This file is a self-scoring sheet and cross-reference matrix serving as Appendix D to Section L of the Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC) solicitation FA8137-26-R-0040. The document provides offerors with a template to demonstrate qualifications across four main categories: relevant construction experience, design experience, professional certifications, and staffing capabilities. Each submission category contains specific scoring thresholds and point allocations, with offerors required to reference their supporting documentation (contracts, Statements of Work, DD Forms 1155, and project records) in a cross-reference matrix format.
The evaluation criteria encompass six scoring categories: Category 1 awards up to 300 points per commercial/industrial/residential project exceeding $10 million with multiple trades; Category 2 provides 300 points per Department of Defense or Department of Veterans Affairs project; Category 3 awards 100 points for parallel project execution; Category 4 addresses specialized construction (AT/FP measures, fire protection, roads/pavement, utility systems, roofing, airfield construction) at up to 300 points per project; Category 5 offers up to 400 points for design-build projects exceeding $10 million; and Category 6 certifications award up to 200 points for Project Management Professional credentials, with 100-point options for LEED, Safety, and Quality certifications. Category 9 staffing qualifications provide points for trade/construction workers (100-200 points), architects/engineers (100-200 points), program managers, quality control managers, site safety managers, and superintendents (100-200 points per position level). Projects must be completed after May 1, 2021, or at least 80 percent complete as of the solicitation date, with design projects required to be completed no later than March 31, 2025.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Self-Score Sheet
| Air Force Sustainment Center PZIOC MACC |
| Solicitation No.: FA813726R0040 |
| Appendix D to Section L, Cross Reference Matrix |
| Element | Offeror to Fill per Column C, Appendix C | Deliverables | Work Sample Number | Reference | |
| Document Title, Document Date, Page, Paragraph, Table Number (if applicable), Block (if applicable) | Notes / Clarifications (Optional) |
Clarifying facts to further substantiate the claim, such as coordinates of remotes sites named in Reference Documents
| EXAMPLE | $ | |||||
| Instruction to Offeror Paragraph | Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts. | 3 | Contract, SOW | WS2 | Example Contract #2 DD Form 1155, 1 Feb 2021, Pg 1 (block 24); SOW Pg 3 (Para 1.5.1) | DD Form 1155s Block 24 shows effective date of work sample and contract value |
SOW shows nature of work 1 Contract, SOW WS3 Example Contract #2 DD Form 1155, 1 Feb 2021, Pg 1 (block 24); SOW Pg 3 (Para 1.5.1) DD Form 1155s Block 24 shows effective date of work sample and contract value SOW shows nature of work
| Instruction to Offeror Paragraph | Section 1 – RELEVANT CONSTRUCTION EXPERIENCE | |
| Relevant Construction Projects: The submitted projects must meet the conditions listed below; completed after 1 May 2021; OR at least 80% complete as of solicitation date | ||
| Category 1 | Commercial, Industrial & Residential Construction, Multi Trade | |
| Paragraph 5.2.1.1.1 | Submit a Project for each threshold (minimum of 1, up to 6 total) multiple trade projects for each threshold | 1-6 Projects Ea. |
| Prime Contractor greater than $10M construction cost, Multiple Trades: Note: each project submitted receives a point value of 300pts. | ||
| Paragraph 5.2.1.1.2 | Identify the number of projects for each range, per definitions provided in referenced paragraph. | 0-6 Projects |
| Number of trades 5-10 Note: each project submitted receives a point value of 200pts. | ||
| Number of trades greater than 10 Note: each project submitted receives a point value of 300pts. | ||
| Category 2 | Construction for the DoD/DoW | |
| Paragraph 5.2.1.2 | Identify projects executed for the DoD/DoW, up to 4 total | 0-4 Projects |
| Prime Contractor greater than $10M: Note: each project submitted receives a point value of 300pts. | ||
| Category 3 | Multiple Construction Projects Executed in Parallel | |
| Paragraph 5.2.1.3. | Identify 2 to 4 Projects executed in parallel during a period of at least 6 months | 2-4 Projects |
| Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a point value of 100pts. | ||
| Category 4 | Specialized Construction (specified construction category shall be at least 60% of total project) | |
| Paragraph 5.2.1.4. | Submit a Project for each threshold, up to 1 total individual trade projects for each | 0-1 Projects |
| Prime Contractor, greater than $10M construction cost, AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS) | ||
| Prime Contractor, greater than $10M construction cost, FIRE PROTECTION/SUPPRESSION SYSTEMS | ||
| Prime Contractor, greater than $10M construction cost, ROAD/PARKING/PAVEMENT CONSTRUCTION | ||
| Prime Contractor, greater than $10M construction cost, UTILITY SYSTEM CONSTRUCTION | ||
| Prime Contractor, greater than $10M construction cost, ROOFING | ||
| Prime Contractor, greater than $10M construction cost, AIRFIELD CONSTRUCTION | ||
| Instruction to Offeror Paragraph | Section 2 - DESIGN EXPERIENCE | |
| Relevant Design Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 10 years of the release date of the MACC solicitation, and at least 80% completed no later 31 March 2025) | ||
| Category 5 | Experience as Prime on Design-Build Projects (KTR Executes Desgin and Construction) | |
| Paragraph 5.2.2.1. | Submit Projects with Design Build effort, up to 2 total projects | 1-2 Projects |
| Prime Contractor, greater than $10M construction cost: Note: each project submitted receives a max point value of 400pts. | ||
| Instruction to Offeror Paragraph | Section 3 - CERTIFICATIONS | |
| Category 6 | Does the Offeror have each or any of the following? Type the word Yes or No in Column C. | |
| Paragraph 5.2.3.1 | Project Management Professionals | Yes or No |
| Certificate: Only one Yes which = 200pts max /No = 0pts. | ||
| Paragraph 5.2.3.2. | LEED Professionals | |
| Certificate: Only one Yes which = 100pts max /No = 0pts. | ||
| Paragraph 5.2.3.3. | Safety Professional | |
| Certificate: Only one Yes which = 100pts max /No = 0pts. | ||
| Paragraph 5.2.3.4. | Quality Professional | |
| Certificate: Only one Yes which = 100pts max /No = 0pts. | ||
| Instruction to Offeror Paragraph | Section 4 - STAFFING | |
| Category 9 | Does the Offeror have each or any of the following? Type the word Yes or No in Column C. | |
| Paragraph 5.1.4.1. | Trade/Construction Workers | Yes or No |
| Submit number of personnel, pick only one | ||
| 1-5 Workers: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0pts | ||
| Paragraph 5.1.4.2. | Architects/Engineers | |
| Submit number of personnel, pick only one | ||
| 1-3 A/E: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >3 A/E: Note: Only one Yes which = 200pts max /No = 0pts. | ||
| Paragraph 5.2.4.3. | Contract Program Manager | |
| Submit number of personnel, pick only one | ||
| 1: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >1: Note: Only one Yes which = 200pts max /No = 0pts. | ||
| Paragraph 5.2.4.4. | Quality Control Manager | |
| Submit number of personnel, pick only one | ||
| 1-2: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >2: Note: Only one Yes which = 200pts max /No = 0pts. | ||
| Paragraph 5.2.4.5. | Site Safety and Health Manager | |
| Submit number of personnel, pick only one for each level | ||
| Level 1 | ||
| Only one Yes which = 200pts max /No = 0pts. | ||
| Level 2 | ||
| 1-2: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >2: Note: Only one Yes which = 200pts max /No = 0pts. | ||
| Level 3 | ||
| 1-3: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >3: Note: Only one Yes which = 200pts max /No = 0pts. | ||
| Paragraph 5.2.4.6. | Design Program Manager | |
| Submit number of personnel, pick only one | ||
| 1: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >1: Note: Only one Yes which = 200pts max /No = 0pts. | ||
| Paragraph 5.2.4.7. | Superintendents | |
| Submit number of personnel, pick only one | ||
| 1-2: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >2: Note: Only one Yes which = 200pts max /No = 0pts. |