This is a Performance Work Statement (PWS) for excess material, equipment, and vegetation removal at Bellows Air Force Station (BAFS) in Oahu, Hawaii, Work Ticket WT#1351024.

The Non-Federal Entity (NFE) contractor is responsible for removing approximately 30 refrigerators, 8 metal piles (scrap), 200 furniture items, 14 transformers, 30 HVAC units, recyclables, concrete, construction debris, copper, mattresses, lights, tools, tires, generators, fuel storage tanks, pallets, and equipment from the installation. Additionally, the contractor must remove 152 DRMO (Defense Reutilization and Marketing Office) assets listed in Attachment 1, 22 vehicles listed in Attachment 2, and 7 acres of invasive plant species (particularly ironwood trees), along with approximately 500 large rocks, sand piles, and asphalt piles. Work includes relocating materials to appropriate disposal sites or restoration areas, providing access road clearance for 1 mile, filling gravel in various areas to create 530,000 square feet of access space, and ensuring all debris is removed off-site in compliance with environmental regulations. Ironwood trees must be chipped and removed off-site per federal, state, and local law.

Task 1 requires submission of a Draft Work Plan within 30 calendar days of award, including a Project Planning Chart, site visit schedule, employee credentials and licenses, equipment list, and Health and Safety Plan. A Final Work Plan must be submitted within 60 calendar days of award. Task 2 encompasses all removal work execution in accordance with the approved work plan. The NFE must coordinate site access through BAFS Security Forces, maintain safety zones around work areas, handle all transportation and disposal costs, and obtain necessary permits and approvals. The contractor must avoid debris falling into roads, waterways, and infrastructure, and leave the site clean and debris-free. Work must comply with all Environmental Laws and regulations, with deviation notifications requiring a 14-calendar-day review period.

View the file

Other files

File Type Posted
Attachment 1 PWS_BAFS_FLIGHTLINE_9.03.26.pdf PDF
PWS_BAFS_FLIGHTLINE_9.03.26.pdf PDF
Attachment 6 RFP_9.03.26.pdf PDF
Attachment 1 Solicitation PWS_8.28.26.pdf PDF
Attachment 6 RFP_8.28.26.pdf PDF
Attachment 7 QA Worksheet_8.28.26.xlsx XLSX spreadsheet
Attachment 5 Itemized Price List_8.28.26.xlsx XLSX spreadsheet
Attachment 3 Additional Clauses_8.28.26.pdf PDF
ATTCH 1 - Solicitation PWS_8.28.26.pdf PDF
Attachment 5 Itemized Price List Amendment 0003 _8.28.26.xlsx XLSX spreadsheet
QA Worksheet Answers_8.2826.xlsx XLSX spreadsheet
Attachment 8 RFP Amendment 0005_8.28.26.pdf PDF
Attachment 7 RFP Amendment 0004.pdf PDF
Attachment 7 RFP Amendment 0003.pdf PDF
Attachment 5 Itemized Price List Amendment 0003.xlsx XLSX spreadsheet
Attachment 3 Additional Clauses.pdf PDF
Attachment 2 Provisions and Clauses.pdf PDF
Attachment 1 PWS BAFS Flightline Amendment 0003.pdf PDF
Attachment 4 SCA Wage Determination.pdf PDF
ATTCH 7 - RFP Amendment 0002.pdf PDF
ATTCH 7 - RFP Amendment 1.pdf PDF
ATTCH 6 - Map and Address to Site Visit.pdf PDF
ATTCH - 1 PWS Amendment 1.pdf PDF
ATTCH 5 - Itemized Price List.xlsx XLSX spreadsheet
ATTCH 1 - Performance Work Statement.pdf PDF
ATTCH 6 - RFP.pdf PDF
ATTCH 2 - Provisions and Clauses.pdf PDF
ATTCH 4 - SCA Wage Determination.pdf PDF
ATTCH 3 - Additional Clauses.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .