Attach_12_L-8_Matrix_REV_11Mar15.pdf
PDF 471 KB Posted
- Attached to
- 25 AF DCGS IDIQ Federal contract opportunity
- Solicitation number
- FA7037-15-R-0001
About this file
Attach 12 L-8 Matrix Revised 11 Mar 2015
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA7037-15-R-0001
Attachment L-8
SOLICITATION CROSS REFERENCE MATRIX
For Prospective Offerors: Offerors shall complete the Cross Reference Matrix by completing the column labeled ―Proposal Reference (Volume, Section No, Page). Failure by the Offeror to complete the matrix will result in the offeror being considered as failing to meet the solicitation terms and conditions. If this matrix conflicts with any other requirement, direction, or provision of this solicitation, the other reference shall take precedence over this matrix. This matrix discloses details as to the extent or manner by which the Government intends to evaluate offeror’s proposals for award, Section M references in the matrix are for information purposes only, and the Government shall be obligated to evaluate proposals solely in conformance with the provisions of the Section M of the solicitation.
PWS
Paragraph
PWS Description Section L Section M CLIN CDRLs Proposal Reference
(Volume, Section, pg
1 INTRODUCTION Not Evaluated Not Evaluated N/A N/A
2 BACKGROUND Not Evaluated Not Evaluated N/A N/A
2.1 Mission Not Evaluated Not Evaluated N/A N/A
2.2 Scope Not Evaluated Not Evaluated N/A N/A
3 REQUIREMENTS Not Evaluated Not Evaluated N/A N/A
3.1 Weapon Systems and C4I Systems information Technology Services
Para 4.2.3, Para 4.2.4, Para 4.2.5, Para 5.3
Para 2.b.1, Para 2.b.2, Para 2.b.3, Para 2.c
X001 N/A
3.1.1 Configuration Management and Engineering Support
Para 4.2.3, Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2, Para 2.b.3
3.1.2 ISR Systems Management Integration Support and Web Services
Para 4.2.3, Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2, X001 A001
3.1.3 Network Systems Management
Para 4.2.3, Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2, Para 2.b.3
X001
N/A
PWS
Paragraph
PWS Description Section L Section M CLIN CDRLs Proposal Reference
(Volume, Section, pg
3.1.4 Network Infrastructure Management
Para 4.2.3, Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2,
3.2 Project Management
Para 4.2.3
Para 2.b.1
3.3 Intelligence Support
Para 4.2.4, Para 4.2.5, Para 5.3
Para 2.b.1, Para 2.b.2, Para 2.b.3,
3.3.1 AF DCGS Infrastructure Imagery Dissemination Support
Para 4.2.3, Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2,
3.3.2 ISR Intelligence Analysis Support
Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2, Para 2.b.3
X001 X002
3.3.3 Mission Planning Support
Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2, Para 2.b.3
X001
3.3.4 ISR Imagery Analysis Support
Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2, Para 2.b.3
X001
3.3.5 ISR Mission Management Analysis Support
Para 4.2.3, Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2,
3.3.6 Weapons and Tactics Analysis Support
Para 4.2.3, Para 4.2.4, Para 4.2.5
Para 2.b.1, Para 2.b.2, X001 A002, A003
PWS
Paragraph
PWS Description Section L Section M CLIN CDRLs Proposal Reference
(Volume, Section, pg
Para 5.3
3.3.7 ISR Signals Intelligence Analysis Support
Para 4.2.3, Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2, Para 2.b.3
X001
3.4 Security Office Support
Para 4.2.4, Para 4.2.5
Para 2.b.1, Para 2.b.2, Para 2.b.3
A004
3.5 Staff Support
Para 4.2.4, Para 4.2.5, Para 5.3
Para 2.b.1, Para 2.b.2, Para 2.b.3, Para 2.c
3.5.1 Senior Consulting Support
Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2, X001 A005
3.5.2 Senior Consulting and Subject Matter Expert (SME) Support
Para 4.2.3, Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2,
3.5.3 Communications Engineering Support
Para 4.2.3, Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2,
3.6 Studies, Reports Analyses and Evaluations
Para 4.2.3, Para 4.2.4, Para 4.2.5, Para 5.3
Para 2.b.1, Para 2.b.2, Para 2.b.3,
3.6.1 Strategic Analysis Support
Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2, Para 2.b.3
A002, A006
PWS
Paragraph
PWS Description Section L Section M CLIN CDRLs Proposal Reference
(Volume, Section, pg
3.6.2 Analysis Support
Para 4.2.3, Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2, Para 2.b.3
A002
3.6.3 Modernization and Development
Para 4.2.4, Para 4.2.5 Para 5.3
Para 2.b.1, Para 2.b.2, Para 2.b.3
A002
3.7 Systems Engineering and Subject Matter Expert (SME) Support
Para 4.2.3, Para 4.2.4, Para 4.2.5
Para 2.b.1, Para 2.b.2,
3.7.1 ISR System Framework
Para 4.2.4, Para 4.2.5
Para 2.b.1, Para 2.b.2, Para 2.b.3
A005, A006
3.7.2 ISR SIGINT Engineering Support
Para 4.2.4, Para 4.2.5
Para 2.b.1, Para 2.b.2, Para 2.b.3
X001 A005
3.8 Surge Not Evaluated Not Evaluated X002 N/A
3.9 Task Order 0001 Not Evaluated Not Evaluated 0006 N/A
4 General Information Not Evaluated Not Evaluated N/A N/A
4.1 Program Management
Para 4.2.3, Para 4.2.4, Para 4.2.5, Para 5.3
Para 2.b.1, Para 2.b.2, Para 2.b.3, Para 2.c
X001 N/A
4.1.1 General Requirements
Para 4.2.3, Para 4.2.4, Para 4.2.5
Para 2.b.1, Para 2.b.2, Para 2.b.3
X001 N/A
4.1.1.1 General Requirements
Para 4.2.3, Para 4.2.4, Para 4.2.5
Para 2.b.1, Para 2.b.2, Para 2.b.3
X001 N/A
4.1.1.2 General Requirements
Para 4.2.3, Para 4.2.4, Para 2.b.1, Para 2.b.2, PWS
Paragraph
PWS Description Section L Section M CLIN CDRLs Proposal Reference
(Volume, Section, pg
Para 4.2.5 Para 2.b.3
4.1.2 Program Management Review (PMR) (TO Level)
Para 4.2.3, Para 4.2.4, Para 4.2.5
Para 2.b.1, Para 2.b.2, Para 2.b.3
X001 A007, A008, A011
4.2 Contract Manpower Reporting Not Evaluated Not Evaluated N/A N/A
4.2.1 Contract Manpower Reporting Not Evaluated Not Evaluated N/A N/A
4.2.2 Contract Manpower Reporting Not Evaluated Not Evaluated N/A N/A
4.3 Contract Management Not Evaluated Not Evaluated XXXX N/A
4.3.1 Request for Proposal (RFP) Not Evaluated Not Evaluated XXXX N/A
4.4 Period of Performance, Basic Contract
Not Evaluated Not Evaluated XXXX N/A
4.5 Period of Performance, Task Order Level
Not Evaluated Not Evaluated XXXX N/A
4.6 Hours of Work Not Evaluated Not Evaluated XXXX N/A
4.7 Federal Holidays Not Evaluated Not Evaluated XXXX N/A
4.8 Kick-Off Meeting (To Be Determined at TO level)
Not Evaluated Not Evaluated XXXX A008, A009
4.9 Travel Not Evaluated Not Evaluated X004 A010
4.10 Deliverables Not Evaluated Not Evaluated XXXX N/A
4.11 Services Summary Not Evaluated Not Evaluated XXXX N/A
4.12 Privacy Act Not Evaluated Not Evaluated XXXX N/A
4.13 Government Furnished Equipment
(GFE.)
Not Evaluated Not Evaluated XXXX N/A
4.13.1 Government Furnished Equipment
(GFE.)
Not Evaluated Not Evaluated XXXX N/A
4.13.2 Government Furnished Equipment
(GFE.)
Not Evaluated Not Evaluated XXXX N/A
4.14 Government Furnished Information
Not Evaluated Not Evaluated XXXX N/A
5.0 Special Contract Provisions Not Evaluated Not Evaluated XXXX N/A
PWS
Paragraph
PWS Description Section L Section M CLIN CDRLs Proposal Reference
(Volume, Section, pg
5.1 Security Concerns and Information Releasability
Not Evaluated
XXXX N/A
5.1.1 Security Concerns and Information Releasability
5.1.2 Security Concerns and Information Releasability
Para 4.2.3
Para 2.b.1
5.1.3 Security Concerns and Information Releasability
Not Evaluated Not Evaluated XXXX N/A
5.1.4 Security Concerns and Information Releasability
Not Evaluated Not Evaluated XXXX N/A
5.2 Purchase of Materials Not Evaluated Not Evaluated X003 A012
6.0 Contractor Personnel Not Evaluated Not Evaluated XXXX N/A
6.1 Contractor Personnel
Para 4.2.3 Para 4.2.4
Para 2.b.1 Para 2.b.2
XXXX N/A
6.2 Contractor Personnel
Para 4.2.4 Para 4.2.6
Para 2.b.2 Para 2.b.4
XXXX N/A
7.0 Continuation of Essential Contractor Services
Para 4.2.6 Para 2.b.4 X001 N/A
8.0 Applicable Publications and Instructions (not Inclusive)
Not Evaluated Not Evaluated XXXX N/A
File details come from the government source that posted it. Updated .