Questions and Responses as of 22 July 2009

View the file

Other files for this federal contract opportunity

Other files attached to Modify/Upgrade Industrial Wastewater Pretreatment System, Bldg 309, newest first.
File Type Posted
RESPONSE TO CONTRACTOR QUESTIONS-Computer Interface Requirements.docx DOCX document
FA6656-08-R0004Prime SubsList- 13Aug 08.rtf RTF text file
FA6656-08-R0004Prime SubsList- 12Aug 08.rtf RTF text file
RESPONSE TO CONTRACTOR QUESTION-HMI SCREENS.docx DOCX document
FA6656-08-R0004 Amd 0003.doc DOC document
FA6656-08-R0004Prime SubsList- 8Aug 08.rtf RTF text file
RESPONSES TO CONTRACTOR QUESTIONS-Site Visit.docx DOCX document
FA6656-08-R0004 Amd 0002.doc DOC document
26 of 27-E4 Rev Electrical Site Plan B-309-Paper.pdf PDF
FA6656-08-R0004 Amd 0002 Atch 1 - Responsibility Questionnaire.doc DOC document
24 of 27-E2 Rev Electrical Power Lighting Plan-Paper.pdf PDF
site visit minutes.doc DOC document
RESPONSES TO CONTRACTOR QUESTIONS AS OF 7AUG 08.doc DOC document
RESPONSES TO CONTRACTOR QUESTIONS AS OF 4 AUG 08.docx DOCX document
SITEVISITINFOPOSTING.doc DOC document
18 of 27-M4 Deicing Manhole Site Plan.pdf PDF
14 of 27-P1 Plumbing Plan.pdf PDF
3 of 27-C2 Site Utility Plan.pdf PDF
27 of 27-E5 Elec Site Plan-Fire Training Facility.pdf PDF
17 of 27-M3 Carbon Tank Repair Coating Details.pdf PDF
FA6656-08-R0004 Atch 2 Specifications.doc DOC document
15 of 27-M1 Mechanical Plan.pdf PDF
11 of 27-S2 Roof Framing Plan Details.pdf PDF
21 of 27-M7 Flow Sensor-Monitor Modification.pdf PDF
16 of 27-M2 P I Diagram.pdf PDF
Attachment 4 - PastPerformanceQuestionnaire.doc DOC document
1 of 27-G1 Title Page.pdf PDF
8 of 27-A3 Sections and Details.pdf PDF
silt fence-002.tif TIF image
24 of 27-E2 Electrical Power Lighting Plan.pdf PDF
22 of 27-FP1 Fire Prot Plan.pdf PDF
2 of 27-C1 Demo Plan.pdf PDF
4 of 27-C3 Grading Plan.pdf PDF
25 of 27-E3 Fire Det Plan.pdf PDF
13 of 27-S4 Frame Sections and Details.pdf PDF
20 of 27-M6 Fire Training Deicing Manhole Site Plan.pdf PDF
23 of 27-E1 Electrical Legend Fixture Sch one Line Diagram.pdf PDF
12 of 27-S3 Foundation Section Detail.pdf PDF
5 of 27-C4 Details.pdf PDF
FA6656-08-R0004.doc DOC document
26 of 27-E4 Electrical Site Plan-B309.pdf PDF
19 of 27-M5 Deicing Collection Sys Details.pdf PDF
7 of 27-A2 Exterior Interior Elevations.pdf PDF
10 of 27-S1 Foundation Plan Detail.pdf PDF
FA6656-08-R0004 Atch 1 Gen Dec Mod 6.doc DOC document
6 of 27-A1 Flr Roof Reflected Ceiling Plans.pdf PDF
silt fence-001.tif TIF image
9 of 27-A4 Schedules and Details.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #FA6656-09-R-0004 Construct Addition/Repair OSI Bldg 502 Questions with Answers/Clarifications as of 22 July 2009:

(Questions 1-5 pertain to Drawing FP-1)

1. Is sprinkler system wet (scope of work and Note #6 “installed inside the insulated area”) or dry as shown on details?

Response: Sprinkler system is to be dry pipe, as stated in note 1.

2. Is attic space to be sprinklered?

Response: Yes, as stated in note 1.

3. What do we design sprinkler system too, NFPA 13, UFC, or? Design density for light hazard - .10/3,900 Sq Ft + 250 GPM hose is not NFPA 13.

Response: Design to NFPA 13 is acceptable.

4. If we are doing dry attic system is 4” underground adequate or do we need 6” with hip roofs, flowing a lot of sprinklers.

Response: 4” is considered adequate.

5. Are sprinklers required over dock canopy?

Response: Yes, as code required.

6. Specifications Section #21-01-00

#101-B Section 23-01-00-HVAC applies to fire protection?

Response: Yes.

7. Specification Section @21-13-16

#2.03 Brass upright sprinklers. How about sprinklers in ceilings? Recessed, concealed, or?

Response: Concealed sprinklers in ceiling are acceptable.

8. #3.01 – F Paint or label exposed pipe – choice up to us?

Response: Painting of all exposed pipe OSHA red is acceptable

9. Is hydrant flow test information available for the site..if not, what is the normal pressure for the site.

Response: See Dwg.FP1.

10. The drawings and spec call for a all dry system. There is a heated plenum above the acoustical ceilings. Can that area be a wet pipe system with a dry pipe in the attic area. This would eliminate the need for dry pendent sprinklers and a considerable cost savings.

Response: No change to current design plans.

11. The drawings specify density of .1 GPM over 3900 square ft. the specifications call for Per NFPA 13 which would be .1 GPM over 1500 sq ft with 30 percent penalty for dry and 4/12 roof pitch which modifies the operating area to 2535 sq ft. which should I calculate to? (3900 sq ft is not referenced anywhere in NFPA 13) Response: Design to NFPA 13 is acceptable.

12. The spec calls for black schedule 10 for main piping and XL thread able thin wall pipe for the line pipe. Are you aware that the life expectancy for such piping on dry systems is 10-12 years under good conditions. You might want to consider schedule 10 galvanized for main piping and schedule 40 galvanized piping. The fittings can be black or painted as they are cast or ductile and do not corrode.

Response: Galvanized pipe is acceptable. Reference attached spec 21 13 16, which incorporates the change.