007200_Attch14_Information for New Boilers.pdf
PDF 144 KB Posted
- Solicitation number
- FA813725R0035
About this file
This document is an information collection form for a new boiler installation, detailing specific documentation and maintenance requirements. The form requires comprehensive details about the boiler, including manufacturer, model, serial number, fuel type, construction/installation dates, and boiler stack specifications. Maintenance requirements specify tune-up frequencies based on the boiler's heat input capacity: annual tune-ups for ≥10 MMBtu/hr units, every 2 years for 5-10 MMBtu/hr units, and every 5 years for ≤5 MMBtu/hr units. The form mandates continuous recordkeeping, including detailed logging of startup and shutdown events, fuel usage, and alternative fuel deployment, with a requirement to notify CEAN (presumably a facilities management entity) of all tune-ups and significant operational changes.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INFORMATION REQUIRED FOR NEW BOILER
INFORMATION REQUIRED FOR INSTALLATION/START‐UP OF THE BOILER IN BLDG_____
POST LOCATION______
Boiler Information Manufacturer:
Model and MMBtu/hr input:
Serial Number:
Type of Boiler:
Primary Fuel:
Secondary/Alternative Fuel:
Dates of construction/installation/startup Date construction commenced:
Date of installation of boiler:
Date of boiler startup (initial startup to check if the boiler is operating properly):
Date of boiler startup for continuous operation (official startup date):
Boiler Stack Information (note units, if different than shown) Stack Diameter (ft):
Stack Height (ft):
Rated Stack Flow (cfm):
Stack temperature (°F):
Provide brochures and specifications available for the boiler
CONTINUOUS MAINTENANCE AND RECORDKEEPING REQUIREMENTS
Tune‐up requirement‐
Frequency is dependent on the Rated Heat Input Capacity of the Boiler, as follows:
> =10MMBtu/hr Annual tuneups
< 10 but >5MMBtu/hr Tune‐ups every 2 years
<= 5MMBtu/hr Tune‐ups every 5 years
CEAN must be informed every time tune‐ups are performed in the boilers
Date, time, and duration of every startup and shutdown of the boiler Type of fuel and amount of fuel used during every startup and shutdown of the boiler
For dual fuel boilers (boilers that operate using NG and have liquid fuel as backup) Date, type and amount of alternative fuel usage. Reason for using alternative fuel. If alternative fuel is used due to a natural gas curtailment, it needs to be notified immediately to CEAN.
| INFORMATION REQUIRED FOR INSTALLATIONSTARTUP OF THE BOILER IN BLDG: |
| Boiler Information: |
| Model and MMBtuhr input: |
| Serial Number: |
| Type of Boiler: |
| Primary Fuel: |
| SecondaryAlternative Fuel: |
| Dates of constructioninstallationstartup: |
| Date of installation of boiler: |
| Date of boiler startup initial startup to check if the boiler is operating properly: |
| Date of boiler startup for continuous operation official startup date: |
| Boiler Stack Information note units if different than shown: |
| Provide brochures and specifications available for the boiler: |
| Frequency is dependent on the Rated Heat Input Capacity of the Boiler as follows: |
| Rated Stack Flow cfm: |
| Stack Diameter: |
| Stack Height: |
File details come from the government source that posted it. Updated .