SITEVISITINFOPOSTING.doc

DOC document 28 KB Posted

Attached to
Modify/Upgrade Industrial Wastewater Pretreatment System, Bldg 309
Solicitation number
FA6656-08-R-0004
Issued by

About this file

SITE VISIT INFORMATION

View the file

Other files

File Type Posted
Q A as of 22 July 2009 B502.doc DOC document
RESPONSE TO CONTRACTOR QUESTIONS-Computer Interface Requirements.docx DOCX document
FA6656-08-R0004Prime SubsList- 13Aug 08.rtf RTF text file
FA6656-08-R0004Prime SubsList- 12Aug 08.rtf RTF text file
RESPONSE TO CONTRACTOR QUESTION-HMI SCREENS.docx DOCX document
FA6656-08-R0004 Amd 0003.doc DOC document
FA6656-08-R0004Prime SubsList- 8Aug 08.rtf RTF text file
RESPONSES TO CONTRACTOR QUESTIONS-Site Visit.docx DOCX document
FA6656-08-R0004 Amd 0002 Atch 1 - Responsibility Questionnaire.doc DOC document
24 of 27-E2 Rev Electrical Power Lighting Plan-Paper.pdf PDF
FA6656-08-R0004 Amd 0002.doc DOC document
26 of 27-E4 Rev Electrical Site Plan B-309-Paper.pdf PDF
site visit minutes.doc DOC document
RESPONSES TO CONTRACTOR QUESTIONS AS OF 7AUG 08.doc DOC document
RESPONSES TO CONTRACTOR QUESTIONS AS OF 4 AUG 08.docx DOCX document
21 of 27-M7 Flow Sensor-Monitor Modification.pdf PDF
silt fence-002.tif TIF image
16 of 27-M2 P I Diagram.pdf PDF
19 of 27-M5 Deicing Collection Sys Details.pdf PDF
7 of 27-A2 Exterior Interior Elevations.pdf PDF
18 of 27-M4 Deicing Manhole Site Plan.pdf PDF
10 of 27-S1 Foundation Plan Detail.pdf PDF
Attachment 4 - PastPerformanceQuestionnaire.doc DOC document
FA6656-08-R0004 Atch 1 Gen Dec Mod 6.doc DOC document
14 of 27-P1 Plumbing Plan.pdf PDF
3 of 27-C2 Site Utility Plan.pdf PDF
6 of 27-A1 Flr Roof Reflected Ceiling Plans.pdf PDF
1 of 27-G1 Title Page.pdf PDF
27 of 27-E5 Elec Site Plan-Fire Training Facility.pdf PDF
17 of 27-M3 Carbon Tank Repair Coating Details.pdf PDF
FA6656-08-R0004 Atch 2 Specifications.doc DOC document
8 of 27-A3 Sections and Details.pdf PDF
15 of 27-M1 Mechanical Plan.pdf PDF
11 of 27-S2 Roof Framing Plan Details.pdf PDF
silt fence-001.tif TIF image
9 of 27-A4 Schedules and Details.pdf PDF
12 of 27-S3 Foundation Section Detail.pdf PDF
22 of 27-FP1 Fire Prot Plan.pdf PDF
24 of 27-E2 Electrical Power Lighting Plan.pdf PDF
FA6656-08-R0004.doc DOC document
20 of 27-M6 Fire Training Deicing Manhole Site Plan.pdf PDF
5 of 27-C4 Details.pdf PDF
23 of 27-E1 Electrical Legend Fixture Sch one Line Diagram.pdf PDF
13 of 27-S4 Frame Sections and Details.pdf PDF
4 of 27-C3 Grading Plan.pdf PDF
2 of 27-C1 Demo Plan.pdf PDF
26 of 27-E4 Electrical Site Plan-B309.pdf PDF
25 of 27-E3 Fire Det Plan.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NBR FA6656-08-R-0004

Modify/Upgrade Industrial Wastewater Pretreatment Facility, Bldg 309 SITE INFORMATION: A site visit has been scheduled for Wednesday, the 6th of August, beginning at 10:00 a.m. (Local Time) in the Visitors Center, Bldg 102. (See Section L, Instructions, Conditions, and Notices to Offerors or Respondents, Provision Nbr 52.236-27 as amended).

Offerors are cautioned that the remarks and explanations at the conference shall not qualify the terms of the solicitation; and the terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. There will be no make-up site visit. Potential prime contractors, subcontractors, and/or suppliers are encouraged to attend the site visit.

Due to the current security situation, all who plan to attend should submit a listing which contains the name of their firm, along with the names of any/all representatives that plan on attending the site visit, to the Contracting Officer, preferably by email, to helen.jordan@youngstown.af.mil or by fax to 330-609-1042 by noon the 5th of August.

The administrative portion of the site visit will be held at the Visitors Center; upon completion of this portion, attendees will be escorted to the site to view existing conditions. Contractors are cautioned to arrive on time as access will be denied to any contractor arriving once attendees and escorts have left the Visitors Center.

File details come from the government source that posted it. Updated .