Solicitation Amendment - FA813726R00400002.pdf
PDF 1 MB Posted
- Solicitation number
- FA8137-26-R-0040
About this file
This is a Solicitation Amendment for a Multiple Award Construction Contract (MACC) Indefinite Delivery/Indefinite Quantity (IDIQ) at Tinker Air Force Base, Oklahoma, issued by the U.S. Air Force. The solicitation number is FA813726R00400002, issued August 4, 2026, with amendments acknowledged on August 5 and August 19, 2026. Sealed bids are due September 11, 2026, at 4:00 PM local time. The contract is a partial small business set-aside with a 50% set-aside requirement. The NAICS code is 236210 with a small business size standard of $45 million in annual receipts.
The MACC provides a single 5-year ordering period (March 26, 2027 to March 25, 2032) followed by one 5-year option period (March 26, 2032 to March 25, 2037) for a total of 10 years. The minimum guaranteed contract value is $500 payable after a mandatory post-award conference. The total aggregate maximum contract value for all awarded contracts combined is $950,000,000. Contractors must furnish performance and payment bonds within 10 calendar days of award and begin performance within 10 calendar days of receiving notice to proceed, with completion required within 365 calendar days. The contract covers general construction services using multiple delivery methods: Design-Build, Progressive Design-Build, Accelerated Design-Build, Construction with Limited Design, and Construction Only. Work will be performed at Tinker AFB, Oklahoma, with inspection and acceptance by the 72 ABW Civil Engineering office. Task orders will be issued using fair opportunity procedures under FAR 16.507-2, with the government reserving rights to on-ramp or off-ramp contractors during the contract period. Pricing is firm fixed price for base services, with economic price adjustment available at the task order level. Proposals must be valid for 365 days from the closing date.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION
NUMBER
FA813726R00400002
2. TYPE OF SOLICITATION
SEALED BID (IFB) INVITATION
FOR BID
NEGOTIATED (RFP) REQUEST
FOR PROPOSAL
3. DATE ISSUED
04 Aug 2026
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
TBD
7. ISSUED BY CODE: FA8137
FA8137 AFSC PZIOC
CP 405 739 4040, 7858 5TH ST STE 1
TINKER AFB, OK 73145-9125
UNITED STATES
HAILIE REYES, Email: hailie.reyes@us.af.mil Telephone: 4053393513 David Logue, Email: david.logue.1@us.af.mil Telephone: 405-734-1512
8. ADDRESS OFFER TO
FA8137 AFSC PZIOC
CP 405 739 4040, 7799 ARNOLD AVE BLDG 3 FIRST FLOOR
TINKER AFB, OK 73145-9125
UNITED STATES
9. FOR
INFORMATION
CALL:
a. NAME
HAILIE REYES
b. TELEPHONE NUMBER (include area code) (NO COLLECT CALLS) 4053393513
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10.THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
Project Title: Multiple Award Construction Contract Project Location: Tinker AFB, Oklahoma
PROGRAM: Multiple Award Construction Contract (MACC) is a competitive Indefinite-Delivery Indefinite-Quantity (IDIQ), for Tinker AFB. Specific projects will be defined with each individual Task Order.
PERIOD OF PERFORMANCE: A Single 5-year Ordering Period followed by one (1), 5-Year Option for a total of ten (10) years.
MININUM/MAXIMUM: The minimum guaranteed amount for the life of each awarded contract is $500.00 that is payable following attendance at a mandatory post-award conference. The total aggregate maximum contract value for all awarded contracts combined is estimated at $950,000,000.00 for the 10-year ordering period.
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving 10 365 award, notice to proceed. This performance period is mandatory negotiable. (See ). FAR 52.211-10
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
YES NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) 1 04:00 PM local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes 11 Sep 2026 containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. 365
Computer generated. STANDARD FORM 1442 (REV. 12/2022) Prescribed by GSA-FAR (48CFR) 53.236-1(d)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
0002 0001
DATE 19 Aug 2026 05 Aug 2026
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED
STATES CODE AT
10 U.S.C 3204(a) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document
Contractor agrees to furnish and return copies to issuing office.)
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
Computer generated. STANDARD FORM 1442 (REV. 12/2022) BACK
Section A - Solicitation/Contract Form Multiple Award Construction Contract (MACC)
NAICS: 236210
Size Standard: USD 45,000,000.00 Annual receipts
Small Business Type: Small Business Set Aside Percent: 50
Product Service Code: Z2JZ
FA813726R00400002
Section B - Supplies or Services & Prices or Costs Additional Information/Notes
Funds are not presently available for this acquisition. No Task Order awards will be made until appropriated funds are available. Funds are anticipated to be available in
FY27.
This is an Indefinite Delivery Indefinite Quantity solicitation/contract as contemplated by RFO 16.501 and referenced in RFO 52.216-22, Indefinite Quantity. Because the Multiple Award Construction Contract (MACC) is a multiple award acquisition, the dollar amount issued under any MACC contract/task order will count towards the total contract maximum of $950,000,000.00. The contract maximum is $950,000,000.00 for all task orders issued under the MACC basic contracts. The CLIN structure for continued performance of services under the option will be incorporated via modification at the time of option exercise.
______ Check here if your proposal applies to the Small Business (SB) Competition Pool
______ Check here if your proposal applies to the Full and Open (F&O) Competition Pool
______ Check here if you are a Small Business proposing for both Competition Pools (Required to submit separate proposals)
Offerors shall annotate in their proposal documentation that the proposal is valid for an acceptance period of 365 days.
FOB: To be cited on each individual order
Item Supplies / Services Estimated Quantity Unit Unit Price Amount
Design-Build
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project Lump Sum
Progressive Design-Build
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project Lump Sum
Accelerated Design Build
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project Lump Sum
Construction with Limited Design
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project Lump Sum
Construction Only
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project Lump Sum
Contract Data Requirement List
(CDRL)
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project Not Separately Priced
Delivery Incentive
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project To Be Negotiated
Economic Price Adjustment
Product Service Code: Z2JZ Pricing Arrangement: Fixed Price with Economic Price Adjustment - Cost Indexes
1 Project To Be Negotiated
Post Award Conference
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project Lump Sum
Option Line Item 1001
Option Period 1 Design-Build Option Period
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project Lump Sum
Option Line Item 1002
Option Period 1 Progressive Design-Build Option Period
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project Lump Sum
Option Line Item 1003
Option Period 1 Accelerated Design Build Option Period
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project Lump Sum
Option Line Item 1004
Option Period 1 Construction with Limited Design Option Period
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project Lump Sum
Option Line Item 1005
Option Period 1 Construction Only Option Period
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project Lump Sum
Option Line Item 1006
Option Period 1 Contract Data Requirement List (CDRL) Option Period
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project Not Separately Priced
Option Line Item 1007
Option Period 1 Delivery Incentive Option Period
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project To Be Negotiated
Option Period 1
Option Line Item 1008 Economic Price Adjustment Option Period
Product Service Code: Z2JZ Pricing Arrangement: Fixed Price with Economic Price Adjustment - Cost Indexes
1 Project To Be Negotiated
Option Line Item 1009
Option Period 1 Post Award Conference Option Period
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project Lump Sum
Section C - Description/Specifications/Statement of Work
Requirements Multiple Award Construction Contract (MACC) Indefinite Delivery/Indefinite Quantity (IDIQ) for general construction services on Tinker AFB, OK
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.246-12 Inspection of Construction. Aug 1996 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements. Aug 1996 Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil
Option Line Item 1001
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil
Option Line Item 1002
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil
Option Line Item 1003
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil
Option Line Item 1004
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil
Option Line Item 1005
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil
Option Line Item 1006
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil
Option Line Item 1007
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Option Line Item 1009
Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG 400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Section F - Deliveries or Performance Overall Contract Delivery Period
Line Item Delivery Schedule Estimated Quantity Address and POC
Delivery Schedule From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2027 To 25 Mar 2032
Delivery Schedule From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2027 To 25 Mar 2032
Delivery Schedule From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2027 To 25 Mar 2032
Delivery Schedule From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
0004 Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2027 To 25 Mar 2032
Delivery Schedule From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2027 To 25 Mar 2032
Delivery Schedule From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2027 To 25 Mar 2032
Delivery Schedule From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2027 To 25 Mar 2032
Delivery Schedule From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2027 To 25 Mar 2032
Delivery Schedule From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2027 To 25 Mar 2032
Option Line Item 1001
Delivery Schedule From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2032 To 25 Mar 2037
Option Line Item 1002
Delivery Schedule From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2032 To 25 Mar 2037
Option Line Item 1003
1 Project
Ordering Period From 26 Mar 2032 To 25 Mar 2037
Delivery Schedule From date of lead time event to beginning of
1 Project Place of Performance DoDAAC: F3Y0AB
Option Line Item 1004 performance 10 Calendar Days Date of Notice to Proceed Receipt
CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2032 To 25 Mar 2037
Option Line Item 1005
Delivery Schedule From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2032 To 25 Mar 2037
Option Line Item 1006
Delivery Schedule From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2032 To 25 Mar 2037
Option Line Item 1007
Delivery Schedule From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2032 To 25 Mar 2037
Delivery Schedule From date of lead time event to beginning of
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
performance 10 Calendar Days Date of Notice to Proceed Receipt
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2032 To 25 Mar 2037
Option Line Item 1009
Delivery Schedule From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F3Y0AB CountryCode: USA
F3Y0AB 72 ABW CE 2
AF BPN NO MLSBLS PROC CP4057343022, 7535 5TH ST BLDG
400 STE 118
TINKER AFB, OK 73145-9043
UNITED STATES
Mr. Matthew Morris Email: matthew.morris.27@us.af.mil Telephone: 4057367081
Ordering Period From 26 Mar 2032 To 25 Mar 2037
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.247-34 F.o.b. Destination. Jan 1991
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC ____ Issue By DoDAAC ____ Admin DoDAAC ____ Inspect By DoDAAC ____ Ship To Code ____ Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
FA8137.52.216-H1 PROCESS AND CRITERIA FOR ISSUING TASK ORDERS (JUNE 2026)
(a) A Procuring Contracting Officer (PCO) at Tinker AFB, will issue task orders under this Multiple Award Construction Contract (MACC). One or more orders may be issued during the performance period of this contract. The Contractor agrees to accept and perform orders issued by the Contracting Officer within the scope and within the maximum value of this contract. It is understood and agreed that the Government has no obligation to issue any orders except the minimum order. In the event of any inconsistency between any order and the contract, the contract shall take precedence. The procedures in this clause shall be used for solicitation, negotiation, and award of individual task orders hereunder.
(1) Small Business Set-Aside Competition Pool (FA8137.52.216-H2(a))
(i) At the discretion of the PCO, order-by-order set-asides for socioeconomic categories identified in RFO 19.000(a)(3) in Small Business Pool only.
(2) Full and Open Competition Pool (FA8137.52.216-H2(b))
(b) Contractors who wish to be considered for award of a task order shall respond in accordance with the instructions in the Fair Opportunity Proposal Request (FOPR) and comply with RFO 16.507-2. Orders placed under this MACC Indefinite Delivery/Indefinite Quantity (IDIQ) contract will be competitively awarded using RFO 16.507-2 fair opportunity processes.
(c) Fair Opportunity: RFO 16.507-2 provides that each contractor shall be given fair opportunity to be considered for each order exceeding $2,000 and issued under multiple award contracts unless an exception exists under RFO 16.507-2. The RFO states that the method to obtain fair opportunity is at the discretion of the PCO and that the PCO must document the rationale for placement and price of each order.
(d) IAW 13 CFR 125.2, 15 U.S.C. 644, RFO 19.504, and RFO 16.507-2, Contracting Officers may, at their discretion, set aside orders under partial small business set-aside Multiple Award Contracts (MAC) and Contracting Officers are encouraged to review the award dollars under the MAC and aim to make available for award at least 50% of the award dollars under the MAC to all small business basic contract holders in the Small Business Pool. After the MAC is awarded, the Contracting Officer will review all contractors in the Small Business Pool to determine what socioeconomic categories are available for additional set-asides. Set-asides may include Small Business Administration (SBA) certified socioeconomic categories identified in RFO 19.000(a)(3), which are listed below:
(1) 8(a) participants, HUBZone small business concerns, service-disabled veteran-owned small business (SDVOSB) concerns eligible under the SDBOSB Program, and economically disadvantaged women-owned small business (EDWOSB) concerns and women-owned small business (WOSB) concerns eligible under the WOSB Program.
(2) Furthermore, there is no order of precedence among the socioeconomic categories. The Contracting Officer will document in the order file showing the apparent successful offeror's certifications in the System for Award Management (SAM) showing that the representations were reviewed.
(3) The FOPR will clearly identify any set-aside orders for socioeconomic categories listed in (d)(1).
(e) Unless otherwise determined by the PCO, the Contractor will not be required to submit mandatory proposals for every requirement. In the event that adequate competition (two or more proposals per the RFO) is not obtained following issuance of a FOPR, the Government may extend the proposal due date and require all contractors in the eligible competition pool to submit a proposal in response to the FOPR. Additionally, at the discretion of the PCO, the FOPR may require mandatory proposals for a particular site. An offeror's task order proposal shall be valid for at least 120 days from the closing date and time specified within the FOPR. The Contractor's proposal shall be furnished to the PCO within the timeframe specified in the FOPR.
(f) The Contracting Officer reserves the right to mandate proposals from every contractor in the specified competition pool to fulfill mission requirements. Mandatory proposals will be designated at the task order level if required.
(g) The Government may offer mandatory site visits before or after issuance of the FOPR. Site visit attendance will be at the expense of the Contractor.
(h) Upon receipt of proposals, the Government will evaluate the proposals and award a task order to the successful offeror. The Government will issue task orders in accordance with the evaluation criteria specified in the FOPR.
(i) The FOPR will describe how the total evaluated price for that task order will be determined and will identify the evaluation criteria and relative weights the Government will use to determine which task order proposal represents the "best value" to the Government. The PCO may use past performance information to determine "best value" when awarding the task order. If a past performance evaluation will be conducted in the individual FOPR, instructions and evaluation criteria will be provided at the FOPR level, as applicable. Any adverse performance information will be provided to the Contractor as it becomes available, and the contractor shall work with the Cognizant Contracting Officer and/or QAPC for resolution of the condition leading to the adverse performance report(s).
(j) The Government may reject any evaluated task order proposal that fails to adequately address a significant portion of the requirement or contract terms and conditions, or unreasonably high or unrealistically low in price. During evaluation, if the Government determines that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the applicable task it may not be considered for further evaluation. The Government may request data other than certified cost and pricing data to assist in this evaluation.
(k) The Government intends to award task orders without interchanges but reserves the right to conduct interchanges if necessary. Offerors are highly encouraged to submit their best offer in their initial proposal.
(l) Interchanges are the fluid exchange of information between the Contracting Officer and Offerors during the ordering process. The Government may conduct interchanges with some, none, or all offerors in its discretion. If needed, the Government reserves the right to request a formal proposal update resulting from interchanges.
A formal proposal update may be in the form of change pages.
(1) The Government reserves the right to withdraw the FOPR at any time prior to award, meaning before or after the closing date for receipt of task order proposals. In the event the Government cancels a FOPR, the Government has no obligation to reimburse an offeror for any costs. This decision shall be final and conclusive and shall not be subject to the disputes clause or the Contract Disputes Act.
(m) The Contractor shall submit the task order proposals via electronic means. Electronic copies of the proposal shall be submitted in a readable format as specified in the FOPR. The email inbox designated in the instructions for proposal preparation for any FOPR is the only point of receipt and no other United States Government (USG) point of contact will be acceptable. Ultimately, it is the offeror's responsibility to submit a timely proposal and allow sufficient time for the proposal to clear the Agency's email servers.
(n) The Government may establish options on individual task orders issued hereunder. The price proposal shall consist of the offeror's price to accomplish the basic requirements as defined in the Statement of Work (SOW). The price proposal shall also include the offeror's price to accomplish each option as applicable. Options will be evaluated IAW 52.217-5, Evaluation of Options incorporated by reference into the award and by the evaluation criteria stated in the FOPR. Evaluation of options will not obligate the Government to exercise the option(s). In the event an option is exercised, a contract modification will be issued to the task order.
(o) Task orders shall be issued in writing using DD Form 1155. All subsequent modifications shall be issued in writing using SF Form 30.
(p) The response time for each FOPR will be determined by the Contracting Officer dependent upon the needs of the Government.
(q) Upon receipt of any task order issued hereunder, the Contractor shall furnish to the Government the services, materials, and data required at the price set forth in the task order.
(r) The Contractor is not authorized to commence performance prior to issuance of the task order without the PCO's written permission.
FA8137.52.206-H2 COMPETITON POOLS (JUNE 2026)
(a) Small Business Set-Aside Competition Pool. This contract has been awarded as a "partial set aside" as defined in 13 CFR Part 125.1. The Government will set aside task orders that it estimates have a magnitude of less than $10 million. For set aside task orders, the PCO will solicit task order proposals from only those small businesses that are certified under the terms of this contract. The PCO may, at their discretion, set-aside on an order-by-order basis for SBA certified socioeconomic categories listed in RFO 19.000(a)(3) for the Small Business Set-Aside Competition Pool only.
(b) Full and Open Competition Pool. Task orders that exceed the partial set-aside standards defined in subparagraph (a) will not be set aside. For task orders that the Government estimates will have a magnitude equal to or exceeding $10 million, the PCO will solicit task order proposals from all the contractors (small and large business) who successfully submitted a proposal in response to the non-set-aside portion of the solicitation that resulted in this contract.
FA8137.52.216-H3 ON-RAMPING (JUNE 2026)
(a) The Government reserves the unilateral right to reopen competition or "on-ramp" additional contractors in either competition pool at any time during the term of the contract. The Government may choose to on-ramp any number of new awardees when the Contracting Officer determines it is in the Government's best interest to do so in order to enhance the competitive environment of FOPRs under the originally awarded IDIQ contracts. This may be due to any reason, including the lack of robust competition for FOPRs or a shrinking of the competitive pool of original effective IDIQ awardees under this solicitation.
(b) When an on-ramp is used, the Government will advertise the reopening of the competition on SAM.gov, and awardees shall meet the criteria established in the initial MACC solicitation; this includes all evaluation criteria. The evaluation and selection of awardees for any on-ramp will be exactly the same as the evaluation and award criteria used for the MACC initial basic contract awards. The anticipated number of awards for any small business and F&O pools of competition will be announced in the reopening announcement posted to SAM.gov. Any new awardees will compete with any existing or remaining Contractors for all task orders in the appropriate competition pool.
(c) The Government will incorporate via unilateral modification any updated, mandatory federal clauses (e.g., clauses arising from RFO class deviations or statutory updates). Acceptance of the unilateral modification is a mandatory condition to remain in the active bidding pool.
(d) Any additions due to on-ramps will not impact the $950 million MACC contract maximum and the ordering period for new awardees will not exceed the overall maximum term of the original ID/IQ contract, including options (i.e., will not extend past the dates established at initial award).
(e) The Government will not consider unsolicited requests for addition to either or both of the competition pools.
FA8137.52.216-H4 OFF-RAMPING (JUNE 2026)
(a) The Government reserves the unilateral right to Off-Ramp Contractors for non-performance or unsatisfactory performance. Contractors that are Off-Ramped will be restricted on future bidding under either competition pool. The Government reserves the right to Off-Ramp contractors with active, ongoing performance on existing task orders. The Off-Ramp process under an IDIQ contract encompasses several methods by which the Government may exercise its right to remove a contractor from the pool of effective IDIQ contract awardees. The Off-Ramp methods include, but are not limited to:
(1) PCO determines that exercising of Option I is not in the Government's best interest, therefore, allowing the Contractor's contract term to expire.
(2) Debarment, suspension, or ineligibility as defined in RFO Subpart 9.4501-1, 9.405-2.
(3) Termination as defined in RFO Part 49.402, 49.403.
FA8137.52.227-H5 GOVERNMENT RIGHTS (JUNE 2026)
(a) Data Rights in Special Works
(1) The contractor shall retain ownership and copyright of contractor's data, designs, drawings, and deliverables resulting for its performance under this contract, unless otherwise specified at the task order (TO) level.
(2) In exchange for retained ownership, contractor grants perpetual, worldwide, nonexclusive, irrevocable, and royalty-free license to use, modify, reproduce, release, perform, display, or disclose these deliverables in any manner and for any Government purpose, and to authorize others to do so on the Government's behalf.
(3) The contractor shall clearly identify any pre-existing intellectual property incorporated into the deliverables prior to delivery and it will be subject to standard commercial licensing terms, provided those terms do not restrict the Government's ability to utilize deliverables for their intended operational purpose.
(b) Unlimited Government Rights
(1) The Government shall have unlimited rights, in all drawings, designs, specifications, notes and other works developed in the performance of this contract, including the right to use same on any other Government design or construction without additional compensation to the Contractor. The Contractor hereby grants to the Government a paid-up license throughout the world to all such works to which he may assert or establish any claim under design patent or copyright laws. The Contractor for a period of three (3) years after completion of the project agrees to furnish the original or copies of all such works on the request of the Contracting Officer.
(c ) Drawings and Other Data
(1) All designs, drawings, specifications, notes and other works developed in the performance of this contract shall become the sole property of the Government and may be used on any other design or construction without additional compensation to the Contractor. The Government shall be considered the "person for whom the work was prepared" for the purpose of authorship in any copyrightable work under 17 U.S.C. 201(b). With respect thereto, the Contractor agrees not to assert or authorize others to assert any rights nor establish any claim under the design patent or copyright laws. The Contractor for a period of three (3) years after completion of the project agrees to furnish all retained works on the request of the Contracting Officer. Unless otherwise provided in this contract, the Contractor shall have the right to retain copies of all works beyond such period.
(d) Rights in Shop Drawings
(1) Shop drawings for construction means drawings, submitted to the Government by the Construction Contractor, subcontractor or any lower-tier subcontractor pursuant to a construction contract, showing in detail (i) the proposed fabrication and assembly of structural elements and (ii) the installation (i.e., form, fit, and attachment details) of materials or equipment. The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.
(2) If any required technical data to include but not limited to shop drawings specified to be delivered under this contract, is not delivered within the time specified by this contract or is deficient upon delivery (including having restrictive markings), the Contracting Officer may until such data is accepted by the Government, withhold payment to the Contractor of ten percent (10%) of the total contract price or amount unless a lesser withholding is specified in the contract. Payments shall not be withheld nor any other action taken pursuant to this paragraph when the Contractor's failure to make timely delivery or to deliver such data without deficiencies arises out of causes beyond the control and without the fault or negligence of the Contractor.
(3) The withholding of any amount or subsequent payment to the Contractor shall not be construed as a waiver of any rights accruing to the Government under this contract.
FA8137.52.236-H6 PROGRESSIVE DESIGN-BUILD (JULY 2026)
(a) 10 U.S.C. (S) 3241(g) formally codifies and authorizes Progressive Design-Build (PDB) to enhance the Government's ability to execute complex projects with greater cost certainty and reduced risk.
(b) PDB is a collaborative project delivery method with a two-phase approach in which the Government selects a design-build team based on qualifications rather than a firm bid, fostering partnership from the earliest stages.
(c ) During the initial phase, the design-builder works with the Government to advance the design to a significant level of completion, while providing pre-construction services to establish a Guaranteed Maximum Price (GMP). Following Government acceptance of the advanced design and GMP for construction, the project proceeds to the second phase final design and construction.
(d) If a fair GMP cannot be negotiated the Government has the right to terminate the contract. If the contract is terminated, the Government shall own the developed design for use to complete the project with a different contractor or utilizing a different delivery method.
FA8137.52.236-H7 ACCELERATED DESIGN-BUILD (JULY 2026)
(a) 10 U.S.C (S) 3241(f)(1) provides the legal and financial authority to utilize Accelerated Design-Build delivery method. The Government is authorized to use MILCON Design Appropriations to award a design-build contract prior to the authorization and appropriation for the construction.
(b) The Government reserves the right to award the initial contract for full design services with the option to proceed with construction at a later date.
(c ) Limiting Liability of an Accelerated Design Effort
(1) 10 U.S.C (S) 3241(f)(2) limits the liability of the Government for design-build efforts.
(2) If the Government does not proceed with construction resulting from an accelerated design-build for any reason to include but not limited to, lack of authorized or appropriated funding for the construction effort or termination for convenience, the Government shall only be liable for the cost of the design work that has been completed.
The Government shall not be liable for any damages resulting from lost construction revenue.
FA8137.52.216-H8 GOVERNMENT USE OF ECONOMIC PRICE ADJUSTMENT (JUNE 2026)
(a) The Government anticipates that certain construction task orders issued under this Multiple Award Indefinite Delivery Indefinite Quantity (IDIQ) contract may be subject to significant economic fluctuations in labor or material costs. To mitigate this risk for both the Government and the Contractor, the Government may utilize Fixed-Price with Economic Price Adjustment (FP-EPA) pricing arrangements for individual task orders.
(b) Because the scope, duration, and specific material requirements (e.g., steel, concrete, copper) of individual construction projects will vary, the specific Fixed-Price Economic Price Adjustment clause(s) are not established at the basic IDIQ level. Instead, the specific RFO, D-RFO, or agency-specific EPA clause(s) will be selected and incorporated at the time of the task order solicitation.
(c ) When an ordering contracting officer determines that an EPA is appropriate for a specific project, the solicitation will explicitly identify:
(1) The specific EPA clause being utilized (e.g., RFO 52.216-2, 52.216-3, RFO 52.216-4, or an approved agency deviation/custom clause).
(2) The specific materials, supplies, or labor categories that are eligible for price adjustment.
(3)…
This is the start of the file's text. The full file is on GovTribe.