About this file

This document outlines requirements for three federal contract awardable tasks to provide uninterruptible power supply systems and associated equipment. The tasks involve replacing and upgrading aging UPS equipment at buildings located at Peterson Air Force Base and Schriever Air Force Base. Offerors are invited to submit design proposals for the tasks by responding to requirements documents that provide equipment and site details. The proposals must include load data, drawings, sequence of operations, and recommendations. The government will award a $3,000 contract for each design package submitted under CLIN 0001. Questions were answered clarifying scope details such as wiring diagrams, site access, and wage determinations. The response summarizes key requirements and terms for the federal contract awardable tasks.

View the file

Other files for this federal contract opportunity

Other files attached to PCCIE MAC III SOLICITATION, newest first.
File Type Posted
FA821720R5002_0006.pdf PDF
FA821720R5002_0005.pdf PDF
B401 - Basement Layout.pdf PDF
Attachment-1-Bldg-401-Rev-2.pdf PDF
GLEN0401A-FPFB.pdf PDF
FA821720R5002_______0003.pdf PDF
FINAL_Question_Answer_Gov Response.xlsx XLSX spreadsheet
11_Wage Determination_El Paso County_CO.pdf PDF
00_FA8217-20-R-5002-A00021.pdf PDF
09_Questions_Answers_Gov_Response.pdf PDF
03_Revised_SOO.pdf PDF
08_Revised_Exhibit_AB_CDRL_Combined.pdf PDF
02_Revised_Pricing_Workbook.xlsx XLSX spreadsheet
01_Revised_Awardable_Task_Requirements_Document.pdf PDF
04_Revised_SRD.pdf PDF
02_Pricing Workbook.xlsx XLSX spreadsheet
03_SOO.docx DOCX document
06_DD254_signed.pdf PDF
05_Awardable_Task_LPTA_Instructions_to_Offerors.pdf PDF
01 Awardable_Task_Requirements_Document.pdf PDF
07_CDRL_Cross_Reference_Matrix_MAC3.xlsx XLSX spreadsheet
08_Exhibit_AB_CDRL_Combined.pdf PDF
04_SRD.doc DOC document
00 FA8217-20-R-5002.pdf PDF
02_Pricing_Workbook.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# Reference Document Page/Para. # Question Response 1 01_Revised_Awardable_Task_Requireme nts_Document Bldg 1844 The one-line shows panel SWBB feeding all three existing UPS systems, and their bypasses. One CB feeds two UPS inputs, three feed each UPS bypass input, and the fifth CB feeds one UPS input. These existing CBs serving the UPS inputs are indicated as being replaced. Provide the manufacturer, model number, and interrupting rating of the existing 2,500A switchboard as well as the model number and interrupting rating for the five 3-phase, 800AF CBs, including the trip unit model data and current settings

A site walk was advertised on Beta.SAM for all public interested to all vendors to obtain all details for the awardabe task. Was conducted 11 Feb -13 Feb 2020. To assist in contractor proposal the Government has placed the option to obtain all pictures from awardable task upon request with details within Beta.SAM.

2 01_Revised_Awardable_Task_Requireme nts_Document

Bldg 1844 Provide photographs, as-built drawings, all trades, and equipment layouts, including installation locations in the building of electrical rooms/project location (UPS, battery banks, electrical panels, etc.). Current documents provided do not show equipment layout or locations.

All reference drawings and supplemental information for the awardable task has been provided upon request to interested vendors.

3 01_Revised_Awardable_Task_Requireme nts_Document

Bldg 1844 In order to respond to the Awardable task with accurate information, can the government provide accurate drawings and photographs of the location of the existing UPS output feeders pathways and physical locations of the UPS1A-OUTPUT-PANEL, UPS-OUTPUT-PANEL, MDP, and MSC 1?

All reference drawings and supplemental information for the awardable task has been provided upon request to interested vendors.

4 01_Revised_Awardable_Task_Requireme nts_Document

Bldg 1844 In order to accurately respond to the Awardable Task, is the assumption to utilize the elevator to move equipment in and out of the building? If not, what is the alternative rigging method to remove and deliver the equipment?

All reference drawings and supplemental information for the awardable task has been provided upon request to interested vendors.

5 01_Revised_Awardable_Task_Requireme nts_Document

Bldg 1844 What is the elevator location, weight limitations, dimensions, and door/opening size? A site walk was advertised on Beta.SAM for all public interested to all vendors to obtain all details for the awardabe task. Was conducted 11 Feb -13 Feb 2020. To assist in contractor proposal the Government has placed the option to obtain all pictures from awardable task upon request with details within Beta.SAM.

6 01_Revised_Awardable_Task_Requireme nts_Document

Bldg 1844, p.10 Define which rooms are secured or unsecured. Which walls/rooms need the dielectric break? None of the rooms are secured and no walls/rooms need dielectric break.

7 01_Revised_Awardable_Task_Requireme nts_Document

Bldg 1844 In order to accurately respond to the awardable task, provide a site plan showing dock location in relation to the building and the UPS rooms.

A site walk was advertised on Beta.SAM for all public interested to all vendors to obtain all details for the awardabe task. Was conducted 11 Feb -13 Feb 2020. To assist in contractor proposal the Government has placed the option to obtain all pictures from awardable task upon request with details within Beta.SAM.

8 01_Revised_Awardable_Task_Requireme nts_Document

Bldg 1844 In order to accurately respond to the awardable task, are there any Hazmat concerns and or selected demolition to execute the work?

Commercial practices dictate batteries are HAZMAT and demolition of old UPS should also include their removal IAW the Awardable Task attachment - Disposal of Ups, Battery Cabinet, Batteries, Anciallary Equipment, Panels section.

9 01_Revised_Awardable_Task_Requireme nts_Document

Bldg 1844 Provide the electrical loads data for SWBB, and all UPS systems, including UPS load history data, UPS input and output each phase load (kVA and kW), and power, current and voltage data for SWBB?

Load readings from phases and gear require Fluke meters operated by trained personnel.

Vendors were given the opportunity to perform these measuremenets on their own during the advertised site walk.

10 01_Revised_Awardable_Task_Requireme nts_Document

Bldg 1844 Provide the manufacturer, model number, and interrupting rating for the CB at SWBB and the MCB, if applicable, for UPS1A-OUTPUT-PANEL, UPS-OUTPUT-PANEL, MDP, and MSC 1.

A site walk was advertised on Beta.SAM for all public interested to all vendors to obtain all details for the awardabe task. Was conducted 11 Feb -13 Feb 2020. To assist in contractor proposal the Government has placed the option to obtain all pictures from awardable task upon request with details within Beta.SAM

11 01_Revised_Awardable_Task_Requireme nts_Document

Bldg 1844 Provide the UPS1B output distribution transformers nameplate details. Government response pending

12 01_Revised_Awardable_Task_Requireme nts_Document

Bldg 1844 Provide the location information of new EPO and REPOs install. Reference attachment 1 of solicitation for location of new EPO & REPOs.

13 01_Revised_Awardable_Task_Requireme nts_Document

Bldg. 1844, p.1, 4 There are three UPS’s shown on the related one-line. By the description on page 1 we are replacing these three UPS systems with two systems whose outputs each feed one side of an STS. Page 4 indicates that each UPS will feed a new output panel, Panels A and B, which pick up the four existing loads. Clarify if the design intent is a single STS with a single output feeding a single new panel that can serve all four loads.

The design details described are per vendor design as long as they meet the government requirements

14 01_Revised_Awardable_Task_Requireme nts_Document

Bldg 1844 The existing three UPS systems feed four panel via switches, taps, and directly. Those load side panels are 400A, 400A, 600A, and 1,200A. The direction set forth is to replace the existing approximately 550 kVA UPS systems on the output of effectively one 225-250 kVA UPS. Provide the current system load data in volts, amperes, and kilowatts to confirm the system reduction is safe.

A site walk was advertised on Beta.SAM for all public interested to all vendors to obtain all details for the awardabe task. Was conducted 11 Feb -13 Feb 2020. To assist in contractor proposal the Government has placed the option to obtain all pictures from awardable task upon request with details within Beta.SAM

15 01_Revised_Awardable_Task_Requireme

Bldg 1844 Provide the UPS normal operating configuration narrative or existing sequence of operations for all three units.

A site walk was advertised on Beta.SAM for all public interested to all vendors to obtain all details for the awardabe task. Was conducted 11 Feb -13 Feb 2020. To assist in contractor proposal the Government has placed the option to obtain all pictures from awardable task upon request with details within Beta.SAM

16 01_Revised_Awardable_Task_Requireme nts_Document

Bldg 1844 Web card and LAN card are listed as “no”. Confirm there is no existing communication, building management or automation system, or electrical power monitoring system related scope, including raceways, conductors, terminations, and system programming that require demolition or other activity.

There is no web card and LAN card required for BLDG 1844.

19 01_Revised_Awardable_Task_Requireme nts_Document

Bldg. 218 Provide photographs, as-built drawings, all trades, and equipment layouts, including installation locations in the building of electrical rooms/project location (UPS, battery banks, electrical panels, etc.). Current documents provided do not show equipment layout or locations.

A site walk was advertised on Beta.SAM for all public interested to all vendors to obtain all details for the awardabe task. Was conducted 11 Feb -13 Feb 2020. To assist in contractor proposal the Government has placed the option to obtain all pictures from awardable task upon request with details within Beta.SAM

20 01_Revised_Awardable_Task_Requireme nts_Document

Bldg. 218 Provide the electrical loads data for MDP and the UPS systems, including UPS load history data, UPS input and output each phase load (kVA and kW), and power, current and voltage data for MDP.

A site walk was advertised on Beta.SAM for all public interested to all vendors to obtain all details for the awardabe task. Was conducted 11 Feb -13 Feb 2020. To assist in contractor proposal the Government has placed the option to obtain all pictures from awardable task upon request with details within Beta.SAM

21 01_Revised_Awardable_Task_Requireme nts_Document

Bldg. 218 Do any environmental conditions exist, like asbestos, lead paint, or other hazardous materials? Government has not identified any abestos, lead paint, or other hazardous materials in any awardable task bldg for this requirement beyond the existing batteries.

22 01_Revised_Awardable_Task_Requireme nts_Document

Bldg. 218 Provide a site plan drawing indicating the location or delivery dock where new equipment/material will be shipped to and unloaded.

Site plan drawing for delivery dock are not available. Vehicle with lift gate is sufficient for delivery of equipment/material to be provided by contractor.

23 01_Revised_Awardable_Task_Requireme

Bldg. 218 What is the existing 30kVA UPS load? What is the manufacturer of the 60A CB located in the MDP serving the existing 30kVA UPS? What is the model number of the 60A CB located in the MDP serving the existing 30kVA UPS?

A site walk was advertised on Beta.SAM for all public interested to all vendors to obtain all details for the awardabe task. Was conducted 11 Feb -13 Feb 2020. To assist in contractor proposal the Government has placed the option to obtain all pictures from awardable task upon request with details within Beta.SAM

24 01_Revised_Awardable_Task_Requireme nts_Document

Bldg. 218 What is the distance from the existing service to the wall where the existing 30kVA UPS is located?

Provide pictures showing the left and right side of UPS for determining obstructions.

A site walk was advertised on Beta.SAM for all public interested to all vendors to obtain all details for the awardabe task. Was conducted 11 Feb -13 Feb 2020. To assist in contractor proposal the Government has placed the option to obtain all pictures from awardable task upon request with details within Beta.SAM

1 FOPR – Instructions to Offerors/Basis of Award

Entire document Is the government planning to provide an update the FOPR based on the May 21, 2020 Q&A changes to solicitation documents? If yes, please provide.

Government did not update reference document from original posting.

2 Solicitation 00_FA8217-20-R-5002-A00021 Subfactor 2, Design, paragraph 50, Table 3, UPS Categories, page 62

Does the government expect to receive the actual customer documents or an overview (synopsis) of the following?• Scope of Work• Description of Findings• Load Measurements• Calculations• Recommendations

• Restriction/Solution

• Existing and Proposed Drawings

• Site Specific Requirements

Government removed the page limitations for proposal submission. Proposals shall include details IAW Table 3, page 62 of solicitation.

3 Solicitation 00_FA8217-20-R-5002-A00021 Paragraph 31, Proposal Submission – address located in paragraph 2.7 of this document …

Please verify contact person and address for receipt of proposals.

AFLCMC/PZZKA

Attn: Wade Pilcher 6039 Wardleigh Road, Bldg. 1206 Hill AFB, UT 84056-5838 Verify building hours (and instructions, if applicable) for overnight receipt of proposals

Government confirms all information IAW solicitation proposal submissions. Bldg hours for delivery during daytime will be from 8am

- 3pm MST to receive on government side.

No further applicable instructions available.

4 01_Revised_Awardable_Task _Requirements_Document.pdf

Please provide the 2020/2021 wage determinations for Peterson AFB, CO and Schriever AFB, CO. The Wage Determinations for Peterson AFB and Schriever AFB, CO are provided now through the attachement Wage Determination_El Paso County_CO. Also, see new Department of Labar website for wages at https://wdolhome.sam.gov/.

1 Site Survey Walk, Schriever AFB, Bldg 401, 2/12/2020

Issue: During the site walk we asked for more time to create a sketch of the main electrical room. We were informed that the site had a drawing of this room and a copy would be provided. We never received this drawing.

Clarification: The SOW for this project indicates that (4) 500kVA transformers in the room need to be removed and replaced. This was not mentioned at the site walk and therefore we did not study how these transformers would have to be removed from their cabinet(s). Can PCCIE provide the referenced drawing?

Government response pending the response from Site for the requested drawing

2 Attachment 00 FA8217-A00021 Pg. 63 / Paragraph 61 Issue: Instructions state that each vendor is eligible to receive $3,000 on CLIN 0001. Clarification:

Please verify if this $3,000 is for all three design packages or is it for each project (i.e.

$9.000 total)?

The design packages for all three buildings will be eligible for a total delivery order award of $3000 for those offerors receiving the Basic Contract award. This amount meets the Minimum Award Amount at the top of Section B of the Model Contract and also is IAW the requirement outlined in FAR 52.216-3.

Attachment 02 Pricing Workbook / CLIN Structure Tab

Issue: Instructions indicate that all CLINs should have a grand total at the bottom of the proposal….

Comment: Please clarify that each CLIN Subtotal should be the addition of all three Awardable Task bids.

Each CLIN subtotal should be the additon of all three awardable task bids

1 Revised Awardable Task Requirements Document and PCCIE Responses to Questions.

Concerning the questions on the awardable task for Peterson Bldg. 1844. Based on the responses to the questions there seems to be a little confusion between the Requirement document and the responses. It’s understood that there is only one source for both UPS systems and that the site wants new breakers in their SWBB input switchboard. It’s understood that the two UPS systems are to be sort of an “A”/”B” setup where each UPS is separate from each other. It is understood that there will be a Critical Output Panel for “A” and a Critical Output Panel for “B” where “A” will feed all the critical loads and “B” will be for future loads. What is not clear is that there appears to be only one Static Switch that both UPS systems will feed and the output will feed the two new Critical Output Panels.

This would mean that one UPS system will never be used unless one UPS system is turned off so the static switch changes to the other system. It doesn’t make sense to have a UPS system in standby feeding a static switch, especially when both UPS system will be fed from the same source. It would make more sense if there was two STSW’s that could feed both output panels so that either UPS system could feed the other output panel but both UPS systems in a normal configuration would feed their respective STSW primary and feed their respective Critical Output Panel. Can PCCIE clarify that they only want one static switch and that it’s understood one UPS system will feed both critical output panels unless a UPS fails and it switches to the other UPS.

The government's intent is to install a traditional "A&B" system within the scope of this awardable task. It is understood that for a true "A&B" system, you need two separate utility feeds where this task only has one feed. Offeror shall design a system that will perform as a true "A&B" system begining at the input feed panel the output panels. The government's intent is a design in which either UPS can feed both panels as a "A&B" configuration.

2 Revised Awardable Task Requirements Document and PCCIE Responses to Questions.

Concerning the questions on the awardable task for Schriever AFB. Bldg. 401. The requirements document states KK and lights to know when it’s safe to transfer which is a manual operated tie system with manual breakers. The discussions during the site survey indicated the site wanted the similar system as they have currently. Which would indicate a motor operated breakers and a control panel that would indicate when it was safe to transfer and do it upon request from the user. The difference in KK and lights and the current system is significantly different. Can PCCIE confirm the site wants a manual operated tie configuration or one similar to what they have where it has motor operated breakers and touch screen controls.

The government's intent is to install an automatic tie system between the two UPS's. A manual tie system is unnaceptable.