This document is a Department of the Air Force Pre-Bid Request for Information (RFI) memorandum for Project WWYK190068, which involves repairing the fire suppression system in Building 2280 at Tinker Air Force Base, Oklahoma. The memorandum addresses two specific technical questions: first, the compatibility of a Capsol LEDM C1D1 text sign with a Monaco MAPP-X control panel (resolved by using the Capsol Controller to monitor input relays), and second, concerns about the character height of CAPCON text signs not meeting NFPA 72 standards (resolved by modifying fire protection standards to accommodate the LED text sign's specifications).

The project involves the 72d Civil Engineering Directorate, with key personnel including Bash Jimoh (Project Manager), Adam Gibson (Construction Inspector), Joshua Wheeler (CSAG Program Manager), and Matthew Morris (Contracting Officer Representative). The memorandum is dated 28 October 2025 and includes two attachments: WWYK190068 RFI 25A Contractor Response and a redacted document. The RFI responses are intended to help contractors prepare their proposals for the fire suppression system repair project.

View the file

Other files

File Type Posted
Solicitation Amendment FA813725R00350009 SF 30.pdf PDF
Solicitation Amendment FA813725R00350008 SF 30.pdf PDF
Solicitation Amendment FA813725R00350009 SF 30.pdf PDF
Solicitation Amendment FA813725R00350007 SF 30.pdf PDF
Solicitation Amendment FA813725R00350006 SF 30.pdf PDF
GOVERNMENT RESPONSE TO RFI 25_25A COR.pdf PDF
Capsol LED Text Displays - Capsol.pdf PDF
WWYK190068_RFI_23-24-25 SEP24.pdf PDF
CAPSOL-EXP-LEDM-Text-Display-Data-Sheet-V1.4.pdf_safe.pdf PDF
CAPSOL-LEDM-Text-Display-Data-Sheet_1.6.pdf PDF
Capsol Mini LED Text Displays - Capsol.pdf PDF
RFI 26 WWYK190068_Rev_1_26 51 00.pdf PDF
RFI 26 Fixture with Joist.pdf PDF
RFI 26 zl1d.pdf_safe.pdf PDF
RFI - Light Fixtures in Joist Ceiling RFI 26 COR.pdf PDF
Solicitation Amendment FA813725R00350005 SF 30.pdf PDF
Solicitation Amendment FA813725R00350004 SF 30.pdf PDF
190068_Attch04_Revised_Design_Analysis.pdf PDF
190068_Attch01_DRWG.pdf PDF
190068_Attch02_Revised_Submittal_Register.pdf PDF
Solicitation Amendment FA813725R00350003 SF 30.pdf PDF
Solicitation Amendment FA813725R00350002 SF 30.pdf PDF
000111_F1.pdf PDF
190068_DD100_Appendix A.pdf PDF
fire prot-01.pdf PDF
190068_DD100_Appendix B.pdf PDF
190068_PreBid RFI GOVT RESPONSE.pdf PDF
190068_IFC_Design Analysis_Final.pdf PDF
FP from DACA63-76-C-0111.pdf PDF
190068_TAFB_IFC_FINAL_SPECIFICATIONS.pdf PDF
UFGS 28 31 76.pdf_safe.pdf PDF
Solicitation Amendment FA813725R00350001 SF 30.pdf PDF
01 78 00.pdf PDF
Recovered Materials Determination Form.pdf PDF
01 78 23.pdf PDF
ufc_3_260_04_2018.pdf PDF
tinkerafb_INRMP_App E.pdf PDF
dafi91-202.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
EM_385-1-1.pdf PDF
007200_Attch7b_Monthly Hazardous Usage Report.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
afman40-201.pdf PDF
007200_Attch14_Information for New Boilers.pdf PDF
Solicitation - FA813725R0035 for WWYK190068.pdf PDF
ufc_3_600_01_2016_c6.pdf PDF
afman32-7003.pdf PDF
dafi13-213.pdf PDF
00 80 00.pdf PDF
01 32 16.00 20.pdf PDF
Show 40 more

Latest 50 of 96 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 72 AIR BASE WING (AFMC)

TINKER AIR FORCE BASE OKLAHOMA

28 Oct. 25

MEMORANDUM FOR AFSC/PZIOC (ATTN: Stephen Palmer )

THROUGH: 72 ABW/CENM

FROM: 72 ABW/CEED

Tepa Companies

SUBJECT: Pre-Bid RFI Responses Project: WWYK190068, REPAIR FIRE SUPRESSION SYSTEM, B2280

Reference: Memo, 06 October 2025, Pre-Bid RFIs, WWYK190068, REPAIR FIRE

SUPRESSION SYSTEM, B2280

1. This office reviewed the referenced RFIs for the subject project and provided answers below. Please forward to the contractor(s) for their use in preparing proposals.

1. Request for information: The Capsol LEDM C1D1 text sign as a basis for design will not interface with the Monaco MAPP-X control panel. Please see Email below from Monaco Government Response: Direct interface between the LED Text Sign and the Monaco MAPP-X is not required. Using the Capsol LEDM C1D1 as a basis of design, the LED Text Signs would be controlled by the Capsol Controller. The controller can monitor up to 12 input relays from the Monaco MAPP-X panel that would be used to trigger any of the up to 12 programmed messages. The controller has a trouble monitor point that can be monitored by the Monaco MAPP-X panel. The dedicated monitor module from the Monaco MAPP-X will provide a point-to-point monitoring of the Capsol Controller.

2. Request for information. Based on NFPA 72 18.9.4.7 and accompanying table the CAPCON text signs character height is too small (1.2”)

Government Response: Due to the limited options for providing a LED Text Sign within a Classified Location, the Tinker Air Force Base Fire Protection Standards have been modified to find UFC and NFPA code compliant solutions. This includes the mounting location of the LED Text Sign at each exit. The height of the LED Text Sign can be adjusted to meet NFPA 72 Table 18.9.4.7 for the size of lettering provided by the LED Text Sign.

https://urldefense.proofpoint.com/v2/url?u=https-3A__url.us.m.mimecastprotect.com_s_blFYCn5WR4FAjEDT9fwtJ0FUJ-3Fdomain-3D18.9.4.7&d=DwMGaQ&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=QrGI4ukupioxu6zAt05RmlkBrCTAhnZf68ZT9Pu-Bts&m=yd8UkvMW8qxSeWwuMTvu4DjkDVc61LtjwpnHBvVCkzz1UFvDhTj_dNiDP1oFnFtP&s=SmPsRKDFkckwj9A3pY1nEG7zt3k9fFLSIUd6YV4eroc&e=

3. The points of contact for this project are:

1. Bash Jimoh, Project Manager. PH: 582-4828

2. Adam Gibson, Construction Inspector. PH: 736-5028

3. Joshua Wheeler, CSAG Program Manager. PH: 582-4826

4. Matthew Morris, Contracting Officer Representative (COR). PH: 736-7081

BASH JIMOH MATTHEW MORRIS

Project Manager ELECTRICAL ENGINEER/COR 72d Civil Engineering Directorate (Tepa) 72d Civil Engineering Directorate

2 Attachment(s):

1. WWYK190068 RFI 25A Contractor Response

2. WWYK190068_RFI_003_20251006_Redacted cc:

Project folder

2025-10-28T12:35:18-0500
JIMOH.BASHIRU.BABATUNDE.1399499174
2025-11-04T14:16:51-0600
MORRIS.MATTHEW.K.1385757456

File details come from the government source that posted it. Updated .