This document outlines requirements for a federal contract solicitation seeking uninterruptible power supply equipment and associated items. The solicitation issued by the Department of the Air Force Materiel Command Lifecycle Management Center seeks commercially available online double conversion single or three-phase UPS systems and related equipment to provide power conditioning and continuation at unspecified sites worldwide. Questions regarding the solicitation are due by May 1, 2020 and proposals are due June 2, 2020. The solicitation will provide UPS and associated equipment for power needs at various facility locations.

View the file

Other files for this federal contract opportunity

Other files attached to PCCIE MAC III SOLICITATION, newest first.
File Type Posted
FA821720R5002_0006.pdf PDF
FA821720R5002_0005.pdf PDF
FA821720R5002_______0003.pdf PDF
FINAL_Question_Answer_Gov Response.xlsx XLSX spreadsheet
B401 - Basement Layout.pdf PDF
Attachment-1-Bldg-401-Rev-2.pdf PDF
GLEN0401A-FPFB.pdf PDF
10_Question_Answer_Gov Response.pdf PDF
11_Wage Determination_El Paso County_CO.pdf PDF
02_Revised_Pricing_Workbook.xlsx XLSX spreadsheet
04_Revised_SRD.pdf PDF
00_FA8217-20-R-5002-A00021.pdf PDF
09_Questions_Answers_Gov_Response.pdf PDF
03_Revised_SOO.pdf PDF
08_Revised_Exhibit_AB_CDRL_Combined.pdf PDF
02_Pricing Workbook.xlsx XLSX spreadsheet
01 Awardable_Task_Requirements_Document.pdf PDF
07_CDRL_Cross_Reference_Matrix_MAC3.xlsx XLSX spreadsheet
03_SOO.docx DOCX document
06_DD254_signed.pdf PDF
05_Awardable_Task_LPTA_Instructions_to_Offerors.pdf PDF
08_Exhibit_AB_CDRL_Combined.pdf PDF
04_SRD.doc DOC document
00 FA8217-20-R-5002.pdf PDF
02_Pricing_Workbook.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements Document for Equipment Purchase/Installation‐Revision 1

PCCIE PM: Clinton Osiek

Site/Location: Peterson AFB, CO Bldg. 1844 PROPOSAL DUE DATE: As identified in the solicitation

Qty

Yes No

Yes No

If Yes, Spares level:

Yes No Reference Bldg. 1844 Attachment 1: Additional Requirements

It will be the Site POCs responsibility to get IP approval for all LAN connections.

Escorts Provided by Site POC:

U.S. Citizens. No Felony Convictions; Entry to JPAS and VAR submittal

Normal Duty Hours:

1Spare Parts Kit (If a spares kit is part of this proposal, provide an itemized list of parts included ):

Yes No

ATS Size and Info:

Yes No

Main Bypass Wall Mount:

Maint Bypass Cabinet(stand alone):

Per Design:

Use Existing:

MBP Notes

The MBP's shall be new and be installed one per side (A & B). MBP may be wall mounted or located in a stand alone cabinet.

Key Inter-lock: N/A

16TH AFMAJCOM:

Battery Racks:

Battery Type:

VRLA

***Provide in your Cost Proposal what Country the Batteries are manufactured in.***

***Provide in your Cost Proposal what Country the UPS is manufactured in.***

Battery Notes See Attachment #1

UPS Size:

UPS configuration:

Batt. Run Time @ Full Load:

Battery Cabinets:

Yes No

Parallel Capacity

The items listed below are part of every project unless otherwise specified. If specified differently than stated here, the changes will be listed below the dotted line with the specifics as discussed and agreed upon at the site survey. No exceptions.

Installation: Inside delivery/Turn-Key installation is required on all projects performed for the PCCIE Office; Items to include, but are not limited to, responsibility for trash removal from the base resulting from this project, repair/replace any landscaping, damaged roadways, concrete, curbing, sidewalks, floors, walls, ceilings, doors, lights, fixtures, etc. Repair/replace any and all damages resulting from this project. Vendor supplies all equipment for off-loading/movement/install of all equipment unless otherwise noted for “inside-delivery”.

Drawings: Unless otherwise specified by the customer, all engineering drawings (AS-Builts) shall be provided to the site electronically, using CAD software compatible with AutoCAD LT IAW. Provide PCCIE with a PDF copy. All As-Builts shall be free of any limited rights statements. One-Line drawings and floor plan diagrams shall be consistent with package provided to an electrical installer. All electrical one-lines will be appropriately labeled showing the panel names, equipment sizing, breaker sizes, etc. Floor plans and/or equipment layout will show room dimensions and measurements of all equipment.

UPS Installs: Provide PCCIE with a detailed start-up report showing the UPS Serial Number and start-up date.

Unless otherwise specified by site, the start-up/commissioning shall be performed immediately after the installation is complete with no more than a 24 hour break in schedule.

Single Parallel

If Other, specify:

If Other, specify:

Other: See Notes

Parallel Redundant

Quantity:

Mission Downtime Requirements:

UPS In/Out put Voltage (60Hz):

UPS In/Out put Voltage (50Hz):

30 days notice for Authorized Service Interruption (ASI) submittal. Power outages shall be scheduled for after normal duty hours and weekends.

Clearance Requirement:

Escorts Required: Weekend Work Permitted:

Yes No

0700 through 1600 local

UPS Notes UPS size shall fall between 225-250 kw. System shall be configured to an “A” and “B” configuration with automatic tie (static switch) on the output between the “A” and “B” Side. (No N+1 redundancy on the “A” or “B” side). UPS shall be fed from single source, panel "SWBB".

Yes No

Specific Location of UPS/Battery:

If Yes, specify Bldg., Room, Location etc.

Existing Locations within UPS and battery Rooms

(Remote Monitoring Panel) RMP: *note; all RMPs will be labeled referencing associated UPS

If Yes, specify Bldg., Room, Location etc.

Reference Bldg. 1844 Attachment 1: Additional Requirements

(Remote Emergency Power Off) REPO: *note; all REPOs will be labeled referencing associated UPS

If Yes, specify Location and if Cover.

Web Card:

Yes No

Yes No

Yes No

If Web Card, Vendor to Connect to LAN:

High Mid Low

Qty Qty

Generator Required: (If installing a generator, it must be compliant with latest ETL)

HVAC

Redundancy:

Yes No

Yes

(Automatic Transfer Switch)

Shelter Required:

(Heating, Ventilation, Air Conditioning)

Yes No

CRAC (Water):

Split (Condenser):

Requirements Document for Equipment Purchase/Installation‐Revision 1

DRMO

Off Base

*Operator Training during Start-Up shall be provided by OEM

Disposition of spent equipment:

*Yes No

*Operator Training during Start-Up:

OEM Site Formal Training:

Notes and additional requirements Reference Bldg. 1844 Attachment 1: Additional Requirements

No

If Yes, What % and Time Reference Attachment #1

Surge Protection:

Yes No

Shelter Required:

(Shelter will be Precast or Fibrebond Like, Concrete and/or Steel Construction and shall contain louvers and exhaust fan connected to a thermostat and contain the proper relay switches to work with the HVAC and Fire Suppression System as necessary)

Load Bank Testing (*Provide PCCIE with load bank test reports if

Peterson AFB, CO Bldg. 1844

Bldg. 1844 Attachment 1: Additional Requirements‐Revision 1

(All changes hightlighted)

Attachment 1: “Additional Requirements” is to be used in conjunction with the Requirements

Document, photos, electrical drawings and the open discussion from site visit.

GENERAL PROJECT SCOPE

The government’s intent is to award a single contract to install UPS equipment at Peterson AFB, CO Bldg.

1844. The existing units are a single Eaton (A System) 9315 model UPS SN: ET053ZXX06 and Two Eaton (B System) 9315 model UPS SN: (1B) ET453ZXX06 and (2B) ET453ZXX01. The new equipment shall be configured to an “A” and “B” configuration with automatic tie between the “A” and “B” Side. (No N+1 redundancy on the “A” or “B” side). All output panels to be picked up by the new UPS system are: (E) “UPS1A‐Output Panel”, (E) “UPS‐OUTPUT‐PANEL”, (E) MDP, and (E) MCS 1.

All equipment shall be new and installed as per manufacture recommended guidelines and specifications for the intended use and application. Existing wiring may be utilized if deemed by the vendor’s electrical engineer and/or electrician as salvageable and are appropriate for the application.

All work performed and materials provided shall conform to NFPA 70, National Electric Code (NEC), Uniform Building Code (UBC), and applicable federal, state, and local codes, latest editions.

Unless a written agreement is arranged prior to start of a project, these rules apply. UPS startup shall commence no more than eight hours after installation. In a multiple building project, UPS installation shall be completed (installed, started up, and supporting critical load) in one building before moving to another. In a multi system within a building, one system shall be completed before commencing any work on another system.

UPS Installs: Provide PCCIE with a detailed UPS OEM start‐up report identifying the UPS Serial Number and start‐up date

Are there any specific CE requirements that must be met?

Noted at Design Survey (DS): None

Scope of work and all dates submitted to Mr. Charles Roberts

Submittal of Peterson AFB Civil Engineering Form 332 work order request upon award.

Coordination of work, scope of work and dates for Peterson AFB Fire Department notification and fire alarm/suppression disable request submitted to Mr. Charles Roberts.

Peterson AFB Civil Engineering Hot work Permit and/or Digging Permit shall be needed (if applicable— coordinate directly with Mr. Charles Roberts.

*NOTE: No work shall be started prior to receiving confirmation of 332 work order approval and fire alarm/suppression approved and complete.

Seismic: Current site infrastructure does not support additional seismic requirements. At the discretion of the site, implementation of additional seismic standards will not included for this building.

Hard Copy Manuals Yes / Qty: 1

Electronic Copy Manuals Yes / Qty: 1

HVAC Modification needed: No, HVAC is sufficient

New runs/whips/conduit/Cable trays/panels etc:

By vendor design.

Any splices must be executed by means of a bolted connection, mechanical splice or crimp and meet current NEC Code.

Existing feeds from legacy system are available for use by vendors to re‐utilize so long as the previously mentioned criteria are followed. Reused legacy cables/cabling shall be meg‐ohmed and results recorded with report sent to PCCIE/Site personnel.

All wires shall be in conduit or cable trays. Exception: RMP and EPO wires located above ceiling tiles.

Battery Configuration and Cabinets:

UPS’s battery configuration o Two strings in parallel configuration, disconnects for each string and primary lead to

UPS.

o The capacity of the total battery strings shall be sized to support the full rated load of 15 min for each UPS (15 min per each UPS not the system).

Should vendor provide a UPS with internal batteries and an external battery cabinet, the batteries in the UPS and the battery cabinet shall be the same make, series, and model.

o Battery Cabinets shall have slide out/pull out trays.

Battery Charging and Rates

During times when the system is being powered by the backup generator, the UPS shall be programmed to limit the battery charging rate to no more than 50% of the maximum charging rate. Due to the critical nature of 16th AF operations, UPS battery charging shall NOT be totally eliminated while the generator is the primary source of power.

Battery Environment Sensor:

Battery Cabinets shall have an environment sensor which is connected and provides temperature data to the UPS and RMP.

Battery Monitoring System:

Vendor shall provide a battery monitoring system to provide real time individual jar battery monitoring and data analytics. Market Research has determined companies such as ALBER, B‐ Tech and Cellwatch provide battery‐monitoring systems designed for UPS system battery monitoring such as required in this application.

Battery Monitoring shall be connected to UPS power.

UPS Input and Output Panels:

Per vendor design. (No longer a requirement)

There shall be two new output panels identified as “Critical Output Panel A” and “Critical Output Panel B”. All critical loads (Panels: (E) “UPS1A‐Output Panel”, (E) “UPS‐OUTPUT‐ PANEL”, (E) MDP, and (E) MCS 1. shall be connected to “Critical Output Panel A”. “Critical Output Panel B” shall be installed and left in place for future re‐alignment of critical loads (to be done in the future by a USSF Civil Engineering team).

Existing UPS input and output panels and breakers may be re‐utilized if deemed by the vendor’s electrical engineer and electrician as salvageable and are appropriate for the application.

(Requirement has been amended and clarified in the bullets below)

Existing UPS input panel may be be re‐utilized if deemed by the vendor’s electrical engineer and electrician as salvageable and appropriate for the application.

Vendor shall install new breakers feeding the UPS system(s) and MBP(s), installed in input panel identified as panel “SWBB”.

Existing legacy output panels and breakers may be re‐utilized if deemed by the vendor’s electrical engineer and electrician as salvageable and are appropriate for the application.

(Please note: Existing legacy output panels may NOT be utilized for “Critical Output Panel “A” and “B” requirement.)

All critical panels to be picked up by the new UPS system are: (E) “UPS1A‐Output Panel”, (E) “UPS‐OUTPUT‐PANEL”, (E) MDP, and (E) MCS 1.

UPS’s shall be “dual fed” from the Input Panel (This requirement has been removed)

Output panels shall be “dual fed” from the UPS Systems (This requirement has been removed)

Breaker Preventative Maintenance/Testing:

Vendor shall provide primary injection circuit breaker testing and reporting on circuit breakers.

Breakers are located within Bldg. 1844 specifically the UPS electrical room. Breakers requiring testing, reporting and are identified as the primary MBP, MDP and the 600 Amp distribution panel. Vendor shall provide a complete report of each breaker testing results.

(This requirement has been removed. )

External Maintenance Bypass:

Shall be new, re‐use of existing MBP is not acceptable.

Maintenance Bypass shall be wrap around design.

Each UPS shall have it’s own MBP

Shall be wall mounted or standalone.

Vendors shall provide instructions to transfer UPS to maintenance bypass and back on line on a placard posted near the MBP or on the MBP itself.

The instructions shall be engraved on red phenolic material (placard). The letters will have different color.

Equipment and Run Labeling:

Vendor shall provide and install identification labels on all panels and termination points.

Conduit shall be identified at both ends, printed on material with an adhesive backing.

Site is old with many old/abandoned runs.

Proper identification will ease in understanding and troubleshooting in the future. ANSI Z535.4‐ 2011, Product Safety Signs and labels, provides guidelines for size and location of labels.

Floor and Metal Plates:

Floor has been identified as having a weight rating capacity of 200 lbs/square foot.

Vendor shall install UPS equipment on top of existing metal plates to distribute the UPS and battery weight more effectively.

Auto Dialer Notification:

Sensaphone 800 or equivalent. To be placed in close proximity to existing telephone jack. Auto dialer shall be connected to UPS and programmed to dial numbers provided by the site POC.

Autodialer shall be connected to UPS power.

Acceptance/Load Bank Testing Required:

Load bank testing shall be completed to the maximum capacity rating of the system.

Minimum, “2 Hour” load bank testing at the following load percentage and duration:

o 30 min @ 25% load, 30 min @ 50% load, 30 min @ 75% load and 30 min @ 100% load.

Vendor to ensure all switchgear installed/associated with this UPS project functions as designed during load bank testing.

Remote Monitoring Panel (RMP):

Yes: Vendor shall coordinate the exact location with Mr. Charles Roberts.

RMP shall be located on North Exposure of existing pillar within Room 20 (Reference document titled Bldg. 1844 UPS Panel) o For reference, the post in the corner of room 16 and back of room 22 is approximately the corner of room 125 upstairs (UPS Room).

o The distances in the RMP room areas are:

From Wall to room 22 288”

From Back of room 22 to UPS panel 337”

Height of post 108”

Vendor not responsible for patch and paint work associated with South wall RMP removal efforts.

The estimated distance from existing UPS system to monitor panel in the operations center is approximately 300 linear feet.

Wiring shall be shielded with drain wire to protect from outside interference. Drain wire shall be bonded at one end to the grounding electrode system. Runs longer than 300 feet shall include signal boosters.

Emergency Power off (EPO) Switches:

Yes: with cover.

EPO shall be located inside Room 128 near West double doors.

Vendor shall identify EPO’s with engraved phenolic identification labels. Should engraved phonic identification labels not be suited for the specific application (ie; insufficient space available) EPO’s may be identified by identification media that is suitable for intended use and application.

EPO identification verbiage shall be identified as:

UPS Emergency Power Off This button will disconnect all Technical Power to the equipment connected.

Spare Parts Kit:

Yes: Spare parts kit shall be contained in a metal cabinet with a document holder and hook.

Qty: 1 Level : “High” requested.

Spares kit shall be properly identified as UPS Spares Kit for UPS Model # XXXXX SN: XXXXXX.

A hard copy listing of items contained in kit (inventory) shall be provided, affixed to the outside of the container. An electronic copy of the spares inventory, in the form of a Microsoft Word document or Microsoft Excel document, shall be provided to Clinton Osiek, PCCIE Program Manager upon “start up” and completion of project.

Market Research Results:

Document holder and hook shall be similar or equivalent to Uline.com’s product identified as:

Document Holder Model number: S‐10508 and Hook Model Number S‐20012.

Material Data Sheet (MDS) for Batteries:

A hard copy MDS shall be provided, affixed to the outside of the UPS battery cabinet by a hook in a document holder.

An electronic copy of the MDS, in the form of a Microsoft Word document or Microsoft Excel document, shall be provided to Clinton Osiek, PCCIE Program Manager.

Each UPS Shall have A MDS attached to the battery cabinet.

Drawings:

In addition to PDF drawings, the offeror shall provide an electronic copy, of the demolition, redlines and “As Built’s” utilizing AutoCAD 2016 or newer of all electrical and infrastructure changes as a result of this project.

Concept of Operation: Vendor shall provide a clear and concise Concept of Operation within their submittal package for review.

Method of Procedure (MOP):

Vendor shall provide a clear and concise MOP for this project identifying the timeline necessary for demolition, installation and startup. (Power outages and power transfers shall be scheduled and completed during the evening or weekend.)

Vendor shall clearly identify downtime requirements.

Any changes to the timeline and MOP shall be provided to the PCCIE Program Manager, site POC and Mr. Louis West.

Issues/Concerns:

It is not the position of the PCCIE Office to correct facility infrastructural issues that may be found while performing the design surveys that are not part of the PCCIE/site requirement. If issues are found, we ask that you notify the PCCIE Program Office and/or contracting so that site may be notified to address as needed.

SHIPPING/TRANSPORTATION/DISPOSAL

Site and Ship to POC’s

Primary: Mr. Charles Roberts Facility Manager charles.roberts.36@us.af.mil

COMM: (719) 554-5663

Alternate: MSgt Michael Conedy Facility Manager michael.conedy@us.af.mil

COMM: (719) 554-7042

16th AF UPS Program UPS Program Manager Mr. Louis West louis.west@us.af.mil

COMM: (210)-977-2874

USSF Program UPS Program Manager Mr. Aller Delarosa aller.delarosa.1@us.af.mil

COMM: (719)-554-2906

Ship to Address

160 Patrick Street Peterson AFB, CO 80914-2102

*NOTE: Delivery logistics shall be coordinated with the site POC.

Removal of Equipment and Facility Care:

Vendor shall protect facility while moving equipment in and out of the building.

Any bolts from existing equipment shall be ground off at floor level.

Disposal of UPS, Battery Cabinet, Batteries, Ancillary equipment, Panels and etc.:

The UPS, Battery Cabinet, Batteries and associated equipment are not accountable on an equipment or CACRL listing. Vendor to dispose and provide a battery disposal/recycle certificate. Vendor to dispose of all construction material and debris.

All legacy equipment, raceways, conduit, battery disconnects, wires and etc., that are not reutilized within the scope of this project shall be removed to leave a complete, clean finished end product for the customer. Vendor shall not abandon in place unused wires, panels, conduit, etc.

USSF’s UPS Program Manager shall be allowed to cannibalize key components off of the UPS and the spare parts inventory for usage throughout his inventory. Mr. Aller Delarosa will coordinate directly with the Vendor’s project manager.

Additional Items:

US Citizens with no felony convictions shall perform ALL work pursuant to this project.

Typical Military Base access procedures shall be followed.

Entry into facility requires two forms of identification.

Phones, cameras and other wireless transmitting devices are not allowed inside facilities.

Vendors representatives shall be entered and receive approval through the JPAS system prior to arriving onsite.

Vendors representatives shall be entered and receive approval of a Visit Access Request.

Escorts shall be provided by on‐site government personnel.

Vendor shall provide a temporary portable lavatory for the duration of this effort for vendor crews.

Gov to provide refuse/trash receptacles.

No GOV furnished forklift or pallet jack is available.

Fire suppression sprinklers were noted during DS.

Vendor responsible for all logistics and shall receive the equipment for this effort.

Access roadway West of building has been stated to support heavy trucks and lifts. Barrier manipulation shall be coordinated with site POC.

Site will provide warehouse space for UPS and batteries. Inside storage available within room

128. Additional outdoor storage is available West of Building/West of berm.

Awarded Vendor shall provide an electronic copy of all drawings 30 days after project completion. PDF drawing submittals still apply.

Forklifts shall be transported to jobsite. They may not travel on roadways.

Power outages and power transfers shall be scheduled and completed during the evening or weekend.

Requirements Document for Equipment Purchase/Installation Revision 1

PCCIE PM: Clinton Osiek

Site/Location: Peterson AFB, CO Bldg. 218 PROPOSAL DUE DATE: As identified in the solicitation

Qty

Yes No

Yes No

If Yes, Spares level:

Yes No Bldg. 218 Attachment 1: Additional Requirements

It will be the Site POCs responsibility to get IP approval for all LAN connections.

Escorts Provided by Site POC:

U.S. Citizens. No Felony Convictions

Normal Duty Hours:

Spare Parts Kit (If a spares kit is part of this proposal, provide an itemized list of parts included ):

Yes No

ATS Size and Info:

4 Pole

Yes No

Main Bypass Wall Mount:

Main Bypass Cabinet(stand alone):

Per Design:

Use Existing:

MBP Notes

Bldg. 218 Attachment 1: Additional Requirements

Key Inter-lock: Mechanical Inter-lock

USSFMAJCOM:

Battery Racks:

Battery Type:

See Notes

VRLA

***Provide in your Cost Proposal what Country the Batteries are manufactured in.***

***Provide in your Cost Proposal what Country the UPS is manufactured in.***

Battery Notes Vendor shall provide a battery runtime of 15 minutes plus or minus 3 minutes at full load of UPS.

UPS Size:

UPS configuration:

Batt. Run Time @ Full Load:

Battery Cabinets:

Yes No

Parallel Capacity

The items listed below are part of every project unless otherwise specified. If specified differently than stated here, the changes will be listed below the dotted line with the specifics as discussed and agreed upon at the site survey. No exceptions.

Installation: Inside delivery/Turn-Key installation is required on all projects performed for the PCCIE Office; Items to include, but are not limited to, responsibility for trash removal from the base resulting from this project, repair/replace any landscaping, damaged roadways, concrete, curbing, sidewalks, floors, walls, ceilings, doors, lights, fixtures, etc. Repair/replace any and all damages resulting from this project. Vendor supplies all equipment for off-loading/movement/install of all equipment unless otherwise noted for “inside-delivery”.

Drawings: Unless otherwise specified by the customer, all engineering drawings (AS-Builts) shall be provided to the site electronically, using CAD software compatible with AutoCAD LT IAW. Provide PCCIE with a PDF copy. All As-Builts shall be free of any limited rights statements. One-Line drawings and floor plan diagrams shall be consistent with package provided to an electrical installer. All electrical one-lines will be appropriately labeled showing the panel names, equipment sizing, breaker sizes, etc. Floor plans and/or equipment layout will show room dimensions and measurements of all equipment.

UPS Installs: Provide PCCIE with a detailed start-up report showing the UPS Serial Number and start-up date.

Unless otherwise specified by site, the start-up/commissioning shall be performed immediately after the installation is complete with no more than a 24 hour break in schedule.

Single Parallel

If Other, specify:

If Other, specify:

Other

Other: See Notes

Parallel Redundant

Quantity:

Mission Downtime Requirements:

UPS In/Out put Voltage (60Hz):

UPS In/Out put Voltage (50Hz):

30 Days notice for proper Authorized Service Interruption (ASI) notification. Should weekend work or after normal duty hours work be necessary, coordinate with site POC in advance.

Critical Load Supported is…208V

Clearance Requirement:

Escorts Required: Weekend Work Permitted:

Yes No

0700 through 1700 local

UPS Notes Vendor shall supply a UPS witin the range of 15-20 KW UPS.

Yes No

Specific Location of UPS/Battery:

If Yes, specify Bldg., Room, Location etc.

Existing UPS Room (Room 120)

(Remote Monitoring Panel) RMP: *note; all RMPs will be labeled referencing associated UPS

If Yes, specify Bldg., Room, Location etc.

(Remote Emergency Power Off) REPO: *note; all REPOs will be labeled referencing associated UPS

If Yes, specify Location and if Cover.

Web Card:

Yes No

Yes No

Yes No

If Web Card, Vendor to Connect to LAN:

High Mid Low

Qty Qty

Generator Required: (If installing a generator, it must be compliant with latest ETL)

HVAC

Redundancy:

Yes No

Yes

(Automatic Transfer Switch)

Shelter Required:

(Heating, Ventilation, Air Conditioning)

Yes No

CRAC (Water):

Split (Condenser):

Requirements Document for Equipment Purchase/Installation Revision 1

DRMO

Off Base

*Operator Training during Start-Up shall be provided by OEM

Disposition of spent equipment:

*Yes No

*Operator Training during Start-Up:

OEM Site Formal Training:

Notes and additional requirements See Bldg. 218 Attachment 1: Additional Requirements

No

If Yes, What % and Time Surge Protection:

Yes No

Shelter Required:

(Shelter will be Precast or Fibrebond Like, Concrete and/or Steel Construction and shall contain louvers and exhaust fan connected to a thermostat and contain the proper relay switches to work with the HVAC and Fire Suppression System as necessary)

Load Bank Testing (*Provide PCCIE with load bank test reports if

Peterson AFB, CO Bldg. 218

Bldg. 218 Attachment 1: Additional Requirements

Bldg. 218 Attachment 1: “Additional Requirements” is to be used in conjunction with the Requirements

The government’s intent is to award a single contract to install UPS equipment at Peterson AFB, CO Bldg.

218. The unit to be replaced is a single Liebert Model N Power 30 kVA UPS SN: 37‐1078. The new equipment shall be configured as a single box. (No redundancy).

All equipment shall be new and installed as per manufacture recommended guidelines and specifications for the intended use and application. Existing wiring may be utilized if deemed by the vendor’s electrical engineer and/or electrician as salvageable and are appropriate for the application.

All work performed and materials provided shall conform to NFPA 70, National Electric Code (NEC), Uniform Building Code (UBC), and applicable federal, state, and local codes, latest editions.

Unless a written agreement is arranged prior to start of a project, these rules apply. UPS startup shall commence no more than eight hours after installation. In a multiple building project, UPS installation shall be completed (installed, started up, and supporting critical load) in one building before moving to another. In a multi system within a building, one system shall be completed before commencing any work on another system.

UPS Installs: Provide PCCIE with a detailed UPS OEM start‐up report identifying the UPS Serial Number

Are there any specific CE requirements that must be met?

Noted at Design Survey (DS): None

Scope of work and all dates submitted to: TSgt Daniel Matthies

Coordination of work, scope of work and dates for Peterson AFB Fire Department notification and fire alarm/suppression disable request submitted to: TSgt Daniel Matthies

Peterson AFB Civil Engineering Hot work Permit and/or Digging Permit shall be needed (if applicable— coordinate directly with TSgt Daniel Matthies

*NOTE: No work shall be started prior to receiving confirmation of 332 work order approval and fire alarm/suppression approved and complete.

Seismic:

Vendor to consult the United States Geological Survey (USGS) to determine the seismic requirements for applicable UPS location. Calculation assistance can be found @

(https://earthquake.usgs.gov/hazards/designmaps/)

Vendor to consult the Federal Emergency Management Agency (FEMA) for guidance on earthquake hazards and its potential effects @ (https://www.fema.gov/earthquake‐hazard‐ maps) FEMA categories are listed as A, B, C, D0, D1, D2, and E.

FEMA Earthquake Hazard Category: C UPS equipment shall be designed/secured to meet Seismic requirements.

Hard Copy Manuals Yes / Qty: 1

Electronic Copy Manuals Yes / Qty: 1

HVAC Modification needed: No, HVAC is sufficient

New runs/whips/conduit/Cable trays/panels etc:

By vendor design.

Any splices must be executed by means of a bolted connection, mechanical splice or crimp and meet current NEC Code.

Existing feeds from legacy system are available for use by vendors to re‐utilize so long as the previously mentioned criteria are followed. Reused legacy cables/cabling shall be meg‐ohmed and results recorded with report sent to PCCIE/Site personnel.

Battery Configuration and Cabinets:

UPS’s battery configuration o Disconnects from battery cabinet and primary lead to UPS.

o The capacity of the total battery strings shall be sized to support the full rated load for

15 min plus or minus 3 min (Per each UPS).

Should vendor provide a UPS with internal batteries and an external battery cabinet, the batteries in the UPS and the battery cabinet shall be the same make, series, and model.

o Battery Cabinets shall have slide out/pull out trays.

UPS Input and Output Panels:

Per vendor design.

Existing UPS input and output panels and breakers may be re‐utilized if deemed by the vendor’s electrical engineer and electrician as salvageable and are appropriate for the application.

External Maintenance Bypass:

Shall be new.

Maintenance Bypass shall be wrap around design.

Shall be wall mounted.

MBP shall have mechanical interlock device.

Vendors shall provide instructions to transfer UPS to maintenance bypass and back on line on a placard posted near the MBP or on the MBP itself.

The instructions shall be engraved on red phenolic material (placard). The letters will have different color.

Conduit shall be identified at both ends, printed on material with an adhesive backing.

Emergency Power off (EPO) Switch:

Yes: with cover.

Single EPO shall be located inside Room 120 on East side of entrance.

Vendor shall identify EPO with engraved phenolic identification labels. Should engraved phonic identification labels not be suited for the specific application (ie; insufficient space available) EPO may be identified by identification media that is suitable for intended use and application.

EPO identification verbiage shall be identified as:

Material Data Sheets (MDS) for Batteries:

in a document holder.

An electronic copy of the MDS, in the form of a Microsoft Word document or Microsoft Excel document, shall be provided to Clinton Osiek, PCCIE Program Manager.

Each UPS Shall have A MDS attached to the battery cabinet.

Drawings:

In addition to PDF drawings, the offeror shall provide an electronic copy, of the demolition, Method of Procedure (MOP):

Vendor shall provide a clear and concise MOP for this project identifying the timeline necessary for demolition, installation and startup.

Vendor shall clearly identify downtime requirements.

and Mr. Delarosa.

found while performing the design surveys that are not part of the PCCIE/site requirement. If

Primary: TSgt Daniel Matthies Email: daniel.matthies@us.af.mil Com: (719)‐556‐7354

Alternate: Mr. Burke Ferrin Primary Facility Manager burke.ferrin@us.af.mil

(719) 556‐4975

Ship to Address

Peterson AFB Fire Station 235 East Duluth Avenue Peterson AFB, CO 80914

*NOTE: Deliver logistics shall be coordinate with site POC.

Removal of Equipment and Facility Care:

Vendor shall protect facility while moving equipment in and out of the building.

equipment or CACRL listing. Vendor to dispose and provide a battery disposal/recycle certificate. Vendor to dispose of all construction material and debris.

All legacy equipment, raceways, conduit, battery disconnects, wires and etc., that is not reutilized within the scope of this project shall be removed to leave a complete, clean finished end product for the customer. Vendor shall not abandon in place unused wires, panels, conduit, etc.

Typical Military Base access procedures shall be followed.

Escorts shall be provided by on‐site government personnel.

Gov’t furnished lavatories are provided onsite for usage

Gov’t to provide refuse/trash receptacles.

Limited Parking onsite.

No Gov’t furnished forklift or pallet jack is available.

Fire suppression sprinklers were noted during DS.

Vendor responsible for all logistics and shall receive the equipment for this effort.

Site will provide warehouse space for UPS and batteries. Room 117, Room 120 and Fire station Bay are available for short term storage during project. Consult TSgt Matthies regarding storage.

Requirements Document for Equipment Purchase/Installation

No CRAC (Water):

Split (Condenser):

Qty Qty

Generator Required: (If installing a generator, it must be compliant with latest ETL)

HVAC

Redundancy:

Yes No

Yes

(Automatic Transfer Switch)

Shelter Required:

(Heating, Ventilation, Air Conditioning)

Yes

Yes No

Specific Location of UPS/Battery:

If Yes, specify Bldg, Room, Location etc.

In existing locations

(Remote Monitoring Panel) RMP: *note; all RMPs will be labeled referencing associated UPS

If Yes, specify Bldg, Room, Location etc.

Room 225 and Room 227, in existing location

(Remote Emergency Power Off) REPO: *note; all REPOs will be labeled referencing associated UPS

If Yes, specify Location and if Cover.

Web Card:

Yes No

Yes No

Yes No

If Web Card, Vendor to Connect to LAN:

High Mid Low

The items listed below are part of every project unless otherwise specified. If specified differently than stated here, the changes will be listed below the dotted line with the specifics as discussed and agreed upon at the site survey. No exceptions.

Installation: Inside delivery/Turn-Key installation is required on all projects performed for the PCCIE Office; Items to include, but are not limited to, responsibility for trash removal from the base resulting from this project, repair/replace any landscaping, damaged roadways, concrete, curbing, sidewalks, floors, walls, ceilings, doors, lights, fixtures, etc. Repair/replace any and all damages resulting from this project. Vendor supplies all equipment for off-loading/movement/install of all equipment unless otherwise noted for “inside-delivery”.

Drawings: Unless otherwise specified by the customer, all engineering drawings (AS-Builts) shall be provided to the site electronically, using CAD software compatible with AutoCAD LT IAW. Provide PCCIE with a PDF copy. All As-Builts shall be free of any limited rights statements. One-Line drawings and floor plan diagrams shall be consistent with package provided to an electrical installer. All electrical one-lines will be appropriately labeled showing the panel names, equipment sizing, breaker sizes, etc. Floor plans and/or equipment layout will show room dimensions and measurements of all equipment.

UPS Installs: Provide PCCIE with a detailed start-up report showing the UPS Serial Number and start-up date.

Unless otherwise specified by site, the start-up/commissioning shall be performed immediately after the installation is complete with no more than a 24 hour break in schedule.

Single Parallel

If Other, specify:

If Other, specify:

Other: See Notes

Parallel Redundant

Quantity:

Mission Downtime Requirements:

UPS In/Out put Voltage (60Hz):

UPS In/Out put Voltage (50Hz):

45 Days Notice for Authorized Service Interruption (ASI) notification

Clearance Requirement:

Escorts Required: Weekend Work Permitted:

Yes No

0600 through 1600 local

UPS Notes UPS to be supplied may be in a range of 225-250 kw. Parallel Redundancy "A" and "B" system.

Maint Bypass Cabinet(stand alone):

Per Design:

Use Existing:

MBP Notes

Reference Bldg. 401 Attachment 1: Additional Requirements

Key Inter-lock: (Solenoid Key Release Unit) SKRU Key

USSFMAJCOM:

Battery Racks:

Battery Type:

VRLA

***Provide in your Cost Proposal what Country the Batteries are manufactured in.***

***Provide in your Cost Proposal what Country the UPS is manufactured in.***

Battery Notes Each UPS shall have 15 minutes runtime

UPS Size:

UPS configuration:

Batt. Run Time @ Full Load:

Battery Cabinets:

Yes No

Parallel Capacity

Escorts Provided by Site POC:

U.S. Citizens. No Felony Convictions; Two forms of identifcation necessary. Vendors will be required to provide PII for access into area.

Normal Duty Hours:

1Spare Parts Kit (If a spares kit is part of this proposal, provide an itemized list of parts included ):

Yes No

ATS Size and Info:

Yes No

Maint Bypass Wall Mount:

Reference Bldg. 401 Attachment 1: Additional Requirements

It will be the Site POCs responsibility to get IP approval for all LAN connections.

PCCIE PM: Clinton Osiek

Site/Location: Schriever AFB, CO Bldg. 401 PROPOSAL DUE DATE: As identified in the solicitation

Qty

Yes No

Yes No

If Yes, Spares level:

Yes No

Requirements Document for Equipment Purchase/Installation

*Operator Training during Start-Up:

OEM Site Formal Training:

Notes and additional requirements Reference Bldg. 401 Attachment 1: Additional Requirements

No

If Yes, What % and Time Ref Bldg. 401 Attachment #1

Surge Protection:

Yes No

Shelter Required:

(Shelter will be Precast or Fibrebond Like, Concrete and/or Steel Construction and shall contain louvers and exhaust fan connected to a thermostat and contain the proper relay switches to work with the HVAC and Fire Suppression System as necessary)

Load Bank Testing (*Provide PCCIE with load bank test reports if

*Yes No

DRMO

Off Base

*Operator Training during Start-Up shall be provided by OEM

Disposition of spent equipment:

Schriever AFB, CO Bldg. 401

Bldg. 401 Attachment 1: Additional Requirements‐Revision 1

(All changes highlighted)

Attachment 1: “Additional Requirements” is to be used in conjunction with the Requirements

The government’s intent is to award a single contract to install UPS equipment at Schriever AFB, CO Bldg. 401. The units to be replaced are Eaton 9315 model UPS SN: ER225ZXX02 (A1), ER115ZXX02 (A2), ER115ZXX04 (B1), ER121ZXX01 (B2) . The new system/equipment shall be configured to an “A” and “B” configuration with automatic tie between the “A” and “B” Side. True N+1 UPS redundancy required on both the “A” and “B” side. (Inherent redundancy not accepted)

All equipment shall be new and installed as per manufacture recommended guidelines and specifications for the intended use and application. Existing wiring may be utilized if deemed by the vendor’s electrical engineer and/or electrician as salvageable and are appropriate for the application.

All work performed and materials provided shall conform to NFPA 70, National Electric Code (NEC), Uniform Building Code (UBC), and applicable federal, state, and local codes, latest editions.

Unless a written agreement is arranged prior to start of a project, these rules apply. UPS startup shall commence no more than eight hours after installation. In a multiple building project, UPS installation shall be completed (installed, started up, and supporting critical load) in one building before moving to another. In a multi system within a building, one system shall be completed before commencing any work on another system.

UPS Installs: Provide PCCIE with a detailed UPS OEM start‐up report identifying the UPS Serial Number

Base Civil Engineering Requirements

Coordination of work, scope of work and dates for Schriever AFB Fire Department notification and fire alarm/suppression disable request submitted to site POC.

Vendor shall provide and submit to Schriever AFB Civil Engineering the Method of Procedure

(MOP) for submittal to the Outage Utility Board for CE notification and permission of power outage.

Schriever AFB Civil Engineering Hot work Permit and/or Digging Permit shall be needed (if applicable—coordinate directly with site POC.

*NOTE: No work shall be started prior to receiving confirmation of a 505 SW Form 21 utility outage request. Method of Procedure (MOP) of winning vendor shall be submitted to Shriever AFB 505 SW in conjunction with Form 21 submittal. (Vendors shall work entire duration of power outage. Multiple shifts of workers may be necessary. Power outages and power transfers shall be scheduled and completed during the evening or weekend.)

High lift crane Requirements.

There are no steps or freight elevator at this site with entry into the basement and UPS room.

Vendor shall hoist equipment through removal grated access area on South side of the building.

Infrastructure or landscape damage caused by hoist shall be repaired by the vendor.

A step up (Lip) was identified at building entry point into building from hoist area.

Approximately a 20 foot depth to basement floor from ground level.

53” spacing from “H” Beams at grated access area.

High Lift Crane logistics, Rigging Plan and Safety Plan

Coordinate logistics and crane placement with site POC.

Vendor shall provide a Rigging Plan for this effort

Vendor shall provide a Safety Plan for this effort.

Vendor shall avoid damage to infrastructure and will be liable for damages.

Seismic:

Vendor to consult the United States Geological Survey (USGS) to determine the seismic requirements for applicable UPS location. Calculation assistance can be found @

(https://earthquake.usgs.gov/hazards/designmaps/)

Vendor to consult the Federal Emergency Management Agency (FEMA) for guidance on earthquake hazards and its potential effects @ (https://www.fema.gov/earthquake‐hazard‐ maps) FEMA categories are listed as A, B, C, D0, D1, D2, and E.

FEMA Earthquake Hazard Category: C UPS equipment shall be designed/secured to meet Seismic requirements.

Hard Copy Manuals Yes / Qty: 1

Electronic Copy Manuals Yes / Qty: 1

HVAC Modification needed: No, HVAC is sufficient

New runs/whips/conduit/Cable trays/panels etc:

By vendor design.

Any splices must be executed by means of a bolted connection, mechanical splice or crimp and meet current NEC Code.

Existing feeds from legacy system are available for use by vendors to re‐utilize so long as the previously mentioned criteria are followed. Reused legacy cables/cabling shall be meg‐ohmed and results recorded with report sent to PCCIE/Site personnel.

Battery Configuration and Cabinets: In compliance with AFSPCH 32‐10004; Section 12.3.2.2.

UPS’s battery configuration o Two strings in parallel configuration, disconnects for each string and primary lead to

UPS.

o The capacity of the total battery strings shall be sized to support the full rated load for

15 min (Per each UPS).

Should vendor provide a UPS with internal batteries and an external battery cabinet, the batteries in the UPS and the battery cabinet shall be the same make, series, and model.

o Battery Cabinets shall have slide out/pull out trays.

Battery Environment Sensor:

Battery Cabinets shall have an environment sensor which is connected and provides temperature data to the UPS and RMP.

UPS Input and Output Panels:

Per vendor design.

Existing UPS input and output panels and breakers may be re‐utilized if deemed by the vendor’s electrical engineer and electrician as salvageable and are appropriate for the application.

Transformers:

Transformers identified as TT‐1A, TT‐2A, TT‐1B and TT‐2B shall be replaced.

Transformers shall be sized accordingly based on UPS size and load supported

Transformers shall be new.

External Maintenance Bypass (Each system “A” and “B”:

Shall be new, re‐use of existing MBP is not acceptable.

Maintenance Bypass shall be wrap around design.

Shall be either wall mounted or stand alone.

Standalone bypass MBP shall not be connected (screwed) to the UPS. It shall remain stand alone.

Vendors shall provide instructions to transfer UPS to maintenance bypass and back on line on a placard posted near the MBP or on the MBP itself.

o The instructions shall be engraved on red phenolic material (placard). The letters will have different color.

Interlock shall be SKRU

UPS Parallel and Tie Equipment:

Shall be new, re‐use of existing equipment is not acceptable.

Ties shall have interlocks (i.e. solenoid key release unit) and indicator lights signaling whether safe/not safe to transfer.

Conduit shall be identified at both ends, printed on material with an adhesive backing.

Site is old with many old/abandoned runs.

Housekeeping Pad:

UPS and equipment associated with this project that are kept on the ground shall be situated on a housekeeping pad.

Housekeeping pads shall be constructed of concrete and be appropriate for the equipment and application.

Existing housekeeping pad; it may be reutilized if it is of proper size and works with the vendor’s equipment/design.

Equipment overhang on the housekeeping pad is not acceptable

Battery cabinets shall be located on a housekeeping pad. Vendor may be required to install new housekeeping pads depending on vendor design.

Vendor not required to remove housekeeping pads that are unused and leftover from legacy equipment.

Auto Dialer Notification:

Sensaphone 800 or equivalent. To be placed in close proximity to existing telephone jack within the UPS room right of the main entry door. Auto dialer shall be connected to UPS and programmed to dial numbers provided by site POC. Autodialer shall be connected to UPS power.

Acceptance/Load Bank Testing Required:

Minimum, “2 Hour” load bank testing at a maximum KW rating of the “A” system and the “B” system.

o 30 min @ 25% load, 30 min @ 50% load, 30 min @ 75% load and 30 min @ 100% load.

Vendor to ensure all switchgear installed/associated with this UPS project functions as designed during load bank testing.

Remote Monitoring Panel (RMP):

Yes, for each system in multiple locations

Vendor shall coordinate with Mr. Cross as the RMP are located in a secure area.

The existing RMP’s are located in Rooms 225 and 227

The estimated distance from the legacy UPS system to the existing RMPs is estimated to be less than 300 feet.

Wiring shall be shielded with drain wire to protect from outside interference. Drain wire shall be bonded at one end to the grounding electrode system. Runs longer than 300 feet shall include signal boosters.

Emergency Power off (EPO) Switches:

Yes; with cover.

EPOS’s shall be located inside UPS room on the left side near the light switch and fire extinguisher box.

Vendor shall identify EPO’s with engraved phenolic identification labels. Should engraved phonic identification labels not be suited for the specific application (ie; insufficient space available) EPO’s may be identified by identification media that is suitable for intended use and application.

EPO identification verbiage shall be identified as:

Spare Parts Kit:

Yes: Spare parts kit shall be placed in existing metal cabinets located onsite.

Qty: 1 Level : OEM “High” requested.

Spares kit shall be properly identified as UPS Spares Kit for UPS Model # XXXXX SN: XXXXXX.

A hard copy listing of items contained in kit (inventory) shall be provided, affixed to the outside of the container with magnetic hook and document holder. An electronic copy of the spares inventory, in the form of a Microsoft Word document or Microsoft Excel document, shall be provided to Clinton Osiek, PCCIE Program Manager upon “start up” and completion of project.

*NOTE: Spares shall be placed in existing cabinets, located at the site. No separate container required.

All remaining spares requirements apply.

Market Research Results:

Document holder and hook shall be similar or equivalent to Uline.com’s product identified as:

Document Holder Model number: S‐10508 and Hook Model Number S‐20012.

Material Data Sheets (MDS) for Batteries:

in a document holder.

An electronic copy of the MDS, in the form of a Microsoft Word document or Microsoft Excel document, shall be provided to Clinton Osiek, PCCIE Program Manager.

Each UPS Shall have A MDS attached to the battery cabinet.

Drawings:

In addition to PDF drawings, the offeror shall provide an electronic copy, of the demolition, Concept of Operation: Vendor shall provide a clear and concise Concept of Operation within their submittal package for review.

Method of Procedure (MOP):

Vendor shall provide a clear and concise MOP for this project identifying the timeline necessary for demolition, installation and startup.

Vendor shall clearly identify downtime requirements (windows and hours) and Mr. Delarosa.

Typical Military Base access procedures shall be followed.

Gov furnished lavatories are provided onsite for usage

Gov to provide refuse/trash receptacles.

Limited Parking onsite.

No GOV furnished forklift or pallet jack is available.

Fire suppression sprinklers were noted during DS.

Vendor responsible for all logistics and shall receive the equipment for this effort. ALL equipment shall be delivered and stored inside the restricted area fence per below:

Site will provide warehouse space for UPS and batteries.

Phones, cameras and other wireless transmitting devices are not allowed inside facilities.

Entry into facility requires two forms of identification.

Awarded Vendor shall provide an electronic copy of all drawings 30 days after project completion. PDF drawing submittals still apply.

Vendors shall be escorted while inside the Restricted Area (RA). Vendors shall be required to comply with the RA requirements consisting but not limited to: No cellular devises, No wireless communication, No WIFI, etc. Vendors shall be U.S. Citizens with no felony convictions.

Vendors shall provide two forms of identification. State Drivers licenses shall be compliant to the Real ID Act.

Vendors shall work entire duration of power outage. Multiple shifts of workers may be necessary to capitalize on critical downtime window.

Power outages and power transfers shall be scheduled and completed during the evening or weekend.

Forklifts shall be transported to jobsite. They may not travel on roadways.

found while performing the design surveys that are not part of the PCCIE/site requirement. If

Primary: Mr. Wallace “Kenny” Cross Email: wallace.cross.1.ctr @us.af.mil

COM: (719) 567‐7875 DSN: (312)‐560‐7875

Alternate: Mr. Patrick Blackwelder Email: patrick.blackwelder.1.ctr@us.af.mil

COM: (719) 567‐7787 DSN: (312)‐560‐7787

Alternate: Mr. Craig Bieber Email: craig.bieber.ctr@us.af.mil

COM: (719) 567‐7784 DSN: (312)‐560‐7784

Facilities “ALL Call” Telephone Number:

(719)‐567‐77789

Ship to Address

National Reconnaissance Operations Squadron 401 Discoverer Avenue Schriever AFB, CO 80912

Deliver logistics shall be coordinate with site POC.

Removal of Equipment and Facility Care:

Vendor shall protect facility while moving…