This is a site visit notes document for an Integrated Monitoring and Protection System (IMPS) 2 federal contract opportunity dated April 2, 2026. The site visit was attended by TSgt Dolley (PIO - Customer) and TSgt Rohrs (Contracting Specialist). The contract involves surveillance and monitoring work for an already-constructed facility, with the majority of work occurring inside the building.
Key questions raised by potential bidders that will be addressed in Amendment 3 of the Questions and Answers document include: whether Intrusion Detection Systems (IDS) are required on the fence; camera specifications; VAT and customs handling procedures; whether a guard booth is required despite not appearing on drawings; clarification on the addendum drawing showing existing versus new items with revised scale; delineation of existing items, demolition extent, and storage/work areas; and stand-off distance requirements for two 20 kW generators in proximity to the flight line. The clarifications indicate that lighting will be installed around the building perimeter and on an adjacent fence between the Storage Support Area (SSA) and the facility, and that the proposal scope covers only one facility. Site visit requests will continue to be accepted until the deadline posted on SAM.gov.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Visit Notes – IMPS 2 April 2026
Attended:
TSgt Dolley PIO - Customer TSgt Rohrs Contracting Specialist
Questions:
1. Is it required to have IDS on the fence?
2. Is there a spec for the cameras?
3. How is VAT and Customs handled?
4. Bid sheet calls-out a guard booth. None is shown on the drawings. Is this required?
5. The addendum drawing is not clear on what exists and what does not. Can the drawing be replotted on a 11x17 with a new scale for site calculation.
6. Is it possible to delineate existing items on the drawing and extent of demolition and clarify areas of storage and work.
7. PWS has a requirement for 2 ea. 20 KW Generators. What is the stand-off requirements for generators near the flight line? Is there enough distance for them?
Questions will be answered on Q and A document Amendment 3
Clarifications:
The facility that will be monitored is already constructed. Majority of work will occur inside the facility.
Lights are to be located all around the building, lights are also located on the adjacent fence between the SSA and the facility.
This proposal shall be focused on only one facility.
Site visit requests will continue to be considered until the date listed on the SAM.gov posting.