SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 49 PAGES
REPR Main Base WWTP, B1190
01 32 01.00 10 SD-01 Preconstruction Submittals
3.4 GProject Schedule
01 33 00 SD-01 Preconstruction Submittals
1.4Submittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5 GLEED Implementation Plan
SD-11 Closeout Submittals
1.6 GLEED Documentation Notebook
01 35 29 SD-01 Preconstruction Submittals
1.6 G AAccident Prevention Plan (APP)
1.7 G AActivity Hazard Analysis (AHA)
1.6.1 G ACrane Critical Lift Plan
1.5.1.3 G ACrane Operators
SD-06 Test Reports
1.11Reports
1.11.1Accident Reports
1.11.3Monthly Exposure Reports
1.11.4Crane Reports
SD-07 Certificates
1.8Confined Space Entry Permit
1.8Hot work permit
1.11.5Certificate of Compliance
3.5.3Machinery & Mechanized
Equipment Certification Form
01 57 20.00 10 SD-01 Preconstruction Submittals
1.7 GEnvironmental Protection Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Atch. 4 to RFP No. FA5205-15-R-0007-0001 Dated 2 Jun 15
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 49 PAGES
01 74 19 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-11 Closeout Submittals
1.7Records
01 75 00 SD-01 Preconstruction Submittals
1.2.1 GVerification of Prior Experience
1.2.1 GDocumentation of Manufacturer's
Prior Experience
1.2.1 GQuality Control Plan
1.2.1 GManufacturer's Sample Warranty
1.2.3 GOperation and Maintenance Data
1.2.1 GProvide Evidence
SD-02 Shop Drawings
1.2.2 GDiagrams and Instructions
1.2.2 GCoordination Drawings
SD-03 Product Data
1.2.3 GCatalog Cuts
1.2.3 GSamples of Warranty Language
SD-05 Design Data
1.2.3 GDesign Calculations
SD-06 Test Reports
1.2.4.1 GFactory Tests
1.2.4.2 GFunctional Field Test
1.2.4.3 GFinal Acceptance Test
1.2.4.4 GTest Procedures
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 49 PAGES
01 75 00 1.2.1 GQualification of Manufacturer
1.2.1 GQualification of Installer
SD-08 Manufacturer’s Instructions
1.2.1 GManufacturer's Administrative
Requirements
1.2.1 GDemonstration and Training
Information
1.2.1 GManufacturer's Procedural
Requirements
SD-09 Manufacturer’s Field
Reports
1.2.4.2 GDocumentation of the Testing and
Verification Actions
SD-10 Operation and Maintenance
Data
1.2.3 GOperation and Maintenance Data
1.2.3 GSafety and Security Data or
Posters
01 78 00 SD-10 Operation and Maintenance
Data
1.5.1 GEquipment/Product Warranty List
SD-11 Closeout Submittals
1.4.1 GRecord Drawings
1.4.3 GRecord Of Materials
1.4.2 GUtility As-Built Drawings
1.5.2 GEquipment/Product Warranty Tag
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 49 PAGES
01 78 00 1.2 GHazardous Material Reporting
1.3 GCertification of EPA Designated
Items
02 41 00 SD-01 Preconstruction Submittals
1.9 GExisting Conditions
SD-07 Certificates
1.2.1 GDemolition Plan
1.6 GNotification
SD-11 Closeout Submittals
3.3.4Receipts
02 82 14.00 10 SD-02 Shop Drawings
1.3 GDetailed Drawings
SD-03 Product Data
3.6.3.1 GAsbestos Waste Shipment
Records
3.6.3.1 GWeight Bills and Delivery Tickets
2.1 GEncapsulants
1.8.1 GRespiratory Protection Program
3.6 GCleanup and Disposal
1.5.1 GQualifications
1.10Training Program
1.7.1 GLicenses, Permits and
Notifications
3.6.3.2 GAsbestos Management Plan
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 49 PAGES
02 82 14.00 10 3.4 GExposure Assessment and Air
Monitoring
1.8Medical Surveillance
Requirements
03 01 30.71 SD-05 Design Data
1.4.1.1Job mix formula
SD-06 Test Reports
2.1.2aggregate
2.1.1.1Epoxy resin binder
2.1.1.2Epoxy grout
SD-07 Certificates
2.1.1.1Epoxy resin binder
2.1.1.2Epoxy grout
SD-08 Manufacturer’s Instructions
2.1.1Epoxy
03 11 13.00 10 SD-02 Shop Drawings
2.2.1 GFormwork
3.1.1 GFormwork
2.2.1 GForm Removal Schedule
SD-03 Product Data
2.2Form Materials
SD-05 Design Data
2.1Calculations
SD-06 Test Reports
3.2Inspection
03 20 00.00 10 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 49 PAGES
03 20 00.00 10 3.1 GReinforcement
SD-07 Certificates
2.3Reinforcing Steel
1.3.1Qualified Welders
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Plan
1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
SD-02 Shop Drawings
1.6.2.1 GReinforcing steel
SD-03 Product Data
2.1Materials for Forms
2.4.1Cementitious Materials
2.3.3Concrete Curing Materials
2.5Reinforcement
2.4.5Admixtures
2.2.1Waterstops
SD-05 Design Data
2.3.1 Gmix design
SD-06 Test Reports
1.6.1.1 GConcrete mix design
1.6.4.1Fly ash
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 49 PAGES
03 30 00 1.6.4.1Pozzolan
1.6.4.2Ground granulated blast-furnace slag
2.4.3Aggregates
3.10.2.1Tolerance report
3.13.2.3 GCompressive strength tests
3.13.2.4Air Content
3.13.2.1Slump Tests
2.4.2Water
SD-07 Certificates
2.5.1Reinforcing Bars
1.8Welder Qualifications
1.6.3.2Material Safety Data Sheets
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.3.3Curing Compound
05 50 13 SD-02 Shop Drawings
2.9 Gstructural steel door frames
2.4 GCover plates and frames
GFloor gratings
2.7 Gangles and plates
SD-03 Product Data
2.4Cover plates and frames
2.9Structural steel door frames
05 52 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 49 PAGES
05 52 00 1.2.1 GFabrication Drawings
3.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars and
Strips
3.1 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.3 GStructural Steel Plates, Shapes, and Bars
2.4 GStructural Steel Tubing
2.6 GConcrete Inserts
GProtective Coating
1.2.1 GSteel Railings and Handrails
1.2.1 GAnchorage and Fastening
Systems
SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.1 GInstallation Instructions
06 74 13.00 SD-02 Shop Drawings
Shop Drawings
SD-03 Product Data
Product Data
Product Sample
07 22 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 49 PAGES
07 22 00 Wood nailers
2.1.3 GTapered roof insulation
SD-03 Product Data
2.3 GFasteners
2.1 GInsulation
SD-06 Test Reports
1.4.1Flame spread and smoke developed ratings
SD-07 Certificates
1.3qualifications
SD-08 Manufacturer’s Instructions
2.3fasteners
2.1insulation
07 57 00 SD-06 Test Reports
GInstallation
URETHANE FOAM
PROTECTIVE COATING
07 60 00 SD-02 Shop Drawings
3.1.20 GCovering on flat, sloped, or
curved surfaces
3.1.17 GDownspouts
3.1.21 GExpansion joints
3.1.15 GGravel stops and fascias
3.1.18 GFlashing for roof drains
3.1.11 GBase flashing
3.1.12 GCounterflashing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) thojoh Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 49 PAGES
07 60 00 3.1.22 GFlashing at roof penetrations
3.1.13 GReglets
3.1.16 GDrip edge
3.1.19 GEave flashing
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.4.2Inspector Qualifications
2.1Firestopping Materials
1.4.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1Sealants
2.2Primers
2.3Bond breakers
2.4Backstops
SD-07 Certificates
3.3.6Sealant
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.5 GFrames
2.5 GFrames
2.3Accessories
2.7Weatherstripping
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 49 PAGES
08 11 13 SD-03 Product Data
2.1 GDoors
2.5 GFrames
2.3Accessories
2.7Weatherstripping
08 33 23 SD-02 Shop Drawings
2.3Overhead Coiling Doors
1.4Counterbalancing Mechanism
2.5Counterbalancing Mechanism
1.4Manual Door Operators
2.6Manual Door Operators
2.3.2Bottom Bars
1.3Guides
2.5.1Mounting Brackets
2.3.6Overhead Drum
1.4Hood
1.4Painting
1.3Installation Drawings
SD-03 Product Data
2.3Overhead Coiling Doors
2.4Hardware
1.4Counterbalancing Mechanism
2.5Counterbalancing Mechanism
1.4Manual Door Operators
2.6Manual Door Operators
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 49 PAGES
08 33 23 2.3Overhead Coiling Doors
2.4Hardware
1.4Counterbalancing Mechanism
2.5Counterbalancing Mechanism
1.4Manual Door Operators
2.6Manual Door Operators
SD-10 Operation and Maintenance
Data
3.4Operation and Maintenance
Manuals
1.4Materials
1.4Devices
1.4Procedures
1.4Manufacture's Brochures
1.4Parts Lists
3.3.2Cleaning
08 71 00 SD-02 Shop Drawings
1.3 GHardware schedule
2.3.5Keying system
SD-03 Product Data
2.3 GHardware items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.3 GHardware Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 49 PAGES
08 71 00 SD-11 Closeout Submittals
1.4Key Bitting
09 29 00 SD-03 Product Data
Gypsum Board Cementitious backer units
2.1.3Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.7Accessories
SD-07 Certificates
2.1 GAsbestos Free Materials
SD-08 Manufacturer’s Instructions
Material Safety Data Sheets
SD-10 Operation and Maintenance
Data
Manufacturer maintenance instructions
3.8Waste Management
09 67 23.13 SD-02 Shop Drawings
1.3.1 GInstallation Drawings
SD-03 Product Data
1.3.1.1 GManufacturer's Catalog Data
2.1.2Cured Epoxy Binder
; G
2.1.1 GEpoxy-Resin Binder/Matrix
2.1.4 GSurface Sealing Coat
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 49 PAGES
09 67 23.13 1.3.1.2 GDesign Mix Data
2.1.1 GEpoxy-Resin Binder/Matrix
SD-06 Test Reports
1.4 GRecords of Inspection
SD-07 Certificates
1.4.1 GListing of Product Installations
1.4 GReferenced Standards
Certificates
3.6 GWarranty
09 67 23.14 SD-02 Shop Drawings
2.1 GFlooring
SD-03 Product Data
GSealer and Resin
3.3.2 GFloor Surfacing
3.2 GMixing
SD-04 Samples
2.2 GFlooring Systems
SD-06 Test Reports
3.4 GTesting
SD-07 Certificates
1.3.1 GQualifications of Installer
SD-08 Manufacturer’s Instructions
3.3 GApplication
SD-10 Operation and Maintenance
Data
2.2 GFlooring Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 49 PAGES
09 68 00 SD-02 Shop Drawings
3.4 GInstallation Drawings
2.4 GMoldings
SD-03 Product Data
2.1 GCarpet
2.4 GMoldings
SD-04 Samples
2.1 GCarpet
2.4 GMoldings
SD-06 Test Reports
3.2 GMoisture and Alkalinity Tests
SD-07 Certificates
2.1Carpet
1.3Regulatory Requirements
SD-08 Manufacturer’s Instructions
3.1Surface Preparation
3.4Installation
SD-10 Operation and Maintenance
Data
2.1 GCarpet
3.5 GCleaning and Protection
Maintenance Service
09 90 00 SD-01 Preconstruction Submittals
2.1Paint
10 44 16 SD-01 Preconstruction Submittals
2.1Manufacturer's Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 49 PAGES
10 44 16 SD-02 Shop Drawings
2.1Fire Extinguishers
1.3.1Accessories
Part 2Cabinets
1.3.1Wall Brackets
SD-03 Product Data
2.1Fire Extinguishers
1.3.1Accessories
Part 2Cabinets
1.3.1Wall Brackets
3.2.1Replacement Parts
SD-04 Samples
1.3.1Fire Extinguisher
1.3.1Cabinet
1.3.1Wall Brackets
1.3.1Accessories
SD-07 Certificates
2.1Fire Extinguishers
2.1Manufacturer's Warranty with
Inspection Tag
13 48 00 SD-02 Shop Drawings
3.1Bracing
3.4Resilient Vibration Isolation
Devices
2.1Equipment Requirements
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 49 PAGES
13 48 00 3.1Bracing
2.1Equipment Requirements
SD-06 Test Reports
3.3Anchor Bolts
13 48 00.00 10 SD-02 Shop Drawings
3.1Coupling and Bracing
3.3Flexible Couplings or Joints
1.3Equipment Requirements
1.2.4Contractor Designed Bracing
SD-03 Product Data
3.1Coupling and Bracing
1.3Equipment Requirements
1.2.4Contractor Designed Bracing
SD-07 Certificates
2.2Flexible Ball Joints
21 13 17.00 10 SD-02 Shop Drawings
1.4.3Shop Drawings
3.9As-Built Drawings
SD-03 Product Data
1.4.1List of Submittals
2.1Materials and Equipment
1.6Spare Parts
1.4.1Fire Protection Specialist
1.4.2Installer Qualifications
3.10Onsite Training
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 49 PAGES
21 13 17.00 10 3.4.1Sway Bracing
1.2.1.2Hydraulic Calculations
SD-06 Test Reports
3.8Preliminary Tests
3.9Final Acceptance Test
SD-07 Certificates
3.3Inspection by Fire Protection
Specialist
SD-10 Operation and Maintenance
Data
3.10Operating and Maintenance
Instructions
22 00 00 SD-03 Product Data
3.7.1.1 GBackflow prevention assemblies
Plumbing System
SD-06 Test Reports
3.7Tests, Flushing and Disinfection
SD-07 Certificates
1.3Materials and Equipment
SD-10 Operation and Maintenance
Data
GPlumbing System
22 07 19.00 40 SD-02 Shop Drawings
1.2 GInstallation Drawings
SD-03 Product Data
GInsulation Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 49 PAGES
22 07 19.00 40 GJacketing
GTape
SD-08 Manufacturer’s Instructions
1.2 GInstallation Manual
22 11 23.13 SD-02 Shop Drawings
Shop Drawings
SD-10 Operation and Maintenance
Data
Operation & Maintenance (O&M)
Data
23 00 00 SD-02 Shop Drawings
1.4.3 GDetail Drawings
SD-03 Product Data
Metallic Flexible Duct
Duct Connectors
2.9.2 GDuct Access Doors
2.9.4 GManual Balancing Dampers
Automatic Smoke-Fire Dampers
2.9.7.1Diffusers
2.9.7.2
Louvers; G
Fans
1.4.4Test Procedures
1.2.1.2Diagrams
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) thojoh Line thojoh Line thojoh Line thojoh Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 49 PAGES
23 00 00 G Ductless Split AC Units; G, S
Vertical AC Unit; G, S Air Cooled
Condensing Units; G, S
SD-06 Test Reports
GPerformance Tests
3.8 GDamper Acceptance Test
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
3.11.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.11.1 GOperation and Maintenance
Manuals
2.9.4 GManual Balancing Dampers
GAutomatic Smoke-Fire Dampers
GFans
Ductless Split AC Units; G
Vertical AC Unit; G Air Cooled
Condensing Units; G
23 05 15 SD-01 Preconstruction Submittals
1.2 GMaterial, Equipment, and Fixture
Lists
SD-02 Shop Drawings
1.2 GRecord Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 49 PAGES
23 05 15 3.1 GInstallation Drawings
SD-03 Product Data
2.1 G SPipe and Fittings
2.2 GPiping Specialties
2.3 GValves
2.5Supporting Elements
1.2Equipment Foundation Data
SD-06 Test Reports
3.1 GHydrostatic Tests
3.1 GAir Tests
3.1 GSystem Operation Tests
SD-07 Certificates
1.4.2 GRecord of Satisfactory Field
Operation
1.4.3 GList of Qualified Permanent
Service Organizations
1.2 GListing of Product Installations
1.2 GRecords of Existing Conditions
SD-10 Operation and Maintenance
Data
3.8 GOperation and Maintenance
Manuals
23 05 48.00 40 SD-03 Product Data
1.2 GEquipment and Performance
Data
GIsolators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 49 PAGES
23 07 00 SD-02 Shop Drawings
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
SD-08 Manufacturer’s Instructions
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
23 09 33.00 40 SD-01 Preconstruction Submittals
1.1.1 GMaterial, Equipment, and Fixture
Lists
1.1.1 GRecords of Existing Conditions
SD-02 Shop Drawings
3.1 GInstallation Drawings
SD-03 Product Data
Part 2 GControl Components
2.1 GControl Components
Part 2 GValves
Part 2 GDampers
2.2 GDampers
Part 2 GOperators
2.3.1 GOperators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 49 PAGES
23 09 33.00 40 SD-06 Test Reports
GSet Points And Final Adjustments
Of Controls
SD-07 Certificates
3.1 GListing of Product Installations
1.2.3 GQualified Permanent Service
Organizations
2.4 GManufacturer's Standard Factory
Finishing
SD-08 Manufacturer’s Instructions
1.1.2 GOperating Instructions
SD-10 Operation and Maintenance
Data
3.5 GOperation and Maintenance
Manuals
3.3 GScheduled Instructional Services
2.3.3 GElectric Operators
23 09 53.00 20 SD-02 Shop Drawings
1.7.1 GControl system diagrams
1.7.2 GOperating parameters
1.7.3 GAutomatic control valve
schedules
1.7.4 GDamper schedules
1.7.6 GSequence of operation
1.7.7 GArrangement drawing
1.7.5 GWiring diagram
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 49 PAGES
23 09 53.00 20 SD-03 Product Data
2.2 GActuators
2.3 GValves
2.4 GDampers
2.6 GSensors
2.8Thermostats
SD-06 Test Reports
1.9.6 GCommissioning procedures
1.9.7 GCalibration adjustment and
commissioning reports
SD-07 Certificates
3.3.4 GCertification of completion
SD-08 Manufacturer’s Instructions
GTraining course documentation
SD-10 Operation and Maintenance
Data
1.9.8 GSpace temperature control
system
SD-11 Closeout Submittals
3.4 GQualified service organization list
23 23 00 SD-02 Shop Drawings
2.3 GRefrigerant Piping System
SD-03 Product Data
2.3Refrigerant Piping System
3.4Refrigerant Piping Tests
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 49 PAGES
23 23 00 3.4Refrigerant Piping Tests
23 31 13.00 40 SD-02 Shop Drawings
1.3 GRecord Drawings
SD-03 Product Data
2.2.1Galvanized Steel Ductwork
Materials
2.3.1Round Sheet Metal Duct Fittings
2.3.4 GTurning Vanes
2.3.6 GFlexible Connectors
2.3.9 GFlexible Duct Materials
2.3.11 GPower Operated Dampers
2.3.12 GFire Dampers and Wall Collars
2.3.10 GManual Volume Dampers
SD-10 Operation and Maintenance
Data
GOperation and Maintenance
Manuals
2.3.11 GPower Operated Dampers
2.3.12 GFire Dampers and Wall Collars
23 35 19.00 20 SD-03 Product Data
2.1 GFans
GDampers
2.4.1Flexible connectors
GFlexible duct
1.8.1Local/Regional Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 49 PAGES
23 35 19.00 20 SD-10 Operation and Maintenance
Data
2.1 GFans
SD-11 Closeout Submittals
1.6Posted operating instructions
23 37 13.00 40 SD-03 Product Data
GEquipment and Performance
Data
23 41 13.00 40 SD-03 Product Data
1.1 GPerformance Data
2.1Air Filters
23 81 00.00 20 SD-03 Product Data
2.1Air conditioners
2.1.7Thermostats
2.4Refrigerant piping and accessories
SD-08 Manufacturer’s Instructions
2.1Air conditioners
2.1.7Thermostats
2.4Refrigerant piping and accessories
SD-10 Operation and Maintenance
Data
2.1Air conditioners
2.1.7Thermostats
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line thojoh Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 49 PAGES
23 81 00.00 20 1.4.4Posted operating instructions
23 82 00.00 20 SD-03 Product Data
2.1Unit heaters
SD-10 Operation and Maintenance
Data
2.1Unit heaters
23 82 02.00 10 SD-02 Shop Drawings
1.4Drawings
SD-03 Product Data
2.1Materials and Equipment
1.6Spare Parts
3.4Posted Instructions
3.1Verification of Dimensions
2.7.1.1Coil Corrosion Protection
3.6System Performance Tests
3.4 GDemonstrations
SD-06 Test Reports
3.5 GRefrigerant Tests, Charging, and
Start-Up
3.6 GSystem Performance Tests
SD-07 Certificates
2.1Materials and Equipment
2.1.1Service Organization
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 49 PAGES
23 82 02.00 10 3.4Operation and Maintenance
Manuals
26 05 13.00 40 SD-06 Test Reports
3.16 GDielectric Absorption Tests
3.16 GMedium-Voltage Tests
SD-07 Certificates
3.16 GMedium-Voltage Tests
3.16 GDielectric Absorption Tests
1.4 GCable Splicers
26 05 19.00 10 SD-03 Product Data
3.17Installation Instructions
SD-06 Test Reports
3.18Tests, Inspections, and
Verifications
26 05 48.00 10 SD-02 Shop Drawings
3.2Lighting Fixtures in Buildings
1.3Equipment Requirements
SD-03 Product Data
3.2 GLighting Fixtures in Buildings
1.3 GEquipment Requirements
1.2.3 GContractor Designed Bracing
26 05 71.00 40 SD-01 Preconstruction Submittals
2.1 GConnection Diagrams
2.1 GFabrication Drawings
2.6 GFuses
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 49 PAGES
26 05 71.00 40 3.1 GControl Devices
3.1 GProtective Devices
SD-03 Product Data
2.2 GMotor Control
2.3 GInstrument Transformers
2.4 GEnclosures
2.5 GCircuit Breakers
3.1 GControl Devices
2.9 GIndicating Lights
SD-06 Test Reports
3.2 GDielectric Tests
3.2 GFinal Test Reports
SD-07 Certificates
2.8 GCircuit Tests
3.2 GInsulating Oil
SD-08 Manufacturer’s Instructions
3.1 GControl Devices
3.1 GProtective Devices
SD-10 Operation and Maintenance
Data
2.2.1 GManual Motor Controllers
2.2.2 GMagnetic Motor Controllers
2.2.3 GCombination Motor Controllers
2.5 GCircuit Breakers
26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 49 PAGES
26 08 00 SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure
26 12 19.10 SD-02 Shop Drawings
GPad-mounted transformer drawings
SD-03 Product Data
GPad-mounted transformers
SD-06 Test Reports
3.4.1 GAcceptance checks and tests
SD-07 Certificates
GTransformer Efficiencies
SD-09 Manufacturer’s Field
Reports
2.15.2 Gdesign tests
2.15.3 Groutine and other tests
SD-10 Operation and Maintenance
Data
GTransformer(s)
SD-11 Closeout Submittals
2.15.1 GTransformer test schedule
26 20 00 SD-02 Shop Drawings
2.12 GPanelboards
2.15 GTransformers
2.3 GCable trays
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 49 PAGES
26 20 00 2.19 GMotor control centers
2.26 GWireways
3.1.9.1 GMarking strips
SD-03 Product Data
2.11 GReceptacles
2.12.3 GCircuit breakers
2.9 GSwitches
2.15 GTransformers
2.13 GEnclosed circuit breakers
2.17 GMotor controllers
2.19.2 GCombination motor controllers
2.18 GManual motor starters
2.27 GMetering
2.28 GSurge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.5 GGrounding system test
3.5.3 GTransformer tests
3.5.4 GGround-fault receptacle test
SD-07 Certificates
2.10 GFuses
SD-09 Manufacturer’s Field
Reports
2.30.1Transformer factory tests
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 49 PAGES
26 20 00 1.5.1 GElectrical Systems
2.27 GMetering
26 23 00.00 40 SD-03 Product Data
1.4.3 GSpare Parts List
SD-06 Test Reports
3.2.1 GAcceptance Checks and Tests
SD-10 Operation and Maintenance
Data
1.4.1 GSwitchboard Operation and
Maintenance
SD-11 Closeout Submittals
1.7 GWarranty
1.4.2 GAssembled Operation and
Maintenance Manuals
3.2 GRequest for Settings
26 24 19.00 40 SD-02 Shop Drawings
2.3.4.3 GDrawings
2.3.2.1 GShop Drawings
2.4 GMotor Control Center
1.2 GSwitchboards
SD-03 Product Data
1.4 GEquipment
SD-06 Test Reports
2.5 GFactory Test Procedures
2.5.1.4 GFactory Test Results
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 49 PAGES
26 24 19.00 40 2.4 GMotor Control Center
SD-08 Manufacturer’s Instructions
1.2 GMotor Control Units
1.2 GProtective Devices
SD-11 Closeout Submittals
3.3 GWarranty
26 27 13.10 30 SD-03 Product Data
2.1 GPower meters
GCurrent
GPotential transformer
GCommunications module
1.6.1 GProtocol modules
1.6.2 GData recorder
1.6.2 GModem
SD-06 Test Reports
3.2.1 GAcceptance checks and tests
SD-10 Operation and Maintenance
Data
2.1 GPower meters
GCommunications module
1.6.1 GProtocol modules
1.6.2 GData recorder
1.6.2 GModem
SD-11 Closeout Submittals
3.2.2 GSystem function verification
26 28 01.00 10 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 49 PAGES
26 28 01.00 10 2.1Fault Current Analysis
2.1Protective Device Coordination
Study
Equipment
1.4.1System Coordinator
Protective Relays
3.2Installation
SD-06 Test Reports
3.3Field Testing
SD-07 Certificates
Devices and Equipment
26 29 23 SD-02 Shop Drawings
1.5.1 GSchematic diagrams
1.5.2 GInterconnecting diagrams
1.5.3 GInstallation drawings
SD-03 Product Data
2.1 GVariable frequency drives
1.5.4Equipment schedule
SD-06 Test Reports
3.2.1VFD Test
3.2.2Performance Verification Tests
3.2.3Endurance Test
SD-08 Manufacturer’s Instructions
1.5.5Installation instructions
SD-09 Manufacturer’s Field
Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 49 PAGES
26 29 23 1.5.6Factory test results
SD-10 Operation and Maintenance
Data
2.1Variable frequency drives
26 32 14.00 10 SD-02 Shop Drawings
1.4.6 GDetailed Drawings
3.11 GAcceptance
SD-03 Product Data
2.4Manufacturer's Catalog
3.10 GInstructions
1.4.3Experience
1.4.4Field Engineer
1.4.2Site Welding
3.2General Installation
3.1Site Visit
SD-05 Design Data
2.8 GSound Limitations
2.13Generator
3.6.2.2Power Factor
2.7.2Heat Exchanger
2.17.5Time-Delay on Alarms
2.7Cooling System
1.2.4Vibration Isolation
SD-06 Test Reports
3.6.6Performance Tests
3.6 GOnsite Inspection and Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 49 PAGES
26 32 14.00 10 SD-07 Certificates
1.2.4Vibration Isolation
3.4Prototype Tests
1.2.5Reliability and Durability
2.10Emissions
2.8Sound limitations
2.13.1Current Balance
2.3Materials and Equipment
2.26Factory Inspection and Tests
3.6.4Inspections
2.7Cooling System
SD-10 Operation and Maintenance
Data
1.6.1 GOperation Manual
1.6.2 GMaintenance Manual
1.6.3Extra Materials
26 51 00 SD-03 Product Data
2.1 GFluorescent lighting fixtures
1.6.1 GFluorescent electronic ballasts
GFluorescent electromagnetic ballasts
2.1.2 GFluorescent lamps
GPhotocell switch
2.6 GExit signs
2.7 GEmergency lighting equipment
2.9 GOccupancy sensors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 49 PAGES
26 51 00 Environmental Data
1.6.3.3Energy Efficiency
SD-06 Test Reports
3.3Operating test
SD-10 Operation and Maintenance
Data
1.4.1 GLighting Control System
Operational Service
26 56 00 SD-01 Preconstruction Submittals
1.5.2 GPhotometric Plan
1.6.1 GLED Luminaire Warranty
SD-02 Shop Drawings
1.5.1.1 GLuminaire drawings
SD-03 Product Data
2.2 GLED Luminaires
2.2.2 GLuminaire Light Sources
2.2.3 GLuminaire Ballasts, and Power
Supply Units (Drivers)
2.3.1 GPhotocell
SD-05 Design Data
1.5.3 GDesign Data for luminaires
SD-06 Test Reports
1.5.4 GLED Luminaire - IES LM-79 Test
Report
1.5.5 GLED Light Source - IES LM-80
Test Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 49 PAGES
26 56 00 3.2Operating test
SD-07 Certificates
1.6.1 GLuminaire Useful Life Certificate
SD-10 Operation and Maintenance
Data
1.6.2Electronic Ballast Warranty
1.7Operational Service
28 31 76 SD-02 Shop Drawings
2.1.2Nameplates
2.5.1Instructions
3.2.1Wiring Diagrams
1.2.1System Layout
2.3System Operation
2.19Notification Appliances
2.16Amplifiers
SD-03 Product Data
1.6Technical Data And Computer
Software
2.15Fire Alarm Control Unit and Mass
Notification Control Unit (FMCP)
2.3.2LED Display Unit
3.2.2Terminal cabinets
2.18Manual stations
2.22Transmitters
2.14.1Batteries
2.14.2Battery chargers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 49 PAGES
28 31 76 2.9Smoke sensors
2.12Heat detectors
2.19Notification appliances
2.7Addressable interface devices
2.16Amplifiers
2.16Tone generators
2.16Digitalized voice generators
2.22.1Radio transmitter and interface panels
1.4.4Local Operating Console (LOC)
SD-05 Design Data
2.14.1.2Battery power
2.14.2Battery chargers
SD-06 Test Reports
3.5Field Quality Control
3.5.1Testing Procedures
2.11Smoke sensor testing
SD-07 Certificates
1.7.1.4Installer
3.5.2.2Formal Inspection and Tests
3.5.2.3Final Testing
SD-09 Manufacturer’s Field
Reports
2.3System Operation
1.7.2.2Fire Alarm/Mass Notification
System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 49 PAGES
28 31 76 SD-10 Operation and Maintenance
Data
3.8Operation and Maintenance
(O&M) Instructions
3.6Instruction of Government
Employees
SD-11 Closeout Submittals
3.5.2.4As-Built Drawings
31 23 00 SD-01 Preconstruction Submittals
1.7.1Shoring and Sheeting Plan
1.7.2 GDewatering work plan
SD-03 Product Data
2.8 GBuried Warning and Identification
Tape
2.9 GDetection Wire for Non-Metallic
Piping
SD-04 Samples
2.6 GFilter Fabric
2.7 GGeogrid Reinforcement
SD-05 Design Data
2.3 GFlowable Fill
SD-06 Test Reports
1.6 GBorrow Site Testing
3.12.2.1 GFill and backfill
3.12.2.2 GSelect material
3.12.2.3 GDensity tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 49 PAGES
31 23 00 2.2 GUtility Bedding Material
2.3 GFlowable Fill
2.5 GStructural Fill
2.6 GFilter Fabric
2.7 GGeogrid Reinforcement
SD-07 Certificates
2.7Certificates of Compliance
32 05 33 SD-01 Preconstruction Submittals
2.4 GIntegrated Pest Management
Plan
3.4.2Plant Quantities
SD-03 Product Data
2.1 GFertilizer
2.2.1Hose
2.3Mulches Topdressing
2.3.2Organic Mulch Materials
SD-07 Certificates
3.4.1Maintenance inspection report
SD-11 Closeout Submittals
3.4.3Tree, staking and guying removal
32 11 16.16 SD-03 Product Data
2.1 GMaterials
SD-06 Test Reports
2.1 GBearing ratio
2.1 GLiquid limit
2.1 GPlasticity index
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 49 PAGES
32 11 16.16 2.1 GDry weight
2.1 GPercentage of wear
3.4.2.1 GGradation tests
3.4.2.3 GDensity tests
SD-07 Certificates
2.2 GSource
32 11 24 SD-06 Test Reports
3.5.2.1Gradation
3.5.2.1Gradation
2.1.1Bearing ratio
2.1.1Liquid limit
2.1.1Plasticity index
2.1.1Percentage of wear
2.1.1Dry weight
3.5.2.3Density
3.5.2.3Density
3.5.2.2Smoothness
3.5.2.5Thickness
32 12 10 SD-06 Test Reports
3.7Sampling and Testing
32 12 17 SD-05 Design Data
1.3.2 GJob-mix formula
2.2 GASPHALT CEMENT BINDER
2.3 GMIX DESIGN
SD-06 Test Reports
2.4.1Specific gravity test of asphalt
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 49 PAGES
32 12 17 2.4.1Coarse aggregate tests
2.4.1Weight of slag test
2.4.1Percent of crushed pieces in gravel
2.4.1Fine aggregate tests
2.4.1Specific gravity of mineral filler
2.4.1Bituminous mixture tests
3.5.2.1Aggregates tests
3.5.2.2Bituminous mix tests
3.5.2.3Pavement courses
32 16 13 SD-03 Product Data
2.1 GConcrete
SD-06 Test Reports
3.8 GField Quality Control
32 17 23 SD-03 Product Data
2.1.1 GPaints for roads and streets
SD-06 Test Reports
2.1.1Paints for roads and streets
3.5.1Volatile Organic Compound
SD-07 Certificates
2.1.1 GPaints for roads and streets
1.5 GConstruction equipment list
SD-08 Manufacturer’s Instructions
2.1.1 GPaints for roads and streets
32 92 23 SD-03 Product Data
2.4 GFertilizer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 49 PAGES
32 92 23 SD-06 Test Reports
2.2.3Topsoil composition tests
SD-07 Certificates
2.1 Gsods
33 11 00 SD-03 Product Data