This document is a summary of changes made to the October 2026 amendment of the Tinker Air Force Base Multiple Award Construction Contract (MACC) solicitation (FA8137-26-R-0040).

The changes reflect revisions to evaluation criteria, personnel qualifications, contract specifications, and submission requirements. Key modifications to the Small Business and Full and Open Pool self-scoring matrices include: adjusted construction cost thresholds (e.g., "greater than $5M" and "greater than $10M" replacing previous language); revised relevant construction experience dating requirements ("completed after 1 May 2021; or at least 80% complete" replacing prior language); removal of "multiple trades" definition language; clarification of design-build project submission requirements with emphasis on Unified Facilities Criteria (UFC) and International Code Council (ICC) compliance; and elimination of license requirements while retaining certifications. Personnel staffing requirements were updated to specify Quality Assurance Construction Inspector (QACI) terminology throughout; define Site Safety and Health Officer (SSHO) qualifications using Level One, Two, or Three designations per USACE publication EM 385-1-1; require separate full-time Quality Control Managers and SHOs for multiple project sites; permit superintendents to serve as Level Three SHOs; and clarify that subcontractors cannot serve as superintendent alternates. Additional changes include contract specification divisions modified (Division 23 HVAC specifications reorganized; Division 26 electrical specifications deleted); updated material approval forms; revised page formatting and file naming conventions; elimination of DD Form 577 requirements for certifying officials; and addition of traffic signage specifications under Division 10. Section L submission format requirements were clarified regarding teaming agreements, work sample documentation, and project eligibility criteria.

View the file

Other files

File Type Posted
Solicitation Amendment - FA813726R00400008.pdf PDF
Solicitation Amendment FA813726R00400008 SF 30.pdf PDF
01 35 26_25 Oct 26.pdf PDF
Follow up Questions and Answers 3 Nov 2026.xlsx XLSX spreadsheet
Attachment_2e_Appendix_E_MACC_SBCross_Reference_Matrix_05 Nov 26.xlsx XLSX spreadsheet
(Reference Only) Attachment 3 Section M Evaluation Criteria_25 Oct 26.docx DOCX document
(Reference Only) Attachment_2c_Appendix_C_MACC_SBSelf_Scoring_Matrix_25 Oct 26.xlsx XLSX spreadsheet
Attachment_2c_Appendix_C_MACC_SBSelf_Scoring_Matrix_05 Nov 26.xlsx XLSX spreadsheet
(Reference Only) Attachment_2e_Appendix_E_MACC_SBCross_Reference_Matrix_25 Oct 26.xlsx XLSX spreadsheet
Attachment_2f_Appendix_F_MACC_FOCross_Reference_Matrix_05 Nov 26.xlsx XLSX spreadsheet
(Reference Only) Attachment_2d_Appendix_D_MACC_FOSelf_Scoring_Matrix_25 Oct 26.xlsx XLSX spreadsheet
(Reference Only) Attachment 2 Section L Instructions to Offerors_25 Oct 26.docx DOCX document
(Reference Only) Attachment 1 Statement of Work r4_25 Oct 26.docx DOCX document
Attachment_2d_Appendix_D_MACC_FOSelf_Scoring_Matrix_10 Nov 26.xlsx XLSX spreadsheet
01 45 00_25 Oct 26.pdf PDF
Solicitation Amendment - FA813726R00400007.pdf PDF
Attachment 1 Statement of Work 5_Nov_26.pdf PDF
Solicitation Amendment FA813726R00400007 SF 30.pdf PDF
Attachment 2 Section L Instructions to Offerors_10 Nov 26.pdf PDF
(Reference Only) Attachment_2f_Appendix_F_MACC_FOCross_Reference_Matrix_25 Oct 26.xlsx XLSX spreadsheet
Attachment 3 Section M Evaluation Criteria_10 Nov 26.pdf PDF
Solicitation Amendment FA813726R0040006 SF30.pdf PDF
Solicitation Amendment FA813726R0040005.pdf PDF
Solicitation Amendment FA813726R0040005 SF30.pdf PDF
Solicitation Amendment FA813726R0040006.pdf PDF
Solicitation Amendment FA813726R0040004 SF30.pdf PDF
Solicitation Amendment FA813726R0040004.pdf PDF
Solicitation Amendment FA813726R00400006 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400006.pdf PDF
Solicitation Amendment FA813726R00400005 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400005.pdf PDF
Solicitation Amendment FA813726R00400004 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400004.pdf PDF
Questions and Answers 16 Sep 2026.xlsx XLSX spreadsheet
Solicitation Amendment FA813726R00400001 SF 30.pdf PDF
Solicitation FA813726R0040.pdf PDF
Solicitation Amendment FA813726R00400002 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400002.pdf PDF
Solicitation Amendment - FA813726R00400001.pdf PDF
Solicitation Amendment - FA813726R00400003.pdf PDF
Solicitation Amendment FA813726R00400003 SF 30.pdf PDF
FA813726R0040 Questions and Answers CAO 25 Aug 2026.xlsx XLSX spreadsheet
Attachment_2__Section_L 18 Aug 26.pdf PDF
Solicitation Amendment FA813726R00400002 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400002.pdf PDF
Attachment_2__Section_L 5 Aug 26.pdf PDF
Solicitation Amendment - FA813726R00400001.pdf PDF
Solicitation Amendment FA813726R00400001 SF 30.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
003 CDRL - TO Progress Mtg Signed.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cross Reference Matrix Category 3 Paragraph 5.2.1.3 Crossed out- with multiple trades of referenced paragraph Category 4 Paragraph 5.2.1.4 Crossed out- Note: each project submitted receives a point value of 100pts. All sections.

Attachment 2c Appendix C MACC SB Self Scoring Matrix Relevant Construction Experience:

Changed verbiage from “cannot be awarded prior to 1 May 2021 and at least 80% complete as of solicitation date” to “completed after 1 May 2021; or at least 80% complete as of solicitation date”.

Category 1:

Adjusted point value Changed “$5M - $10M” to “greater than $5M construction cost”.

Category 3:

Removed verbiage “with multiple trades as defined in referenced paragraph”.

Category 4:

Clarified “over $1M” to “greater than $1M construction cost”.

Category 6:

Removed the word “licenses”, kept “Certifications”.

Attachment 2f Appendix C MACC FO Self Scoring Matrix Relevant Construction Experience:

Changed verbiage from “cannot be awarded prior to 1 May 2021 and at least 80% complete as of solicitation date” to “completed after 1 May 2021; or at least 80% complete as of solicitation date”.

Category 1:

Changed “over $10M” to “greater than $10M construction cost”.

Category 3:

Removed verbiage “with multiple trades as defined in referenced paragraph”.

Category 4:

Clarified “over $10M” to “greater than $10M construction cost”.

Category 5:

Added verbiage “Ktr Executes Design and Construction”.

Added verbiage “to demonstrate” Added verbiage “Design Analysis” Category 6:

Removed Certifications for Credentialed Professionals

Statement of Work Section 2.2 Contracting Officer’s Representative (COR)- Crossed out definition.

Section 2.4 Project Manager- Updated Section 2.5 Quality Assurance Construction Inspector (QACI)- Updated Section 3.1.2.1 Contract Program Manager- Crossed out-when there is an active task order.

Section 3.1.2.2 Quality Control Manager (QCM)- crossed out (or Alternative) and Construction QA Inspector changed to QACI. Added additional paragraph- When the Contractor has multiple TO/projects sites, provide a separate full-time assistant QCM or QC Specialist (reference specification section 01 45 00) for each project site; the assistant/specialist may not serve as the Superintendent. A designated member of the QC organization shall be at each TO/project site at all times when work is being performed.

Section 3.1.2.3 Site Safety and Health Officer (SHHO) added: meet the qualification requirements of a Level One or Two SSHO as, crossed out have the minimum qualifications. Added the sentence and U.S. Army Corps of Engineers (USACE) publication EM 385-1-1, Safety—Safety and Occupational health (SOH) Requirements.

Added paragraph- When the Contractor has multiple TO/projects sites, provide a separate full-time Level Three SSHO for each project site; the Level Three SSHO may also serve as the Superintendent. A designated SSHO shall be at each project site at all times when work is being performed.

For purposes of this contract, a Level Three SSHO (i.e. Superintendent) is not considered to be a member of the QC organization. Crossed out- When SSHO is not a project site, a Designated Representative may be used (reference specification section 01 35 26). The SSHO, Alternate, or a DR shall be at each project site at all times when work is being performed.

Section 3.1.2.4 Design Program Manager- crossed out licensed in the State of Oklahoma AND DoDD changed to DOW Section 3.1.2.5 Project Superintendent (s) Crossed out -Superintendents are primarily and schedule adherence Crossed out- Superintendents must have a minimum of 5 years paragraph Added- subcontractors will not be used as alternates.

Added- 1. Previous experience as a superintendent is not required.

2. Qualified as a Level Three SSHO (qualified person) as set forth in specification section 01 35 26 and EM 385-1-1.

3. Alternate(s) shall be designated in writing to the CO.

Crossed out- The Superintendent of Alternate(s) cannot by the QCM. Construction QA Inspector changed to QACI.

Added- When the Contractor has multiple TO/projects sites, the Superintendent (or alternate) may serve as the Level Three SSHO for their respective TO/project sites (reference paragraph SITE SAFETY AND HEALTH OFFICER).

Crossed out- The Superintendent (or alternates) can be the Designated Representative (reference paragraph SITE SAFETY AND HEATLH OFFICER.

Section 3.1.3.1 Design Project Manager- Changed DoD to DOW Section 7.2 File Naming Conventions- Spacing adjusted Section 8 Correspondence- Crossed out- Construction QA Inspector changed to QACI Section 10.4 Contractor’s Proposal- crossed out- round changed to around Section 11.4 Task Order Progress Reporting- Crossed out- Construction QA Inspector and changed to QACI.

Section 11.5.0 General- Space format updated Section 11.5.4 Mechanical- Crossed out numbers 1,7, and 8.

Section 11.5.6 Fire Protection- Crossed out number 4.

Section 11.9 Inspection by the Government- crossed out Construction QA Inspector and changed to QACI.

Section 11.10 Field Changes- Crossed out Construction QA Inspector changed to QACI.

Section 11.11.4 Architectural/Engineering Review Crossed out Panel changed to Meeting.

Section 11.19 Warranty- Construction QA Inspector to QACI Section 14 Badges- Crossed out- The designated Certifying Officials shall complete DD Form 577, Appointment/ Termination Record- Authorized Signature and submit to the COR upon award of the contract. (Note: DD Form 577 must be renewed annually.)

Section 16 Work in Occupied Areas- crossed out Construction QA Inspector and changed to QACI.

Section 17 Protection of Existing Utilities During Excavation- crossed out Construction QA Inspector and changed to QACI.

Section 19 Outages and Closures-crossed out Construction QA Inspector and changed to QACI.

Appendix A- Abbreviations Added DOW-Department of War FAR- Federal Acquisition Regulation QACI- Quality Assurance Construction Inspector Deleted: UPB- Unit Price Break Appendix B- Contract Specifications Table of Contents Division 01- General Requirements Crossed out 014500.00 10 Quality Control replaced with 01 45 00 Quality Control Division 10- Added 10 14 53 Traffic Signage Division 23- Crossed out 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment 23 08 00 Commissioning of HVAC Systems 23 09 23.01 LONWorks Direct Digital Control for HVAC and Other building control systems.

23 31 13.00 40 Metal Ducks 23 34 23.00 40 HVAC Power Ventilators 23 36 00.00 40 Air Terminal Units 23 82 16.00 40 Air Coils 23 82 23.00 40 Unit Ventilators 23 82 43.00 40 Electric Duct Heaters 23 82 46.00 40 Electric Unit Heaters

ADDED

23 09 00Instrumentation and Control for HVAC
23 09 13Instrumentation and Control Devices for HVAC

Division 26 Electrical Deleted 26 25 00.00 40 Common Work Results for Electrical 26 05 48.00 10 Seismic Protection for Electrical Equipment Appendix C- TAFB Facility Standards and Reference Documents Tinker AFB General Requirements Specifications Attachments/Forms Deleted 01 33 00 Attachment 1 AF3000, Material Approval Submittal 01 78 00 Attachment 2 DD1354 Checklist

ADDED

01 33 00, Attachment 1 TAFB Form 3000, Material Approval Submittal (6 lines) 01 33 00, Attachment 1 TAFB Form 3000, Material Approval Submittal (12 lines)

SECTION L

1.9.2 Page Size and Format General Page Instructions- deleted Pages shall be numbered sequentially by volume, with each volume starting at page one.

1.9.3 Submission format- deleted- and will not rely on any other electronic submission.

3.4 Corporate Relationships and Structures- deleted Subcontracting relationships will be accepted.

Added # 8. If teaming contractor: provide teaming agreement(s) in accordance with RFO 9.6

4.1 General. Deleted-Self Scoring Matrix for small business pool proposals changed to Small Business Pool Self- Scoring Matrix. Deleted- Self Scoring Matrix for Full and Open Pool proposals changed to Full and Open Pool Self-Scoring Matrix

4.3 Work Samples. Added Small Business Pool Self-Scoring Matrix, deleted Self Scoring Matrix for Small Business Pool proposals. Added Full and Open Pool Self-Scoring Matrix, deleted Self Scoring Matrix for Full and Open Pool Proposals.

4.3.3 In 1. Added AND and deleted awarded and replaced with completed added OR and 2. The Offeror performed for at least six months AND

4.3.5 Deleted Work Samples shall be provided in their original format.

5.1.1.1.1 Deleted Category 1 and Bldg. Thresholds and added Construction.

5.1.1.1.2 Deleted Category 1 and Bldg. Thresholds and added Construction.

5.1.1.2 Admin changes to delete Category 1

5.1.1.3 Category 3. Multiple Construction deleted Multiple Trade is defined as definition.

5.1.2 Section 2, Category 5: Design Experience-deleted paragraph on which the Offeror performed for at least six months, the project was awarded on or after 1 May 2021 and the project is at least 80% complete as of the date of solicitation. The submitted projects must have been awarded on or after 1 May 2021, and the construction phase of the project is at least 80% complete and the Offeror performed for at least six months.

5.1.2.2 Design Document Submission. Deleted- one work sample submitted for Experience as Prime on Design Build Projects. Deleted- on one of the projects submitted for Experience as Prime on Design Build Projects. Deleted- Design Build is defined as the Offeror designing then building within one project. The submitted project must have been awarded on or after 1 May 2021 and the project is at least 80% complete as of the date of the solicitation. The Offeror shall provide at minimum with the design documents in compliance with all requirements of Unified Facilities Criteria (UFC) and the corresponding International Code Council (ICC) model codes and/or standards (i.e. NFPA, ASTM) within the work sample. Offerors will be scored by the completed elements submitted.

5.1.3 Section 3, Category 6: Certifications. Deleted Licenses

5.1.4.4.4 Changed to 5.1.4.5

5.1.4.4.3 Changed to 5.1.4.5.2

5.1.4.4.4 Changed to 5.1.4.5.3

5.1.4.4.4.5 Changed to 5.1.4.6

5.2.1.3 Category 3: Multiple Construction. Deleted- Multiple Trades is defined as: 1 and 2.

5.2.2 Section 2, Category 5: Design Experience. Deleted Several Paragraphs to include: On which the offeror performed for at least six months, the project was awarded on or after 1 May 2021 and the project is at least 80% complete as of the date of solicitation. The submitted projects must have been awarded on or after 1 May 2021, and the construction phase of the project is at least 80% complete and the Offeror performed for at least six month. Offeror shall provide the Contract, SOW, and approved scheduled within the work sample.

Design build is defined as the Offeror designing then building within one project. The submitted project must have been awarded on or after 1 May 2021 and the project is at least 80% complete as of the date of solicitation. The Offeror shall provide at minimum the design documents in compliance with all requirements of United Facilities Criteria (UFC) and the corresponding International Code Council (ICC) model codes and/or standards within the work sample. Offerors will be scored by the completed elements submitted.

5.2.3 Section 3, Category 6: Certifications Deleted Licenses

5.2.4.4 Changed to 5.2.4.5

5.2.4.4.1 Changed to 5.2.4.5.1

5.2.4.4.3 Changed to 5.2.4.5.2

5.2.4.4.4 Changed to 5.2.4.5.3

5.2.4.5 Changed 5.2.4.6

SECTION M

4.1 Technical Experience Small Business Pool deleted Evaluation.

4.1.1.1.1 Changed to 4.1.1.1.2

4.1.1.3 Category 3: Multiple Construction -Multiple Trade changed to Projects Executed in Parallel. Multiple Trade deleted throughout paragraph.

4.1.2.1 Experience as Prime Contractor on Design-Build Projects. Deleted-It is important for the Government to understand the Offeror’s prior experience and ability to identify problem solving if, and when, unknowns arise in a given construction project.

4.1.2.2 Design Document Submission. Deleted- the Offerors compliance with Unified Facilities Guides Specifications (UFGS) 01 33 16 00.10, Design Data(Design After Award).

4.2 Technical Experience Full and Open Pool. Deleted Evaluation.

4.2.1.1.1 Changed to 4.2.1.1.2

4.2.1.3 Category 3: Multiple Construction Multiple Trade changed to Projects in Parallel. Multiple Trade deleted throughout paragraph along with definition.

4.2.2.2 Design Document Submission. Deleted the offeror’s compliance with Unified Facilities Guides Specification (UFGS) 01 33 16 00.10, Design Data (Design After Award). It is important for the Government to understand the Offeror’s prior experience and ability to problem solve if, and when, unknowns arise in a given construction project.

4.2.3, 4.2.4, 4.2.4.5,4.2.4.7 Added Contingent hire added in all sections.

4.2.4.4 Changed to 4.2.4.6

4.2.4.5 Changed to 4.2.4.7