This file is a cross-reference matrix appendix for the Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC), solicitation number FA8137-26-R-0040. The file serves as a template or reference document and does not specify required products, services, response dates, or pricing terms. It is designed to assist offerors in navigating the solicitation requirements and correlating information across the RFP documents.
The matrix appendix supports an Indefinite Delivery Indefinite Quantity (IDIQ) contract vehicle issued by the Department of the Air Force Materiel Command Air Force Sustainment Center for general construction services at Tinker Air Force Base, Oklahoma. Work will encompass sustainment, maintenance, repair, alteration/renovation, and minor construction projects executed through either Design-Build methodology (contractor provides both design and construction) or Construction with Limited Design methodology (government provides design; contractor develops portions and performs construction). Task orders will define specific execution methods and project requirements.
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SB Cross Reference Matrix
| Air Force Sustainment Center PZIOC MACC |
| Solicitation No.: FA813726R0040 |
| Appendix E to Section L, Small Business Cross Reference Matrix |
| Element | Offeror to Fill per Column C, Appendix C | Deliverables | Work Sample Number | Reference | |||
| Document Title, Document Date, Page, Paragraph, Table Number (if applicable), Block (if applicable) | Notes / Clarifications (Optional) | ||||||
| Clarifying facts to further substantiate the claim, such as coordinates of remotes sites named in Reference Documents | Make sure columf F agrees with Section L, Para 4.5 (specifically the date) | ||||||
| EXAMPLE | $ | ||||||
| 300 | Contract, SOW | WS2 | Example Contract #2 DD Form 1155, 1 Feb 2021, Pg 1 (block 24); SOW Pg 3 (Para 1.5.1) | DD Form 1155s Block 24 shows effective date of work sample and contract value |
SOW shows nature of work
| Instruction to Offeror Paragraph | Section 1 – RELEVANT CONSTRUCTION EXPERIENCE | |
| Relevant Construction Projects: The submitted projects must meet the conditions listed below; completed after 1 May 2021; or at least 80% complete as of solicitation date | ||
| Category 1 | Commercial, Industrial & Residential Construction, Multi Trade | |
| Paragraph 5.1.1.1.1 | Submit multiple trade projects within the following thresholds (minimum of 1 project, up to 5 in each range, maximum of 10 total) | 1-10 Projects (total) |
| Prime Contractor, $1M to $5M construction cost, Multiple Trades: Note: each project submitted receives a point value of 400pts | ||
| Prime Contractor, greater than $5M construction cost, Multiple Trades: Note: each project submitted receives a point value of 100 pts. | ||
| Paragraph 5.1.1.1.2 | Identify the number of projects for each threshold, per definitions provided in referenced paragraph. | 0-10 Projects |
| Number of trades 5-10 Note: each project submitted receives a max point value of 200pts. | ||
| Number of trades >10 Note: each project submitted receives a max point value of 300pts. | ||
| Category 2 | Construction for the DoD/DoW | |
| Paragraph 5.1.1.2. | Identify the number of projects executed for the DoD/DoW, up to 4 total | 0-4 Projects |
| Prime Contractor Projects for DoD/Dow: Note: each project submitted receives a max point value of 300pts. | ||
| Category 3 | Multiple Construction Projects Executed in Parallel | |
| Paragraph 5.1.1.3. | Identify 2 to 4 Projects executed in parallel during a period of at least 6 months, with multiple trades as defined in referenced paragraph. | 2-4 Projects |
| Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a max point value of 200pts. | ||
| Category 4 | Specialized Construction (specified construction category shall be at least 60% of total project) | |
| Paragraph 5.1.1.4 | Submit up to 1 project for each Specialized Construction category. Note: each project submitted receives a point value of 100pts. | 0-1 Projects |
| Prime Contractor greater than $1M construction cost, AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a point value of 100pts. | ||
| Prime Contractor, geater than $1M construction cost, $1M FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 100pts. | ||
| Prime Contractor greater than $1M construction cost, ROAD/PARKING/PAVEMENT CONSTRUCTION: Note: each project submitted receives a point value of 100pts. | ||
| Prime Contractor greater than $1M construction cost, UTILITY SYSTEM CONSTRUCTION: Note: each project submitted receives a point value of 100pts. | ||
| Prime Contractor greater than $1M construction cost, ROOFING: Note: each project submitted receives a point value of 100pts. | ||
| Prime Contractor greater than $1M construction cost, AIRFIELD CONSTRUCTION: Note: each project submitted receives a point value of 100pts. | ||
| Instruction to Offeror Paragraph | Section 2 - DESIGN EXPERIENCE | |
| Relevant Design Projects: (The submitted projects must meet the conditions listed below; completed after 1 May 2021; OR at least 80% complete as of solicitation date) | ||
| Category 5 | Experience as Prime on Design-Build Projects (KTR Executes Design and Construction) | |
| Paragraph 5.1.2.1. | Submit a Project with Design Build effort | 0-1 Projects |
| Prime Contractor greater than $1M: Note: the project submitted receives a max point value of 400pts. | ||
| Paragraph 5.1.2.2. | For the Project above submit all design documents to demonstrate compliance with Unified Facilities Criteria (UFC) and the corresponding International Code Council (ICC) model codes and/or standards (i.e. NFPA, ASTM, ASCE) | Yes or No |
| Specifications: Note: completeness and accuracy of documents and compliance with local code requirements receives a point value of 20pts. | ||
| Interior and exterior walls (vertical construction elements) | ||
| Ceilings (horizontal construction elements) | ||
| Roofs | ||
| Waste water, water, and gas systems | ||
| Fire-extinguishing systems | ||
| Heat-supply systems | ||
| HVAC systems | ||
| Electrical systems | ||
| Communications, security and information systems | ||
| Building automation and automation of engineering structures | ||
| Drawings: Note: completeness and accuracy of documents and compliance with local code requirements receives a point value of 40pts. | ||
| Interior and exterior walls (vertical construction elements) | ||
| Ceilings (horizontal construction elements) | ||
| Roofs | ||
| Waste water, water, and gas systems | ||
| Fire-extinguishing systems | ||
| Heat-supply systems | ||
| HVAC systems | ||
| Electrical systems | ||
| Communications, security and information systems | ||
| Building automation and automation of engineering structures | ||
| Design Analysis/Calculations: Note: completeness and accuracy of documents and compliance with local code requirements receives a point value of 40pts. | ||
| Interior and exterior walls (vertical construction elements) | ||
| Ceilings (horizontal construction elements) | ||
| Roofs | ||
| Waste water, water, and gas systems | ||
| Fire-extinguishing systems | ||
| Heat-supply systems | ||
| HVAC systems | ||
| Electrical systems | ||
| Communications, security and information systems | ||
| Building automation and automation of engineering structures | ||
| Instruction to Offeror Paragraph | Section 3 - CERTIFICATION/LICENSES | |
| Category 6 | Does the Offeror have each or any of the following? Type the word Yes or No in Column C. | |
| Paragraph 5.1.3.1. | Project Management Professional | |
| Only one Yes which = 100pts /No = 0pts. | ||
| Paragraph 5.1.3.2. | LEED Professional | |
| Only one Yes which = 100pts /No = 0pts. | ||
| Paragraph 5.1.3.3. | Safety Professional | |
| Only one Yes which = 100pts /No = 0pts. | ||
| Paragraph 5.1.3.4. | Quality Professional | |
| Only one Yes which = 100pts /No = 0pts. | ||
| Instruction to Offeror Paragraph | Section 4 - STAFFING | |
| Category 7 | Does the Offeror have the following employees on their staff or have they previously employed these positons as of 1 May 2021? Type the word Yes or No in Column C. | |
| Paragraph 5.1.4.1 | Trade/Construction Workers | |
| 1-5 Workers: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0pts | ||
| Paragraph 5.1.4.2. | Architects/Engineers | |
| 1-3 A/E: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >3 A/E: Note: Only one Yes which = 200pts max /No = 0pts. | ||
| Paragraph 5.1.4.3. | Contract Program Manager(s) | |
| 1: Note: Only one Yes which = 100pts/No = 0pts. | ||
| >1: Note: Only one Yes which = 200pts/No = 0pts. | ||
| Paragraph 5.1.4.4. | Quality Control Manager(s) | |
| 1-2: Note: Only one Yes which = 100 pts/No = 0 pts | ||
| >2: Note: Only one Yes which = 200 pts/No = 0 pts | ||
| Paragraph 5.1.4.5.1. | Site Safety and Health Manager(s) | |
| Level 1 | ||
| Only one Yes which = 200pts max /No = 0pts. | ||
| Level 2 | ||
| 1-2: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >2: Note: Only one Yes which = 200pts max /No = 0pts. | ||
| Level 3 | ||
| 1-3: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >3: Note: Only one Yes which = 200pts max /No = 0pts. | ||
| Paragraph 5.1.4.6. | Design Program Manager(s) | |
| 1: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >1: Note: Only one Yes which = 200pts max /No = 0pts. | ||
| Paragraph 5.1.4.7. | Superintendents | |
| 1-2: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >2: Note: Only one Yes which = 200pts max /No = 0pts. |