FA6656-08-R0004 Amd 0002.doc
DOC document 69 KB Posted
- Attached to
- Modify/Upgrade Industrial Wastewater Pretreatment System, Bldg 309 Federal contract opportunity
- Solicitation number
- FA6656-08-R-0004
About this file
FA6656-08-R0004 Amendment 0002
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
f
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
a. SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS – Add the following attachment to the list of Documents, Exhibits and Other Attachments :
“Attachment 5 – FINANCIAL INSTITUTION REFERENCE SHEET” ( Amd 002, Atch 1)
b. SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS – Paragraph L-003,2.b.(1)(d) - Change to read as follows: “Financial Resources: Offerors shall submit a financial capability letter from their financial institution (Atch 5), and a letter from the bonding company confirming bonding capability and maximum dollar threshold. This letter will be used in the Contracting Officer’s determination of responsibility.”
c. SECTION M – EVALUTION FACTORS FOR AWARD – 1.) Paragraph M-002.2.a – Change to read as follows: “Current contracts or subcontract completed within the past three (3) years will be considered RECENT. RELEVANT contracts are contracts of similar size and complexity and have a logical connection with the work being acquired, whether or not it was government work or commercial work. The following relevancy definitions shall apply: Very Relevant – Past/present performance effort involved essentially the same magnitude of effort and complexities this solicitation requires; Relevant – Past/present performance effort involved much of the magnitude of effort and complexities this solicitation requires; Somewhat Relevant – Past/present performance effort involved some of the magnitude of effort and complexities this solicitation requires; and Not Relevant – Past/present performance effort did not evolve any of the magnitude of effort and complexities this solicitation requires.
2.) Paragraph M-002.2.c. and d. – Change Performance Confidence Rating Table to read as follows:
| Substantial Confidence |
| Satisfactory Confidence |
| Limited Confidence |
| No Confidence |
| Unknown Confidence |
Based on the Offeror’s performance record, the government has a high expectation that the offeror willl successfully perform the required effort.
| Based on the offeror’s performance record, the government has an expectation that he offeror will successfully perform the required effort. |
| Based on the Offeror’s performance record, the government has a low expectation that the offeror will successfully perform the required effort. |
Based on the Offeror’s performance record, the government has no expectation that the offeror will be able to successfully perform the required effort.
No performance record is identifiable or the offeror’s performance record is so sparse that no confidence assessment rating can be reasonably assigned.
d. SPECIFICATION SECTION 22 40 00
1.) Paragraph 1.02 Related Sections – Add the following to the list of related sections:
“Section 06 61 17 – Solid Surface Countertops.”
2.) Add paragraph 2.13 as follows:
“2.13 COUNTERTOP SINK (LAV-1)
A. Lavatory is integral with the countertop and is specified as an architectural product in Specification Section 06 6117.
B. Faucet shall be chrome plated combination supply fitting with grid strainer, 0.5 GPM flow device, aerator, loose key supplies, single lever handle, chrome plated 17 gauge brass P-trap with cleanout plug and arm with escutcheon. American Standard 2385.009 with grid strainer or equal.”
e. SPECIFICATION SECTION 31 23 00 – 1.) Paragraph 3.01 – Change to read as follows:
“The Base will mark the location of the Air Force-owned utilities; the Contractor shall contact OUPS (1-800-362-2764) for the location of all other underground utilities. The Government will provide a general map. Work shall not commence until the Contractor receives a completed AF Form 103 from Base Engineering and has notified the Contracting Officer at least 48 hours prior to excavating, fencing, planting, or other work.”
2.) Paragraph 3.01 E – Change to read as follows:
“If conditions are encountered that are different from those shown on the Drawings, notify the Contracting Officer per the terms of the contract. Discontinue affected work in the area until notified to resume work.”
f. DRAWINGS THROUGHOUT – Any/all references to equipment being ‘FURN BY OTHERS” is changed to “FURN BY CONTRACTOR.” There is no Government-furnished property included in this contract.
g. DRAWING C-4 , Sheet 5 of 27, G ENERAL NOTE 7 – Add the following requirement: “Any/all restoration of excavation on the flightline side of the building/inside the flightline fence shall be accomplished via hydro-mulching/seeding.”
h. DRAWING P-1 Sheet 14 of 27, PLUMBING FIXTURE SCHEDLE – Change LAV1 Remarks from “wall hung” to “integral w/countertop.”
i. DRAWINGS E-2, Sheet 24 of 27 and E-4, Sheet 26 of 27 – Replace existing drawings with attached revised drawings. (Atch 2, two sheets)
j. REVISED DRAWING E-2 Sheet 24 of 27- 1.) Electrical Coded Note 1 – Change to read as follows: “EXISTING 480/277 VOLT, 3-PHASE, 4-WIRE DISTRIBUTION PANEL DP1. REMOVE EXISTING 20 AMP, 3-POLE CIRCUIT BREAKER FOR THE AIR COMPRESSOR AND SET ASIDE TO LATER INSTALL INTO EXISTING PANEL LCP (SEE CODED NOTE #9). FURNISH AND INSTALL ONE (1) NEW 40 AMP, 3-POLE CIRCUIT BREAKER. MATCH EXISTING BREAKER SIZE AND TYPE.”
2.) Detail 1 Electrical Power Plan, Existing Warehouse Room 102 – Change from “2 4/0 #16 SHIELDED CABLE…” to “2 4/c #16 SHIELDED CABLE…”
k. DRAWING E-5, Sheet 27 of 27 - Add GENERAL ELECTRICAL NOTE as follows:
“2. Contractor shall coordinate connection to Flow Meter Control Panel. Meter to be field located near manhole.”
(End of Summary of Changes)
F5Q3378133A001
ZQEL 06-0003
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
See pages 2 and 3 with attachments.
1. CONTRACT ID CODE
PAGE OF PAGES
J
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
08-Aug-2008
16B. UNITED STATES OF AMERICA
15C. DATE SIGNED
15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)
(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code)
X
FA6656-08-R-0004
9B. DATED (SEE ITEM 11)
18-Jul-2008
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Aug-2008
CODE
910 MSG/CONF OPERATIONAL CONRACTING OFF
YOUNGSTOWN ARS
3976 KING GRAVES RD UNIT 31
VIENNA OH 44473-5931
FA6656
7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
See Item 6
FACILITY CODE
EMAIL:
TEL:
File details come from the government source that posted it. Updated .