I n t e g r i t y - S e r v i c e - E x c e l l e n c e
35th FW Misawa Air Base
Pre-Proposal Conference / Site Visit Project No. QKKA 07-1054
Repair Main Wastewater Treatment Plant (WWTP) Bldg. 1190, Misawa AB, Japan
RFP No. FA5205-15-R-0007
35 CONS/LGCP
35 CES/CENM
15 May 15
0900 hrs
Summary
Scope & Requirements General Requirement / Pricing Structure
RFP
CONS remarks for solicitation / filling instructions
CES tech briefing (Specs and Drwg)
Q&A Session
Site Visit to B1190 (see next slides)
Summary
Attachment 2
Misawa Air Base Map
Scope & Requirements
Project Description (Sec B):
Repair main wastewater treatment plant
Repair Bldg.1190 , 1191 and treatment facility (83108)
Main WWTP must remain in operation during construction
Place: Bldg. 1190, Misawa AB, Japan
Contract Type: Firm-Fixed-Price
Performance Period: 540 CD (incl. 30 CD mobilization)
Scope & Requirements
Solicitation
RFPComplete block 14 thru 20.
Fill-in
RFP
RFP - Page 2
Proposal of CLIN Amounts
Solicitation
RFP - Page 3
Fill-in
Section F:
52.211-12 Liquidated Damages @¥146,076 (1st day ) & @¥130,622 (2nd day ~ )
F-901 Performance Period (PP)
PP: 540 CD (incl. 30 CD mobilization)
NTP: Within 30 CD after the date of contract award
Solicitation
RFP - Page 7
Section H:
H-901 Required Insurance Property Damage - ¥2,000,000
H-902 Performance Bond Amount Required: 100% of awarded contract amt.
Submission: Within 30 CD after contract award
Required add’l if Mod >$10K
Japanese Yen or U.S. dollar equivalent to yen-based contract amount accompanying the surety’s separate certification
FAR 52.228-15 as modified, Sec. I, page 14
Solicitation
RFP - Page 9 - 10
Section I
52.223-3 Hazardous Material
Section J
List of Documents, Exhibit & Other Attachments Atch 1: Specifications
Atch 2: Drawings
Atch 3: Past Performance Questionnaire (PPQ) Cover Letter
Atch 4: Past/Present Performance Questionnaire (PPQ)
Atch 5: Schedule of Material Submittals
Solicitation
Fill-in
RFP - Page 11 - 22
RFP - Page 23
Section K
FAR 52.204-8 Annual Reps & Certs
FAR 52.209-7 Responsibility Matters Info
DFARS 252.204-7007 Alt. A Annual Reps & Certs
DFARS 252.247-7022 Transportation by Sea
K-800 Tax Exemption under SOFA
K-900 Contractor’s Cert
K-901 Construction Contractor License
Fill-in
Fill-in
Fill-in
Solicitation
Fill-in
Fill-in
Submit
RFP - Page 24 - 32
Fill-in
Section K (cont’d)
K-901 CONSTRUCTION CONTRACTOR LICENSE
Offeror shall submit 7 copies of “special construction license” under applicable law of Japan together with offer, to demonstrate compliance with FAR 52.236-7, as modified, and DFARS 252.225-7042.
Joint Venture or Partnership – the special construction license of each member of the JV or each partner of the partnership must be submitted together with the offeror.
Such offeror that fails in representation of the above required license will not be considered for award.
Submit
Section L
L-100 Proposal Preparation Instructions
Offer required to meet all sol. requirements, terms & conditions, reps & certs, & tech requirements
Prepare & Submit:
Part I – Summary & Misc. Data (Submit Orig. + 2 Copies)
Part II – Price Proposal (Submit Orig.)
Part III – Past Performance Proposal (Submit Orig. + 7 copies)
Solicitation
Submit
RFP - Page 33 - 38
Section M
M-900 Basis of Award & Evaluation
Weight of Importance:
Past Performance is approximately equal to price
Evaluation Process:
Step 1. Price – Fairness and Reasonableness of price and price realism analysis
Step 2. Past Performance – Recent and Relevant performance information
Solicitation
RFP - Page 39 - 40
Section M (Cont’d)
Past Performance Factor
Recency: Work within the last 3-Yr
Relevancy: Performance effort involved similar scope, magnitude of effort, and complexities to that required by this solicitation.
Integrated Assessment
The Gov’t reserves the right to award a contract to other than the lowest price offeror if the difference in the PP Confidence Rating of another offeror justifies the higher price premium.
Technical Briefing
CES Technical Briefing
Description of Work Requirement:
Upgrade & Modernization of Main Base WWTP
Demo pumps, generators, electrical, and mechanical equipment at treatment plant
Wastewater Process Engineering upgrades
Physical plant modernization
Electrical and controls upgrades
QKKA 07-1054,REPR Main Base WWTP B1190, Misawa AB, Japan
Description of Work Requirement (Cont’d):
Headworks 1191
Replace Screens
Replace grit pumps
Eliminate comminutors and secondary screens
Replace raw sewage pumps
QKKA 07-1054,REPR Main Base WWTP B1190, Misawa AB, Japan
Description of Work Requirement (Cont’d):
Treatment Works Building 83108 Replace oil/water separator (primary clarifier) with microstrainers
Convert Secondary Treatment and Tertiary Treatment to Single Stage Nitrification
Retrofit EQ Tank to provide mixing, Aeration Tank, Secondary Clarifier and Nitrification Tank for aeration
Decommission Denitrification Tank, Second Stage Aeration, and Rapid Mix/Slow Mix Systems, and reuse tankage area for Circular Clarifiers.
Decommission Final Clarifiers and convert to Disinfection Tankage.
Utilize existing Methanol and Caustic Soda chemical feed Systems as back up systems for carbon and alkalinity.
QKKA 07-1054,REPR Main Base WWTP B1190, Description of Work Requirement (Cont’d):
Control Building 1190 Decommission Treatment Works Polymer System.
Shut down Aluminum Sulfate System; future use potential.
Replace Dehydrator (Centrifuge), and ancillary equipment.
QKKA 07-1054,REPR Main Base WWTP B1190, Misawa AB, Japan
Description of Work Requirement (Cont’d):
Control Building 1190 Decommission Treatment Works Polymer System.
Shut down Aluminum Sulfate System; future use potential.
Replace Dehydrator (Centrifuge), and ancillary equipment.
QKKA 07-1054,REPR Main Base WWTP B1190, 35 CES Personnel Mr. Daniel Erickson (PM)
Lt Shane Lockridge (PM)
Mr. Norihiro Maruyama (35 CES Engineer)
QKKA 07-1054,REPR Main Base WWTP B1190, Misawa AB, Japan
Travel Route (Approx 2hrs):
1. Start: B656
2. Headworks Bldg 1191
3. Treatment Works Facility Bldg 83108
1. Influent Tank
2. Aeration Tank
3. Denitrification Tank
4. Sterilization Tank
4. Control Bldg 1190
5. Chemical Storage Tanks
6. End: B656
QKKA 07-1054,REPR Main Base WWTP B1190, QKKA 07-1054,REPR Main Base WWTP B1190, Misawa AB, Japan
Questions???
QKKA 07-1054,REPR Main Base WWTP B1190, Let’s move on to Site Visit but please remind
RFP Closing Date / Time:
12 Jun 15 / 02:30 PM (JST)
Questions shall be submitted to 35 CONS/LGCP NLT 27 May 15 (JST)