007200_Attch7b_Monthly Hazardous Usage Report.pdf

PDF 123 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
Solicitation number
FA813725R0035
Issued by

About this file

The document is a Monthly Hazardous Material Usage Report template designed for contractors to track and report chemical usage on a military installation. The form requires detailed documentation including contract number, contractor information, product details, and quantitative measurements of hazardous material brought on-site, used, stored, and removed. The form captures critical information such as product nomenclature, trade name, part number, manufacturer details, physical storage locations, and the specific description of how the product is used. The form provides multiple unit of measure options including gallons, units, pints, fluid ounces, and pounds, allowing flexible reporting of chemical quantities. The template is associated with the Tinker Air Force Base MAC BOA solicitation (FA813725R0035) for a fire suppression system repair project, and is intended to help maintain safety and tracking protocols for hazardous materials used during contract performance.

View the file

Other files

File Type Posted
Solicitation Amendment FA813725R00350009 SF 30.pdf PDF
Solicitation Amendment FA813725R00350008 SF 30.pdf PDF
Solicitation Amendment FA813725R00350009 SF 30.pdf PDF
190068_GOVT RESPONSE TO RFI 25A AND REDATED RESPONSE COR.pdf PDF
Solicitation Amendment FA813725R00350007 SF 30.pdf PDF
Solicitation Amendment FA813725R00350006 SF 30.pdf PDF
GOVERNMENT RESPONSE TO RFI 25_25A COR.pdf PDF
Capsol LED Text Displays - Capsol.pdf PDF
WWYK190068_RFI_23-24-25 SEP24.pdf PDF
CAPSOL-EXP-LEDM-Text-Display-Data-Sheet-V1.4.pdf_safe.pdf PDF
CAPSOL-LEDM-Text-Display-Data-Sheet_1.6.pdf PDF
Capsol Mini LED Text Displays - Capsol.pdf PDF
RFI 26 WWYK190068_Rev_1_26 51 00.pdf PDF
RFI 26 Fixture with Joist.pdf PDF
RFI 26 zl1d.pdf_safe.pdf PDF
RFI - Light Fixtures in Joist Ceiling RFI 26 COR.pdf PDF
Solicitation Amendment FA813725R00350005 SF 30.pdf PDF
Solicitation Amendment FA813725R00350004 SF 30.pdf PDF
190068_Attch04_Revised_Design_Analysis.pdf PDF
190068_Attch01_DRWG.pdf PDF
190068_Attch02_Revised_Submittal_Register.pdf PDF
Solicitation Amendment FA813725R00350003 SF 30.pdf PDF
Solicitation Amendment FA813725R00350002 SF 30.pdf PDF
000111_F1.pdf PDF
190068_DD100_Appendix A.pdf PDF
fire prot-01.pdf PDF
190068_DD100_Appendix B.pdf PDF
190068_PreBid RFI GOVT RESPONSE.pdf PDF
190068_IFC_Design Analysis_Final.pdf PDF
FP from DACA63-76-C-0111.pdf PDF
190068_TAFB_IFC_FINAL_SPECIFICATIONS.pdf PDF
UFGS 28 31 76.pdf_safe.pdf PDF
Solicitation Amendment FA813725R00350001 SF 30.pdf PDF
01 78 00.pdf PDF
Recovered Materials Determination Form.pdf PDF
01 78 23.pdf PDF
ufc_3_260_04_2018.pdf PDF
tinkerafb_INRMP_App E.pdf PDF
dafi91-202.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
EM_385-1-1.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
afman40-201.pdf PDF
007200_Attch14_Information for New Boilers.pdf PDF
Solicitation - FA813725R0035 for WWYK190068.pdf PDF
ufc_3_600_01_2016_c6.pdf PDF
afman32-7003.pdf PDF
dafi13-213.pdf PDF
00 80 00.pdf PDF
01 32 16.00 20.pdf PDF
Show 40 more

Latest 50 of 96 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MONTHLY HAZARDOUS MATERIAL USAGE REPORT

REPORT ON CHEMICAL USAGE

1. GENERAL INFORMATION

Contract Number _________________ Contract Performance Period ______________

Contractor's Name ___________________________ Date of Report _______________

Name of On-Base Contractor Point of Contact ________________________________

Phone Number of Contractor On-Base Point of Contact ________________________

Emergency Phone Number _____________________________________________________

Address or Physical Location of the Contractor's Field Office

2. PRODUCT INFORMATION

Product Nomenclature _______________________________________________________

Product Trade Name _________________________________________________________

Product Part Number ________________________________________________________

Manufacturer's Name ________________________________________________________

Manufacturer's Address _____________________________________________________

Physical Locations(s) of On-Base Usage and Storage

_____ Same as Above _____ Other

Description of How Product is used _________________________________________

3. USAGE/STORAGE AMOUNT

Unit of Measure: ______ Gallon(s) ______ Unit(s) ______ Pint(s)

______ Fluid Ounce(s) ______ Pound(s)

______ Other (Specify) _______________________________

Amount Brought Amount Used During Amount Amount on Installation Reporting Period Stored Removed

Signature __________________________________________________________________

(Responsible Contractor)

(Continue on additional sheets if needed)

Contract Number:
Contract Performance Period:
Contractors Name:
Date of Report:
Name of OnBase Contractor Point of Contact:
Phone Number of Contractor OnBase Point of Contact:
Emergency Phone Number:
Address or Physical Location of the Contractors Field Office:
Product Nomenclature:
Product Trade Name:
Product Part Number:
Manufacturers Name:
Manufacturers Address:
Physical Locationss of OnBase Usage and Storage:
Same as Above:
Other:
Description of How Product is used:
undefined:
Units:
Unit of Measure 1:
Unit of Measure 2:
Unit of Measure 3:
Fluid Ounces:
Other Specify:
on Installation:
Reporting Period:
Stored:
Removed:

File details come from the government source that posted it. Updated .