The document is a Tinker General Requirements Change Log dated August 2022, detailing modifications across multiple specification sections. Key changes primarily involve replacing references to "Contracting Officer" with "Contracting Officers Representative" throughout several documents, including sections 01 33 00 and 01 78 00. Substantive updates include adding definitions for "Contracting Officers Representative", modifying submittal requirements such as mandating the Contractor's Submittal Register be submitted with final design submittal and updated monthly, and introducing DOD Safe as an approved method for transmittal of submittals. Additional administrative changes include updating references, adding and/or language in various sections, and replacing the AF Form 3000 with a new TAFB Form 3000.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tinker General Requirements Change Log – Aug 2022
00 70 00 No Changes
00 71 00 No Changes
00 72 00 No Changes
00 80 00 No Changes
00 80 05 No Changes
01 32 16.00 20 No Changes
01 33 00 Throughout document, changed ‘Contracting Officer’ to ‘Contracting Officers Representative.’
Section 1.2.3. Added definition of ‘Contracting Officers Representative.’
Section 1.4.2.1. Added ‘and/or Contracting Officer’s Representative.’
Section 1.5.1. First sentence revised for clarity.
Section 1.5.3.3.2. Added ‘and/or Contracting Officer’s Representative.’
Section 1.5.3.3.2. Added ‘and/or Contracting Officer’s Representative.’
Section 1.5.3.8.1. Added ‘and/or the Contracting Officer or designated alternate.’
Section 1.5.5. Multiple Changes
- Added Language specifying that file naming convention are specified in contract documents.
- Added language specifying that the COR can change requirement for submittals in PDF format.
- Added DOD Safe as means for transmittal of submittals.
Section 1.8.2. Changed requirement that Contractor’s Submittal Register must be submitted with final design submittal.
Section 1.8.7. Changed requirement that updated Submittal Register must be submitted monthly.
Section 1.14. Added ‘and/or Contracting Officer’s Representative.’
Attachment 1. Replaced AF Form 3000 with new TAFB Form 3000.
01 33 16.00 10 No Changes.
01 42 00 No Changes.
01 45 00.00 10 No Changes.
01 50 00 No Changes
01 78 00 Throughout document, changed ‘Contracting Officer’ to ‘Contracting Officers Representative.’
Section 1.1. Updated references as required to reflect most current.
Section 1.2.1. Added ‘and/or Contracting Officer’s Representative.’
Section 1.4. Changed ‘Interim DD Form 1354’ to ‘DD Form 1354.’
Section 1.7.1. Added ‘and/or Contracting Officer’s Representative.’
Section 1.7.2. Added ‘and/or Contracting Officer’s Representative.’
Section 1.7.3. Added ‘and/or Contracting Officer’s Representative.’
Section 3.6. Added ‘attachment’ references.
01 78 23 No Changes