Questions_and_Responses_P2_8_Mar_2019.docx

DOCX document 14 KB Posted

Attached to
Small Munitions Trailers Federal contract opportunity
Solicitation number
FA8532-18-R-0003
Issued by
Department of the Air Force Materiel Command

About this file

This document contains questions and responses related to a federal contract opportunity for small munitions trailers. The contract opportunity is for a firm fixed price, indefinite delivery indefinite quantity contract over seven years to design, test, and produce two classifications of munitions handling trailers, the MHU-110V2 and MHU-141V2, in accordance with technical requirements. First article units will be required for each item, with a basic contract period of two years for ramp up and first article approval. The contract will be awarded by the Department of the Air Force Materiel Command utilizing tradeoff best value procedures. Anticipated award is August to September 2019. The document addresses CE certification requirements and timing for the trailer design.

Part 2 of 8 March 2019 Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Small Munitions Trailers, newest first.
File Type Posted
Questions_and_Answers_Industry_5_Apr_2019.docx DOCX document
01_Apr_2019_(UPDATED)_Industry_Questions_and_Answers.DOCX DOCX document
01_April_2019_Industry_Questions_and_Answers.docx DOCX document
18_MAR_2019_Industry_Questions_and_Answers.docx DOCX document
Questions_and_Responses_8_Mar_2019.docx DOCX document
FA853218R0003_______0001.pdf PDF
CDRL_ELIN_B003.pdf PDF
CDRL_ELIN_C004.pdf PDF
CDRL_ELIN_A002.pdf PDF
Attachment_4.docx DOCX document
CDRL_ELIN_C002.pdf PDF
CDRL_ELIN_A00L.pdf PDF
M-900.pdf PDF
Packaging_AFMC_158.pdf PDF
CDRL_ELIN_A001.pdf PDF
CDRL_ELIN_A00B.pdf PDF
CDRL_ELIN_A00T.pdf PDF
L-900.pdf PDF
CDRL_ELIN_A006.pdf PDF
Attachment_2.docx DOCX document
CDRL_ELIN_A00M.pdf PDF
Attachment_9.xlsx XLSX spreadsheet
CDRL_ELIN_C001.pdf PDF
FA853218R0003.pdf PDF
CDRL_ELIN_A00S.pdf PDF
CDRL_ELIN_D002.pdf PDF
CDRL_ELIN_A003.pdf PDF
CDRL_ELIN_A00K.pdf PDF
CDRL_ELIN_A00A.pdf PDF
CDRL_ELIN_C003.pdf PDF
CDRL_ELIN_D004.pdf PDF
CDRL_ELIN_C005.pdf PDF
Attachment_10.xlsx XLSX spreadsheet
Attachment_7.xlsx XLSX spreadsheet
CDRL_ELIN_A00P.pdf PDF
CDRL_ELIN_A007.pdf PDF
CDRL_ELIN_A00F.pdf PDF
CDRL_ELIN_B001.pdf PDF
CDRL_ELIN_A00R.pdf PDF
Trans_DD_1653.pdf PDF
CDRL_ELIN_B002.pdf PDF
Attachment_1.docx DOCX document
CDRL_ELIN_A008.pdf PDF
Attachment_3.docx DOCX document
CDRL_ELIN_A00C.pdf PDF
CDRL_ELIN_A00N.pdf PDF
AFHDBK_63-126.pdf PDF
Draft_Section_M_Small_Munition_Trailers.doc DOC document
Draft_Section_M_Small_Munition_Trailers_-_19_NOV_2018.doc DOC document
Draft_Section_L_Small_Munition_Trailers.doc DOC document
Show all 50

Small Munitions Trailers has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Part 2 - Questions and Responses – 8 March 2019

1. Question:

In regards to CE compliance, In order to meet the design and construction requirements stated in 3.3 of PD15WRWNZEA05 and 2016/C272/01 Official Journal of the European Union Appendix IV. Module G, at what stage of the design review must the offeror explicitly declare that the qualification design meets Conformite Europeenne requirements and produce a Certificate of Registration in order for the “CE” marking to be properly affixed? Are any subassemblies or parts explicitly excluded from CE conformance requirements?

Answer:

The offeror must meet the CE requirement prior to First Article approval. The first article will not be approved without CE certification. The trailer design process is not complete until approval of all first articles.

CE certification applies to the “End-Item” trailer only. The Government has levied no requirements in the PD or SOW for sub-components/assembles to be CE certified. Also, part of the solicitation is for the contractor to develop an Integrated Master Schedule (IMS) which will set the actual First Article Government Acceptance date, SOW paragraph 3.1.5.

The below PD and SOW excerpts point to CE certification as part of and due at First Article (FA) Acceptance:

In the Purchase Description PD15WRWNZEA05. Refer to 4.2, First Article Inspection, all requirements as described in 4.6. Refer to 4.6, Test Methods and 4.6.2 Certification, TABLE VIII. Required Certifications; 3.3 Design and Construction; Required Certification: “Contractor certification that the trailers are designed, constructed, and tested in accordance with the PD. Contractor certification that the production trailers shall be built and released to the same standards as the first article trailers. Contract Certification that the trailers have CE declaration of conformity.”

The Statement of Work (SOW) paragraph 3.5.1.3 states “Testing and verification shall be performed in accordance with Section 4.0 of PD. Paragraph 3.5.1.3.3 “Completed analysis, Certification, Inspection and Demonstrated results shall be presented with test data requirement. Paragraph 3.5.1.4 “First Article approval shall not be granted until satisfactory completion and Government approval of all testing and associated analysis and reporting.”

File details come from the government source that posted it. Updated .