00 80 00.pdf

PDF 8 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
Solicitation number
FA813725R0035
Issued by

About this file

The document is a Special Provisions specification (Section 00 80 00) for working on Tinker Air Force Base (TAFB), dated January 2022. It outlines critical requirements for contractors operating on the airfield and base premises, including strict protocols for airfield operations, vehicle movement, and site management. Key provisions include:

Contractors must pre-coordinate all airfield activities with the Contracting Officer and Chief, Airfield Management (CAM), with specific restrictions on equipment height (12 feet maximum), personnel access, and vehicle operations. All contractor personnel working on the airfield for projects over seven days must complete flight line driver training and have portable radios for communication with Tinker Ground Control. Additional requirements cover traffic control, road closures, waste disposal, and a potential winter recess between December 1 and March 1, which can be negotiated as a no-cost contract modification. The document emphasizes safety, operational continuity, and precise coordination with base management throughout the project execution.

View the file

Other files

File Type Posted
Solicitation Amendment FA813725R00350009 SF 30.pdf PDF
Solicitation Amendment FA813725R00350007 SF 30.pdf PDF
Solicitation Amendment FA813725R00350006 SF 30.pdf PDF
GOVERNMENT RESPONSE TO RFI 25_25A COR.pdf PDF
WWYK190068_RFI_23-24-25 SEP24.pdf PDF
CAPSOL-EXP-LEDM-Text-Display-Data-Sheet-V1.4.pdf_safe.pdf PDF
CAPSOL-LEDM-Text-Display-Data-Sheet_1.6.pdf PDF
RFI 26 Fixture with Joist.pdf PDF
RFI 26 WWYK190068_Rev_1_26 51 00.pdf PDF
Solicitation Amendment FA813725R00350005 SF 30.pdf PDF
190068_Attch04_Revised_Design_Analysis.pdf PDF
190068_Attch01_DRWG.pdf PDF
Solicitation Amendment FA813725R00350003 SF 30.pdf PDF
190068_IFC_Design Analysis_Final.pdf PDF
190068_DD100_Appendix A.pdf PDF
FP from DACA63-76-C-0111.pdf PDF
EMS General Awareness Training for Contractors Aug 2018 PDF.pdf PDF
00 70 00.pdf PDF
tinkerafb_INRMP.pdf PDF
dafman91-203.pdf PDF
ufc_3_260_04_2018.pdf PDF
afi91-202_afmcsup.pdf PDF
ufc_3_601_02_2021.pdf PDF
dafi91-202.pdf PDF
tinkerafbi21-100.pdf PDF
tinkerafb_INRMP_App E.pdf PDF
017800_Attch1_DD1354.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 45 00.00 10.pdf PDF
01 78 23.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
ufc_3_600_01_2016_c6.pdf PDF
tinkerafbi13-204.pdf PDF
afman32-7003.pdf PDF
tinkerafb_HWMP.pdf PDF
Recovered Materials Determination Form.pdf PDF
013300_Attch1_TAFBF3000.pdf PDF
007200_Attch7a_AF3952.pdf PDF
WWYK190068 2nd SiteVisit Signin 23JUN25.pdf PDF
01 42 00.pdf PDF
01 50 00.pdf PDF
Tinker General Requirements Specifications_Nov 2022_Change Log.pdf PDF
01 33 16.00 10.pdf PDF
UMRL.pdf PDF
190068_ATT10_Submittal_Register.pdf PDF
190068_ATT9_SOW.pdf PDF
EAL List - 190068.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker AFB Tinker General Requirements

SECTION 00 80 00

SPECIAL PROVISIONS FOR WORKING ON TINKER AFB

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. The most current edition of the listed publications at the time of contract/delivery order award shall be used.

TINKER AIR FORCE BASE (TAFB)

TAFBI 13-204 (2021) Airfield Operations

1.2 DEWATERING EXCAVATED AREA

It shall be the Contractor's responsibility to protect the construction area from damage due to rainwater. The Contractor shall provide and maintain at the job site sufficient pumps to remove rainwater from the excavated area as soon as practicable.

1.3 HAUL ROUTES

The haul routes to be used by the Contractor shall be as directed on the project drawings or by the Contracting Officer.

1.4 AIRFIELD OPERATIONS

All contractor activities on the airfield shall be pre-coordinated with the Contracting Officer in conjunction with the Chief, Airfield Management (CAM) prior to the Contractor proceeding on the airdrome. The provisions of TAFBI 13-204 and Section 00 80 05 SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE AIRFIELD shall be strictly adhered to.

All runways, taxiways and aprons shall remain open during this project, unless specified otherwise by the Contracting Officer. The height of construction vehicles and equipment shall be limited to 12 feet above the surface. Absolutely no equipment or personnel will be allowed on the aircraft movement area or within 200 feet of the runways without permission from the Tinker Control Tower.

All Contractor personnel who will be operating their equipment or vehicles within the movement area or on any aircraft-parking ramp shall receive flight line driver training and have portable radios capable of communicating with Tinker Ground Control for projects over seven days.

The CAM may authorize certain contractors and other personnel to drive on the airdrome for short specified periods without completing the flight line driving training. However, Airfield Management will brief contractors and project engineers (or other supervisors responsible for the work being accomplished) and will provide flight line orientation for contractor vehicle operators prior to allowing them to drive on the airdrome.

January 2022 Page 1 Section 00 80 00

Tinker AFB Tinker General Requirements

Prior to commencing work on this project, the Contractor shall coordinate with the Contracting Officer for any airfield authorization passes that may be required.

Taxiing and towed aircraft shall have the right-of-way at all times.

Close coordination will be maintained between the Contractor's on-site foreman and the Airfield Manager.

1.5 TRAFFIC CONTROL AND BARRICADES

1.5.1 Automobile Movement Areas

Construction areas affecting automobile movement areas shall be protected by an adequate number of barricades with working flashing lights, warning devices, construction signs, flagmen and personnel. The barricades and warning devices shall be in accordance with the "Manual on Uniform Traffic Control Devices for Streets and Highways" developed by the U.S. Department of Transportation as an approved national standard. All costs associated with providing the traffic control and barricades shall be considered incidentals and shall be borne by the Contractor at no additional cost to the Government.

1.5.2 Road Closures

On two lane roads, only one lane may be blocked at a time. On four lane roads, at least two lanes shall be kept open at all times and three at rush hour.

1.6 WASTE AREA

Unless otherwise specified in these specifications, all waste materials removed shall become property of the Contractor and shall be taken off base for disposal. Disposal site location shall be the responsibility of the Contractor.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.1 WINTER RECESS

A winter recess, between December 1 and March 1, can be negotiated per Delivery Order between the Contracting Officer and the Contractor. It shall be a no cost modification to the contract moving the Delivery Order completion date the amount of the recess time.

-- End of Section --

January 2022 Page 2 Section 00 80 00

File details come from the government source that posted it. Updated .