USSF-SPOC Buckley 731 (28 Oct 22).docx
DOCX document 31 KB Posted
- Attached to
- Power Conditioning and Continuation Interfacing Equipment RFP Federal contract opportunity
- Solicitation number
- FA821723R5000
View the file
Other files for this federal contract opportunity
Show all 50
Power Conditioning and Continuation Interfacing Equipment RFP has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USSF/SPOC Uninterruptible Power Supply (UPS) Site Information Sheet
| 28 October 2022 |
| Buckley SFB, CO |
| Bldg. 731 |
1. POINTS OF CONTACT
| Primary: David Zubiate |
| Alternate: SSgt Eric Martineau |
| Govt. POC: Arthur Engelbrecht |
| DISA Node Site Coordinator |
| Title: Systems Control NCOIC |
| Director IT Support Flt |
| david.zubiate.2@spaceforce.mil |
| eric.martineau@spaceforce.mil |
| arthur.engelbrecht@spaceforce.mil |
| 720-847-5700 DSN: 847-5700 |
| 720-847-5706 DSN: 847-5706 |
| 720-847-2034 DSN 847-2034 |
SPOC POC: Mr. Aller Delarosa; DSN 692-2906; Comm. (719) 554-2906; Email: aller.delarosa.1@spaceforce.mil
Security Management Office (SMO) Code: BU1SFB4M6 Security Manager: SSgt Ruben D. Puebla, 720-847-5851
Installation/Restricted Area/Facility Access Requirements: Controlled area, Contact POC 1 or 2 for access
2. ORGANIZATION, MISSION, & LOCATION
Command and Organization: USSF; SPOC; SBD 2, Information Technology Flight
| UNCLASS Mission Supported by UPS: IT |
| UPS Room #: 1 |
| Street Address Where UPS is Located: 84 N Aspen Bldg 731 |
| Battery Rm #: 1 |
| Installation or City: Buckley AFS |
| State: CO |
| Zip: 80011 |
| DoDAAC: |
3. UPS MODULE
| Configuration: Single |
| Configuration (CTO) or Tag #: UNK |
| Manufacturer: Eaton |
| Series: 9155 |
| Model: 10 |
| kVA: 10 |
| kW: 9 |
| Input/output Voltage: 208/208 |
| System Load: UNK |
Serial Number/s: BG236FBB06
| Date Manufactured: Jun 2013 |
| Date Installed: Mar 2018? |
| Caps Upgrade: N/A |
4. INTEGRAL EQUIPMENT (i.e. Parallel Cabinet, Maintenance Bypass Cabinet, etc.)
| Manufacturer: Eaton |
| Type: MBP |
| Serial #: UNK |
| Remote Monitor Panel: No |
| Remote Emergency Power Off: Yes |
| Spare Parts Kit: No |
5. BATTERIES
Configuration: eight Strings; 16 jars per string; 128 jars total
| Manufacturer: Eaton |
| Series: 9155 |
| Model: PWHR1234W2FR |
| Watts/Cell: 34 |
| Type (Flooded/Sealed): Sealed |
| # Volts per Cell/Jar: 2 |
| DC Float: |
| #Strings /Unit: 8 |
| # Jars / String: 16 |
| #Cells/Jar: 6 |
| # Jars / Unit: 128 |
| Total jars /System: 128 |
| Date Code: 0522 |
| Date Installed: 27 Oct 22 |
| Installer: Pergravis |
| Warranty: 3 years |
| Battery Monitoring System: No |
| Spare Batteries: No |
6. PREVENTIVE MAINTENANCE
Modules, integral equipment, and sealed batteries are semi-annual (every 6 mos.); flooded batteries are quarterly (every 3 mos.)
7. ADDITIONAL DATA
Laptop Computer Permitted in UPS Room: Yes
Mobile Telephone Permitted in UPS Room: Yes
| Telephone in UPS Room: Yes 720-841-9931 |
| In Battery Room (if separate): No |