Atch_24_AFMC_807.pdf

PDF 84 KB Posted

Attached to
Bomber Armament Tester (BAT) Federal contract opportunity
Solicitation number
FA8533-16-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Attachment 24 - Form 807 (Quality Requirements)

View the file

Other files for this federal contract opportunity

Other files attached to Bomber Armament Tester (BAT), newest first.
File Type Posted
Updated_BAT_NEWS_dated_4_May_16.pdf PDF
DD_Form_2345 _Militarily_Critical_Technical_Data_Agreement.pdf PDF
AFGSC_Industry-Day_Brief-18Feb15.pdf PDF
Bomber_Armament_Tester_Bidder's_Library-Notice_to_Industry.pdf PDF
BAT_Pre-Proposal_Teleconference_Slides.pdf PDF
Updated_BAT_NEWS_dated_21_Apr_16.pdf PDF
Updated_BAT_NEWS_dated_19_Apr_16_(2).pdf PDF
Updated_BAT_NEWS_dated_18_Apr_16.pdf PDF
Updated_BAT_NEWS_dated_15_Apr_16.pdf PDF
Atch_19_CDRL_General_Notes.pdf PDF
DRAFT_BAT_Section_L.pdf PDF
Atch_6_Transmittal_Letter.pdf PDF
Atch_4_Client_Authorization_Letter.pdf PDF
Atch_26_AFMC_260.pdf PDF
Atch_16_Contract_Data_Requirements_List_B00U-B018.pdf PDF
Atch_18_Contract_Data_Requirements_List_C001-C008.pdf PDF
Atch_1_Cross_Reference_Martix.pdf PDF
Atch_22_SGFP_BAT_GFP_Form.pdf PDF
Atch_3_Past_Performance_Information_for_Offerors.pdf PDF
DRAFT_BAT_Section_M.pdf PDF
Atch_21_RGFP_BAT_GFP_Form.pdf PDF
Atch_15_Contract_Data_Requirements_List_A001-A00G.pdf PDF
Atch_11_Total_Resources_Volume_WBS_Breakdown.xlsx XLSX spreadsheet
Atch_2_Electronic_Format_for_All_Proposal_Volumes.pdf PDF
Responses_to_Draft_RFP_Questions.pdf PDF
Atch_17_Contract_Data_Requirements_List_B001-B00T.pdf PDF
Updated_BAT_NEWS_dated_14_Apr_16.pdf PDF
Atch_7_Past_Performance_Questionnaire.pdf PDF
Atch_14_Performance_Specification_Rev9.pdf PDF
Atch_5_Consent_Form.pdf PDF
Atch_20_TMCR_for_Bomber_Armament_Test_Set.pdf PDF
Atch_27_Form_158.pdf PDF
RFP_Incentive_Language.pdf PDF
Updated_BAT_NEWS_dated_22Mar16.pdf PDF
Updated_BAT_NEWS_dated_21Mar16.pdf PDF
Updated_BAT_NEWS_dated_17Mar16.pdf PDF
Contractor_Briefing_of_BAT_Incentives.pdf PDF
Contract_Data_Requirements_List_C_Portfolio.pdf PDF
Contract_Data_Requirements_List_A_Portfolio.pdf PDF
DRAFT_BAT_Performance_Specification _dated_8_Mar__16 _Rev_9.pdf PDF
DRAFT_BAT_Section_L_-_As_of_5_Feb_16.pdf PDF
DRAFT_BAT_Performance_Specification _dated_26_Jan_16 _Rev_8.pdf PDF
DRAFT_FA8533-16-R-0001.pdf PDF
DRAFT_BAT_Statement_of_Work dated_21_Jan_16 _Rev_5.pdf PDF
Questions_and_Responses_ao_Jan_4_16.pptx PPTX presentation
DRFP_BAT_CDRLs_26_Jan_16.pdf PDF
Bomber_Armament_Tester_Bidder's_Library-Notice_to_Industry.pdf PDF
DRAFT_BAT_APPENDIX_C_as_of_30_Oct_15.pdf PDF
Updated_BAT_NEWS_dated_5_Feb_16.pdf PDF
DRAFT_BAT_Section_M_-_As_of_5_Feb_16.pdf PDF
Show all 50

Bomber Armament Tester (BAT) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RECOMMENDED QUALITY ASSURANCE PROVISIONS

AND SPECIAL INSPECTION REQUIREMENTS

1. PR / MIPR NUMBER

2. NATIONAL STOCK NUMBER

4920016490428KV

3. POINT OF INSPECTION

SOURCE DESTINATION

X

SEE DFARS 246.402

4. POINT OF ACCEPTANCE

SOURCE DESTINATION

X

5. ITEM MANAGER / PHONE

Houser, Erika L / 478-222-0324

6. EQUIPMENT SPEC / PHONE

Blye, Ceasar / 478-222-2239

7. CONTRACT QUALITY REQUIREMENTS/SPECIAL INSPECTION REQUIREMENTS

CERTIFICATE OF CONFORMANCE

FAR 52.246-15

CONTRACT RESPONSIBILITY

FOR INSPECTION

FAR 52.246-1

STANDARD INSPECTION

FAR 52.246-2,-3,-4,-5 OR -6

AS APPLICABLE TO CONTRACT

X HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS

AS 9100

COMMERCIAL ITEM INSPECTION

FAR 52.212-4

OTHER (Describe in Block 8)

8. REMARKS

Ahlburn, Andy RNAME: 30 MAR 2016DATE:

PD15WNAEBAT and BAT SOW.

The PoI/PoA for Production Representative Articles will be source/destination. DCMA will inspect the Production Representative Articles at the contractor facility. The BAT Program personnel will accept the Production Representative Articles at the contractor facility once the items are delivered in place. After approval, all Production Representative Articles will become Contractor Acquired Property.

Production Articles will be source/destination.

Transportation and packaging will be FOB DESTINATION.

8a. OZONE DEPLETING SUBSTANCES (ODS)

X STATEMENT

"I HAVE REVIEWED THE REQUIREMENT, INCLUDING AVAILABLE TECHNICAL DOCUMENTATION, AND BELIEVE THAT IT DOES NOT REQUIRE THE CONTRACTOR USE CLASS I OZONE DEPLETING SUBSTANCES (ODS) IDENTIFIED IN AIR FORCE POLICY, NOR IS IT WRITTEN SO THAT IT CAN

ONLY BE MET BY THE USE OF A CLASS I ODS."

WAIVER (SEE AF FARS 5323)

NOTE: Quality provisions as annotated hereon will not be downgraded without Technical Authority coordination. The Technical Authority must be notified if award selection is made to a new source using Acquisition Method Code (AMC) 3, 4, or 5.

9. QUALITY PRE-AWARD SURVEY

YES X NEW SOURCE

PREVIOUS SOURCEX NO

AFMC PARTICIPATION

RECOMMENDED

10. CODES

A. I&A

B. CQR

G

11. SIGNATURE OF TECHNICAL AUTHORITY

Ahlburn, Andy R

ORGANIZATION / SYMBOL

AFLCMC / WNAEA

PHONE

478-222-2260 / 472-2260

DATE

30 MAR 2016

Page 1 of 1AFMC FORM 807, 20060111, V1 Version 6Generated by PRPS using Jasper Reports on 30 Mar 2016

File details come from the government source that posted it. Updated .