(Reference Only) Attachment_2d_Appendix_D_MACC_FOSelf_Scoring_Matrix_25 Oct 26.xlsx
XLSX spreadsheet 94 KB Posted
- Solicitation number
- FA8137-26-R-0040
About this file
This file is a self-scoring matrix template for the Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC) solicitation. The matrix serves as an appendix to the Request for Proposals and provides contractors with a tool to self-assess their proposals against the government's evaluation criteria prior to submission. The document is dated October 26, 2026, and is intended for reference purposes only to assist offerors in understanding how their qualifications, experience, and technical approach will be evaluated. The self-scoring matrix enables prospective contractors to align their proposals with the stated evaluation factors and scoring methodology established by the Air Force Sustainment Center, facilitating compliance with solicitation requirements and improving proposal quality before final submission.
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Air Force Sustainment Center PZIOC MACC |
| FA813726R0040 |
| Appendix D to Section L, Full and Open Pool Self-Scoring Matrix |
Element Offeror to Fill This Column Only Point Value Score
Instruction to Offeror Paragraph Section 1 – RELEVANT CONSTRUCTION EXPERIENCE
| Relevant Construction Projects: The submitted projects must meet the conditions listed below; completed after 1 May 2021; OR at least 80% complete as of solicitation date | ||||
| Category 1 | Commercial, Industrial & Residential Construction, Multi Trade | |||
| Paragraph 5.2.1.1.1 | Submit a Project for each threshold (minimum of 1, up to 6 total) multiple trade projects for each threshold | 1-6 Projects Ea. | Point Value Each | Total Across |
| Prime Contractor greater than $10M construction cost, Multiple Trades: Note: each project submitted receives a point value of 300pts. | 300 | 0 | ||
| Paragraph 5.2.1.1.2 | Identify the number of projects for each range, per definitions provided in referenced paragraph. | 0-6 Projects | Point Value Each | Total Across |
| Number of trades 5-10 Note: each project submitted receives a point value of 200pts. | 200 | 0 | ||
| Number of trades greater than 10 Note: each project submitted receives a point value of 300pts. | 300 | 0 | ||
| Category 2 | Construction for the DoD/DoW | |||
| Paragraph 5.2.1.2 | Identify projects executed for the DoD/DoW, up to 4 total | 0-4 Projects | Point Value Each | Total Across |
| Prime Contractor greater than $10M: Note: each project submitted receives a point value of 300pts. | 300 | 0 | ||
| Category 3 | Multiple Construction Projects Executed in Parallel | |||
| Paragraph 5.2.1.3. | Identify 2 to 4 Projects executed in parallel during a period of at least 6 months, with multiple trades as defined in referenced paragraph. | 2-4 Projects | Point Value Each | Total Across |
| Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a point value of 100pts. | 100 | 0 | ||
| Category 4 | Specialized Construction (specified construction category shall be at least 60% of total project) | |||
| Paragraph 5.2.1.4. | Submit a Project for each threshold, up to 1 total individual trade projects for each | 0-1 Projects | Point Value Each | Total Across |
| Prime Contractor, greater than $10M construction cost, AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a point value of 100pts. | 100 | 0 | ||
| Prime Contractor, greater than $10M construction cost, FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a point value of 100pts. | 100 | 0 | ||
| Prime Contractor, greater than $10M construction cost, ROAD/PARKING/PAVEMENT CONSTRUCTION: Note: each project submitted receives a point value of 100pts. | 100 | 0 | ||
| Prime Contractor, greater than $10M construction cost, UTILITY SYSTEM CONSTRUCTION Note: each project submitted receives a point value of 100pts. | 100 | 0 | ||
| Prime Contractor, greater than $10M construction cost, ROOFINGNote: each project submitted receives a point value of 100pts. | 100 | 0 | ||
| Prime Contractor, greater than $10M construction cost, AIRFIELD CONSTRUCTION: Note: each project submitted receives a point value of 100pts. | 100 | 0 | ||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | |||
| Instruction to Offeror Paragraph | Section 2 - DESIGN EXPERIENCE | |||
| Relevant Design-Build Projects: The submitted projects must meet the conditions listed; completed after 1 May 2021; OR at least 80% complete as of solicitation date) | ||||
| Category 5 | Experience as Prime on Design-Build Projects (KTR Executes Desgin and Construction) | |||
| Paragraph 5.2.2.1. | Submit Projects with Design Build effort, up to 2 total projects | 1-2 Projects | Point Value Each | Total Across |
| Prime Contractor, greater than $10M construction cost: Note: each project submitted receives a max point value of 400pts. | 400 | 0 | ||
| Paragraph 5.2.2.2. | For one of the Projects above, submit all design documents to demonstrate compliance with Unified Facilities Criteria (UFC) and the corresponding International Code Council (ICC) model codes and/or standards (i.e. NFPA, ASTM, ASCE) | Yes or No | Point Value Each | Total Across |
| Specifications: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 20pts. | ||||
| Interior and exterior walls (vertical construction elements) | 20 | 0 | ||
| Ceilings (horizontal construction elements) | 20 | 0 | ||
| Roofs | 20 | 0 | ||
| Waste water, water, and gas systems | 20 | 0 | ||
| Fire-extinguishing systems | 20 | 0 | ||
| Heat-supply systems | 20 | 0 | ||
| HVAC systems | 20 | 0 | ||
| Electrical systems | 20 | 0 | ||
| Communications, security and information systems | 20 | 0 | ||
| Building automation and automation of engineering structures | 20 | 0 | ||
| Drawings: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 40pts. | ||||
| Interior and exterior walls (vertical construction elements) | 40 | 0 | ||
| Ceilings (horizontal construction elements) | 40 | 0 | ||
| Roofs | 40 | 0 | ||
| Waste water, water, and gas systems | 40 | 0 | ||
| Fire-extinguishing systems | 40 | 0 | ||
| Heat-supply systems | 40 | 0 | ||
| HVAC systems | 40 | 0 | ||
| Electrical systems | 40 | 0 | ||
| Communications, security and information systems | 40 | 0 | ||
| Building automation and automation of engineering structures | 40 | 0 | ||
| Design Analysis/Calculations: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 40pts. | ||||
| Interior and exterior walls (vertical construction elements) | 40 | 0 | ||
| Ceilings (horizontal construction elements) | 40 | 0 | ||
| Roofs | 40 | 0 | ||
| Waste water, water, and gas systems | 40 | 0 | ||
| Fire-extinguishing systems | 40 | 0 | ||
| Heat-supply systems | 40 | 0 | ||
| HVAC systems | 40 | 0 | ||
| Electrical systems | 40 | 0 | ||
| Communications, security and information systems | 40 | 0 | ||
| Building automation and automation of engineering structures | 40 | 0 | ||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | |||
| Instruction to Offeror Paragraph | Section 3 - CERTIFICATIONS | |||
| Category 6 | Does the Offeror have each or any of the following? Type the word Yes or No in Column C. | |||
| Paragraph 5.2.3.1 | Project Management Professionals | Yes or No | Point Value Each | Total Across |
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Paragraph 4.6.3.2. | Certification for Credentialed Professionals | |||
| Certificate-Architect: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| Certificate-Civil Engineer: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| Certificate-Structural Engineer: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| Certificate-Mechanical/plumbing Engineer: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| Certificate-Electrical Engineer: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| Certificate-Fire Protection: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| Certificate-Interior Desgin (ref UFC 3-120-10): Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| Paragraph 5.2.3.2. | LEED Professionals | |||
| Certificate: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| Paragraph 5.2.3.3. | Safety Professional | |||
| Certificate: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| Paragraph 5.2.3.4. | Quality Professional | |||
| Certificate: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | |||
| Instruction to Offeror Paragraph | Section 4 - STAFFING | |||
| Category 7 | Does the Offeror have each or any of the following in their own company? Type the word Yes or No in Column C. | |||
| Paragraph 5.2.4.1. | Trade/Construction Workers | |||
| Submit number of personnel, pick only one | Yes or No | Point Value Each | Total Across | |
| 1 - 5 Workers: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| >5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0pts | 200 | 0 | ||
| Paragraph 5.2.4.2. | Architects/Engineers | |||
| Submit number of personnel, pick only one | ||||
| 1 - 3 A/E: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| >3 A/E: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Paragraph 5.2.4.3. | Contract Program Manager | |||
| Submit number of personnel, pick only one | ||||
| 1: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| >1: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Paragraph 5.2.4.4. | Quality Control Manager | |||
| Submit number of personnel, pick only one | ||||
| 1-2: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| >2: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Paragraph 5.2.4.5. | Site Safety and Health Manager | |||
| Submit number of personnel, pick only one for each level | ||||
| Level 1 | ||||
| Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Level 2 | ||||
| 1-2: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| >2: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Level 3 | ||||
| 1-3: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| >3: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Paragraph 5.2.4.6. | Design Program Manager | |||
| Submit number of personnel, pick only one | ||||
| 1: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| >1: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Paragraph 5.2.4.7. | Superintendents | |||
| Submit number of personnel, pick only one | ||||
| 1-2: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| >2: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | |||
| TOTAL POINTS SCORED | - 0 | |||
| MAXIMUM POINTS | 10,200 | |||
| MINIMUM SCORE REQUIRED | 7,140 |