

NSN: 4920-01-649-0428 KV

Production of BAT Systems (Core Testers and UUT TPSs) The Contractor shall manufacture and deliver BAT Systems for the B-2A IAW SOW Paragraphs 4.2.1 and 4.2.3

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

AS9100 9100

Physical Item Markings:

INCREMENT I

Production (B-2A) BAT Systems Item No.

0004AA

Incentive Successive Targets Quantity U/I Target Cost Target Profit % Target Price

10 EA

NSN: 4920-01-649-0428 KV

INCREMENT I

Production (B-2A) BAT Systems Production I The Contractor shall manufacture and deliver BAT Systems for the B-2A IAW SOW Paragraphs 4.2.1 and 4.2.3 IUID Required: Yes Physical Item Markings:

Type / Ship To PACRN Mark For

PAA

Type / Ship To Quantity (U/I) *ARO Approval of

First Article _ Req No / Pri

Required Delivery

10 EA *12 Months

Proposed Delivery

10 EA

INCREMENT I

Production (B-2A) BAT Systems Item No.

0004AB

Incentive Successive Targets Quantity U/I Target Cost Target Profit % Target Price

9 EA

NSN: 4920-01-649-0428 KV

Production I The Contractor shall manufacture and deliver BAT Systems for the B-2A IAW SOW Paragraphs 4.2.1 and 4.2.3 IUID Required: Yes Physical Item Markings:

Type / Ship To PACRN Mark For

PAA

Type / Ship To Quantity (U/I) *ARO Approval of

First Article _ Req No / Pri

Required Delivery

9 EA *24 Months

Proposed Delivery

9 EA

Contract Data Requirements Lists (CDRLs)

Data Item No.

Not Separately Priced Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

CDRLs

Contract Data Requirements Lists (CDRLs)

Data A001, A002, A003, A004, A005, A006, A007, A008, A009, A00A, A00B, A00C, A00D, A00E, B001, B002, B008, B009, B010, B011, B012, B013, B014, B016, B017, B00A, B00D, B00E, B00F, B00G, B00H, B00J, B00K, B00Q, B00R, B00S, B00T, B00X, B00Y, C001, C002, C003, C004, C005, C007, and C008.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD Form 1423 Exhibit: A Quality Assurance: IAW DD Form 1423

INCREMENT I

Provisioning (As Ordered) Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Provisioning for B-2A BAT Systems (As Ordered) IUID Required: Yes Buy American Act/Balance of Payments Program Physical Item Markings:

INCREMENT I

B-2A Weapon System Platform Familiarization Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

BAT System Familiarization Provided one (1) time at each location upon first production delivery.

Ref: SOW Paragraphs 3.9.4 and 4.1.7 IUID Required: No

Increment II - Option II: (Start of EMD II) The Government will not exercise Option II until the Increment I PRR has been successfully documented and completed. An option is determined to have been exercised at the time the Government provides written notification to the Contractor.

INCREMENT II

Engineering and Manufacturing Development Item No.

INCREMENT II

Engineering and Manufacturing Development Cost Plus Incentive Fee Quantity U/I Est Target Cost Target Fee Total Estimated Cost

1 LO

Engineering and Manufacturing Development The Contractor shall design, develop, integrate, and test all B-1B TPSs listed in Appendix A of the SOW, including incorporation of the MPRL TPS developed in Increment I.

Ref: SOW Paragraph 5.1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: 2-in-1 Invoice Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Place of Perf Quantity (U/I) *ARO Exercise of option

_ Req No / Pri

Required Period of Performance

1 LO *15 Months

Proposed Period of Performance

1 LO

Contract Data Requirements Lists (CDRLs)

Data Item No.

Not Separately Priced Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

CDRLs A001, A002, A003, A004, A005, A006, A007, A008, A009, A00A, A00B, A00C, A00D, A00E, B001, B002, B003, B004, B005, B006, B007, B008, B009, B010, B011, B012, B013, B014, B015, B016, B017, B018, B00A, B00B, B00C, B00D, B00E, B00F, B00G, B00H, B00J, B00K, B00L, B00M, B00N, B00P, B00Q, B00R, B00S, B00T, B00U, B00V, B00W, B00X, B00Y, B00Z, C001, C002, C003, C004, C005, C006, C007, and C008.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD Form 1423

Contract Data Requirements Lists (CDRLs)

Data Exhibit: A Quality Assurance: IAW DD Form 1423

INCREMENT II - EMD

Performance/Schedule Incentive Item No.

Schedule Incentive Fees The Contractor has the opportunity to earn schedule incentives at CDR and PRR if the performance reviews are satisfactorily completed within the allotted timeframe. The system reviews must be scheduled and completed, with all action items closed and approved within 30 calendar days, to earn the full incentive amounts.

Applicability: None ;

INCREMENT II - EMD

Performance/Schedule Incentive Item No.

1003AA

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

CDR Schedule Incentive

INCREMENT II - EMD

Performance/Schedule Incentive Item No.

1003AB

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

PRR Schedule Incentive

B-1B WEAPON SYSTEM PRODUCTION

Option III - Production of BAT Systems - Common Core Testers and B-1B UUT TPSs

All supporting UUT TPSs shall be shipped together and delivered with a Common Core Tester as one 'BAT System'.

However, the Core Tester and UUT TPSs shall be signed for and accepted individually via their own separate DD Forms 250 when accepted by the Government.

Production of Common Core Testers and B-1B UUT TPSs in Increment II will be initiated as an Option at the discretion of the Government within 60 days after successful documentation and completion of PRR. An option is determined to have been exercised at the time the Government provides written notification to the Contractor.

Interim Contractor Support shall be included with Production when Option III is exercised.

INCREMENT II

Production (B-1B) Item No.

NSN: 4920-01-649-0428 KV

Production II The Contractor shall manufacture and deliver BAT Systems for the B-1B IAW SOW Paragraphs 5.2.1 and 5.2.3

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:

INCREMENT II

Production (B-1B) BAT Systems Item No.

1004AA

Incentive Successive Targets Quantity U/I Target Cost Target Profit % Target Price

17 EA

NSN: 4920-01-649-0428 KV

Production II The Contractor shall manufacture and deliver BAT Systems for the B-1B IAW SOW Paragraphs 5.2.1 and 5.2.3 IUID Required: Yes Physical Item Markings:

Type / Ship To PACRN Mark For

PAA

Type / Ship To Quantity (U/I) *ARO Approval of

First Article _ Req No / Pri

Required Delivery

17 EA *12 Months

Proposed Delivery

17 EA

INCREMENT II

Production (B-1B) BAT Systems Item No.

1004AB

Incentive Successive Targets Quantity U/I Target Cost Target Profit % Target Price

16 EA

NSN: 4920-01-649-0428 KV

Production II The Contractor shall manufacture and deliver BAT Systems for the B-1B IAW SOW Paragraphs 5.2.1 and 5.2.3 IUID Required: Yes Physical Item Markings:

Type / Ship To PACRN Mark For

PAA

Type / Ship To Quantity (U/I) *ARO Approval of

First Article _ Req No / Pri

Required Delivery

16 EA *24 Months

Proposed Delivery

16 EA

Contract Data Requirements Lists (CDRLs)

Data Item No.

Not Separately Priced Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

CDRLs A001, A002, A003, A004, A005, A006, A007, A008, A009, A00A, A00B, A00C, A00D, A00E, B001, B002, B008, B009, B010, B011, B012, B013, B014, B016, B017, B00A, B00D, B00E, B00F, B00G, B00H, B00J, B00K, B00Q, B00R, B00S, B00T, B00X, B00Y, C001, C002, C003, C004, C005, C007, and C008.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD Form 1423 Exhibit: A Quality Assurance: IAW DD Form 1423

INCREMENT II

Provisioning (As Ordered) Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

INCREMENT II

Provisioning (As Ordered) Provisioning for B-1B BAT Systems (As Ordered) IUID Required: Yes Buy American Act/Balance of Payments Program Physical Item Markings:

INCREMENT II

B-1B Weapon System Platform Familiarization Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

BAT System Familiarization Provided one (1) time at each location upon first production delivery.

Ref: SOW Paragraphs 3.9.4 and 4.1.7 IUID Required: No

Increment III - Option IV: (Start of EMD III) The Government will not exercise Option IV until the Increment II PRR has been successfully documented and completed. An option is determined to have been exercised at the time the Government provides written notification to the Contractor.

INCREMENT III

Engineering and Manufacturing Development Item No.

Cost Plus Incentive Fee Quantity U/I Est Target Cost Target Fee Total Estimated Cost

1 LO

Engineering and Manufacturing Development The Contractor shall design, develop, integrate, and test a common BAT Core Tester capable of testing all B-52H UUT TPSs listed in Appendix A of the SOW, including incorporation of the SUU-67 Pylon Wing Disconnects TPS developed in Increment I.

Ref: SOW Paragraph 6.1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: 2-in-1 Invoice Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Place of Perf Quantity (U/I) *ARO Exercise of option

_ Req No / Pri

INCREMENT III

Engineering and Manufacturing Development Required Period of Performance

1 LO *15 Months

Proposed Period of Performance

1 LO

Contract Data Requirements Lists (CDRLs)

Data Item No.

Not Separately Priced Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

CDRLs A001, A002, A003, A004, A005, A006, A007, A008, A009, A00A, A00B, A00C, A00D, A00E, B001, B002, B003, B004, B005, B006, B007, B008, B009, B010, B011, B012, B013, B014, B015, B016, B017, B018, B00A, B00B, B00C, B00D, B00E, B00F, B00G, B00H, B00J, B00K, B00L, B00M, B00N, B00P, B00Q, B00R, B00S, B00T, B00U, B00V, B00W, B00X, B00Y, B00Z, C001, C002, C003, C004, C005, C006, C007, and C008.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD Form 1423 Exhibit: A Quality Assurance: IAW DD Form 1423

INCREMENT III - EMD

Performance/Schedule Incentive Item No.

Schedule Incentive Fees The Contractor has the opportunity to earn schedule incentives at CDR and PRR if the performance reviews are satisfactorily completed within the allotted timeframe. The system reviews must be scheduled and completed, with all action items closed and approved within 30 calendar days, to earn the full incentive amounts.

Applicability: None ;

INCREMENT III - EMD

Performance/Schedule Incentive Item No.

2003AA

INCREMENT III - EMD

Performance/Schedule Incentive Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

CDR Schedule Incentive

INCREMENT III - EMD

Performance/Schedule Incentive Item No.

2003AB

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

PRR Schedule Incentive

B-52H WEAPON SYSTEM PRODUCTION

Option V - Production of BAT Systems - Common Core Testers and B-52H UUT TPSs

All supporting UUT TPSs shall be shipped together and delivered with a Common Core Tester as one 'BAT System'.

However, the Core Tester and UUT TPSs shall be signed for and accepted individually via their own separate DD Forms 250 when accepted by the Government.

Production of Common Core Testers and B-52H UUT TPSs in Increment III will be initiated as an Option at the discretion of the Government within 60 days after successful documentation and completion of PRR. An option is determined to have been exercised at the time the Government provides written notification to the Contractor.

Interim Contractor Support shall be included with Production when Option V is exercised.

INCREMENT III

Production III (B-52H) Item No.

NSN: 4920-01-649-0428 KV

Production III The Contractor shall manufacture and deliver BAT Systems for the B-52H IAW SOW Paragraphs 6.2.1 and 6.2.3

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required

INCREMENT III

Production III (B-52H) Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:

INCREMENT III

Production III (B-52H) BAT Systems Item No.

2004AA

Incentive Successive Targets Quantity U/I Target Cost Target Profit % Target Price

19 EA

NSN: 4920-01-649-0428 KV

Production III The Contractor shall manufacture and deliver BAT Systems for the B-52H IAW SOW Paragraphs 6.2.1 and 6.2.3 IUID Required: Yes Physical Item Markings:

Type / Ship To PACRN Mark For

PAA

Type / Ship To Quantity (U/I) *ARO Approval of

First Article _ Req No / Pri

Required Delivery

19 EA *12 Months

Proposed Delivery

19 EA

INCREMENT III

Production III (B-52H) BAT Systems Item No.

2004AB

Incentive Successive Targets Quantity U/I Target Cost Target Profit % Target Price

19 EA

NSN: 4920-01-649-0428 KV

Production III The Contractor shall manufacture and deliver BAT Systems for the B-52H IAW SOW Paragraphs 6.2.1 and 6.2.3 IUID Required: Yes Physical Item Markings:

Type / Ship To PACRN Mark For

PAA

Type / Ship To Quantity (U/I) *ARO Approval of

First Article _ Req No / Pri

Required Delivery

19 EA *24 Months

Proposed Delivery

INCREMENT III

Production III (B-52H) BAT Systems

19 EA

Contract Data Requirements Lists (CDRLs)

Data Item No.

Not Separately Priced Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

CDRLs A001, A002, A003, A004, A005, A006, A007, A008, A009, A00A, A00B, A00C, A00D, A00E, B001, B002, B008, B009, B010, B011, B012, B013, B014, B016, B017, B00A, B00D, B00E, B00F, B00G, B00H, B00J, B00K, B00Q, B00R, B00S, B00T, B00X, B00Y, C001, C002, C003, C004, C005, C007, and C008.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD Form 1423 Exhibit: A Quality Assurance: IAW DD Form 1423

INCREMENT III

Provisioning (As Ordered) Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Provisioning for B-52H BAT System (As Ordered) IUID Required: Yes Buy American Act/Balance of Payments Program Physical Item Markings:

INCREMENT III

B-52H Weapon System Platform Familiarization Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

BAT System Familiarization Provided one (1) time at each location upon first production delivery.

Ref: SOW Paragraphs 3.9.4 and 4.1.7 IUID Required: No

In order for the Government to initiate ICS coverage via an Option, the Contractor shall notify the Government PM and PCO 60 days prior to delivery of the first BAT System for that particular Increment. Notification for continued ICS coverage is required annually thereafter, 60 days prior to expiration of current coverage to ensure support is maintained, at the Government's discretion, for the duration of the contract.

ICS OPTIONS

Interim Contractor Support Item No.

Interim Contractor Support (ICS) The Contractor shall provide ICS beginning one year from the date of delivery of the first BAT System.

Ref: SOW Paragraph 7.0.

ICS OPTION I

Interim Contractor Support Item No.

3001AA

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

First Year of Interim Contractor Support (ICS) The Contractor shall provide 12 months of ICS Ref: SOW Paragraph 7.0.

ICS OPTION II

Interim Contractor Support Item No.

3001AB

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Second Year of Interim Contractor Support (ICS) The Contractor shall provide 12 months of ICS Ref: SOW Paragraph 7.0.

ICS OPTION III

Interim Contractor Support Item No.

3001AC

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Third Year of Interim Contractor Support (ICS) The Contractor shall provide 12 months of ICS

ICS OPTION III

Interim Contractor Support Ref: SOW Paragraph 7.0.

ICS OPTION IV

Interim Contractor Support Item No.

3001AD

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Fifth Year of Interim Contractor Support (ICS) The Contractor shall provide 12 months of ICS Ref: SOW Paragraph 7.0.

ICS OPTION V

Interim Contractor Support Item No.

3001AE

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Sixth Year of Interim Contractor Support (ICS) The Contractor shall provide 12 months of ICS Ref: SOW Paragraph 7.0.

ICS OPTION VI

Interim Contractor Support Item No.

3001AF

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Sixth Year of Interim Contractor Support (ICS) The Contractor shall provide 12 months of ICS Ref: SOW Paragraph 7.0.

Over and Above Repairs Item No.

To be Determined Quantity U/I Unit Price Amount 1 LO To be Negotiated To be Negotiated

Over and Above Repair The Contractor shall cover repairs of non-warranty BAT System components IAW SOW Paragraph 8.0.

Engineering and Contract Change Proposals Item No.

To be Determined Quantity U/I Unit Price Amount 1 LO To be Negotiated To be Negotiated

Engineering or Contract Change Proposals / Notices of Revision IAW SOW Paragraph 3.9.6.3

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: + IAW1423

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: + TBC

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

E-1D

52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)

(IAW FAR 46.302)

E-2

52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE -- ALTERNATE I (JUL 1985)

(IAW FAR 46.302)

E-4

52.246-3 INSPECTION OF SUPPLIES--COST-REIMBURSEMENT (MAY 2001)

(IAW FAR 46.303)

E-5

52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

(IAW FAR 46.304)

E-6

52.246-5 INSPECTION OF SERVICES--COST-REIMBURSEMENT (APR 1984)

(IAW FAR 46.305)

E-11

52.246-8 INSPECTION OF RESEARCH AND DEVELOPMENT--COST-REIMBURSEMENT

(MAY 2001)

(IAW FAR 46.308)

E-13

52.246-9 INSPECTION OF RESEARCH AND DEVELOPMENT (SHORT FORM) (APR 1984)

(IAW FAR 46.309)

E-15

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(IAW FAR 46.311, DFARS 246.202-4(1))

(a) The Contractor shall comply with the higher-level quality standard(s) listed below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]*

Title Number Date Tailoring *See Individual Line Item Schedule

ANSI STD NOTE: Inspection and Acceptance for Production Representative Articles (PRAs) will be source/destination. DCMA will inspect the PRAs at the contractor facility. After approval, the PRAs will become Contract Aquired Property.

E-22

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(IAW FAR 46.316)

E-240

252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)

(IAW DFARS 246.370)

E-42

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503) Government Contract Quality Assurance Inspection and Acceptance will be at (Final):

[CONTRACTOR FILL-IN]

Item No(s): See schedule for items with the following code(s) listed below :

Inspection Code and Address:

Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).

Item No(s): 0002, 0005, 1002, 1005, 2002, 2005

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

F-1

52.211-8 TIME OF DELIVERY (JUN 1997)

(IAW FAR 11.404(a)(2)) DELIVERY FOR EACH ITEM IS ANNOTATED IN THE SCHEDULE (PART I SECTION B) UNDER EACH LINE ITEM.

F-1E

52.211-8 TIME OF DELIVERY -- ALTERNATE III (APR 1984)

(IAW FAR 11.404(a)(2)) F-24

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

(IAW FAR 11.703(b)) F-26

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1)) F-27

52.242-15 STOP-WORK ORDER -- ALTERNATE I (APR 1984)

(IAW FAR 42.1305(b)(2))

F-29

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(IAW FAR 42.1305(c)) F-30

52.247-29 F.O.B. ORIGIN (FEB 2006)

(IAW FAR 47.303-1(c)) F-36

52.247-34 F.O.B. DESTINATION (NOV 1991)

(IAW FAR 47.303-6(c))

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

G-210

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

(Contracting Officer: Insert applicable document type(s).

Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC Issue By DoDAAC Admin DoDAAC Inspect By DoDAAC Ship To Code Ship From Code Mark For Code Service Approver (DoDAAC) Service Acceptor (DoDAAC) Accept at Other DoDAAC LPO DoDAAC DCAA Auditor DoDAAC Other DoDAAC(s) (*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g.

timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

(Contracting Officer: Insert applicable email addresses or “Not applicable.”)

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

IA-10

252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)

(IAW DFARS 201.602-70)

IB-300

5352.201-9101 OMBUDSMAN (NOV 2015)

(IAW AFFARS 5301.9103)

(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Kim McDonald at 478 222 -1088 , FAX 478 222 -1121 , email kimberly.mcdonald@us.af.mil . Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.

I-11

52.202-1 DEFINITIONS (NOV 2013)

(IAW FAR 2.201)

I-19

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

I-20

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

I-21

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

(IAW FAR 3.503-2)

I-22

52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

(IAW FAR 3.502-3)

I-23

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

I-25

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b)) I-25C

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(OCT 2010)

(IAW FAR 3.808(b))

I-25E

52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT 2015)

(IAW FAR 3.1004(a))

IA-21D

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

IA-22

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (DEC 2008)

(IAW DFARS 203.570-3)

IA-24D

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(SEP 2013)

(IAW DFARS 203.970)

IA-25D

252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (DEC 2012)

(IAW DFARS 203.1004(a), DFARS 212.301(f)(iii))

IA-26

252.203-7004 DISPLAY OF HOTLINE POSTERS (OCT 2015)

(IAW FAR 203.1004(b)(2)(ii))

(a) Definition. “United States,” as used in this clause, means the 50 States, the District of Columbia and outlying areas.

(b) Display of fraud hotline poster(s).

(1) The Contractor shall display prominently the DoD fraud hotline poster, prepared by the DoD Office of the Inspector General, in common work areas within business segments performing work in the United States under Department of Defense (DoD) contracts.

(2) If the contract is funded, in whole or in part, by Department of Homeland Security (DHS) disaster relief funds, the DHS fraud hotline poster shall be displayed in addition to the DoD fraud hotline poster. If a display of a DHS fraud hotline poster is required, the Contractor may obtain such poster from:

http://www.dodig.mil/hotline/hotline_posters.htm

(c) Display of combating trafficking in persons and whistleblower protection hotline posters. The Contractor shall display prominently the DoD Combating Trafficking in Persons and Whistleblower Protection hotline posters, prepared by the DoD Office of the Inspector General, in common work areas within business segments performing work under DoD contracts.

(d) (1) These DoD hotline posters may be obtained from: Defense Hotline, The Pentagon, Washington, DC 20301-1900, or are also available via the internet at http://www.dodig.mil/hotline/hotline_posters.htm .

(2) If a significant portion of the employee workforce does not speak English, then the posters are to be displayed in the foreign languages that a significant portion of the employees speak. Contact the DoD Inspector General at the address provided in paragraph (d)(1) of this clause if there is a requirement for employees to be notified of this clause and assistance with translation is required.

(3) Additionally, if the Contractor maintains a company Web site as a method of providing information to employees, the Contractor shall display an electronic version of these required posters at the Web site.

(e) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (e), in all subcontracts that exceed $5.5 million except when the subcontract Is for the acquisition of a commercial item.

(The above Clause/Provision has been modified.)

IA-29Z

252.203-7997 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN

INTERNAL CONFIDENTIALITY AGREEMENTS (DEVIATION 2016-O0003)

(OCT 2015)

(IAW DARS Tracking # 2016-O0003)

(a) The Contractor shall not require employees or subcontractors seeking to report fraud, waste, or abuse to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or contactors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.

(b) The Contractor shall notify employees that the prohibitions and restrictions of any internal confidentiality agreements covered by this clause are no longer in effect.

(c) The prohibition in paragraph (a) of this clause does not contravene requirements applicable to Standard Form 312, Form 4414, or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

(d) (1) Use of funds appropriated (or otherwise made available) by the Continuing Appropriations Act, 2016 (Pub. L. 114-53) or any other FY 2016 appropriations act that extends to FY 2016 funds the same prohibitions as contained in sections 743 of division E, title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) may be prohibited, if the Government determines that the Contractor is not in compliance with the provisions of this clause.

(2) The Government may seek any available remedies in the event the Contractor fails to perform in accordance with the terms and conditions of the contract as a result of Government action under this clause.

I-27

52.204-2 SECURITY REQUIREMENTS (AUG 1996)

(IAW FAR 4.404(a)) I-39

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)

(IAW FAR 4.303)

I-43

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (OCT 2015)

(IAW FAR 4.1403(a))

I-48E

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2015)

(IAW FAR 4.1804(c), FAR 12.301(d)) I-48F

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

IA-33

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

IA-37C

252.204-7009 LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY CONTRACTOR

REPORTED CYBER INCIDENT INFORMATION (DEC 2015)

(IAW DFARS 204.7304(b))

IA-39

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING (DEC 2015)

(IAW DFARS 204.7304(c))

IA-39H

252.204-7015 DISCLOSURE OF INFORMATION TO LITIGATION SUPPORT CONTRACTORS

(FEB 2014)

(IAW DFARS 204.7403(c), DFARS 212.301(f)(ix))

IA-40

252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS

(DEC 1991)

(IAW DFARS 205.470, DFARS 212.301(f)(x))

I-78

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

(OCT 2015)

(IAW FAR 9.409)

I-80

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (JUL 2013)

(IAW FAR 9.104-7(c))

IA-92

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM

(OCT 2015)

(IAW DFARS 209.409)

IB-307

5352.209-9000 ORGANIZATIONAL CONFLICT OF INTEREST (OCT 2010)

(IAW AFFARS 5309.507-2, Policy Memo 10-C-15)

IB-307E

5352.209-9000 ORGANIZATIONAL CONFLICT OF INTEREST--ALTERNATE III (OCT 2010)

(IAW AFFARS 5309.507-2(a)(3), Policy Memo 10-C-15)

IB-307F

5352.209-9000 ORGANIZATIONAL CONFLICT OF INTEREST--ALTERNATE IV (OCT 2010)

(IAW AFFARS 5309.5072(a)(5), Policy Memo 10-C-15) I-82

52.210-1 MARKET RESEARCH (APR 2011)

(IAW FAR 10.003)

I-83

52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

(IAW FAR 11.304)

I-102

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

(IAW FAR 11.604(b)) This is a rated order certified for national defense , emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).

IA-103

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)

(IAW DFARS 211.274-6(a)(1), DFARS 212.301(f)(xii))

(a) Definitions. As used in this clause—

“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid/equivalents.html .

“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at http://www.acq.osd.mil/dpap/pdi/uid/uii_types.html .

(c) Unique item identifier.

(1) The Contractor shall provide a unique item identifier for the following:

(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

See Schedule as Applicable

(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

*Items less than $5000, which require UID, will be specifically identified in the schedule.

See Schedule as Applicable

(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).

(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).

(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.

(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:

(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .

(2) Embedded items shall be reported by one of the following methods—

(i) Use of the embedded items capability in WAWF;

(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or

(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.

IA-118K

252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY (AUG 2012)

(IAW DFARS 211.274-6(b), DFARS 212.301(f)(iv)) I-128

52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)

(IAW FAR 15.209(b)(1)) I-129G

52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(IAW FAR 15.209(h), AFFARS 53.15.209(h)) I-137C

52.215-14 INTEGRITY OF UNIT PRICES (OCT 2010)

(IAW FAR 15.408(f)(1)) I-153

52.216-7 ALLOWABLE COST AND PAYMENT (JUN 2013)

(IAW FAR 16.307(a))

(a) Invoicing.

(3) The designated payment office will make interim payments for contract financing on the _30th day

I-157

52.216-10 INCENTIVE FEE (JUN 2011)

(IAW FAR 16.307(d))

(e) Fee payable.

(1) The fee payable under this contract shall be the target fee increased by * cents for every dollar that the total allowable cost is less than the target cost or decreased by ** cents for every dollar that the total allowable cost exceeds the target cost. In no event shall the fee be greater than *** _____ percent or less than **** percent of the target cost.

*Target Fee Increase **Target Fee Decrease ***Greater Than % ****Less Than % 80 20 11.00 .00

(Applicable when specifying cost-plus-incentive-fee pricing arrangement)

I-168

52.216-17 INCENTIVE PRICE REVISION--SUCCESSIVE TARGETS (OCT 1997)

(IAW FAR 16.406(b))

(a) The supplies or services identified in the Schedule as Items SEE SCHEDULE are subject to price revision in accordance with this clause; provided, that in no event shall the total final price of these items exceed the ceiling price of ____** dollars ($ ____***____). The prices of these items shown in the Schedule are the initial target prices, which include an initial target profit of ___****___ percent of the initial target cost.

**Ceiling Price (words) ***Ceiling Price (dollars) ****Target Profit % 105.45% of target price $ 10.00

(c)(1) Within ___*___ days after the end of the month in which the Contractor has completed ___**___ (see Note 1), the Contractor shall submit the following data:

*Days **Degree of Completion

(d)(2) The initial target profit shall be increased or decreased by ____*____ percent (see Note 2) of the difference between the total initial…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .