This is a Questions and Answers (Q&A) worksheet containing 78 questions and government responses related to the BAFS Flight Line Debris and Restoration solicitation (FA521526R0013). The Q&A document addresses critical project parameters, work scope, environmental requirements, and operational details for offerors preparing proposals.
The project involves removal of vehicles, tires, debris, scrap metal, large rocks, invasive vegetation (7 acres), asphalt piles, and DRMO assets from Bellows Air Force Station (BAFS) in Hawaii. Work is divided into two CLINs with separate completion dates: CLIN 0001 (Red Zone, 8 acres) must be completed by February 1, 2027, with liquidated damages of $18,351.50 per calendar day for delays; CLIN 0002 (Yellow Zone, 9 acres) must be completed by May 1, 2027. The engineer's estimate is $1,000,000. Key specifications include aggregate placement at 3/4"-1" size with 95% maximum density compaction per AASHTO standards, relocation of approximately 500 large rocks spaced 4-5 feet apart along a 5,000-foot access path, and removal of approximately 5 tons of asphalt, 2,700 cubic feet of sand, and 200 tons of vegetation. Working hours are 0700-1600, seven days per week. The government will provide DRMO vehicle documentation and NPDES pesticide permit information, while contractors must handle all other documentation, hazardous materials (fuel, diesel, and possibly freon), and compliance with DAFMAN 32-7002, DoD 7000.14-R, and CFR Part 102-38 for asset disposal. An archaeological monitor is required due to historical runway significance. Bonding is not required, and this is classified as a service contract subject to SCA wage determination requirements.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 8
| No. | Reference Document | |
| (If Applicable) | Paragraph/Section |
Reference
| (If Applicable) | QUESTION | GOVERNMENT RESPONSE | ||
| Q&A FROM PREVIOUS SITE VISIT | ||||
| 1 | Is there any incumbent/recompete or this is a brand-new project? If yes, could you please provide us with their award number or even if the customer bought similar services in the past. | No, this is a new project. | ||
| 2 | The amendment states that the red outlined area on page 12 of the Performance Work Statement must be completed no later than 1 February 2027. Could you please confirm the overall contract period of performance and required final completion date for all work under the contract? | CLIN 0001/the red outlined area must be completed NLT 1 Feb 2027. |
ClIN 0002/the yellow outlined portion and project completion must be completed by 1 May 2027
| 3 | PWS | Page 12 | Additionally, please clarify whether the red outlined area on page 12 represents the entire project scope or only the portion of work that must be completed by 1 February 2027. | The entire project scope is the yellow outlined area of page 12 in the PWS. The Red outlined area needs to be completed NLT 1 Feb 2027. |
| 4 | In Attachment 2, FAR 52.211-11 identifies liquidated damages of $18,351.50 per calendar day of delay. Please clarify the specific milestone(s) or performance requirement(s) that would trigger assessment of liquidated damages, including whether the liquidated damages provision is associated with the 1 February 2027 completion requirement referenced in the amendment. | The liquidated damages clause 52.211-11 is associated for the red outlined area on page 12 with the deadline of 1 Feb 2027. If not completed by then the Contractor will be held liable to pay liquidated damages in the amount of $18,351.50 per day to the government. | ||
| 5 | Can you provide any additional photos, maps, or quantity information for the debris, vegetation, asphalt piles, gravel, and rock relocation areas? | The PWS contains the estimates. If there is something more specific you are wanting, please clarify. | ||
| 6 | Will the Government provide the paperwork for the DRMO assets and vehicles, or is the contractor responsible for preparing all required documentation? | The Government has a list of vehicle DRMO items. Any other DRMO items not identified on it, the contractor will be responsbile for preparing the required documentation. | ||
| 7 | Are there any hazardous materials or regulated waste that will require special handling or disposal? | There is high potential for Hazardous materials or regulated waste. The only know hazardous/regulated waste at this time is fuel/dieslel. | ||
| 8 | What is the desired aggregate type thickness and compaction density? 57 stone was mentioned at the site visit, but there should be cost saving alternatives to that unless it is specified. Aggregate thickness was loosely discussed; 1"-4"is a wide range and will be very impactful on the cost of the work. Please specify depth of aggregate OR specify if the end result is to have a unifomr finished grade with drainage and copmpaction (please specify compaction requirement and if standard or modified proctor is required) Will Commingling of asphalt millings be allowed into agg base as long as similarly sized (no chunks)? | Desired aggregrate size is 3/4" - 1" with compaction to 95% maximum density at 3% to +5% moisture content as determined by AASHTO standards. Alternatives are to be provided by contractor for approval. End result is to have uniform finish grade and compaction. Standard proctor needs to be provided by contractor or by contractor's material testing lab facility. Asphalt millings may be utilized with acceptable grade lab results. | ||
| 9 | Will stumps left at ground level be sufficient or shall we quote stump removal by grinding or plucking the rootball? Any herbicide applied to stumps if left at ground level? | Stumps can be left at ground level. Removing vegetation from the root could result in inadvertent discoveries. |
Herbicide can be applied to stumps, but if herbicide is to be used it must be done in accordance of the pesticide permit.
| 10 | Once moved, what is spacing/layout for “large rocks”? | Relocate large rocks along 5,000-foot path (relocate to east of access road spaced 4' - 5' apart starting from back gate not to block any entry ways). |
| 11 | Any burning allowed with appropriate firefighting measures and a burn plan in place? | A burn permit will be required. Please note the base does not have a wildfire management plan currently. |
| 12 | It was stated in site visit that no items, vehicles, or other material be reserved/salvaged for Government reuse or recycling. Please confirm ALL items are to be disposed of responsibly, and/or become contractor property. | All items must be removed and disposed of IAW DAFMAN 32-7002 paragraph 6.8, DoD 7000.14-R, and CFR Part 102-38 may be necessary. |
| 13 | If the Government wishes to retain any items, is a salvage plan required to reimburse Gov for disposed/salvaged items or will that be included in the final work plan? Is an auction required/planned/contemplated? | The governement does not plan on retaining items. Review and compliance of DAFMAN 32-7002 paragraph 6.8, DoD 7000.14-R, and CFR Part 102-38 may be necessary. |
| 14 | What is engineer estimate for the work? | $1,000,000 |
| 15 | Is bonding (Bid, Pay, Perfomance) required? | No, bonding is not required. |
| 16 | What is the expected period of performance? | CLIN 0001/the red outlined area must be completed NLT 1 Feb 2027. |
ClIN 0002/the yellow outlined portion and project completion must be completed by 1 May 2027
| 17 | What are the working hours for the installation? Are after hours/weekend hours (NON-Holiday) allowed? | Working hours will be 0700 - 1600. 7 days a week. After hours is not prohibited. |
| 18 | If unforeseen environmental hazards are observed outside of our environmental assessment, will the NFE/contractor be reimbursed for the remediation? Will a contingency quote be recognized/accepted for this? | This Claus is being added. |
52.236-2 Differing Site Conditions.
As prescribed in 36.101-7(a), insert the following clause:
Differing Site Conditions (Deviation Date)
(a) The Contractor shall promptly, and before the conditions are disturbed, give a written notice to the Contracting Officer of
(1) Latent physical conditions or subsurface conditions at the site which differ materially from those indicated in this contract; or
(2) Unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.
(b)(1) The Contracting Officer will investigate the site conditions promptly after receiving such a notice.
(2) If the conditions materially so differ and cause an increase or decrease in the Contractor's cost of, or the time required for, performing any part of the work under this contract an equitable adjustment must be made under this clause.
(c) No request for an equitable adjustment to the contract under this clause will be allowed, unless the Contractor has given the written notice required.
(d) No request for an equitable adjustment to the contract for differing site conditions will be allowed if made after final payment under this contract.
(End of clause) 19 As a 100% disabled veteran, I have access to use MWR facilities. Will the Government allow use of MWR housing on an "as available" basis for our crew to offset the cost of the work and provide better value to the Government? The MWR facilities are booked approximately a year out. Currently the cabins are 100% booked through December. There are Camp sites available, but they will need to be paid for like an ordinary customer.
Please visit www.BellowsAFS.com to verify eligibility and project availability.
| 20 | Can you provide the approximate quantity/tonnage of asphalt and concrete requiring removal and off-site disposal? | Approximate tonnage is 5T |
| 21 | What is the approximate quantity/volume of the existing sand stockpile, and approximately how far will it be relocated to the dune restoration area? | Volume of sand is approximately 2,700 cubic feet. Distance to transport sand is 6-1 mile. |
| 22 | Are the existing ironwood logs and vegetation piles already cut and stockpiled, and is there an estimated quantity or volume? | They are cut and compiled, Est. volume would be 200 tons |
| 23 | For the approximately 7 acres of vegetation removal, please confirm whether vegetation/trees are to be cut down to the base only and whether stump grinding or stump/root removal is required? | Stumps can be left at ground level. Removing vegetation from the root could result in inadvertent discoveries. |
Herbicide can be applied to stumps, but if herbicide is to be used it must be done in accordance of the pesticide permit.
| 24 | PWS | 1.1.7 | For the approximately 500 large rocks, can you provide approximate sizes/weights and confirm these are to be relocated on-site only? | Two piles have been identified. With both piles under heavy vegetation, approximate number is 500. Pile 1 rocks ranges from 3" to 2', may have bigger rocks underneath. Pile 2 size range from 1.5' 3'. Items will be relocated on site (PWS 1.1.7) | |
| 25 | Are the debris, vehicles, DRMO assets, asphalt, and other materials located in multiple work areas, or primarily within one area? | Primarily within one area. The DRMO, vehicles, asphalt and additional solid waste are all captured in the red box. The vegetation is adj. to the golf driving range and throughout the red and yellow outlined areas on the maps provided. | |||
| 26 | Are there any hazardous or regulated materials within the project scope requiring special handling or disposal by the contractor? | There is high potential for Hazardous materials or regulated waste. The only know hazardous/regulated waste at this time is fuel/dieslel. | |||
| 27 | For the DRMO assets and vehicles, will the Government provide the required transfer/disposition paperwork, or is the contractor responsible for preparing the documentation? | The Government has a list of vehicle DRMO items. Any other DRMO items not identified on it, the contractor will be responsbile for preparing the required documentation. | |||
| 28 | The project includes removal of vehicles, transformers, HVAC units, refrigerators, fuel storage tanks, and other equipment. Please advise whether any known hazardous materials, hazardous waste, contaminated materials, contaminated soil, PCB-containing equipment, petroleum contamination, refrigerants, or other regulated materials have been identified within the project area and whether any special handling, disposal, or remediation requirements apply. | There is high potential for Hazardous materials or regulated waste. The only know hazardous/regulated waste at this time is fuel/dieslel and possibly freon. | |||
| 29 | Item 1.1.10 on the PWS references removal of additional materials and vegetation to expose the 1-mile access road. Could the government please clarify whether the vegetation removal associated with the access road is included within the approximately 7-acre invasive vegetation removal requirement identified in Item 1.1.5, or whether it is additional work beyond the 7-acre area. | It's within the 17 acre scope. Red = 8 & Yellow = 9 | |||
| 30 | The project area contains tree species in addition to ironwood trees. Can the government please clarify whether all trees located within the project area are required to be removed, or just the ironwood trees. Additionally, please confirm whether tree removal includes stump and root removal or whether cutting, chipping, and surface clearing are sufficient. | All invasive will need to be removed. This area is know to have invasive speicies and plants that are not part of the active natural restoration project. If a native plant is found in the project area please contact the environmental office at 808-448-4913 for further coordination. Please see previous questions about tree removale. | |||
| 31 | Can the government please clarify the required final condition of the project area. Specifically, please identify any requirements for grading, gravel placement, surface restoration, or other site finishing. Additionally, Item 1.1.11 references placing gravel in various areas as needed to provide a 530,000 square foot access area (12.16 acres). Please clarify the area(s) where gravel placement is required and whether the 530,000 square feet represents the access road only, the access road plus the approximately 7-acre vegetation removal area, or another defined area. | Desired aggregrate size is 3/4" - 1" with compaction to 95% maximum density at 3% to +5% moisture content as determined by AASHTO standards. Alternatives are to be provided by contractor for approval. End result is to have uniform finish grade and compaction. Standard proctor needs to be provided by contractor or by contractor's material testing lab facility. Asphalt millings may be utilized with acceptable grade lab results. | |||
| 32 | During the site visit, numerous uprooted tree stumps were observed within the project area. Can the government please clarify whether there are additional tree stumps remaining in the ground that are required to be excavated and removed by the contractor? | Stumping the vegetation is fine. Herbicide in accordance with pesticide permits is allowed. | |||
| 33 | Will the Government consider conducting an additional site visit prior to the submission deadline? | Due to time constraints an additional site visit will not be permitted at this time. | |||
| 34 | PWS | Work Limits – Please confirm the final limits of work and provide an updated map if revised. | Please Refer to the PWS with the update map. | ||
| 35 | Updated Quantities – If the work area changes, will updated quantities be provided? | Yes, 18 additional GEMS need to be added to the DRMO Vehicle listing. | GEMS- electronic carts | ||
| 36 | Items to Remain / Relocate – Please identify all items within the work area that are to remain or be relocated, including the metal structure and sand pile, and provide the relocation location for applicable items. | Please refere to the PWS and previous questions. | |||
| 37 | Listed vs. Unlisted Assets – Are all assets within the work limits included, regardless of whether they are listed in the PWS attachments? | 18 additional GEMS need to be added to the DRMO Vehicle listing. The Government has a DRMO list of all vehicles, all additional items with NSNs are not included and will be a responsibility of the contractor. | |||
| 38 | Concealed Items – How will items concealed by vegetation or otherwise not visible during the site visit be handled? | Contractor responsible for cutting and removal of vegetation concealing items. | |||
| 39 | Vehicle Documentation – Will the Government provide the documentation needed to remove and dispose of titled/registered vehicles, trailers, and watercraft? | A list of the vehicles will be provided. The documentation for title/reigstered is not vehicles, trailers and watercraft will be a responsibility of the Contractor. | |||
| 40 | Watercraft / Trailers – Are all watercraft, kayaks, trailers, and related equipment within the work limits included? | Yes | |||
| 41 | Salvage Rights – Does removed material become contractor property, and may the contractor retain scrap/salvage proceeds? | Removed items must be in accordance with and in compliance of DAFMAN 32-7002 paragraph 6.8, DoD 7000.14-R, and CFR Part 102-38 may be necessary. | |||
| 42 | Shipping Containers – Are the shipping/connex containers and all contents included in removal? | Yes | |||
| 43 | Container Inventory – Is an inventory of the contents of the containers available? | No. | |||
| 44 | Vegetation for Access – May vegetation be cleared as necessary to access and remove equipment and debris? | Contractor responsible for cutting and removal of vegetation concealing/blocking debris and equipment. | |||
| 45 | Gravel Placement – Where specifically is gravel required? | Please refer to No. 8 | |||
| 46 | Gravel Quantity – What gravel quantity, thickness, and material type should be included? | Please refer to No. 8 | |||
| 47 | Grading Requirements – What are the required grading limits, slopes, elevations, and finish requirements? | Please refer to No. 8 | |||
| 48 | Water Source – Will a Government water source be available for dust control? | Water source will be available on base hydrants. Contractor will be responsible for obtaining water meter from local water supplier. | |||
| 49 | Restrooms – Will existing restroom facilities be available for contractor use? | Public restrooms are avaliable for use. | |||
| 50 | Haul Restrictions – Are there any haul-route, weight, vehicle-size, or access restrictions? | No. | |||
| 51 | Staging Area – Where may contractor equipment, trucks, and containers be staged? | After award, a recommendation for staging area will be made. | |||
| 52 | Disposal Documentation – Will the Government provide any ownership/release documentation required for legal disposal of Government assets? | Only the DRMO list of vehicles will be included from the Government | |||
| 53 | Is that green grinder / mulcher part of the equipment being removed? How about that F750 dump truck? | The green grinder / mulcher and F750 dump truck are not inlcuded. It will be removed from the area prior to the start of the contract. | |||
| 54 | Are the 14 transformers drained of any residual oil?. | Transformers should be empty, but we cannot confirm at this time. Please contact environmental at 808-789-9701 if any still have material. | |||
| 55 | Any lab data reports for transformers oil testing for PCB’s | Transformers tested negative for PCB's and emptied. If any were placed out there without coordinating with Environmental the status is unknown. | |||
| 56 | How much percentage of the the seven acres are invasive species? | It is likely that 100% of the area are invasive. | |||
| 57 | Please provide detail information of all containers contents. | A large array of items, no list exists. Everything in the containers is up for disposal. | |||
| 58 | is this a service contract or Davis Bacon? | This is a Service Contract | |||
| 59 | ATTCH 4 SCA Wage Determination | Please provide a copy of applicable payroll wage determination. | Yes, An SCA Wage Determination is avaliable on the solicitation. Refer to Attachment 4 of RFP. | ||
| 60 | When is the start date of the contract? | Start date of contract is date of award | |||
| 61 | How much percentage of of the 530,000 sf area needs restoration? | Unknow due to unable to visually see the entire area for spills that may be under vehicles or hidden by vegetation. | |||
| 62 | Amendment 0003 identifies two project areas totaling 17 acres and separates pricing into a Red Zone CLIN and Yellow Zone CLIN. Can the government please clarify the approximate acreage of the Red Zone and Yellow Zone individually? And how should offerors allocate the vegetation-clearing requirements among the two CLINs? Is this located entirely within one zone or distributed between both zones? If distributed between both zones, what is the approximate acreage of vegetation clearing associated with each zone? | Two areas separately highlighted on map will be area of responsibility for removal totaling 17 acres. Red highlighted zone is 8 acres. Yellow highlighted zone is 9 acres. Vegetation clearing is required for both zones of combined 17 acres. | |||
| 63 | PWS Section 2.2 states that DRMO assets are military equipment with an NSN and are to be transported to DLA. Attachment 1 includes numerous items with "NA" listed in the NSN/VIN field. Can the government please clarify whether all items listed in Attachment 1 are considered DRMO assets requiring transfer to DLA, or whether items without an NSN/VIN may be disposed of through a contractor-selected disposal vendor? | ||||
| If a NSN is identified, it needs to be transported and disposed through DLA. If there is not a NSN, they may be disposed of by other means. | |||||
| 64 | Can you confirm the intended allocation of each PWS objective to CLIN 0001 or CLIN 0002, or confirm that offerors may allocate on a stated and documented basis so long as the total price captures the full scope? Please also confirm how shared costs — mobilization, the Work Plan, the NPDES permit, and base access — should be apportioned between the two CLINs. | CLIN 0001/0002 are all inclusive of the areas they are outlined. The breakdown fo cost can be found on the Excel sheet labeled "BME" | |||
| 65 | Confirm |
(a) whether liquidated damages attach only to the 1 February 2027 completion of the red-outlined area, or also to CLIN 0002 and to the Deliverable 1a and 1b submission dates;
(b) whether the daily rate applies once per contract or separately per CLIN; and (c) the required completion date for CLIN 0002. We have committed both CLINs to 1 February 2027 in the absence of a stated date for CLIN 0002. a) Yes, If the work for CLIN 0001 exceeds Feb 1, the contractor will be charged the daily liquidated damages.
b) Refer to CONS 66 Can you confirm
(a) whether Bellows AFS holds any existing installation-wide NPDES coverage under which this work could operate, which would change the filing path;
(b) that the Government will furnish the site information and installation-level coordination needed to support the application; and
(c) whether the Government has a view on the Hawaii Department of Health review period that offerors should assume. We have priced the standalone permit path as the conservative case. a) The only NPDES on file for Bellows AFS is for pesticide use.
b) At other bases CE assists with this and ENV reviews.
| 67 | Can you state the approximate number of rocks and their size and weight range, or confirm that offerors should price an allowance? We have priced an allowance and offered a firm unit rate for quantities beyond it. | Two piles have been identified. With both piles under heavy vegetation, approximate number is 500. Pile 1 rocks ranges from 3" to 2', may have bigger rocks underneath. Pile 2 size range from 1.5' 3'. |
| 68 | Confirm the intended reading, and if any surfacing is intended, state the target compacted depth and aggregate gradation. If spot fill is intended, consider stating an estimated tonnage so all offerors price the same quantity. | Desired aggregrate size is 3/4" - 1" with compaction to 95% maximum density at 3% to +5% moisture content as determined by AASHTO standards. Alternatives are to be provided by contractor for approval. End result is to have uniform finish grade and compaction. Standard proctor needs to be provided by contractor or by contractor's material testing lab facility. Asphalt millings may be utilized with acceptable grade lab results. |
| 69 | Can you furnish any existing PCB test results, nameplate data, or dielectric fluid records for the 14 units, and state whether each tank is empty and cleaned or contains residual product or sludge? Please also confirm whether the ConVault fuel tank, the two engines, and the 80 tires listed on Attachment 1 are to be turned in to DLA or dispositioned commercially. | ENV has lab results for 7 of the transformers. Information will be provided after award. |
| 70 | Can you confirm that the BAFS property custodian will furnish accurate accountable property records and DD Forms 1348-1A with correct demilitarization codes; that the Government will coordinate DLA turn-in authorization; how the parties proceed if DLA declines an item listed at Attachment 1; and that Standard Form 97 or equivalent title documentation will be furnished for vehicles routed to a commercial vendor. | A DRMO list of the vehicles will be provided. All additional documentation will be the responsibility of the contractor. |
| 71 | Can you confirm whether the 1 June through 15 September restriction applies to clearing under this contract, identify any additional INRMP-derived seasonal or spatial constraints, identify the dune restoration site location and any material specification for the relocated sand, and confirm which party is responsible for any required USFWS coordination? | Yes the 1June through 15 September restriction on tree trim apply to all projects on the installation. Additionally we need to be aware of turtle nesting season running May through August for any dune activities. The dune restoration area requires more planning and design. The environmental office should be able to coordinate with USFWS. |
| 72 | Can you identify any known archaeological sites, avoidance areas, or existing NHPA Section 106 conditions within or adjacent to the project areas and the installation Cultural Resources Manager point of contact? | The section 106 has completed and SHPD had no comments within the 30 day required time frame. The area was a runway in the 1940's then was declared inactive in the 1950's. The SHPD claims the runway is part of norther runway complex that is still considered eligible. An intact burial was removed from the Southern part of the project area in the late 1900's. Any ground disturbance will require an archaeological monitor due the historical significance of the area. |
| 73 | Can you confirm that the Government will identify all active and abandoned utilities including overhead power lines prior to ground-contact work; and confirm whether any munitions response area or MEC concern applies within the project areas? | CE will identify all active and abandoned utilities. |
| 74 | Can you furnish any existing survey covering the materials in the project areas? If none exists, can you confirm how suspect asbestos-containing material encountered during removal is to be handled and which party bears survey and abatement responsibility? | CE will provide existing utility map only. |
| 75 | Can you confirm whether partial payments against completed milestones will be permitted in accordance with FAR 32.102(d) and FAR 52.232-1, or whether payment is due only upon final acceptance of each CLIN? We have proposed a milestone schedule in its proposal for the Contracting Officer's consideration. | Contract financing will not be offered for this requirement. |
| 76 | Can you furnish the Government points of contact for the project, including the Contracting Officer's Representative to be designated under DFARS 252.201-7000 and the BAFS Environmental Manager? | These contacts will be given to the Awardee upon Award of this contract. |
| 77 | Can you confirm that "NFE" is to be read as "Contractor" and "sub-cooperator" as "subcontractor," and that the ¶3.3 restrictions apply as written. | Confirmed. |
| 78 | ||
| 79 |