About this file

This file is a self-scoring sheet and cross-reference matrix serving as Appendix D to Section L of the Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC) solicitation FA8137-26-R-0040. The document provides offerors with a template to demonstrate qualifications across four main categories: relevant construction experience, design experience, professional certifications, and staffing capabilities. Each submission category contains specific scoring thresholds and point allocations, with offerors required to reference their supporting documentation (contracts, Statements of Work, DD Forms 1155, and project records) in a cross-reference matrix format.

The evaluation criteria encompass six scoring categories: Category 1 awards up to 300 points per commercial/industrial/residential project exceeding $10 million with multiple trades; Category 2 provides 300 points per Department of Defense or Department of Veterans Affairs project; Category 3 awards 100 points for parallel project execution; Category 4 addresses specialized construction (AT/FP measures, fire protection, roads/pavement, utility systems, roofing, airfield construction) at up to 300 points per project; Category 5 offers up to 400 points for design-build projects exceeding $10 million; and Category 6 certifications award up to 200 points for Project Management Professional credentials, with 100-point options for LEED, Safety, and Quality certifications. Category 9 staffing qualifications provide points for trade/construction workers (100-200 points), architects/engineers (100-200 points), program managers, quality control managers, site safety managers, and superintendents (100-200 points per position level). Projects must be completed after May 1, 2021, or at least 80 percent complete as of the solicitation date, with design projects required to be completed no later than March 31, 2025.

View the file

Other files

File Type Posted
Solicitation Amendment - FA813726R00400008.pdf PDF
Solicitation Amendment FA813726R00400008 SF 30.pdf PDF
01 35 26_25 Oct 26.pdf PDF
Follow up Questions and Answers 3 Nov 2026.xlsx XLSX spreadsheet
Attachment_2e_Appendix_E_MACC_SBCross_Reference_Matrix_05 Nov 26.xlsx XLSX spreadsheet
(Reference Only) Attachment 3 Section M Evaluation Criteria_25 Oct 26.docx DOCX document
(Reference Only) Attachment_2c_Appendix_C_MACC_SBSelf_Scoring_Matrix_25 Oct 26.xlsx XLSX spreadsheet
Attachment_2c_Appendix_C_MACC_SBSelf_Scoring_Matrix_05 Nov 26.xlsx XLSX spreadsheet
(Reference Only) Attachment_2e_Appendix_E_MACC_SBCross_Reference_Matrix_25 Oct 26.xlsx XLSX spreadsheet
MACC Summary of Changes October 2026.docx DOCX document
Attachment_2f_Appendix_F_MACC_FOCross_Reference_Matrix_05 Nov 26.xlsx XLSX spreadsheet
(Reference Only) Attachment_2d_Appendix_D_MACC_FOSelf_Scoring_Matrix_25 Oct 26.xlsx XLSX spreadsheet
(Reference Only) Attachment 2 Section L Instructions to Offerors_25 Oct 26.docx DOCX document
(Reference Only) Attachment 1 Statement of Work r4_25 Oct 26.docx DOCX document
Attachment_2d_Appendix_D_MACC_FOSelf_Scoring_Matrix_10 Nov 26.xlsx XLSX spreadsheet
01 45 00_25 Oct 26.pdf PDF
Solicitation Amendment - FA813726R00400007.pdf PDF
Attachment 1 Statement of Work 5_Nov_26.pdf PDF
Solicitation Amendment FA813726R00400007 SF 30.pdf PDF
Attachment 2 Section L Instructions to Offerors_10 Nov 26.pdf PDF
(Reference Only) Attachment_2f_Appendix_F_MACC_FOCross_Reference_Matrix_25 Oct 26.xlsx XLSX spreadsheet
Attachment 3 Section M Evaluation Criteria_10 Nov 26.pdf PDF
Solicitation Amendment FA813726R0040006 SF30.pdf PDF
Solicitation Amendment FA813726R0040005.pdf PDF
Solicitation Amendment FA813726R0040005 SF30.pdf PDF
Solicitation Amendment FA813726R0040006.pdf PDF
Solicitation Amendment FA813726R0040004 SF30.pdf PDF
Solicitation Amendment FA813726R0040004.pdf PDF
Solicitation Amendment FA813726R00400006 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400006.pdf PDF
Solicitation Amendment FA813726R00400005 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400005.pdf PDF
Solicitation Amendment FA813726R00400004 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400004.pdf PDF
Questions and Answers 16 Sep 2026.xlsx XLSX spreadsheet
Solicitation Amendment FA813726R00400001 SF 30.pdf PDF
Solicitation FA813726R0040.pdf PDF
Solicitation Amendment FA813726R00400002 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400002.pdf PDF
Solicitation Amendment - FA813726R00400001.pdf PDF
Solicitation Amendment - FA813726R00400003.pdf PDF
Solicitation Amendment FA813726R00400003 SF 30.pdf PDF
FA813726R0040 Questions and Answers CAO 25 Aug 2026.xlsx XLSX spreadsheet
Attachment_2__Section_L 18 Aug 26.pdf PDF
Solicitation Amendment FA813726R00400002 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400002.pdf PDF
Attachment_2__Section_L 5 Aug 26.pdf PDF
Solicitation Amendment - FA813726R00400001.pdf PDF
Solicitation Amendment FA813726R00400001 SF 30.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Self-Score Sheet

Air Force Sustainment Center PZIOC MACC
Solicitation No.: FA813726R0040
Appendix D to Section L, Cross Reference Matrix
ElementOfferor to Fill per Column C, Appendix CDeliverablesWork Sample NumberReference
Document Title, Document Date, Page, Paragraph, Table Number (if applicable), Block (if applicable)Notes / Clarifications (Optional)

Clarifying facts to further substantiate the claim, such as coordinates of remotes sites named in Reference Documents

EXAMPLE$
Instruction to Offeror ParagraphPrime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts.3Contract, SOWWS2Example Contract #2 DD Form 1155, 1 Feb 2021, Pg 1 (block 24); SOW Pg 3 (Para 1.5.1)DD Form 1155s Block 24 shows effective date of work sample and contract value

SOW shows nature of work 1 Contract, SOW WS3 Example Contract #2 DD Form 1155, 1 Feb 2021, Pg 1 (block 24); SOW Pg 3 (Para 1.5.1) DD Form 1155s Block 24 shows effective date of work sample and contract value SOW shows nature of work

Instruction to Offeror ParagraphSection 1 – RELEVANT CONSTRUCTION EXPERIENCE
Relevant Construction Projects: The submitted projects must meet the conditions listed below; completed after 1 May 2021; OR at least 80% complete as of solicitation date
Category 1Commercial, Industrial & Residential Construction, Multi Trade
Paragraph 5.2.1.1.1Submit a Project for each threshold (minimum of 1, up to 6 total) multiple trade projects for each threshold1-6 Projects Ea.
Prime Contractor greater than $10M construction cost, Multiple Trades: Note: each project submitted receives a point value of 300pts.
Paragraph 5.2.1.1.2Identify the number of projects for each range, per definitions provided in referenced paragraph.0-6 Projects
Number of trades 5-10 Note: each project submitted receives a point value of 200pts.
Number of trades greater than 10 Note: each project submitted receives a point value of 300pts.
Category 2Construction for the DoD/DoW
Paragraph 5.2.1.2Identify projects executed for the DoD/DoW, up to 4 total0-4 Projects
Prime Contractor greater than $10M: Note: each project submitted receives a point value of 300pts.
Category 3Multiple Construction Projects Executed in Parallel
Paragraph 5.2.1.3.Identify 2 to 4 Projects executed in parallel during a period of at least 6 months2-4 Projects
Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a point value of 100pts.
Category 4Specialized Construction (specified construction category shall be at least 60% of total project)
Paragraph 5.2.1.4.Submit a Project for each threshold, up to 1 total individual trade projects for each0-1 Projects
Prime Contractor, greater than $10M construction cost, AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS)
Prime Contractor, greater than $10M construction cost, FIRE PROTECTION/SUPPRESSION SYSTEMS
Prime Contractor, greater than $10M construction cost, ROAD/PARKING/PAVEMENT CONSTRUCTION
Prime Contractor, greater than $10M construction cost, UTILITY SYSTEM CONSTRUCTION
Prime Contractor, greater than $10M construction cost, ROOFING
Prime Contractor, greater than $10M construction cost, AIRFIELD CONSTRUCTION
Instruction to Offeror ParagraphSection 2 - DESIGN EXPERIENCE
Relevant Design Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 10 years of the release date of the MACC solicitation, and at least 80% completed no later 31 March 2025)
Category 5Experience as Prime on Design-Build Projects (KTR Executes Desgin and Construction)
Paragraph 5.2.2.1.Submit Projects with Design Build effort, up to 2 total projects1-2 Projects
Prime Contractor, greater than $10M construction cost: Note: each project submitted receives a max point value of 400pts.
Instruction to Offeror ParagraphSection 3 - CERTIFICATIONS
Category 6Does the Offeror have each or any of the following? Type the word Yes or No in Column C.
Paragraph 5.2.3.1Project Management ProfessionalsYes or No
Certificate: Only one Yes which = 200pts max /No = 0pts.
Paragraph 5.2.3.2.LEED Professionals
Certificate: Only one Yes which = 100pts max /No = 0pts.
Paragraph 5.2.3.3.Safety Professional
Certificate: Only one Yes which = 100pts max /No = 0pts.
Paragraph 5.2.3.4.Quality Professional
Certificate: Only one Yes which = 100pts max /No = 0pts.
Instruction to Offeror ParagraphSection 4 - STAFFING
Category 9Does the Offeror have each or any of the following? Type the word Yes or No in Column C.
Paragraph 5.1.4.1.Trade/Construction WorkersYes or No
Submit number of personnel, pick only one
1-5 Workers: Note: Only one Yes which = 100pts max /No = 0pts.
>5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0pts
Paragraph 5.1.4.2.Architects/Engineers
Submit number of personnel, pick only one
1-3 A/E: Note: Only one Yes which = 100pts max /No = 0pts.
>3 A/E: Note: Only one Yes which = 200pts max /No = 0pts.
Paragraph 5.2.4.3.Contract Program Manager
Submit number of personnel, pick only one
1: Note: Only one Yes which = 100pts max /No = 0pts.
>1: Note: Only one Yes which = 200pts max /No = 0pts.
Paragraph 5.2.4.4.Quality Control Manager
Submit number of personnel, pick only one
1-2: Note: Only one Yes which = 100pts max /No = 0pts.
>2: Note: Only one Yes which = 200pts max /No = 0pts.
Paragraph 5.2.4.5.Site Safety and Health Manager
Submit number of personnel, pick only one for each level
Level 1
Only one Yes which = 200pts max /No = 0pts.
Level 2
1-2: Note: Only one Yes which = 100pts max /No = 0pts.
>2: Note: Only one Yes which = 200pts max /No = 0pts.
Level 3
1-3: Note: Only one Yes which = 100pts max /No = 0pts.
>3: Note: Only one Yes which = 200pts max /No = 0pts.
Paragraph 5.2.4.6.Design Program Manager
Submit number of personnel, pick only one
1: Note: Only one Yes which = 100pts max /No = 0pts.
>1: Note: Only one Yes which = 200pts max /No = 0pts.
Paragraph 5.2.4.7.Superintendents
Submit number of personnel, pick only one
1-2: Note: Only one Yes which = 100pts max /No = 0pts.
>2: Note: Only one Yes which = 200pts max /No = 0pts.

File details come from the government source that posted it. Updated .