RESPONSES TO CONTRACTOR QUESTIONS-Site Visit.docx

DOCX document 13 KB Posted

Attached to
Modify/Upgrade Industrial Wastewater Pretreatment System, Bldg 309 Federal contract opportunity
Solicitation number
FA6656-08-R-0004
Issued by
Department of the Air Force Reserve Command

View the file

Other files for this federal contract opportunity

Other files attached to Modify/Upgrade Industrial Wastewater Pretreatment System, Bldg 309, newest first.
File Type Posted
Q A as of 22 July 2009 B502.doc DOC document
RESPONSE TO CONTRACTOR QUESTIONS-Computer Interface Requirements.docx DOCX document
FA6656-08-R0004Prime SubsList- 13Aug 08.rtf RTF text file
FA6656-08-R0004Prime SubsList- 12Aug 08.rtf RTF text file
RESPONSE TO CONTRACTOR QUESTION-HMI SCREENS.docx DOCX document
FA6656-08-R0004 Amd 0003.doc DOC document
FA6656-08-R0004Prime SubsList- 8Aug 08.rtf RTF text file
FA6656-08-R0004 Amd 0002.doc DOC document
26 of 27-E4 Rev Electrical Site Plan B-309-Paper.pdf PDF
FA6656-08-R0004 Amd 0002 Atch 1 - Responsibility Questionnaire.doc DOC document
24 of 27-E2 Rev Electrical Power Lighting Plan-Paper.pdf PDF
site visit minutes.doc DOC document
RESPONSES TO CONTRACTOR QUESTIONS AS OF 7AUG 08.doc DOC document
RESPONSES TO CONTRACTOR QUESTIONS AS OF 4 AUG 08.docx DOCX document
SITEVISITINFOPOSTING.doc DOC document
18 of 27-M4 Deicing Manhole Site Plan.pdf PDF
14 of 27-P1 Plumbing Plan.pdf PDF
3 of 27-C2 Site Utility Plan.pdf PDF
27 of 27-E5 Elec Site Plan-Fire Training Facility.pdf PDF
17 of 27-M3 Carbon Tank Repair Coating Details.pdf PDF
FA6656-08-R0004 Atch 2 Specifications.doc DOC document
15 of 27-M1 Mechanical Plan.pdf PDF
11 of 27-S2 Roof Framing Plan Details.pdf PDF
21 of 27-M7 Flow Sensor-Monitor Modification.pdf PDF
16 of 27-M2 P I Diagram.pdf PDF
Attachment 4 - PastPerformanceQuestionnaire.doc DOC document
1 of 27-G1 Title Page.pdf PDF
8 of 27-A3 Sections and Details.pdf PDF
silt fence-002.tif TIF image
24 of 27-E2 Electrical Power Lighting Plan.pdf PDF
22 of 27-FP1 Fire Prot Plan.pdf PDF
2 of 27-C1 Demo Plan.pdf PDF
4 of 27-C3 Grading Plan.pdf PDF
25 of 27-E3 Fire Det Plan.pdf PDF
13 of 27-S4 Frame Sections and Details.pdf PDF
20 of 27-M6 Fire Training Deicing Manhole Site Plan.pdf PDF
23 of 27-E1 Electrical Legend Fixture Sch one Line Diagram.pdf PDF
12 of 27-S3 Foundation Section Detail.pdf PDF
5 of 27-C4 Details.pdf PDF
FA6656-08-R0004.doc DOC document
26 of 27-E4 Electrical Site Plan-B309.pdf PDF
19 of 27-M5 Deicing Collection Sys Details.pdf PDF
7 of 27-A2 Exterior Interior Elevations.pdf PDF
10 of 27-S1 Foundation Plan Detail.pdf PDF
FA6656-08-R0004 Atch 1 Gen Dec Mod 6.doc DOC document
6 of 27-A1 Flr Roof Reflected Ceiling Plans.pdf PDF
silt fence-001.tif TIF image
9 of 27-A4 Schedules and Details.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESPONSES TO CONTRACTOR QUESTIONS

RAISED DURING SITE VISIT HELD 6 AUG 08

SOLICITATION NBR FA6656-08-R-0004

Modify/Upgrade Industrial Wastewater Pretreatment System, Bldg 309

1. CONTRACTOR QUESTION: Contractor requested clarification of amps required, stating that Dwg E-2, Electrical Coded Note 1 shows 100 amp circuit breaker; however, the one-line drawing #1 on Dwg E-1 shows a 40 amp circuit breaker. Please clarify. Comment also made in regard to Dwg E-2, Note 1 in that the Contractor did not feel the existing circuit breaker would fit into the new panel DP3. Contractor inquired as to whether they should replace the breaker with a new one rather than relocate the existing one in the DP3 as stated on the drawing. Response: Requirement corrected via Amendment 0002, paragraph j.1., posted to the FBO site 8/8/08.

2. CONTRACTOR QUESTION: It was noted that conduit in interior of Bldg 308 is required to be rigid steel; exterior piping coming out of the ground will be PVC.

Question raised as to what type pipe will be required to enter into Bldg 308? Please clarify whether rigid steel or PVC. Response: PVC may be used to enter building; transitioning to RGS once inside.

3. CONTRACTOR QUESTION: Dwg E-4, Detail 1 - Contractor raised question as to why piping was shown being placed around the perimeter of the addition rather than directly across the footprint of the building. Response: Piping was designed as shown to avoid conflict with addition to Bldg 308, not included in this project.

4. CONTRACTOR QUESTION: Contractor pointed out that the proposed location of the Flow Meter Control Panel (U-2) does not appear on the electrical drawings and could easily be overlooked during the proposal period. At first it was thought the panel was to be installed in the metering manhole; however, the type of monitor and install detail was noted on Dwg M-6. Response: Location of the Flow Meter Control Panel was clarified via Amendment 0002, paragraph k., posted to the FBO site 8/8/08.

5. CONTRCTOR QUESTION: Who is responsible for marking utilities. Response: Base will mark Air Force-owned utilities; Contractor is responsible for contacting OUPS. Requirement is clarified via Amendment 0002, pargraph e.1., posted to the FBO site 8/8/08.

6. REQUIREMENT REGARDING HYDROSEEDING: Requirement clarified via Amendment 0002,paragraph g., posted to FBO site 8/8/08.

7. CONTRACTOR QUESTION: On sheet E2 in the existing warehouse where it shows option #2 and the cable description should the 4/0 # 16 shielded cables be referred to as a 4/c #16 shielded cable? Response: Yes, cable description should read “4/c”. Item corrected via Amendment 0002,paragraph j.2., posted to the FBO site 8/8/08. Amendment also included revised drawings E-2 and E-4 (Amendment 0002, Atch 2) deleting reference to “Options” from the requirement.

8. CONTRACTOR QUESTION: On sheet E2 coded note #6 refers to duplicating the current screens. What software is currently operating the screens? Response: Information regarding the existing system, including software, is contained in Electrical Coded Note 6 of Drawing E2.

File details come from the government source that posted it. Updated .