07_CDRL_Cross_Reference_Matrix_MAC3.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- PCCIE MAC III SOLICITATION Federal contract opportunity
- Solicitation number
- FA8217-20-R-5002
About this file
This document contains a solicitation for the PCCIE MAC III contract opportunity and a CDRL matrix for the associated contract. The solicitation seeks proposals to provide commercially available, online, double conversion UPS systems and associated equipment for power conditioning and continuation at sites worldwide. All questions are due by May 1st, 2020 and proposals are due by June 2nd, 2020. The CDRL matrix lists 14 contract data requirements including monthly progress reports, funding reports, planning surveys, design reports, maintenance data, training, manuals, safety reports, and a safety plan. Deliverables vary in frequency from monthly to as required. The Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base is the issuing agency.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CDRL Matrix
| PCCIE MAC III CDRL Matrix | ||||||
| Item # | DID | CDRL # | SRD Reference | SOO Reference | Frequency | General Reference |
| 1 | DI-MGMT-80277 | A/B 001 | 1.0 | 3.2 | Monthly | Contractor's Progress, Status and Management Report |
| 2 | DI-MGMT-80277 | A/B 002 | 1.0 | 3.2 | Monthly | Monthly Status Teleconference |
| 3 | DI-MGMT-81468 | A/B 003 | 1.0 | 3.2 | Monthly | Funding Report for Delivery Orders |
| 4 | DI-MGMT-81737 | A/B 004 | 6.1 | 1.1 | 30-90 days as specified | Preliminary Planning Survey Report |
| 5 | DI-MGMT-81893 | A/B 005 | 6.2, 6.2.1, 6.2.2 | 1.1, 1.2, 1.6 | 30-90 days as specified | Design Survey Report, Cost Proposal and Site Installation Plan |
| 6 | DI-MGMT-81893 | A/B 006 | 1.0, 6.3 | 1.7 | 30-90 days as specified | Power Distribution Assessment, Short Circuit Study, Coordination, Arc Flash Study |
| 7 | DI-MGMT-82002/DI-MISC-80508 | A/B 007 | 10.4 | 6.2 | Upon Request | Information Assurance /Cyber Securities |
| 8 | DI-MGMT-81893 | A/B 008 | 5.0 | 1.4, 2.1, 7.0 | As Required | Maintenance and Warranty Data Report |
| 9 | DI-MGMT-81893 | A/B 009 | 1.0 | 5.1,5.2 | As Required | System Overview Training |
| 10 | DI-MGMT-80227 | A/B 010 | 1.0 | 7 | As Required | Operation/Maintenance Technical Manuals, As Built Drawings, Warranty and Project Closeout Checklist |
| 11 | DI-SAFT-81563 | A/B 011 | 3.2, 4.2.1, Section 1 | 7.3 | As Required | Accident/Incident Report |
| 12 | DI-SAFT-81563 | A/B 012 | 3.2, 4.2.1, Section 1 | 7.3 | As Required | Mishap Report |
| 13 | DI-MGMT-81893/DI-ADMN-81250B | A/B 013 | 1 | 3.3 | As Required | Program Management Reviews (PMR's) |
| 14 | DI-SAFT-81563 | A/B 014 | 3.0, Appendix B | - | As Required | Contractor's Safety Plan |