24 of 27-E2 Rev Electrical Power Lighting Plan-Paper.pdf

PDF 317 KB Posted

Attached to
Modify/Upgrade Industrial Wastewater Pretreatment System, Bldg 309 Federal contract opportunity
Solicitation number
FA6656-08-R-0004
Issued by
Department of the Air Force Reserve Command

About this file

FA6656-08-R0004 Amd 0002 Atch 2 Sheet 1 of 2 - Revised DWG E-2 - Electrical Power and Lighting Plan

View the file

Other files for this federal contract opportunity

Other files attached to Modify/Upgrade Industrial Wastewater Pretreatment System, Bldg 309, newest first.
File Type Posted
Q A as of 22 July 2009 B502.doc DOC document
RESPONSE TO CONTRACTOR QUESTIONS-Computer Interface Requirements.docx DOCX document
FA6656-08-R0004Prime SubsList- 13Aug 08.rtf RTF text file
FA6656-08-R0004Prime SubsList- 12Aug 08.rtf RTF text file
RESPONSE TO CONTRACTOR QUESTION-HMI SCREENS.docx DOCX document
FA6656-08-R0004 Amd 0003.doc DOC document
FA6656-08-R0004Prime SubsList- 8Aug 08.rtf RTF text file
RESPONSES TO CONTRACTOR QUESTIONS-Site Visit.docx DOCX document
FA6656-08-R0004 Amd 0002.doc DOC document
26 of 27-E4 Rev Electrical Site Plan B-309-Paper.pdf PDF
FA6656-08-R0004 Amd 0002 Atch 1 - Responsibility Questionnaire.doc DOC document
site visit minutes.doc DOC document
RESPONSES TO CONTRACTOR QUESTIONS AS OF 7AUG 08.doc DOC document
RESPONSES TO CONTRACTOR QUESTIONS AS OF 4 AUG 08.docx DOCX document
SITEVISITINFOPOSTING.doc DOC document
16 of 27-M2 P I Diagram.pdf PDF
Attachment 4 - PastPerformanceQuestionnaire.doc DOC document
1 of 27-G1 Title Page.pdf PDF
8 of 27-A3 Sections and Details.pdf PDF
silt fence-002.tif TIF image
18 of 27-M4 Deicing Manhole Site Plan.pdf PDF
14 of 27-P1 Plumbing Plan.pdf PDF
3 of 27-C2 Site Utility Plan.pdf PDF
27 of 27-E5 Elec Site Plan-Fire Training Facility.pdf PDF
17 of 27-M3 Carbon Tank Repair Coating Details.pdf PDF
FA6656-08-R0004 Atch 2 Specifications.doc DOC document
15 of 27-M1 Mechanical Plan.pdf PDF
11 of 27-S2 Roof Framing Plan Details.pdf PDF
21 of 27-M7 Flow Sensor-Monitor Modification.pdf PDF
24 of 27-E2 Electrical Power Lighting Plan.pdf PDF
22 of 27-FP1 Fire Prot Plan.pdf PDF
2 of 27-C1 Demo Plan.pdf PDF
4 of 27-C3 Grading Plan.pdf PDF
25 of 27-E3 Fire Det Plan.pdf PDF
13 of 27-S4 Frame Sections and Details.pdf PDF
20 of 27-M6 Fire Training Deicing Manhole Site Plan.pdf PDF
23 of 27-E1 Electrical Legend Fixture Sch one Line Diagram.pdf PDF
12 of 27-S3 Foundation Section Detail.pdf PDF
5 of 27-C4 Details.pdf PDF
FA6656-08-R0004.doc DOC document
26 of 27-E4 Electrical Site Plan-B309.pdf PDF
19 of 27-M5 Deicing Collection Sys Details.pdf PDF
7 of 27-A2 Exterior Interior Elevations.pdf PDF
10 of 27-S1 Foundation Plan Detail.pdf PDF
FA6656-08-R0004 Atch 1 Gen Dec Mod 6.doc DOC document
6 of 27-A1 Flr Roof Reflected Ceiling Plans.pdf PDF
silt fence-001.tif TIF image
9 of 27-A4 Schedules and Details.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E2E2

ELECTRICAL POWER PLAN

SCALE: 1/4"= 1'-0"

ELECTRICAL POWER AND LIGHTING PLAN E2 24 OF 27

AS NOTED

TJM 06/12/07

AJH 09/05/07

ELECTRICAL CODED NOTES:

EXISTING 480/277 VOLT, 3-PHASE, 4-WIRE DISTRIBUTION PANEL DP1. REMOVE

EXISTING 20 AMP, 3-POLE CIRCUIT BREAKER FOR THE AIR COMPRESSOR AND SET

ASIDE TO LATER INSTALL INTO NEW PANEL DP3 (SEE CODED NOTE #9). FURNISH

AND INSTALL ONE (1) NEW 100 AMP, 3-POLE CIRCUIT BREAKER. MATCH EXISTING

BREAKER SIZE AND TYPE.

FOR NEW FIXTURES IN ADDITION USE 2 #12, #12 EG-3/4" PVC TO FEED

FIXTURES FROM EXISTING PANEL LCP. ELECTRICAL CONTRACTING SHALL FURNISH

AND INSTALL MOUNTING BRACKETS TO MOUNT TYPE "A" FIXTURES TO JOISTS.

PLACE BRACKETS AS CLOSE TO PANEL POINTS AS POSSIBLE.

REFER TO: ELECTRICAL LEGEND AND FIXTURE SCHEDULE, DWG. E1;

ONE LINE DIAGRAM, DWG. E1; AND ELECTRICAL PANEL SCHEDULES FOR

INSTALLATION DETAILS FEEDER AND CONDUIT SIZES, ETC., DWG. E1.

SEE MECHANICAL DRAWINGS FOR T-STAT LOCATIONS.

GENERAL ELECTRICAL NOTES:

1.

3.

NEW SURFACE MOUNTED 480:120/208 VOLT MINI POWER CENTER WITH PANEL DP3.

FURNISH AS SHOWN ON ONE LINE DIAGRAM, DWG. E1.

NEW GARAGE DOOR OPENER/CONTROLLER FURNISHED BY CONTRACTOR. ELECTRICAL

CONTRACTOR SHALL INSTALL LOCAL PUSHBUTTON STATION, DOOR EDGE, PHOTO EYES

AND MOTOR CONTROLLER ALONG WITH ALL ASSOCIATED CONDUIT AND WIRE REQUIRED

FOR PROPER DOOR OPERATION. REFER TO MANUFACTURERS SUPPLIED DOOR

OPERATOR WIRING DIAGRAM FOR EXACT REQUIREMENTS.

NEW 250 VOLT, 30 AMP, NON-FUSED, NEMA-4X, SURFACE MOUNTED DISCONNECT

SWITCH. FURNISH AND INSTALL AS SHOWN ON ONE LINE DIAGRAM, DWG. E1.

EQUIPMENT SERVED AS INDICATED.

NEW 120 VOLT, 20 AMP FRACTIONAL HORSEPOWER STARTER (ST) MOUNTED ON

EXHAUST FANS AND LOUVER AS SHOWN. FURNISH AND INSTALL 2 #12, #12

EG-3/4" PVC FROM CIRCUIT AS INDICATED ON PANEL SCHEDULES TO EXHAUST FAN

VIA THERMOSTAT CONTROL IF PROVIDED WITH EXHAUST FAN OR LOUVER. SEE

MECHANICAL DRAWINGS FOR LOCATIONS. TYPICAL FOR ALL (ST).

E2E2

ELECTRICAL LIGHTING PLAN

SCALE: 1/4"= 1'-0"

ALL CIRCUITS SHALL BE RUN WITH INDIVIDUAL #12 NEUTRAL WIRE.

CIRCUITS SHALL NOT SHARE NEUTRAL WIRES.

4.

NIGHT LIGHTS, EMERGENCY LIGHTS, AND EXIT LIGHTS TO BE CONNECTED TO

ROOM CIRCUIT AHEAD OF ANY SWITCHING.

5.

FURNISH AND INSTALL THE FOLLOWING TO UPGRADE THE WASTEWATER PRETREATMENT

FACILITY COMPUTER MONITORING SYSTEM: REPLACE THE EXISTING ALLEN-BRADLEY

PROGRAMMABLE LOGIC CONTROLLER SLC-5/03 WITH A SLC-5/05, UPGRADE THE

EXISTING DOS SOFTWARE TO THE MOST CURRENT MICROSOFT OPERATING SYSTEM,

RSLOGIX 500 SOFTWARE, 1747-SDN DEVICENET SCANNER MODULE, RSNETWORX

SOFTWARE, A NEW 13-SLOT RACK, NEW MODULES, INTEGRATION SOFTWARE TO CREATE

NEW USER INTERFACE SCREENS, AND NEW COMPUTER (2.40 GHZ PROCESSOR) AND

PRINTER. CONTRACTOR SHALL SUPPLY ALL PROGRAMMING SETUP INCLUDING HARDWARE

AND SOFTWARE FOR A MINIMUM OF 7 SCREENS (DUPLICATING CURRENT SCREENS).

CONTRACTOR SHALL PROVIDE TRAINING FOR BASE PERSONNEL TO ADEQUATELY

OPERATE/MAINTAIN COMPUTER SYSTEM.

W-500 ULTRASONIC OCCUPANCY SENSOR-SEE DETAIL #3, THIS DRAWING.7

EXISTING 480/277 VOLT, 3-PHASE, 4-WIRE LIGHTING CONTROL PANEL LCP. FURNISH

AND INSTALL EXISTING 20 AMP, 3-POLE CIRCUIT BREAKER FOR THE AIR COMPRESSOR

AND ONE (1) NEW 20 AMP 1-POLE CIRCUIT BREAKER FOR THE NEW LIGHTING. MATCH

EXISTING BREAKER SIZE AND TYPE.

R E D

B L K

B L U

WHT

BLK

POWER

PACK

CONTROL OUTPUT

COMMON

+24VDC

D

A

L

O

OCCUPANCY SENSOR CEILING

MOUNTED ULTRASONIC DETAIL

SCALE: NONE

E2E2

W-500

OCCUPANCY SENSOR WALL

MOUNTED DUAL TECH. DETAIL

SCALE: NONE

E2E2

LIGHT LEVEL OUTPUT

NORMALLY CLOSED

R e d

B lk

B lu

WHT

BLK

POWER

PACK

COMMON

ISOLATED RELAY

+24VDC

COMMON

NORMALLY OPEN

CONTROL OUTPUT

7-Vio

8-Gry

6-Grn

5-Yel

4-Blu

3-Brn

2-Orn

1-Red

D

A

L

O

DT-200

MOMENTARY SWITCH

#12 NEUTRAL

#12 HOT #12 RED

#12 RED

#12 NEUTRAL

#12 HOT #12 RED

#12 RED

IN ADDITION TO CODED NOTE #6, PROVIDE 2 ADDITIONAL I/O MODULES AND

ADDITIONAL INTEGRATION SOFTWARE. THIS WILL ENABLE THE PERSONNEL IN BUILDING

309 TO VIEW THE DATA FROM THE NEW EFFLUENT FLOW METER, PH MONITOR, AND

OPERATE THREE NEW DEICING VALVES.

PROVIDE A NEW FIBER OPTIC RUN FROM BUILDING 309 TO BUILDING 308. THIS RUN

WILL BE PARALLEL TO THE EXISTING SECURED BASE NETWORK, NOT INTERFACING WITH

IT. ALSO PROVIDE A NEW COMPUTER FOR BUILDING 503 IDENTICAL TO SETUP AS

DESCRIBED IN CODED NOTE #6. THIS WILL ENABLE PERSONNEL FROM BUILDING 503 TO

INTERFACE WITH THE CONTROL SYSTEM IN BUILDING 309.

NORTH

NORTH

FOR NEW RECEPTACLES USE 2 #12, #12 EG-1/2" PVC TO FEED

RECEPTACLES FROM PANEL DP3.

2.

DT-200 DUAL TECHNOLOGY OCCUPANCY SENSOR-SEE DETAIL #4, THIS DRAWING.8

RELOCATED SIDEWALL EXHAUST FAN, SEE MECHANICAL DRAWING M1. EXTEND CONDUIT

AND WIRE TO NEW LOCATION. MATCH EXISTING CONDUIT AND WIRE SIZE AND TYPE.

CONNECT NEW GROUND LOOP TO EXISTING BUILDING GROUND LOOP OR EXISTING

BUILDING COLUMNS.

OFF

277V LOCAL

SWITCH

OFF

277V LOCAL

SWITCH

OSBORN

DESCRIPTION OF ISSUE DATE BY

APPROVED DATE

DRAWN DATE

CHECKED DATE

DRAWING NO SCALE

PRINTED ISSUE NO

MARK DESCRIPTION OF REVISIONMARK DATE BY

ARCHITECTS

CLEVELAND OHIO

ENGINEERS

AKRON OHIO

OEC PROJECT 12910-280

AIR FORCE RESERVE COMMAND HEADQUARTERS

910 AIRLIFT WING

INDUSTRIAL WASTEWATER - BLDG. 309

SHEET NO

TH

OSBORN ARCHITECTS ENGINEERS0 ISSUED FOR BIDS 1/23/08 OEC

PROJECT ZQEL 06-0003

1 ELECTRICAL CODED NOTES 12 & 13 REVISED 03/20/08 EAM

VERBAGE "OPTION 2" REMOVED 06/17/08 EAM2

EXISTING

37.5 kVA

TRANSFORMER

EXISTING

PANEL SMP

EXISTING

PANEL LCP

EXISTING

PANEL DP2EXISTING

PANEL DP1

EXISTING

PANEL SMP

EXISTING

PANEL LCP

EXISTING

PANEL DP2EXISTING

PANEL DP1

X

EM

EMEM

GFCI

+44"

GFCI

GFCI

GFCI

GFCI

GFCI

+44"

GFCI

WP

GFCI

WP

S

TO

PANEL DP3

CKT-7

T

T

EF-1

120/1/60

RH-1

120/1/60

ST

T

T

RH-1

T-STAT

24 VOLT

#4/0 COPPER

GROUND WIRE IN

1" PVC PER N.E.C.

TO EXISTING

DISTRIBUTION

PANEL

DWH-1

120/1/60

ST

ST

L-1

120/1/60

F A C P

FEEDS THREE POST INDICATOR

VALVE CONTROLS LOCATED

UNDERGROUND ON THE DEICING

PAD'S COLLECTION PIPELINE AND

REDUNDANT CONTROLS AND

MONITORING LIGHTS ON BLDG.

308. FOR CONTINUATION, SEE

DWG. E4.

C O N T R O L

P A N E L

(M C P

S3

EXISTING PANEL

MCP-AA

EXISTING

37.5 kVA

TRANSFORMER

EXISTING PANEL

MCP-AA

EFFLUENT

J

(N)

12 #10, #8 EG-1-1/2"PVC

TYPICAL FOR 3

MINI POWER

CENTER AND

PANEL DP3

120/208 VOLT

TO

PANEL DP3

CKT-18

J

T

T

(E)(E)

(E) (E)

(E)

B

B

A

A

A

A

A

A

A

A

A

A

A

A

(E)

J

(E)

A

D

GFCI

+44"

G G G

G

G

G

G

G

G G G

6/6 SINGLE/MULTI

FIBER OPTIC

GFCI

GFCI

GFCI

GFCI

GFCI

+44"

NL

NL

(N)

COUNTERTOP

HOOD

GFCI

+44"

S

2 4/0, #16 SHIELDED CABLE-1" PVC. ROUTE 1

TO EACH DEVICE.

J

BASE BID:

2" PVC

TO

PANEL DP3

CKT-1

ST

EF-2

120/1/60

EF-3

120/1/60

WH-1

277/1/60

TOILET ROOM

WAREHOUSE

SHOWER

EXIST

WAREHOUSE

EXIST

CONTROL ROOM

TOILET ROOM

WAREHOUSE

SHOWER

EXIST

WAREHOUSE

EXIST

CONTROL ROOM

EF-1

120 VOLT

T-STAT

GFCI

GFCI

Paper