Attachment_2d_Appendix_D_MACC_FOSelf_Scoring_Matrix_10 Nov 26.xlsx
XLSX spreadsheet 96 KB Posted
- Solicitation number
- FA8137-26-R-0040
About this file
This file is a self-scoring matrix template used for evaluating offeror qualifications in response to the Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC), solicitation number FA8137-26-R-0040. The matrix organizes evaluation criteria across four primary sections: relevant construction experience, design experience, certifications, and staffing qualifications. Under construction experience, offerors must document completed projects after May 1, 2021 (or at least 80% complete as of the solicitation date) across four categories: commercial/industrial/residential multi-trade projects greater than $10 million (300 points per project, up to 6 projects), Department of Defense/Department of War construction projects greater than $10 million (300 points per project, up to 4 projects), multiple construction projects executed in parallel over at least six months (100 points per project, 2-4 projects), and specialized construction categories including AT/FP measures, fire protection systems, road/parking/pavement, utility systems, roofing, and airfield construction (100 points per project, up to 1 per category). The design experience section (Section 2) awards points for design-build project experience as prime contractor exceeding $10 million (400 points per project, up to 2 projects) and evaluates submission of design documentation demonstrating compliance with Unified Facilities Criteria and International Code Council standards across ten building system categories, with separate point allocations for specifications (20 points each), drawings (40 points each), and design analysis/calculations (40 points each).
The certifications section (Section 3) awards fixed point values for professional credentials: Project Management Professionals (200 points), LEED Professionals (100 points), Safety Professional (100 points), and Quality Professional (100 points). The staffing section (Section 4) evaluates in-house personnel capacity across multiple categories including trade/construction workers, architects/engineers, contract program managers, quality control managers, site safety and health managers, design program managers, and superintendents, with point values ranging from 100 to 200 points depending on staffing levels. The total maximum possible score is 10,200 points, with a minimum required score of 7,140 points for award consideration. Offerors complete the scoring matrix by entering their qualifications in designated columns, and the document includes instruction notes referencing specific evaluation paragraphs within Section 5.2 of the solicitation for detailed submission requirements.
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Air Force Sustainment Center PZIOC MACC |
| FA813726R0040 |
| Appendix D to Section L, Full and Open Pool Self-Scoring Matrix |
Element Offeror to Fill This Column Only Point Value Score
Instruction to Offeror Paragraph Section 1 – RELEVANT CONSTRUCTION EXPERIENCE
| Relevant Construction Projects: The submitted projects must meet the conditions listed below; completed after 1 May 2021; OR at least 80% complete as of solicitation date | ||||
| Category 1 | Commercial, Industrial & Residential Construction, Multi Trade | |||
| Paragraph 5.2.1.1. | Submit a Project for each threshold (minimum of 1, up to 6 total) multiple trade projects for each threshold | 1-6 Projects Ea. | Point Value Each | Total Across |
| Prime Contractor greater than $10M construction cost, Multiple Trades: Note: each project submitted receives a point value of 300pts. | 300 | 0 | ||
| Paragraph 5.2.1.1.2 | Identify the number of projects for each range, per definitions provided in referenced paragraph. | 0-6 Projects | Point Value Each | Total Across |
| Number of trades 5-10 Note: each project submitted receives a point value of 200pts. | 200 | 0 | ||
| Number of trades greater than 10 Note: each project submitted receives a point value of 300pts. | 300 | 0 | ||
| Category 2 | Construction for the DoD/DoW | |||
| Paragraph 5.2.1.2 | Identify projects executed for the DoD/DoW, up to 4 total | 0-4 Projects | Point Value Each | Total Across |
| Prime Contractor greater than $10M: Note: each project submitted receives a point value of 300pts. | 300 | 0 | ||
| Category 3 | Multiple Construction Projects Executed in Parallel | |||
| Paragraph 5.2.1.3. | Identify 2 to 4 Projects executed in parallel during a period of at least 6 months | 2-4 Projects | Point Value Each | Total Across |
| Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a point value of 100pts. | 100 | 0 | ||
| Category 4 | Specialized Construction (specified construction category shall be at least 60% of total project) | |||
| Paragraph 5.2.1.4. | Submit a Project for each threshold, up to 1 total individual trade projects for each | 0-1 Projects | Point Value Each | Total Across |
| Prime Contractor, greater than $10M construction cost, AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS) | 100 | 0 | ||
| Prime Contractor, greater than $10M construction cost, FIRE PROTECTION/SUPPRESSION SYSTEMS |
tc={BAD567CD-CEC8-40D3-B7BC-1E4C8A02FAB7}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
For cells B26-27:
| Ensure the heights of the rows are adjusted as needed for readability | 100 | 0 | |||
| Prime Contractor, greater than $10M construction cost, ROAD/PARKING/PAVEMENT CONSTRUCTION | 100 | 0 | |||
| Prime Contractor, greater than $10M construction cost, UTILITY SYSTEM CONSTRUCTION | 100 | 0 | |||
| Prime Contractor, greater than $10M construction cost, ROOFING | 100 | 0 | |||
| Prime Contractor, greater than $10M construction cost, AIRFIELD CONSTRUCTION | 100 | 0 | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | ||||
| Instruction to Offeror Paragraph | Section 2 - DESIGN EXPERIENCE | ||||
| Relevant Design-Build Projects: The submitted projects must meet the conditions listed; completed after 1 May 2021; OR at least 80% complete as of solicitation date) | |||||
| Category 5 | Experience as Prime on Design-Build Projects (KTR Executes Desgin and Construction) | ||||
| Paragraph 5.2.2.1. | Submit Projects with Design Build effort, up to 2 total projects | 1-2 Projects | Point Value Each | Total Across | |
| Prime Contractor, greater than $10M construction cost: Note: each project submitted receives a max point value of 400pts. | 400 | 0 | |||
| Paragraph 5.2.2.2. | For one of the Projects above, submit all design documents to demonstrate compliance with Unified Facilities Criteria (UFC) and the corresponding International Code Council (ICC) model codes and/or standards (i.e. NFPA, ASTM, ASCE) | Yes or No | Point Value Each | Total Across | |
| Specifications: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 20pts. | |||||
| Interior and exterior walls (vertical construction elements) | 20 | 0 | |||
| Ceilings (horizontal construction elements) | 20 | 0 | |||
| Roofs | 20 | 0 | |||
| Waste water, water, and gas systems | 20 | 0 | |||
| Fire-extinguishing systems | 20 | 0 | |||
| Heat-supply systems | 20 | 0 | |||
| HVAC systems | 20 | 0 | |||
| Electrical systems | 20 | 0 | |||
| Communications, security and information systems | 20 | 0 | |||
| Building automation and automation of engineering structures | 20 | 0 | |||
| Drawings: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 40pts. | |||||
| Interior and exterior walls (vertical construction elements) | 40 | 0 | |||
| Ceilings (horizontal construction elements) | 40 | 0 | |||
| Roofs | 40 | 0 | |||
| Waste water, water, and gas systems | 40 | 0 | |||
| Fire-extinguishing systems | 40 | 0 | |||
| Heat-supply systems | 40 | 0 | |||
| HVAC systems | 40 | 0 | |||
| Electrical systems | 40 | 0 | |||
| Communications, security and information systems | 40 | 0 | |||
| Building automation and automation of engineering structures | 40 | 0 | |||
| Design Analysis/Calculations: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 40pts. | |||||
| Interior and exterior walls (vertical construction elements) | 40 | 0 | |||
| Ceilings (horizontal construction elements) | 40 | 0 | |||
| Roofs | 40 | 0 | |||
| Waste water, water, and gas systems | 40 | 0 | |||
| Fire-extinguishing systems | 40 | 0 | |||
| Heat-supply systems | 40 | 0 | |||
| HVAC systems | 40 | 0 | |||
| Electrical systems | 40 | 0 | |||
| Communications, security and information systems | 40 | 0 | |||
| Building automation and automation of engineering structures | 40 | 0 | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | ||||
| Instruction to Offeror Paragraph | Section 3 - CERTIFICATIONS | ||||
| Category 6 | Does the Offeror have each or any of the following? Type the word Yes or No in Column C. | ||||
| Paragraph 5.2.3.1 | Project Management Professionals | Yes or No | Point Value Each | Total Across | |
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |||
| Paragraph 5.2.3.2. | LEED Professionals | ||||
| Certificate: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |||
| Paragraph 5.2.3.3. | Safety Professional | ||||
| Certificate: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |||
| Paragraph 5.2.3.4. | Quality Professional | ||||
| Certificate: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | ||||
| Instruction to Offeror Paragraph | Section 4 - STAFFING | ||||
| Category 7 | Does the Offeror have each or any of the following in their own company? Type the word Yes or No in Column C. | ||||
| Paragraph 5.2.4.1. | Trade/Construction Workers | ||||
| Submit number of personnel, pick only one | Yes or No | Point Value Each | Total Across | ||
| 1 - 5 Workers: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |||
| >5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0pts | 200 | 0 | |||
| Paragraph 5.2.4.2. | Architects/Engineers | ||||
| Submit number of personnel, pick only one | |||||
| 1 - 3 A/E: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |||
| >3 A/E: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |||
| Paragraph 5.2.4.3. | Contract Program Manager | ||||
| Submit number of personnel, pick only one | |||||
| 1: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |||
| >1: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |||
| Paragraph 5.2.4.4. | Quality Control Manager | ||||
| Submit number of personnel, pick only one | |||||
| 1-2: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |||
| >2: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |||
| Paragraph 5.2.4.5. | Site Safety and Health Manager | ||||
| Submit number of personnel, pick only one for each level | |||||
| Level 1 | |||||
| Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |||
| Level 2 | |||||
| 1-2: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |||
| >2: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |||
| Level 3 | |||||
| 1-3: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |||
| >3: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |||
| Paragraph 5.2.4.6. | Design Program Manager | ||||
| Submit number of personnel, pick only one | |||||
| 1: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |||
| >1: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |||
| Paragraph 5.2.4.7. | Superintendents | ||||
| Submit number of personnel, pick only one | |||||
| 1-2: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |||
| >2: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | ||||
| TOTAL POINTS SCORED | - 0 | ||||
| MAXIMUM POINTS | 10,200 | ||||
| MINIMUM SCORE REQUIRED | 7,140 |
For cells B26-27:
Ensure the heights of the rows are adjusted as needed for readability
File details come from the government source that posted it. Updated .