This document is a Pre-Bid Request for Information (RFI) #001 for a fire suppression system repair project at Tinker Air Force Base, Project #WWYK190068, dated 8/13/2025. The project involves removing the existing foam system within the hangar bays and replacing it with an automatic sprinkler system, focusing specifically on the hangar level only. The government provided clarifications on three key technical aspects: confirming the scope is limited to hangar bay sprinkler installation, allowing design flexibility for sprinkler placement and penetrations, and specifying requirements for explosion-proof LED text notification signs within the hangar bays, which must meet Class 1 Div 1 requirements and include programmable two-line display capabilities with alert and scrolling messages.

View the file

Other files

File Type Posted
Solicitation Amendment FA813725R00350009 SF 30.pdf PDF
Solicitation Amendment FA813725R00350008 SF 30.pdf PDF
Solicitation Amendment FA813725R00350009 SF 30.pdf PDF
190068_GOVT RESPONSE TO RFI 25A AND REDATED RESPONSE COR.pdf PDF
Solicitation Amendment FA813725R00350007 SF 30.pdf PDF
Solicitation Amendment FA813725R00350006 SF 30.pdf PDF
GOVERNMENT RESPONSE TO RFI 25_25A COR.pdf PDF
Capsol LED Text Displays - Capsol.pdf PDF
CAPSOL-EXP-LEDM-Text-Display-Data-Sheet-V1.4.pdf_safe.pdf PDF
CAPSOL-LEDM-Text-Display-Data-Sheet_1.6.pdf PDF
Capsol Mini LED Text Displays - Capsol.pdf PDF
RFI 26 WWYK190068_Rev_1_26 51 00.pdf PDF
RFI 26 Fixture with Joist.pdf PDF
RFI 26 zl1d.pdf_safe.pdf PDF
RFI - Light Fixtures in Joist Ceiling RFI 26 COR.pdf PDF
Solicitation Amendment FA813725R00350005 SF 30.pdf PDF
Solicitation Amendment FA813725R00350004 SF 30.pdf PDF
190068_Attch04_Revised_Design_Analysis.pdf PDF
190068_Attch01_DRWG.pdf PDF
190068_Attch02_Revised_Submittal_Register.pdf PDF
Solicitation Amendment FA813725R00350003 SF 30.pdf PDF
Solicitation Amendment FA813725R00350002 SF 30.pdf PDF
000111_F1.pdf PDF
190068_DD100_Appendix A.pdf PDF
fire prot-01.pdf PDF
190068_DD100_Appendix B.pdf PDF
190068_PreBid RFI GOVT RESPONSE.pdf PDF
190068_IFC_Design Analysis_Final.pdf PDF
FP from DACA63-76-C-0111.pdf PDF
190068_TAFB_IFC_FINAL_SPECIFICATIONS.pdf PDF
UFGS 28 31 76.pdf_safe.pdf PDF
Solicitation Amendment FA813725R00350001 SF 30.pdf PDF
01 78 00.pdf PDF
Recovered Materials Determination Form.pdf PDF
01 78 23.pdf PDF
ufc_3_260_04_2018.pdf PDF
tinkerafb_INRMP_App E.pdf PDF
dafi91-202.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
EM_385-1-1.pdf PDF
007200_Attch7b_Monthly Hazardous Usage Report.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
afman40-201.pdf PDF
007200_Attch14_Information for New Boilers.pdf PDF
Solicitation - FA813725R0035 for WWYK190068.pdf PDF
ufc_3_600_01_2016_c6.pdf PDF
afman32-7003.pdf PDF
dafi13-213.pdf PDF
00 80 00.pdf PDF
01 32 16.00 20.pdf PDF
Show 40 more

Latest 50 of 96 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8/13/2025

Tinker Air Force Base Project # WWYK190068 Repair Fire Suppression System, B2280 Pre-Bid RFI #001

23. The plans only provide floor plans for the hangar level. The drawings do not include plans for the currently un-sprinklered mechanical level above the hangar bays. Please confirm that this contract must not sprinkler the mechanical level.

GOVT. RESPONSE: Confirmed, the scope of work for this project is to remove the foam system within the Hangars and replace with an automatic sprinkler system within the hanger bays only.

24. The existing sprinklers are spaced closer than the maximum allowable spacing in the hangar bay.

Please confirm the existing holes in the structural ceiling must be reused. Closer sprinkler spacing may increase system demand. However it appears to be the governments intent to avoid patching ceiling holes and redrilling through the structural floor.

GOVT. RESPONSE: The design of the new sprinkler system for the hangers is a delegated design and the contractor is responsible for final installation design. The design intent does not require the reuse of existing penetrations or openings. Reference Structural Sheet S- 001 General Note 5 on openings and Fire Sheet F-001 Sprinkler System Demolition Note 13 and Sprinkler System General Notes 8 & 9.

25. The contract drawings indicate textual notification signs are required to be explosion proof.

Please provide the basis of design product for the text signs located within the hangar bays.

GOVT. RESPONSE: LED Text Signs within Class 1 areas that meet Explosion Proof Class 1 Div 1 requirements, either standalone or within an enclosure, that meet UFC requirements for LED Text Signs and are two line programmable. Top line shall display alert message “Evacuate” or “Alert” and second line shall scroll message from right to left. The Capsol LEDM would be referenced as the bases of design, but not the required product.