Appendix L ECMM Sample Trip Report.docx
DOCX document 122 KB Posted
- Solicitation number
- FA8052PRE0722
About this file
This document is an ECMM Sample Trip Report that provides details on maintenance activities performed on various ECMM assemblages at multiple locations. The report includes an inventory of the assemblages, validation of equipment and supplies, removal of excess and expired items, and training provided. The report indicates that the maintenance requirements set forth in the ECMM Contract were met. This document is an appendix to a larger federal contract opportunity for Expeditionary/Contingency Medical Material (ECMM) Services. The purpose of the ECMM Program is to provide personnel, services, and expertise to assemble, manage, maintain, and sustain ECMM assemblages for the U.S. Air Force, Air Force Reserve Command, Air National Guard, U.S. Army, and JANUS Project installations within CONUS and OCONUS. The contract will provide analytical, logistics, and warehousing support services.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE MEDICAL AGENCY
Falls Church VA
APPENDIX L
ECMM Sample Trip Report
DATE
MEMORANDUM FOR NAME
ADDRESS
FROM: AFMED/SG4W
601 Davy Crockett Rd Bldg 1534, Suite 100 San Antonio, TX 78226-1885
SUBJECT: Delivery Report Name
1. 1. On DATE, the XXXXX Team (XXXXX, XXXXX and XXXXX) performed maintenance on the following projects:
| Location |
| Host Account |
| Project Description |
| Allowance Std |
| UTC |
| Readiness % |
| 75 MDG |
| Hill AFB |
| Anti Malaria/Cholera |
| N/A |
| N/A |
| 75% |
| 75 MDG |
| Hill AFB |
| BW/CW |
| N/A |
| N/A |
| 68% |
| 151 MDG |
| Hill AFB |
| Anti Malaria/Cholera |
| N/A |
| N/A |
| 75% |
| 151 MDG |
| Hill AFB |
| BW/CW |
| N/A |
| N/A |
| 72% |
| 419 AFRES |
| Hill AFB |
| Anti Malaria/Cholera |
| N/A |
| N/A |
| 75% |
| 419 AFRES |
| Hill AFB |
| BW/CW |
| N/A |
| N/A |
| 67% |
MC-CBRN:
| Location |
| Team Chief |
| Project Description |
| Allowance Std |
| UTC |
| Readiness % |
| 75 MDG |
| SrA XXXX |
| In-Place Patient Decon |
| 886A |
| HSMRA |
| 95% |
| 75 MDG |
| XXXX |
| Pharmaceuticals |
| 886E |
| HSMRE |
| 99% |
| 75 MDG |
| A1C XXXX |
| Bioenvironmental |
| 886H |
| HSMRH |
| 97% |
| 75 MDG |
| N/A |
| Field Response |
| 886J |
| HSMRJ |
| 95% |
| 75 MDG |
| Capt XXXX |
| Triage |
| 886K |
| HSMRK |
| 100% |
| 75 MDG |
| Capt XXXX |
| Clinical |
| 886L |
| HSMRL |
| 96% |
| 75 MDG |
| SSgt XXXX |
| Medical Unit Security |
| 886M |
| HSMRM |
| 100% |
| 75 MDG |
| SSgt XXXX |
| Public Health |
| 886P |
| HSMRP |
| 97% |
| 75 MDG |
| SSgt XXXX |
| PPE |
| SG05 |
| N/A |
| 100% |
| 75 MDG |
| SSgt XXXX |
| Pandemic Pharmacy |
| SG06 |
| N/A |
| 61% |
| 75 MDG |
| SSgt XXXX |
| Ebola Virus Defense |
| SG10 |
| N/A |
| 91% |
2. Point of contact for D: NAME, Phone: XXXX , Email. NAME was contacted by the NAME on Date, regarding this Name of Maintenance visit.
3. Name of Maintenance Item assemblages maintained were validated using the latest Medical Resource Letter (MRL) and Allowance Standard (AS).
4. A complete inventory of the above Name of Maintenance Item assets was accomplished.
a. All quality assurance data was validated and changes were updated during the inventory.
b. Research was performed on overages and shortages to include validation of prime substitute relationships and adjusted units of issue.
c. Excess and expired items up to 1 Sep 2017 were removed and processed for final disposition on all Name of Maintenance Item assemblages even those not inventoried during this maintenance visit.
d. Training was provided IAW AFMED guidance to XXXX, XXXXX and XXXXX.
e. No Inventory Adjustment Vouchers (IAV) were processed. The inventory certification package was forwarded to the Medical Logistics Flight Commander: NAME.
5. . Name of Maintenance Item assemblages maintained were validated using the latest AS with locally approved changes.
a. Annual inventories and quality assurance requirements were completed, as described for Name of Maintenance Item assemblages, excluding all Biomedical Equipment maintenance work orders.
b. Excess and expired items up to Date were removed and processed for final disposition except for a few pharmaceuticals that Team Chiefs wanted to hold onto until replacements were received.
c. SG06 low percentage was due to items being expired. The Logistics Team will contact XXXX at AFMED/SG4W to work shortages.
e. No Inventory Adjustment Vouchers (IAV) were processed. The inventory certification packages were forwarded to Team Chiefs for signatures and to be briefed at the next Medical Readiness Committee IAW AFI 41-209, Chapter 8.30.3.2.3.1. OPEN: OPR: NAME.
6. During the Name of Maintenance Item inventory process equipment and maintenance significant items were inspected, calibrated or tested. Equipment data files (EDF) were inspected and work orders were filed or provided to Name for further review and filing IAW AFI 41-201, Para 2.4.3. Equipment data files are located in the BMET shop. Attached is a list of equipment requiring additional action (Name of Maintenance Item Equipment Service Report). OPEN: OPR: NAME.
7. The Travel Team Lead from Base had access to Server Name server.
8. Name (s) were out-briefed on all aspects of the Name of Maintenance Item maintenance visit. Members of the XXXX maintenance team express their sincere appreciation for the professional courtesy and assistance provided by the NAME. Please feel free to contact NAME, Phone or Email should you desire further discussion regarding this visit.
NAME
ECMM Contract Program Manager
I certify that the performance of this maintenance visit meets the requirements set forth in the ECMM Contract.
NAME
ECMM COR
Attachments: