FA6656-08-R0004 Atch 1 Gen Dec Mod 6.doc
DOC document 62 KB Posted
- Attached to
- Modify/Upgrade Industrial Wastewater Pretreatment System, Bldg 309 Federal contract opportunity
- Solicitation number
- FA6656-08-R-0004
About this file
FA6656-08-R-0004 Atch 1 General Decision - Modification 6
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: OH080003 07/04/2008 OH3
Superseded General Decision Number: OH20070003
State: Ohio
Construction Type: Building
Counties: Columbiana, Mahoning and Trumbull Counties in Ohio.
BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 02/08/2008
1 02/15/2008
2 03/07/2008
3 04/04/2008
4 05/02/2008
5 06/06/2008
6 07/04/2008
ASBE0084-003 07/01/2007
Rates Fringes
ASBESTOS WORKER/INSULATOR
(Includes application of all insulating materials, protective coverings coatings
& finishings to all types of mechanical systems)..............$ 25.70 12.30
ASBE0207-011 07/01/2006
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging
& disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 21.00 8.30
BOIL0154-006 06/01/2008
COLUMBIANA
Rates Fringes
BOILERMAKER......................$ 33.90 19.82
* BOIL0744-004 07/01/2008
MAHONING & TRUMBULL
Rates Fringes
BOILERMAKER......................$ 35.34 17.48
BROH0006-011 05/01/2008
COLUMBIANA (Knox, Butler, West & Hanover Townships)
Rates Fringes
Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 25.58 10.15
BROH0008-002 06/01/2007
COLUMBIANA (Salem, Perry, Fairfield, Center, Elk Run, Middleton
& Unity Townships and the city of New Waterford) & MAHONING & the city of Youngstown
Rates Fringes
Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 25.22 11.51
BROH0008-003 06/01/2007
COLUMBIANA (Center, Elk Run, Fairfield, Middleton, New
Waterford, Perry, Salem & Unity Townships) & MAHONING
Rates Fringes
Marble Setter, Terrazzo
Worker & Tile Setter.............$ 24.83 9.45
BROH0008-005 06/01/2007
COLUMBIANA, MAHONING (Excluding Smith Township) & TRUMBULL
Rates Fringes
Marble Setter Finisher, Terrazzo Worker Finisher, Tile Setter Finisher.............$ 22.17 9.45
* BROH0010-005 07/01/2008
COLUMBIANA COUNTY (St. Clair, Madison, Wayne, Franklin, Washington, Yellow Creek & Liverpool Townships)
Rates Fringes
BRICKLAYER
BRICKLAYERS; CAULKERS;
CLEANERS; CEMENT
BLOCKLAYERS; MARBLE
SETTERS; POINTERS;
STONEMASONS & TERRAZZO
WORKERS.....................$ 24.20 12.11
TILE FINISHER....................$ 19.80 12.11
TILE SETTER......................$ 22.80 12.11
BROH0043-001 06/01/2007
TRUMBULL COUNTY (Except city of Youngstown)
Rates Fringes
BRICKLAYER
Caulker, Cleaner, Marble
Setter, Pointer, Stonemason, Terrazzo
Worker, & Tile Setter.......$ 26.25 10.48
CARP0003-001 05/01/2008
MAHONING & TRUMBULL
Rates Fringes
Carpenter & Soft Floor Layer.....$ 23.61 11.96
CARP0171-004 05/01/2008
COLUMBIANA
Rates Fringes
Carpenter & Soft Floor Layer.....$ 23.19 12.20
CARP1871-016 05/01/2008
MAHONING & TRUMBULL
Rates Fringes
PILEDRIVERMAN....................$ 24.36 12.19
CARP1871-018 05/01/2008
MAHONING & TRUMBULL
Rates Fringes
MILLWRIGHT.......................$ 24.36 12.19
CARP1871-021 05/01/2008
COLUMBIANA
Rates Fringes
MILLWRIGHT.......................$ 26.05 11.95
CARP2235-005 01/01/2008
Rates Fringes
PILEDRIVERMAN
Piledriverman (welder)......$ 28.15 11.50
Piledriverman...............$ 27.85 11.50
ELEC0064-002 12/03/2007
COLUMBIANA (Butler, Fairfield, Perry, Salem & Unity Townships)
MAHONING (Austintown, Beaver, Berlin, Boardman, Canfield, Ellsworth, Coitsville, Goshen, Green, Jackson, Poland, Springfield & Youngstown Townships) & TRUMBULL (Hubbard &
Liberty Townships)
Rates Fringes
ELECTRICIAN......................$ 28.25 11.92
ELEC0071-007 05/29/2006
Rates Fringes
Line Construction
Equipment Operator..........$ 25.47 9.78
Groundman...................$ 18.40 8.38
Lineman.....................$ 28.30 10.34
ELEC0246-002 10/29/2007
COLUMBIANA (South of Butler, Fairfield, Knox, Salem & Unity
Townships)
Rates Fringes
ELECTRICIAN......................$ 31.00 18.29+a
FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday
ELEC0540-004 05/28/2007
COLUMBIANA (Knox Township) & MAHONING (Smith Township)
Rates Fringes
ELECTRICIAN......................$ 26.69 15.63
ELEC0573-004 06/02/2008
MAHONING (Milton Township) & TRUMBULL (Except Liberty & Hubbard
Townships)
Rates Fringes
ELECTRICIAN......................$ 29.60 12.31
ELEV0045-003 01/01/2008
Rates Fringes
ELEVATOR MECHANIC................$ 37.29 16.285+a&b
FOOTNOTES: a. Eight Paid Holidays: New Year's Day; Memorial
Day; Independence Day; Labor Day; Veterans' Day;
Thanksgiving Day; Day after Thanksgiving; & Christmas Day
b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years.
* ENGI0066-023 06/01/2008
COLUMBIANA, MAHONING & TRUMBULL COUNTIES
Rates Fringes
OPERATOR: Power Equipment
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 1 - A & B.............$ 34.11 13.66
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 2 - A & B.............$ 33.86 13.66
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 3 - A & B.............$ 30.92 13.66
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 4 - A & B.............$ 27.43 13.66
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 5 - A & B.............$ 24.12 13.66
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 1 - C & D.............$ 31.30 13.66
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 2 - C & D.............$ 31.09 13.66
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 3 - C & D.............$ 28.35 13.66
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 4 - C & D.............$ 25.15 13.66
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 5 - C & D.............$ 22.11 13.66
ALL OTHER WORK
GROUP 1.....................$ 28.49 13.66
ALL OTHER WORK
GROUP 2.....................$ 28.22 13.66
ALL OTHER WORK
GROUP 3.....................$ 25.77 13.66
ALL OTHER WORK
GROUP 4.....................$ 22.86 13.66
ALL OTHER WORK
GROUP 5.....................$ 20.10 13.66
GROUP 1 - Rig, Pile Driver or Caisson Type; & Rig, Pile
Hydraulic Unit Attached
GROUP 2 - Asphalt Heater Planer; Backfiller with Drag
Attachment; Backhoe; Backhoe with
Shear attached; Backhoe-Rear Pivotal Swing; Batch
Plant-Central Mix Concrete; Batch Plant, Portable concrete; Berm Builder-Automatic; Boat Derrick; Boat-Tug;
Boring Machine Attached to Tractor; Bullclam; Bulldozer;
C.M.I. Road Builder & Similar Type; Cable Placer & Layer;
Carrier-Straddle; Carryall-Scraper or Scoop; Chicago Boom;
Compactor with Blade Attached; Concrete Saw (Vermeer or similar type); Concrete Spreader Finisher; Combination, Bidwell Machine; Crane; Crane-Electric Overhead;
Crane-Rough Terrain; Crane-Side Boom; Crane-Truck;
Crane-Tower; Derrick-Boom; Derrick-Car; Digger-Wheel (Not trencher or road widener); Double Nine; Drag Line; Dredge;
Drill-Kenny or Similar Type; Easy Pour Median Barrier
Machine (or similar type); Electromatic; Frankie Pile;
Gradall; Grader; Gurry; Self-Propelled; Heavy Equipment
Robotics Operator/Mechanic; Hoist-Monorail;
Hoist-Stationary & Mobile Tractor; Hoist, 2 or 3 drum;
Horizontal Directional Drill Operator; Jackall; Jumbo
Machine; Kocal & Kuhlman; Land-Seagoing Vehicle; Loader, Elevating; Loader, Front End; Loader, Skid Steer;
Locomotive; Mechanic/Welder; Metro Chip Harvester with
Boom; Mucking Machine; Paver-Asphalt Finishing Machine;
Paver-Road Concrete; Paver-Slip Form (C.M.I. or similar);
Place Crete Machine with Boom; Post Driver (Carrier mounted); Power Driven Hydraulic Pump & Jack (When used in
Slip Form or Lift Slab Construction); Pump Crete Machine;
Regulator-Ballast; Hydraulic Power Unit not attached to Rig for Pile Drillings; Rigs-Drilling; Roto Mill or similar
Full Lane (8' Wide & Over); Roto Mill or similar type
(Under 8'); Shovel; Slip Form Curb Machine; Speedwing;
Spikemaster; Stonecrusher; Tie Puller & Loader; Tie Tamper;
Tractor-Double Boom; Tractor with Attachments; Truck-Boom;
Truck-Tire; Trench Machine; Tunnel Machine (Mark 21 Java or similar); & Whirley (or similar type)
GROUP 3 - Asphalt Plant; Bending Machine (Pipeline or similar type); Boring machine, Motor Driven; Chip Harvester without Boom; Cleaning Machine, Pipeline Type; Coating
Machine, Pipeline Type; Compactor; Concrete Belt Placer;
Concrete Finisher; Concrete Planer or Asphalt; Concrete
Spreader; Elevator; Fork Lift (Home building only); Fork
Lift Walk Behind (Hoisting over 1 buck high); Form Line
Machine; Grease Truck operator; Grout Pump; Gunnite
Machine; Horizontal Directional Drill Locator; Single Drum
Hoist with or without Tower; Huck Bolting Machine;
Hydraulic Scaffold (Hoisting building materials); Paving
Breaker (Self-propelled or Ridden); Pipe Dream; Pot
Fireperson (Power Agitated); Refrigeration Plant; Road
Widener; Roller; Sasgen Derrick; Seeding Machine; Soil
Stabilizer (Pump type); Spray Cure Machine, Self-Propelled; Straw Blower Machine; Sub-Grader; Tube
Finisher or Broom C.M.I. or similar type; & Tugger Hoist
GROUP 4 - Air Curtain Destructor & Similar Type; Batch
Plant-Job Related; Boiler Operator; Compressor; Conveyor;
Curb Builder, self-propelled; Drill Wagon; Fork lift &
Lulls; Generator Set; Generator-Steam; Heater-Portable
Power; Hydraulic Manipulator Crane; Jack-Hydraulic Power driven; Jack-Hydraulic (Railroad); Ladavator; Minor Machine
Operator; Mixer-Concrete; Mulching Machine; Pin Puller;
Power Broom; Pulverizer; Pump; Road Finishing Machine (Pull
Type); Saw-Concrete-Self-Propelled (Highway Work); Signal
Person; Spray Cure Machine-Motor Powered; Stump Cutter;
Tractor; Trencher Form; Water Blaster; Steam Jenny;
Syphon; Vibrator-Gasoline; & Welding Machine
GROUP 5 - Brakeperson; Fireperson; & Oiler
* IRON0207-005 06/01/2008
COLUMBIANA (E. of a line from Damascus to Highlandtown), MAHONING (N. of Old Route #224) & TRUMBULL
Rates Fringes
IRONWORKER
Layout; Sheeter.............$ 27.31 16.03
Ornamental; Reinforcing;
Structural..................$ 26.31 16.03
IRON0550-002 05/01/2008
COLUMBIANA (W. of a line from Damascus to Highlandtown) &
MAHONING (S. of Old Rte #224)
Rates Fringes
Ironworkers:Structural, Ornamental and Reinforcing.......$ 23.88 16.07
LABO0125-001 06/01/2005
MAHONING & TRUMBULL
Rates Fringes
LABORER
HAZARDOUS WASTE
Level A....................$ 21.99 5.82
Level B....................$ 21.86 5.82
Level C....................$ 21.73 5.82
Level D....................$ 21.60 5.82
ALL OTHER WORK
GROUP 1....................$ 21.30 5.82
GROUP 2....................$ 21.42 5.82
GROUP 3....................$ 21.54 5.82
GROUP 4....................$ 21.61 5.82
GROUP 5....................$ 21.80 5.82
LABORER CLASSIFICATIONS
GROUP 1: Building & Construction Laborer; Asphalt Paving;
Railroad Labor Construction; Carpenter Tender; Asbestos
Removal
GROUP 2: Mortar Mixer (Hand or Machine); Mason Tender;
Jackhammer Operator; All Machine Driven Tools (Electric, gas or air) & operation of all Pumps Under 4"; Spiker; All
Laborers Working in Concrete Such as Pouring, Puddling, Raking & Conveying; All Scaffold Help; Scrap Iron Burning
GROUP 3: Hod Carrier; Rough Terrain Forklift Driver when tending Masons; Work Done by Laborers 7' or more in Depth
GROUP 4: Laborer (Except Jackhammer) Working on Repair of
Blast Furnace or Coke Plant & Auxiliary Facilities;
Jackhammer Operator in Trench or Shaft 7' or more in depth;
Concrete Buster; Pipelayer; Powder & Dynamite; Jackhammer on Blast Furnace or Coke Plant & Auxiliary Facilities
GROUP 5: Wrench Laborer; Miner - Air Tool; Guniting &
Sandblasting; Pumpcrete Operations; Build Up Rates - Blast
Furnace; Ram Tight; Bellman & Hook-up Man; Lancing Blast
Furnace
* LABO0809-003 07/01/2008
COLUMBIANA
Rates Fringes
LABORER..........................$ 22.12 7.50
Asbestos Work; Hazardous Waste Work; Instrument & Laser; and
Lead Based Paint Removal - Additional $.50 per hour
Hot Pay - Additional $1.00 per hour when working with other crafts receiving hot pay
* PAIN0476-002 06/01/2008
Rates Fringes
PAINTER
GROUP 1.....................$ 22.95 9.40
GROUP 2.....................$ 23.15 9.40
GROUP 3.....................$ 23.16 9.40
GROUP 4.....................$ 23.20 9.40
GROUP 5.....................$ 23.45 9.40
GROUP 6.....................$ 23.60 9.40
GROUP 7.....................$ 23.85 9.40
PAINTER CLASSIFICATIONS
GROUP 1: Brush; Roller
GROUP 2: Drywall - Hand Finisher
GROUP 3: Structural Steel
GROUP 4: Wallpaper Hanger - Furnishing Own Tools
GROUP 5: Spray, Except Bar Joist/Deck
GROUP 6: Drywall - Mechanical Tools; Epoxy/Mastic; Spray-
Bar Joist/Deck; Working Above 50 feet; Swingstages
GROUP 7: Sandblasting
PAIN0639-001 05/01/2003
Rates Fringes
Sign Painter & Erector...........$ 17.57 4.55+a+b+c
FOOTNOTES: a. 7 Paid Holidays: New Year's Day; Memorial Day;
July 4th; Labor Day; Thanksgiving Day; Christmas Day & 1
Floating Day
b. Vacation Pay: After 1 year's service - 5 days' paid vacation; After 2, but less than 10 years' service - 10 days' paid vacation; After 10, but less than 20 years' service - 15 days' paid vacation; After 20 years' service -
20 days' paid vacation
c. Funeral leave up to 3 days maximum paid leave for death of mother, father, brother, sister, spouse, child, mother-in-law, father-in-law, grandparent and inlaw provided employee attends funeral
* PAIN0847-002 06/01/2008
Rates Fringes
GLAZIER..........................$ 25.16 10.89
PLAS0179-001 06/01/2008
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.11 11.65
PLAS0179-002 06/01/2008
Rates Fringes
PLASTERER........................$ 26.45 10.96
PLUM0396-002 06/01/2008
COLUMBIANA (Excluding Washington & Yellow Creek Townships &
Liverpool Township, Secs. 35 & 36, West of County Road #427), MAHONING & TRUMBULL
Rates Fringes
PLUMBER/PIPEFITTER...............$ 26.66 14.06
PLUM0495-003 06/01/2008
COLUMBIANA COUNTY (Washington & Yellow Creek Townships and
Liverpool Township - Sections #35 & #36 - west of County Road
#427)
Rates Fringes
Plumber, Pipefitter, Steamfitter......................$ 29.23 14.38
ROOF0071-004 06/01/2007
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply
Roofs............................$ 21.36 11.82
ROOF0088-003 06/01/2005
COLUMBIANA
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply
Roofs............................$ 21.90 8.74
SFOH0669-003 04/01/2008
Rates Fringes
SPRINKLER FITTER.................$ 31.85 14.80
SHEE0033-007 06/01/2008
Rates Fringes
Sheet metal worker...............$ 27.33 13.80
TEAM0377-004 05/01/1997
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 16.29 6.22
GROUP 2.....................$ 16.34 6.22
GROUP 3.....................$ 16.39 6.22
GROUP 4.....................$ 16.49 6.22
GROUP 5.....................$ 16.76 6.22
TRUCK DRIVER CLASSIFICATIONS
GROUP 1 - Asphalt Distributor; Batch; 4- Wheel Service;
4-Wheel Dump; & Oil Distributor
GROUP 2 - Tandem
GROUP 3 - Tractor-Trailer Combination: Fuel; Pole Trailer;
Ready Mix; Semi-Tractor; & Asphalt Oil Spraybar Man
GROUP 4 - 5 Axles & Over; & Asphalt Oiler Spraybar Man When
Operated From Cab
GROUP 5 - Belly Dump; End Dump; Articulated Dump; Heavy Duty
Equipment; Low Boy; & Truck Mechanic
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Solicitation Nbr FA6656-08-R-0004, Atch 1
File details come from the government source that posted it. Updated .