007200_Attch14_Information for New Boilers.pdf

PDF 144 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
Solicitation number
FA813725R0035
Issued by

About this file

This document is an information collection form for a new boiler installation, detailing specific documentation and maintenance requirements. The form requires comprehensive details about the boiler, including manufacturer, model, serial number, fuel type, construction/installation dates, and boiler stack specifications. Maintenance requirements specify tune-up frequencies based on the boiler's heat input capacity: annual tune-ups for ≥10 MMBtu/hr units, every 2 years for 5-10 MMBtu/hr units, and every 5 years for ≤5 MMBtu/hr units. The form mandates continuous recordkeeping, including detailed logging of startup and shutdown events, fuel usage, and alternative fuel deployment, with a requirement to notify CEAN (presumably a facilities management entity) of all tune-ups and significant operational changes.

View the file

Other files

File Type Posted
Solicitation Amendment FA813725R00350009 SF 30.pdf PDF
Solicitation Amendment FA813725R00350007 SF 30.pdf PDF
Solicitation Amendment FA813725R00350006 SF 30.pdf PDF
GOVERNMENT RESPONSE TO RFI 25_25A COR.pdf PDF
WWYK190068_RFI_23-24-25 SEP24.pdf PDF
CAPSOL-EXP-LEDM-Text-Display-Data-Sheet-V1.4.pdf_safe.pdf PDF
CAPSOL-LEDM-Text-Display-Data-Sheet_1.6.pdf PDF
RFI 26 Fixture with Joist.pdf PDF
RFI 26 WWYK190068_Rev_1_26 51 00.pdf PDF
Solicitation Amendment FA813725R00350005 SF 30.pdf PDF
190068_Attch04_Revised_Design_Analysis.pdf PDF
190068_Attch01_DRWG.pdf PDF
Solicitation Amendment FA813725R00350003 SF 30.pdf PDF
190068_IFC_Design Analysis_Final.pdf PDF
190068_DD100_Appendix A.pdf PDF
FP from DACA63-76-C-0111.pdf PDF
EMS General Awareness Training for Contractors Aug 2018 PDF.pdf PDF
00 70 00.pdf PDF
tinkerafb_INRMP.pdf PDF
dafman91-203.pdf PDF
ufc_3_260_04_2018.pdf PDF
afi91-202_afmcsup.pdf PDF
ufc_3_601_02_2021.pdf PDF
dafi91-202.pdf PDF
tinkerafbi21-100.pdf PDF
tinkerafb_INRMP_App E.pdf PDF
017800_Attch1_DD1354.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 45 00.00 10.pdf PDF
01 78 23.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
ufc_3_600_01_2016_c6.pdf PDF
tinkerafbi13-204.pdf PDF
afman32-7003.pdf PDF
tinkerafb_HWMP.pdf PDF
Recovered Materials Determination Form.pdf PDF
013300_Attch1_TAFBF3000.pdf PDF
007200_Attch7a_AF3952.pdf PDF
Solicitation - FA813725R0035 for WWYK190068.pdf PDF
01 33 00.pdf PDF
00 80 05.pdf PDF
01 32 16.00 20.pdf PDF
WWYK190068 Canceled SiteVisit Signin 12JUN25.pdf PDF
190068_ATT10_Submittal_Register.pdf PDF
190068_ATT9_SOW.pdf PDF
EAL List - 190068.xlsx XLSX spreadsheet
190068_ATT11_Revised_Drawings.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INFORMATION REQUIRED FOR NEW BOILER

INFORMATION REQUIRED FOR INSTALLATION/START‐UP OF THE BOILER IN BLDG_____

POST LOCATION______

Boiler Information Manufacturer:

Model and MMBtu/hr input:

Serial Number:

Type of Boiler:

Primary Fuel:

Secondary/Alternative Fuel:

Dates of construction/installation/startup Date construction commenced:

Date of installation of boiler:

Date of boiler startup (initial startup to check if the boiler is operating properly):

Date of boiler startup for continuous operation (official startup date):

Boiler Stack Information (note units, if different than shown) Stack Diameter (ft):

Stack Height (ft):

Rated Stack Flow (cfm):

Stack temperature (°F):

Provide brochures and specifications available for the boiler

CONTINUOUS MAINTENANCE AND RECORDKEEPING REQUIREMENTS

Tune‐up requirement‐

Frequency is dependent on the Rated Heat Input Capacity of the Boiler, as follows:

> =10MMBtu/hr Annual tuneups

< 10 but >5MMBtu/hr Tune‐ups every 2 years

<= 5MMBtu/hr Tune‐ups every 5 years

CEAN must be informed every time tune‐ups are performed in the boilers

Date, time, and duration of every startup and shutdown of the boiler Type of fuel and amount of fuel used during every startup and shutdown of the boiler

For dual fuel boilers (boilers that operate using NG and have liquid fuel as backup) Date, type and amount of alternative fuel usage. Reason for using alternative fuel. If alternative fuel is used due to a natural gas curtailment, it needs to be notified immediately to CEAN.

INFORMATION REQUIRED FOR INSTALLATIONSTARTUP OF THE BOILER IN BLDG:
Boiler Information:
Model and MMBtuhr input:
Serial Number:
Type of Boiler:
Primary Fuel:
SecondaryAlternative Fuel:
Dates of constructioninstallationstartup:
Date of installation of boiler:
Date of boiler startup initial startup to check if the boiler is operating properly:
Date of boiler startup for continuous operation official startup date:
Boiler Stack Information note units if different than shown:
Provide brochures and specifications available for the boiler:
Frequency is dependent on the Rated Heat Input Capacity of the Boiler as follows:
Rated Stack Flow cfm:
Stack Diameter:
Stack Height:

File details come from the government source that posted it. Updated .