Attachment_2d_Appendix_D_MACC_FOSelf_Scoring_Matrix_10 Nov 26.xlsx

XLSX spreadsheet 96 KB Posted

Attached to
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation number
FA8137-26-R-0040
Issued by

About this file

This file is a self-scoring matrix template used for evaluating offeror qualifications in response to the Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC), solicitation number FA8137-26-R-0040. The matrix organizes evaluation criteria across four primary sections: relevant construction experience, design experience, certifications, and staffing qualifications. Under construction experience, offerors must document completed projects after May 1, 2021 (or at least 80% complete as of the solicitation date) across four categories: commercial/industrial/residential multi-trade projects greater than $10 million (300 points per project, up to 6 projects), Department of Defense/Department of War construction projects greater than $10 million (300 points per project, up to 4 projects), multiple construction projects executed in parallel over at least six months (100 points per project, 2-4 projects), and specialized construction categories including AT/FP measures, fire protection systems, road/parking/pavement, utility systems, roofing, and airfield construction (100 points per project, up to 1 per category). The design experience section (Section 2) awards points for design-build project experience as prime contractor exceeding $10 million (400 points per project, up to 2 projects) and evaluates submission of design documentation demonstrating compliance with Unified Facilities Criteria and International Code Council standards across ten building system categories, with separate point allocations for specifications (20 points each), drawings (40 points each), and design analysis/calculations (40 points each).

The certifications section (Section 3) awards fixed point values for professional credentials: Project Management Professionals (200 points), LEED Professionals (100 points), Safety Professional (100 points), and Quality Professional (100 points). The staffing section (Section 4) evaluates in-house personnel capacity across multiple categories including trade/construction workers, architects/engineers, contract program managers, quality control managers, site safety and health managers, design program managers, and superintendents, with point values ranging from 100 to 200 points depending on staffing levels. The total maximum possible score is 10,200 points, with a minimum required score of 7,140 points for award consideration. Offerors complete the scoring matrix by entering their qualifications in designated columns, and the document includes instruction notes referencing specific evaluation paragraphs within Section 5.2 of the solicitation for detailed submission requirements.

View the file

Other files

File Type Posted
Solicitation Amendment - FA813726R00400008.pdf PDF
Solicitation Amendment FA813726R00400008 SF 30.pdf PDF
01 35 26_25 Oct 26.pdf PDF
Follow up Questions and Answers 3 Nov 2026.xlsx XLSX spreadsheet
Attachment_2e_Appendix_E_MACC_SBCross_Reference_Matrix_05 Nov 26.xlsx XLSX spreadsheet
(Reference Only) Attachment 3 Section M Evaluation Criteria_25 Oct 26.docx DOCX document
(Reference Only) Attachment_2c_Appendix_C_MACC_SBSelf_Scoring_Matrix_25 Oct 26.xlsx XLSX spreadsheet
Attachment_2c_Appendix_C_MACC_SBSelf_Scoring_Matrix_05 Nov 26.xlsx XLSX spreadsheet
(Reference Only) Attachment_2e_Appendix_E_MACC_SBCross_Reference_Matrix_25 Oct 26.xlsx XLSX spreadsheet
MACC Summary of Changes October 2026.docx DOCX document
Attachment_2f_Appendix_F_MACC_FOCross_Reference_Matrix_05 Nov 26.xlsx XLSX spreadsheet
(Reference Only) Attachment_2d_Appendix_D_MACC_FOSelf_Scoring_Matrix_25 Oct 26.xlsx XLSX spreadsheet
(Reference Only) Attachment 2 Section L Instructions to Offerors_25 Oct 26.docx DOCX document
(Reference Only) Attachment 1 Statement of Work r4_25 Oct 26.docx DOCX document
01 45 00_25 Oct 26.pdf PDF
Solicitation Amendment - FA813726R00400007.pdf PDF
Attachment 1 Statement of Work 5_Nov_26.pdf PDF
Solicitation Amendment FA813726R00400007 SF 30.pdf PDF
Attachment 2 Section L Instructions to Offerors_10 Nov 26.pdf PDF
(Reference Only) Attachment_2f_Appendix_F_MACC_FOCross_Reference_Matrix_25 Oct 26.xlsx XLSX spreadsheet
Attachment 3 Section M Evaluation Criteria_10 Nov 26.pdf PDF
Solicitation Amendment FA813726R0040006 SF30.pdf PDF
Solicitation Amendment FA813726R0040005.pdf PDF
Solicitation Amendment FA813726R0040005 SF30.pdf PDF
Solicitation Amendment FA813726R0040006.pdf PDF
Solicitation Amendment FA813726R0040004 SF30.pdf PDF
Solicitation Amendment FA813726R0040004.pdf PDF
Solicitation Amendment FA813726R00400006 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400006.pdf PDF
Solicitation Amendment FA813726R00400005 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400005.pdf PDF
Solicitation Amendment FA813726R00400004 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400004.pdf PDF
Questions and Answers 16 Sep 2026.xlsx XLSX spreadsheet
Solicitation Amendment FA813726R00400001 SF 30.pdf PDF
Solicitation FA813726R0040.pdf PDF
Solicitation Amendment FA813726R00400002 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400002.pdf PDF
Solicitation Amendment - FA813726R00400001.pdf PDF
Solicitation Amendment - FA813726R00400003.pdf PDF
Solicitation Amendment FA813726R00400003 SF 30.pdf PDF
FA813726R0040 Questions and Answers CAO 25 Aug 2026.xlsx XLSX spreadsheet
Attachment_2__Section_L 18 Aug 26.pdf PDF
Solicitation Amendment FA813726R00400002 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400002.pdf PDF
Attachment_2__Section_L 5 Aug 26.pdf PDF
Solicitation Amendment - FA813726R00400001.pdf PDF
Solicitation Amendment FA813726R00400001 SF 30.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
003 CDRL - TO Progress Mtg Signed.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Air Force Sustainment Center PZIOC MACC
FA813726R0040
Appendix D to Section L, Full and Open Pool Self-Scoring Matrix

Element Offeror to Fill This Column Only Point Value Score

Instruction to Offeror Paragraph Section 1 – RELEVANT CONSTRUCTION EXPERIENCE

Relevant Construction Projects: The submitted projects must meet the conditions listed below; completed after 1 May 2021; OR at least 80% complete as of solicitation date
Category 1Commercial, Industrial & Residential Construction, Multi Trade
Paragraph 5.2.1.1.Submit a Project for each threshold (minimum of 1, up to 6 total) multiple trade projects for each threshold1-6 Projects Ea.Point Value EachTotal Across
Prime Contractor greater than $10M construction cost, Multiple Trades: Note: each project submitted receives a point value of 300pts.3000
Paragraph 5.2.1.1.2Identify the number of projects for each range, per definitions provided in referenced paragraph.0-6 ProjectsPoint Value EachTotal Across
Number of trades 5-10 Note: each project submitted receives a point value of 200pts.2000
Number of trades greater than 10 Note: each project submitted receives a point value of 300pts.3000
Category 2Construction for the DoD/DoW
Paragraph 5.2.1.2Identify projects executed for the DoD/DoW, up to 4 total0-4 ProjectsPoint Value EachTotal Across
Prime Contractor greater than $10M: Note: each project submitted receives a point value of 300pts.3000
Category 3Multiple Construction Projects Executed in Parallel
Paragraph 5.2.1.3.Identify 2 to 4 Projects executed in parallel during a period of at least 6 months2-4 ProjectsPoint Value EachTotal Across
Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a point value of 100pts.1000
Category 4Specialized Construction (specified construction category shall be at least 60% of total project)
Paragraph 5.2.1.4.Submit a Project for each threshold, up to 1 total individual trade projects for each0-1 ProjectsPoint Value EachTotal Across
Prime Contractor, greater than $10M construction cost, AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS)1000
Prime Contractor, greater than $10M construction cost, FIRE PROTECTION/SUPPRESSION SYSTEMS

tc={BAD567CD-CEC8-40D3-B7BC-1E4C8A02FAB7}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

For cells B26-27:

Ensure the heights of the rows are adjusted as needed for readability1000
Prime Contractor, greater than $10M construction cost, ROAD/PARKING/PAVEMENT CONSTRUCTION1000
Prime Contractor, greater than $10M construction cost, UTILITY SYSTEM CONSTRUCTION1000
Prime Contractor, greater than $10M construction cost, ROOFING1000
Prime Contractor, greater than $10M construction cost, AIRFIELD CONSTRUCTION1000
SUBTOTAL SCORE FOR THIS SECTION ONLY:0
Instruction to Offeror ParagraphSection 2 - DESIGN EXPERIENCE
Relevant Design-Build Projects: The submitted projects must meet the conditions listed; completed after 1 May 2021; OR at least 80% complete as of solicitation date)
Category 5Experience as Prime on Design-Build Projects (KTR Executes Desgin and Construction)
Paragraph 5.2.2.1.Submit Projects with Design Build effort, up to 2 total projects1-2 ProjectsPoint Value EachTotal Across
Prime Contractor, greater than $10M construction cost: Note: each project submitted receives a max point value of 400pts.4000
Paragraph 5.2.2.2.For one of the Projects above, submit all design documents to demonstrate compliance with Unified Facilities Criteria (UFC) and the corresponding International Code Council (ICC) model codes and/or standards (i.e. NFPA, ASTM, ASCE)Yes or NoPoint Value EachTotal Across
Specifications: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 20pts.
Interior and exterior walls (vertical construction elements)200
Ceilings (horizontal construction elements)200
Roofs200
Waste water, water, and gas systems200
Fire-extinguishing systems200
Heat-supply systems200
HVAC systems200
Electrical systems200
Communications, security and information systems200
Building automation and automation of engineering structures200
Drawings: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 40pts.
Interior and exterior walls (vertical construction elements)400
Ceilings (horizontal construction elements)400
Roofs400
Waste water, water, and gas systems400
Fire-extinguishing systems400
Heat-supply systems400
HVAC systems400
Electrical systems400
Communications, security and information systems400
Building automation and automation of engineering structures400
Design Analysis/Calculations: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 40pts.
Interior and exterior walls (vertical construction elements)400
Ceilings (horizontal construction elements)400
Roofs400
Waste water, water, and gas systems400
Fire-extinguishing systems400
Heat-supply systems400
HVAC systems400
Electrical systems400
Communications, security and information systems400
Building automation and automation of engineering structures400
SUBTOTAL SCORE FOR THIS SECTION ONLY:0
Instruction to Offeror ParagraphSection 3 - CERTIFICATIONS
Category 6Does the Offeror have each or any of the following? Type the word Yes or No in Column C.
Paragraph 5.2.3.1Project Management ProfessionalsYes or NoPoint Value EachTotal Across
Certificate: Only one Yes which = 200pts max /No = 0pts.2000
Paragraph 5.2.3.2.LEED Professionals
Certificate: Only one Yes which = 100pts max /No = 0pts.1000
Paragraph 5.2.3.3.Safety Professional
Certificate: Only one Yes which = 100pts max /No = 0pts.1000
Paragraph 5.2.3.4.Quality Professional
Certificate: Only one Yes which = 100pts max /No = 0pts.1000
SUBTOTAL SCORE FOR THIS SECTION ONLY:0
Instruction to Offeror ParagraphSection 4 - STAFFING
Category 7Does the Offeror have each or any of the following in their own company? Type the word Yes or No in Column C.
Paragraph 5.2.4.1.Trade/Construction Workers
Submit number of personnel, pick only oneYes or NoPoint Value EachTotal Across
1 - 5 Workers: Note: Only one Yes which = 100pts max /No = 0pts.1000
>5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0pts2000
Paragraph 5.2.4.2.Architects/Engineers
Submit number of personnel, pick only one
1 - 3 A/E: Note: Only one Yes which = 100pts max /No = 0pts.1000
>3 A/E: Note: Only one Yes which = 200pts max /No = 0pts.2000
Paragraph 5.2.4.3.Contract Program Manager
Submit number of personnel, pick only one
1: Note: Only one Yes which = 100pts max /No = 0pts.1000
>1: Note: Only one Yes which = 200pts max /No = 0pts.2000
Paragraph 5.2.4.4.Quality Control Manager
Submit number of personnel, pick only one
1-2: Note: Only one Yes which = 100pts max /No = 0pts.1000
>2: Note: Only one Yes which = 200pts max /No = 0pts.2000
Paragraph 5.2.4.5.Site Safety and Health Manager
Submit number of personnel, pick only one for each level
Level 1
Only one Yes which = 200pts max /No = 0pts.2000
Level 2
1-2: Note: Only one Yes which = 100pts max /No = 0pts.1000
>2: Note: Only one Yes which = 200pts max /No = 0pts.2000
Level 3
1-3: Note: Only one Yes which = 100pts max /No = 0pts.1000
>3: Note: Only one Yes which = 200pts max /No = 0pts.2000
Paragraph 5.2.4.6.Design Program Manager
Submit number of personnel, pick only one
1: Note: Only one Yes which = 100pts max /No = 0pts.1000
>1: Note: Only one Yes which = 200pts max /No = 0pts.2000
Paragraph 5.2.4.7.Superintendents
Submit number of personnel, pick only one
1-2: Note: Only one Yes which = 100pts max /No = 0pts.1000
>2: Note: Only one Yes which = 200pts max /No = 0pts.2000
SUBTOTAL SCORE FOR THIS SECTION ONLY:0
TOTAL POINTS SCORED- 0
MAXIMUM POINTS10,200
MINIMUM SCORE REQUIRED7,140

For cells B26-27:

Ensure the heights of the rows are adjusted as needed for readability

File details come from the government source that posted it. Updated .