Sample_Task_3a.pdf
PDF 24 KB Posted
- Attached to
- Technical Order Support and Sustainment Federal contract opportunity
- Solicitation number
- FA8202-12-R-50990
About this file
Attached is a PDF version of Sample Task 3a. The purpose of adding the PDF version is incase offerors cannot open the xfdl version of Sample Task 3a.
View the file
Other files for this federal contract opportunity
Show all 50
Technical Order Support and Sustainment has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMPLIANCE INFORMATION
PREVIOUS EDITION IS OBSOLETEAFTO FORM 873, 20090903
HEADING INFORMATION
A-10 TECHNICAL ORDER SUSTAINMENT CONTRACTOR
P.O. BOX 1234, ANYTOWN, USA 12345 20120930
INSTALLATION OF SUITE 15 SOFTWARE ON A-10C AIRCRAFT
1A-10C-999 1234567 20121201
12345 11 AUGUST 2012
TIME COMPLIANCE TECHNICAL ORDER REQUIREMENTS
1. TO 2. DATE
l.
3. TCTO TITLE
4. TCTO/SUPPLEMENT 5. DATA CODE NUMBER 6. TCTO ISSUE DATE
7. ECP NUMBER 8. CCB APPROVAL DATE (NSN or CPIN)
N/A
10. REPLACES/REINSTATES TCTO NUMBER 11. TYPE/CATEGORY OF TCTO
a.
URGENT ROUTINE
b
SUPPLEMENT
c.
d.SAFETY
RECORD
IMMEDIATE
1 YEAR 20131201
12. CLASSIFICATION OF TCTO 13. MOD NUMBER 14. MIP NUMBER
15. FAA APPROVAL NUMBER
UNCLASS SECRET CONF
16. SAFETY TCTO MARKING REQUIRED (Routine Safety TCTO only) 17. RECISSION PERIOD/DATE
YES NO
ll.
18. LEVEL OF ACCOMPLISHMENT 19. WHEN TO BE ACCOMPLISHED
O/I LEVEL MAINTENANCE a. IMMEDIATELY UPON RECEIPT OF THE TCTO (Immediate)
DEPOT LEVEL TRC FIELD NOT LATER THAN DAYS AFTER (The TCTO) (All components) b.
20. ARE AVAILABLE (Urgent)
c. AT TIME OF ALL COMPONENTS BEING AVAILABLETCTO FUEL PURGE REQUIRED
ADDITIONAL WORK REQUIRED d. DURING DEPOT LEVEL MAINTENANCE
SUPPLY INFORMATION
ORGANIZATIONAL/INTERMEDIATE MAJCOMS/ORGANIZATIONS
1A-10C-900 0123456
E DIRECT MILITARY SUPPORT AFLCMC/WWAEH
20121201
AFLCMC/WWAEH, 6067 BOX ELDER LANE, BUILDING 1284, HILL AFB, UT 84056
21. WORK REQUIRED BY THIS TCTO WILL BE ACCOMPLISHED
a. BY (ALC) b. AS SCHEDULED BY c.
CONCURRENTLY WITH PRIOR SUBSEQUENT TO TCTO DATA CODE
d.
LAUNCH FACILITIES WILL
WILL
N/A
N/A
WILL NOT BE REMOVED FROM ALERT STATUS TO ACCOMPLISH THIS WORK
WILL NOT BE REMOVED FROM ALERT STATUS TO ACCOMPLISH THIS WORK
e.
SYSTEM
22. DISTRIBUTION STATEMENT 23. REASON 24. CONTROLLING DOD OFFICE
26. EXPORT 27. HANDLING & DESTRUCTION NOTICE25. AS OF DATE
YES NO YES NO
llI.
28. AFMC FORM 874 IS REQUIRED 29. SPARES AFFECTED
YES NO YES NO
30. CONTRACTOR SHOULD SUBMIT AFMC FORM 874 TO
31. WAR RESERVE MATERIAL (WRM) N/A
CANISTERED ITEMS AFFECTED SPECIAL INSTRUCTIONS REQUIRED COMPLIANCE ESSENTIAL FOR ALL WRM
KIT INSTALLATION TOOLSlV.
SPECIAL TOOLS, TEST EQUIPMENT, FIXTURES, OR SOFTWARE ARE REQUIRED YES NO
MANHOURS REQUIRED WEIGHT AND BALANCEV. VI.
EXPANDED BREAKDOWN AS SHOWN IN SPECIFICATION
CHANGE NO CHANGE N/ATOTAL (manhours)
URGENT NOT URGENT
9. END ITEM NUMBER
1A-10C-999FORM ENTRY REQUIREMENTS PRESCRIBED BY THE 00-20 SERIES TECHNICAL ORDERS
TECHNICAL ORDER NUMBER/CHANGE #
FUNCTIONAL CHECK
AFTO FORM 873, 20090903
TCTO NO:Vll.
32.
VIII.
33. 34. 35. FLIGHT MANUAL MANAGER
REQUIRED
N/A
FUNCTIONAL CHECK FLIGHT
N/A
N/A
SIGN
NOT REQUIRED SYSTEM OPERATIONAL CHECK
N/AlX. TECHNICAL ORDERS
DATE OF BASIC/CHG TECHNICAL ORDER NUMBER/CHANGE # DATE OF BASIC/CHG
1A-10C-01 20080601 20120110
1A-10C-1 20081110 20110910
1A-10C-2-12JG-1 20070601 20110202
1A-10C-2-23JG-1 20080201 20100203
1A-10C-2-34JG-1 20100205 20110101
1A-10C-2-40MS-1 20100205 20110101
Upon completion of TCTO, update applicable maintenance data collection system(s) in accordance with command directives and TO 00-20-2, Table 3-10, Rule 1. The activity performing the TCTO shall make the appropriate status entries in the maintenance records (e.g. AFTO Form 349, AFTO Form 95, AFMC Form 173, IMDS/REMIS/CEMS/G081, etc.) and compliance reports.
Click here to sign
REMARKS
1A-10C-999
COMPLETE KIT
MODIFICATION MARKINGS
CERTIFICATION: "I CERTIFY THAT THE ABOVE ENTRIES ARE ESSENTIAL REQUIREMENTS AND CONFORM TO EXISTING AIR FORCE POLICIES"
AFTO FORM 873, 20090903
TCTO NO:
XIV.
INDIVIDUAL PREPARING FORM (Signature, Orgn, Symbol and Phone) BRANCH APPROVAL (Typed Name and Signature)
FAA APPROVING OFFICIAL (Typed Name and Signature) TECH ORDER MANAGEMENT OFFICE APPROVAL (Typed Name and Signature)
PROGRAM MANAGER (PM) (Typed Name and Signature) SAFETY OFFICE (Typed Name and Signature)
Blocks 9, 13, 14, 15, 20, 40: Intentionally left blank.
Purpose: The purpose of this Time Compliance Technical Order (TCTO) is to update the A-10C aircraft to Suite 15.
21c. Work Required by this TCTO will be accomplished subsequent to TCTO 1A-10C-900, Installation of Suite 14 Software On A-10C Aircraft.
XX1234-10-E-9000 0009
42. CONTRACT NO: 43. CLIN:
XlIl.
41. REMARKS
VERIFICATION (TCTO/Kit) XI.X.
36. 37. VERIFICATION SITE 38. WAIVED
REQUIRED
CONTRACTOR FACILITY
YES NO
NOT REQUIRED (See Remarks ) DEPOT FIELD
XlI.
MAJCOM COORDINATION FOR
WAIVER -- DATE
39. REQUIRED 40. TYPE AND LOCATION
YES
NAME:
GRADE:
NO OFFICE SYMBOL:
PHONE:
Click here to sign Click here to sign
Click here to sign Click here to sign
Click here to sign Click here to sign
File details come from the government source that posted it. Updated .