Appendix I ECMM Mission Essential Services Plan.docx

DOCX document 28 KB Posted

Attached to
Expeditionary/ Contingency Medical Material (ECMM) Services
Solicitation number
FA8052PRE0722
Issued by

About this file

This document is a Mission-Essential Contractor Services Plan template to be submitted with a federal contract offer. It outlines the contractor's plan to continue providing mission-essential Expeditionary/Contingency Medical Materiel (ECMM) services identified in the solicitation during crisis situations, per DFARS requirements.

The plan addresses challenges, procedures for acquiring and mobilizing essential personnel and resources, alert and notification protocols, and communication expectations with contractor employees. It specifies that mission-essential services will be paid at the contract prices in effect when the plan is activated, and outlines the process for plan deactivation. The contract opportunity is for non-personal services to provide personnel, logistics support, and general warehousing for ECMM assemblages at USAF, AFRC, ANG, USA, and JANUS Project installations within CONUS and OCONUS.

View the file

Other files

File Type Posted
Appendix B ECMM Applicable Publications and Instructions.docx DOCX document
Appendix F3 ECMM ANG HRF-CERFP Locations.docx DOCX document
Appendix H ECMM Mission Essential Designation Letter.pdf PDF
Appendix L ECMM Sample Trip Report.docx DOCX document
Appendix P Addendums 1 and 2.docx DOCX document
Appendix R(d) ECMM APS-3 Ship Schedule.xlsx XLSX spreadsheet
Appendix S ECMM CDRLs - DIDs.docx DOCX document
Appendix A ECMM Definitions - Acronyms.docx DOCX document
Appendix D ECMM Site Lists.docx DOCX document
Appendix G ECMM Labor Categories.docx DOCX document
Appendix O AF ECMM Baseline Workload_2024.xlsx XLSX spreadsheet
Appendix Q ECMM Equipment Maintenance Items List.docx DOCX document
Appendix R(b) ECMM APS-3 Goose Creek Assemblages and Lines.xlsx XLSX spreadsheet
Appendix F1 ECMM ANG Labor Category Duties.docx DOCX document
Appendix J ECMM Government Furnished Property List.xlsx XLSX spreadsheet
Appendix K Air Force ECMM Baseline Workload.xlsx XLSX spreadsheet
Appendix N ECMM ANG GMU Standardized Equipment List 2024.xlsx XLSX spreadsheet
Appendix R(c) ECMM UDP POSA Assemblages and Lines.xlsx XLSX spreadsheet
ECMM PWS 7-10-24 Draft.pdf PDF
Appendix C ECMM Performance Objectives.docx DOCX document
Appendix E ECMM AF Baseline Staffing Levels at In-Garrison sites.docx DOCX document
Appendix F2 ECMM ANG Medical group Locations - Host Support.docx DOCX document
Appendix H ECMM Mission Essential Designation Letter.docx DOCX document
Appendix M ECMM JANUS Planned and Unplanned Travel.docx DOCX document
Appendix R(a) ECMM APS-1 POSA Assemblages and Lines.xlsx XLSX spreadsheet
ECMM__Request for Information.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX I

Mission-Essential Contractor Services Plan Template In accordance with (IAW) DFARS Provision 252.237-7024, Notice of Continuation of Essential Contractor Services, the Offeror shall be prepared to continue providing mission-essential services IAW the terms and conditions of the contract during periods of crisis. IAW DFARS Clause 252.237-7023, Continuation of Essential Contractor Services, the Offeror shall provide with its offer a written plan describing how it will continue to perform the essential contractor services listed in Attachment 8, Mission-Essential Contractor Services Designation, dated 13 March 2018, during periods of crisis. Specifically, within the Offeror’s Plan, the Offeror shall–

(1) Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed;

(2) Address in the plan, at a minimum—

(i) Challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves;

(ii) The time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site;

(iii) The components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home;

(iv) Any established alert and notification procedures for mobilizing identified “essential contractor service” personnel; and

(v) The approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis.

The Mission-Essential Contractor Services Plan Template below is a suggested format. The Plan shall be generalizable for the continuation of performance for all Task Orders awarded at any Contiguous United States (CONUS) (excluding Alaska and Hawaii) active duty Air Force (AF) installations or Air National Guard and Reserve installations.

1. INTRODUCTION. This Mission-Essential Contractor Services Plan has been developed in accordance with (IAW) DFARS Provision 252.237-7024, Notice of Continuation of Essential Contractor Services, and DFARS Clause 252.237-7023, Continuation of Essential Contractor Services. This Plan addresses how [Insert Name of Offeror] will continue providing the mission-essential Expeditionary/Contingency Medical Materiel (ECMM) services identified in the Request for Proposal (RFP) during periods of crisis, upon notification by the Contracting Officer (CO) to activate the Plan.

2. OBJECTIVE. In support of the Air Force, the objective is to provide mission-essential services Air Force wide during a crisis.

3. PURPOSE. Briefly describe the purpose of the Mission-Essential Contractor Services Plan.

Example: The purpose of this Mission-Essential Contractor Services Plan is to prepare the Contractor in the event of extended service outages caused by a Crisis Situation to maintain operational capability of active vehicle barrier equipment. The Plan addresses challenges, initiation of personnel and resources, alert and notification procedures, and communication expectations during the declaration of a Crisis Situation.

4. EMERGENCY NOTIFICATION CONTACTS.

Name
Title
Mobile Phone
Big Wig
General Manager
123-654-3210
Smaller Wig
Quality / Service Manager
123-654-3211
Coordinator Wig
Project Manager
123-654-3212
Call Center
24/7/365
123-654-3200

5. ASSUMPTIONS. Briefly describe the assumptions of the Mission-Essential Contract Services Plan.

6. CONTINUED PERFORMANCE OF OPERATION DURING A CRISIS SITUATION.

a. Crisis Situation Declaration Describe how a Crisis Situation will be declared.

b. Invoking the Plan Describe how the Mission-Essential Contractor Services Contractor Services Plan will be invoked.

c. Challenges Address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves.

d. Initiation of Essential Personnel and Resources Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed.

Address the time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site.

Discuss how you will address components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home.

e. Alert and Notification Procedures Discuss how you will establish an alert and notification procedure for mobilizing identified “essential contractor service” personnel.

For example:

· General Manager should be notified first (POC at 123-654-3210)

· General Manager will contact Base for additional instructions and an update on process up to that point.

· General Manager, Big Wig will then notify Quality/Service Manager, Smaller Wig (123-654-3211) to assess next steps.

· Big Wig will then notify Human Resources who will activate the calling list of all available personnel.

f. Communication Expectations to Contractor Personnel Describe the approach you will use for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis.

7. MISSION-ESSENTIAL CONTRACTOR SERVICES PLAN MAINTENANCE AND REVIEW. Briefly describe how the plan will be maintained and reviewed.

8. PRICING. The mission-essential ECMM services will be paid at the prices in the contract at the time the Plan is activated. The prices will also be used as the basis for any equitable adjustments resulting from the activation of the Plan.

9. DEACTIVATION OF PLAN. [Insert Name of Offeror] shall perform the mission-essential contractor services during a crisis until notified by the CO to cease performance of the Plan.

SIGNATURE PAGE

Contractor Point of Contact:_______________________________________

Phone Number(s):_______________________________________

Email Address:_______________________________________

Date:_____________________________

FAXXXX-XX-X-XXXX

Attachment 3

File details come from the government source that posted it. Updated .