JA-4_EAFB_Work_Items_and_Definitions.pdf
PDF 243 KB Posted
- Attached to
- Paving MACC Federal contract opportunity
- Solicitation number
- FA5004-15-R-C001
About this file
JA-4 EAFB Work Items and Definitions
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
31 Mar 2015
WORK ITEMS AND DEFINITIONS: The following is an outline of the items of work and the descriptions of each item to be constructed under this contract for EAFB.
001 SAWCUT NEW OR EXISTING ASPHALT, EXCLUDES JOINT CUTTING/ WIDENING
002 SAWCUT NEW OR EXISTING PORTLAND CEMENT CONCRETE
016 SAWCUT NEW OR EXISTING ASPHALT, EXCLUDES JOINT CUTTING/ WIDENING
017 SAWCUT NEW OR EXISTING PORTLAND CEMENT CONCRETE
Laying out cut location and accurately sawing pavement to the limits and depth identified in the
Delivery Order. Cleanup of cutting residue is a part of this item.
003 REMOVE EXISTING ASPHALT TO 3" INCHES THICK, HAULING OFF BASE
004 REMOVE EXISTING ASPHALT OVER 3" TO 6" THICK, HAULING OFF BASE
005 REMOVE EXISTING ASPHALT OVER 6" THICK, HAULING OFF BASE
018 REMOVE EXISTING ASPHALT TO 3 INCHES THICK, HAULING OFF BASE
Complete removal of the existing AC pavement to the base aggregate level, within the limits of area identified by the Delivery Order. Also included is loading, hauling and dumping at a location off base.
006 COLD-MILLING OF ASPHALT TO 2" & HAULING OFF BASE
019 COLD-MILLING OF ASPHALT TO 2" & HAULING OFF BASE
Set up and milling of AC pavement to the limits, grades (slopes) and depths identified in the Delivery
Order. This item is for the milling depth of up to 2”. Also included is cleanup, loading, hauling and dumping of the milled material at a location off base.
007 REMOVE EXISTING CONCRETE SLABS- UNREINFORCED, OVER 6", ISOLATED
AREAS <400 SF, ON-BASE DISPOSAL
008 REMOVE EXISTING CONCRETE SLABS- UNREINFORCED, OVER 6", LARGE AREAS
>400SF, ON-BASE DISPOSAL
010 REMOVE MISCELLANEOUS CONCRETE, UNREINFORCED, ON-BASE DISPOSAL
020 REMOVE EXISTING CONCRETE SLABS- UNREINFORCED, OVER 6", ISOLATED
AREAS <400 SF, ON-BASE DISPOSAL
021 REMOVE EXISTING CONCRETE SLABS-UNREINFORCED, OVER 6"", LARGE
AREAS >400SF, ON-BASE DISPOSAL
023 REMOVE MISCELLANEOUS CONCRETE, UNREINFORCED
Complete removal of the existing PCC pavement to the base aggregate level, within the limits of area identified by the Delivery Order. Also included is loading, hauling and dumping at location approved on the Waste/Borrow Pit Plan.
009 ADDITIONAL REMOVAL COST FOR L/I'S 7-10 IF CONCRETE IS REINFORCED
011 ADDITIONAL REMOVAL COST FOR L/I 12 IF CONCRETE IS REINFORCED
022 ADDITIONAL REMOVAL COST FOR L/I'S 7-10 IF CONCRETE IS REINFORCED
024 ADDITIONAL REMOVAL COST FOR L/I 12 IF CONCRETE IS REINFORCED
Additional cost for removing reinforcement in the existing PCC pavement within the limits of area identified by the Delivery Order. Also included is loading, hauling and dumping at a location off base.
012 REMOVE EXISTING CULVERT, TO 12"
013 REMOVE EXISTING CULVERT, OVER 12" TO 24"
014 REMOVE EXISTING CULVERT, OVER 24"
029 REMOVE EXISTING CULVERT, TO 12"
030 REMOVE EXISTING CULVERT, OVER 12" TO 24"
031 REMOVE EXISTING CULVERT, OVER 24"
Removal of culvert pipe including connections. This item includes the removal and hauling and dumping at an approved location. This does not include excavation.
015 REMOVAL OF PAVEMENT MARKINGS
032 REMOVAL OF PAVEMENT MARKINGS
Removal of pavement markings to the limits identified in the Delivery Order. Also included is the cleaning and disposal of the removed pavement markings.
025 REMOVE CURB & GUTTER, CURB ONLY, OR VALLEY GUTTERS, ISOLATED,
LENGTHS UNDER 20 LF
026 REMOVE CURB & GUTTER, CURB ONLY, OR VALLEY GUTTERS, CONTINUOUS,
LENGTHS OVER 20 LF
Complete removal of the existing PCC gutter, curb and gutter, or gutter to the base aggregate level, within the limits of area identified by the Delivery Order. Also included is loading, hauling and dumping at a location approved on the Waste/Borrow Pit Plan.
027 REMOVE CONCRETE SIDEWALK; TO 400SF
028 REMOVE CONCRETE SIDEWALK; OVER 400SF
Complete removal of the existing PCC sidewalk to the base aggregate level, within the limits of area identified by the Delivery Order. Also included is loading, hauling and dumping at a location approved on the Waste/Borrow Pit Plan.
033 EXCAVATE EXISTING BASE, SUBBASE, STONE OR TOPSOIL; INCLUDES HAULING
& ON-BASE DISPOSAL < 3,000CY
034 EXCAVATE EXISTING BASE, SUBBASE, STONE OR TOPSOIL; INCLUDES HAULING
& ON-BASE DISPOSAL OVER 3,000CY
044 EXCAVATE EXISTING BASE, SUBBASE, STONE OR TOPSOIL; INCLUDES HAULING
& ON-BASE DISPOSAL < 3,000CY
Excavation of soil, aggregate and other earthen materials to the limits and grades identified in the
Delivery Order. Does not include concrete type materials or timber and brush required to be removed before earthen excavation can begin. Also included is all layout and survey work required to excavate to the limits and grades identified in the Delivery Order and hauling to a location approved on the
Waste/Borrow Pit Plan.
035 EXCAVATE EXISTING BASE, SUBBASE, STONE OR TOPSOIL; STOCKPILE ONSITE
TO BE REUSED < 3,000CY
036 EXCAVATE EXISTING BASE, SUBBASE, STONE OR TOPSOIL; STOCKPILE ON
PROJECT SITE OR OTHER APPROVED LOCATION TO BE REUSED, OVER 3,000CY
045 EXCAVATE EXISTING BASE, SUBBASE, STONE OR TOPSOIL; STOCKPILE ONSITE
TO BE REUSED < 3,000CY
Excavation of soil, aggregate and other earthen materials to the limits and grades identified in the
Delivery Order. Does not include concrete type materials or timber and brush required to be removed before earthen excavation can begin. Also included is all layout and survey work required to excavate to the limits and grades identified in the Delivery Order and hauling to project site stockpile.
037REUSE EXISTING OR STOCKPILED ONSITE SUBBASE, STRUCTURAL FILL,
INCLUDES PLACE, GRADE & COMPACT TO 100% DENSITY, < 3,000CY
038 REUSE EXISTING OR STOCKPILED ONSITE SUBBASE, STRUCTURAL FILL,
INCLUDES PLACE, GRADE & COMPACT TO 100% DENSITY, OVER 3,000CY
046 REUSE EXISTING/ STOCKPILED ONSITE MAT'L AS SUBBASE, STRUCTURAL FILL,
INCLUDES PLACE, GRADE & COMPACT TO 98% DENSITY
Grading and compacting stockpiled soil and/or aggregate to the limits and grades identified in the
Delivery Order. This item does include redistribution of sub grade material as normally performed by a grader to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Delivery Order. Also included is the hauling of the material from the project site stockpile.
039 SCARIFY, FINISH, GRADE & COMPACT EXISTING BASE COURSE/SUBGRADE TO
100% DENSITY; TO 15,000SY
040 SCARIFY, FINISH, GRADE & COMPACT EXISTING BASE COURSE/SUBGRADE TO
100% DENSITY; OVER 15,000SY
047 SCARIFY, FINISH GRADE & COMPACT EXISTING BASE COURSE; TO 15,000 SY
Grading and compacting in situ soil and/or aggregate to the limits and grades identified in the Delivery
Order. This item does include redistribution of base course/ sub grade material as normally performed by a grader to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Delivery Order.
041 NEW SUBBASE, STRUCTURAL FILL, INCLUDES SUPPLY, PLACE, GRADE &
COMPACT TO 100% DENSITY
048 NEW SUBBASE, STRUCTURAL FILL, INCLUDES SUPPLY, PLACE, GRADE &
COMPACT
Obtaining, loading, hauling, dumping, grading and compacting subbase aggregate material to the limits, depths and grades identified in the Delivery Order. Also included is the distribution of fill material to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Delivery Order. Aggregate material shall be obtained by the
Contractor, off base, unless otherwise authorized by the Contracting Officer.
042 NEW BASE COUSE (HIGH FRACTURE D-1), INCLUDES SUPPLY, PLACE, FINISH,
GRADE & COMPACT TO 100% DENSITY TO 2500 CY
043 NEW BASE COUSE (HIGH FRACTURE D-1), INCLUDES SUPPLY, PLACE, FINISH,
GRADE & COMPACT TO 100% DENSITY OVER 2500 CY
Obtaining, loading, hauling, dumping, grading and compacting high fracture D-1 base aggregate material to the limits, depths and grades identified in the Delivery Order, and maintaining compacted surface clean and ready for paving operations until subsequent operations take place. Also included is the distribution of fill material to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Delivery Order. High fracture D-
1 Aggregate material shall be obtained by the Contractor, off base, unless otherwise authorized by the
Contracting Officer.
049 NEW SUBBASE, RECLAIMED ASPHALT FROM BASE STOCKPILE; INCLUDES
PLACE, GRADE & COMPACT TO 98% DENSITY
Obtaining, loading, hauling, dumping, grading and compacting subbase course reclaimed asphalt material to the limits, depths and grades identified in the Delivery Order. Also included is the distribution of fill material to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Delivery Order. Reclaimed asphalt material shall be obtained by the Contractor from the on base stockpile.
050 NEW BASE COURSE (D-1), INCLUDES SUPPLY, PLACE, FINISH GRADE & COMPACT
TO 100%
Obtaining, loading, hauling, dumping, grading and compacting D-1 base aggregate material to the limits, depths and grades identified in the Delivery Order, and maintaining compacted surface clean and ready for paving operations until subsequent operations take place. Also included is the distribution of fill material to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Delivery Order. D-1 Aggregate material shall be obtained by the Contractor, off base, unless otherwise authorized by the Contracting Officer.
051 NEW BASE COURSE (RECLAIMED ASPHALT) FROM BASE STOCKPILE, PLACE,
FINISH GRADE & COMPACT TO 100%
Obtaining, loading, hauling, dumping, grading and compacting base course reclaimed asphalt material to the limits, depths and grades identified in the Delivery Order. Also included is the distribution of fill material to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Delivery Order. Reclaimed asphalt material shall be obtained by the Contractor from the on base stockpile.
052 PULVERIZE ASPHALT AND BASE COURSE IN PLACE TO 6", INCLUDES REGRADE
AND COMPACT TO 100%
Pulverizing the existing AC (Asphalt Concrete) pavement in place by use of a pulverizing machine or other equipment to break up the pavement to the required size limit, grading and compacting in place for use as road base course to the limits identified in the Delivery Order. Also included is clean up of pavement debris lost outside of the compacted base area.
053 NEW SBS MODIFIED ASPHALT INCLUDES SUPPLY, PLACE, GRADE AND
COMPACT TO 2500 TONS
054 NEW SBS MODIFIED ASPHALT INCLUDES SUPPLY, PLACE, GRADE AND
COMPACT OVER 2500 TONS
Placing and compacting new SBS modified asphalt to the required thickness in no more than 2” lifts, grade, smoothness and compaction specified, within the limits identified in the Work Order. Also includes hauling of asphalt material from the asphalt mixing plant, layout, survey work, density testing and core sampling, required to meet the limits and grades identified in the Delivery Order and as specified for quality control. Also included is distributing asphalt prime coat and/ or tack coat at the proper rate and distribution coverage, to the limits identified in the Delivery Order and preparation of the surface by removing any loose or objectionable materials such as uncompacted aggregate, debris or vegetation spilled on the compacted surface after final grading and compaction of the base. This item also includes clean-up of spills or inaccurate placements onto surfaces outside of the area identified, to eliminate any environmental concerns and correct misplacements that are unsightly or a nuisance and all calibration and test patterns within or outside of the work area required to obtain the specified distribution. Preparation of the base course surface is not a part of this item.
055 CONSTRUCT CONCRETE SLABS- UNREINFORCED, OVER 6" THICK, ISOLATED
AREAS UP TO 400SF
056 CONSTRUCT CONCRETE SLABS- UNREINFORCED, OVER 6"" THICK, LARGE
AREAS, >400SF
057 INSTALL MISCELLANEOUS CONCRETE, INCLUDES FORMWORK AND FINISHING,
UNREINFORCED
061 CONSTRUCT CONCRETE SLABS- UNREINFORCED, OVER 6" THICK, ISOLATED
AREAS UP TO 400SF
062 CONSTRUCT CONCRETE SLABS- UNREINFORCED, OVER 6"" THICK, LARGE
AREAS, >400SF
063 INSTALL MISCELLANEOUS CONCRETE, INCLUDES FORMWORK AND FINISHING,
UNREINFORCED
Placing, consolidating, finishing and curing PCC to the required thickness, grade, smoothness and finish specified within the limits identified in the Delivery Order. Also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing and core sampling, required to meet the limits and grades identified in the Delivery Order and as specified for quality control.
Preparation of the base course surface is not a part of this item.
058 ADD STEEL REINFORCEMENT TO L/I'S 45-49, #4 TO #8 BARS
059 DOWELS SUPPLIED IN FORM EDGES OR DRILLED INTO EXISTING CONCRETE
IAW UFC 3-260-02
067 ADD STEEL REINFORCEMENT TO L/I'S 45-49, #4 TO #8 BARS
068 DOWELS SUPPLIED IN FORM EDGES OR DRILLED INTO EXISTING CONCRETE
IAW UFC 3-260-02
This includes preparation of PCC for reinforcement or dowels, hauling of material, and placement of material.
060 NEW ASPHALT PAVEMENT, INCLUDES SUPPLY, PLACE, GRADE AND COMPACT.
Placing and compacting asphalt to the required thickness, grade, smoothness and compaction specified, within the limits identified in the Work Order. Also includes hauling of asphalt material from the asphalt mixing plant, layout, survey work, density testing and core sampling, required to meet the limits and grades identified in the Delivery Order and as specified for quality control. Also included is distributing asphalt prime coat and/ or tack coat at the proper rate and distribution coverage, to the limits identified in the Delivery Order and preparation of the surface by removing any loose or objectionable materials such as uncompacted aggregate, debris or vegetation spilled on the compacted surface after final grading and compaction of the base. This item also includes clean-up of spills or inaccurate placements onto surfaces outside of the area identified, to eliminate any environmental concerns and correct misplacements that are unsightly or a nuisance and all calibration and test patterns within or outside of the work area required to obtain the specified distribution. Preparation of the base course surface is not a part of this item.
066 INSTALL CURB & GUTTER, CURB ONLY, OR VALLEY GUTTERS, ISOLATED,
LENGTHS UNDER 20 LF
067 INSTALL CURB & GUTTER, CURB ONLY, OR VALLEY GUTTERS, CONTINUOUS,
LENGTHS OVER 20 LF
Placing, consolidating, finishing and curing PCC curb, curb and gutter, or gutter to the required configuration, grade, smoothness and finish specified within the limits identified in the Delivery Order.
This item also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing, required to meet the limits and grades identified in the Delivery Order and as specified for quality control. Preparation of the placement surface including minor excavation, grading and compaction such as is associated with installing new curb, curb and gutter, or gutter where old curb, curb and gutter, or gutter has been removed is a part of this item.
068 CONSTRUCT NEW FIBER REINFORCED CONCRETE SIDEWALK TO 400SF
069 CONSTRUCT NEW FIBER REINFORCED CONCRETE SIDEWALK OVER 400SF
Placing, consolidating, finishing and curing PCC to the required thickness, grade, smoothness and finish specified within the limits identified in the Delivery Order. This item also includes layout, survey work, forming, transverse expansion, contraction and construction joints, field and strength testing required to meet the limits and grades identified in the Delivery Order and as specified for quality control.
Preparation of the placement surface including minor excavation, grading and compaction such as is associated with installing new sidewalk where old sidewalk has been removed is a part of this item.
070 INSTALL SIDEWALK SCUPPER WITH 4 FT SPILLWAY INCLUDES FORMWORK,
REINFORCEMENT AND GRATE
Placing, consolidating, finishing and curing the PCC sidewalk scupper and spillway including curb and gutter around the scupper This item also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing required to meet the limits and grades identified in the sidewalk scupper details and as specified for quality control. Preparation of the placement surface including minor excavation, grading and compaction such as is associated with installing new ramp where old ramp or sidewalk has been removed is a part of this item. Also included is the placement of the reinforcement and grate as identified in the sidewalk scupper details.
071 INSTALL CURB RAMP WITH CAST IN PLACE DETECTABLE WARNING TILE ,
INCLUDING FORMWORK
Placing, consolidating, finishing and curing the PCC handicapped ramp including curb and gutter around the ramp, tapering from the base of the ramp to the full height curb and gutter, to the required thickness, grade, smoothness and finish specified within the limits identified in the sidewalk ramp detail.
This item also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing required to meet the limits and grades identified in the Delivery Order and as specified for quality control. Preparation of the placement surface including minor excavation, grading and compaction such as is associated with installing new ramp where old ramp or sidewalk has been removed is a part of this item.
072 SAWCUT WIDENING OF PORTLAND CEMENT CONCRETE JOINT FOR JOINT
SEALANT
073 CUT/WIDEN JOINTS IN ASPHALT FOR JOINT SEALANT
082 SAWCUT WIDENING OF PORTLAND CEMENT CONCRETE JOINT FOR JOINT
SEALANT
091 ROUT CRACKS IN ASPHALT FOR CRACK SEALANT INSTALLATION; TO 10,000LF
092 ROUT CRACKS IN ASPHALT FOR CRACK SEALANT INSTALLATION; OVER
10,000LF
095 ROUT CRACKS IN PORTLAND CEMENT CONCRETE FOR CRACK SEALANT
INSTALLATION
Laying out cut location and accurately sawing pavement to the limits and depth identified in the
Delivery Order. Cleanup of cutting residue is a part of this item.
074 INSTALL NEW HOT POUR JOINT SEALANT IN ASPHALTIC CEMENT CONCRETE
INCLUDES BACKERROD/BOND BREAKER; LESS THAN 10,000LF
075 INSTALL NEW HOT POUR JOINT SEALANT IN ASPHALTIC CEMENT CONCRETE
INCLUDES BACKERROD/BOND BREAKER; OVER 10,000LF
076 INSTALL PREFORMED JOINT SEAL IN CONCRETE
083 INSTALL PREFORMED JOINT SEAL IN CONCRETE
093 HOT POUR ASPHALT CRACK SEALING; LESS THAN 10,000 LF
094 HOT POUR ASPHALT CRACK SEALING 10,000 LF MINIMUM
096 INSTALL SILICONE JOINT SEALANT IN CONCRETE JOINTS AND/OR CRACKS,
DOW CORNING 890-SL OR EQUIVALENT
Removing foreign material from cracks by blowing with high pressure air, high pressure water and/or mechanical means, drying crack and filling joint with specified sealant.
077 INSTALL TOPSOIL TO 6" DEPTH; INCLUDES SUPPLY, PLACE AND FINISH GRADE
084 INSTALL TOPSOIL TO 6"" DEPTH; INCLUDES SUPPLY, PLACE AND FINISH GRADE
Obtaining, loading, hauling, dumping, grading and compacting topsoil material to the limits, depths and grades identified in the Delivery Order, and maintaining the surface ready for planting. This item includes scarification of sub grade prior to placing topsoil, and layout and survey work required to grade the topsoil to the limits, thickness and grades identified in the Delivery Order.
078 INSTALL HYDROSEED MIX
085 INSTALL HYDROSEED MIX
Scarifying soil for planting, applying fertilizer, grass seed and cover mix, and maintaining seeded area through the establishment period.
079 INSTALL BULL ROCK OR RIP-RAP FOR EROSION CONTROL; UP TO 6" PIECES
086 INSTALL BULL ROCK OR RIP-RAP FOR EROSION CONTROL; UP TO 6" PIECES
087 INSTALL BULL ROCK OR RIP-RAP FOR EROSION CONTROL; 12"+ PIECES
Obtaining, loading, hauling, and dumping material at the location specified in the Delivery Order.
080 NEW PAVEMENT MARKINGS, WATERBORNE PAINT, 6" LINES
081 PAINT AIRFIELD MARKINGS, WATERBORNE, OTHER THAN 6" LINES
088 NEW PAVEMENT MARKINGS, METHYL METHACRYLATE, 4" LINES
089 NEW PAVEMENT MARKINGS, LOW VOC SOLVENT BASED, 4" LINES
090 PAINT PAVEMENT, LOW VOC SOLVENT BASED, MARKINGS, ARROWS, ETC…
Laying out and striping pavement to the configuration and limits identified in the Delivery Order.
Cleaning and preparation of the surface for paint is a part of this item.
097 CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSAL
105 CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSAL
Removal of trees, shrubs, stumps and rubbish from the areas specified in the Delivery Order. This also includes hauling and disposing of the material as approved in the Waste/Borrow Pit Plan.
098 INSTALL NEW CMP CULVERT, UP TO 12" DIAMETER
099 INSTALL NEW CMP CULVERT, OVER 12" TO 24" DIA
100 INSTALL NEW CMP CULVERT, OVER 24" TO 36" DIA
107 INSTALL NEW CMP CULVERT, UP TO 12" DIAMETER
108 INSTALL NEW CMP CULVERT, OVER 12" TO 24" DIA
109 INSTALL NEW CMP CULVERT, OVER 24" TO 36" DIA
Installation of Corrugated Metal Pipe (CMP) culvert pipe with connections to grade with bedding and compaction to 12" over top of pipe. Also install a culvert thaw pipe including all supports, anchors and standpipes. This item also includes layout and survey work required to meet drainage as identified in the Delivery Order. Excavation and backfill above the bedding is not a part of this item.
101 INSTALL GEOTEXTILE FABRIC
110 INSTALL GEOTEXTILE FABRIC
Installation of stabilization fabric on a prepared surface to the limits identified in the Delivery Order including smoothing the fabric with proper seams and overlaps, and retaining the fabric in place until suitably covered by subsequent construction. Also included is clean up and disposal of all trash and debris created from this work. Preparing of the surface for fabric is not a part of this item.
102 INSTALL PETROLEUM RESISTANT SEAL COAT
Preparation of the placement surface by cleaning and sweeping and application to the limits identified in the Delivery Order. This includes cleanup of spills or inaccurate placements onto surfaces outside of the area identified, to eliminate any environmental concerns and correct misplacements that are unsightly or a nuisance. This item also includes all calibration and test placements within or outside of the work area required to obtain the specified distribution.
103 PERFORM PETROLEUM CONTAMINATED SOIL TESTING IAW ADEC
REQUIREMENTS
111 PERFORM PETROLEUM CONTAMINATED SOIL TESTING IAW ADEC
REQUIREMENTS
Perform contaminated soil testing as outlined in the 01 30 00 specifications. Includes preparing a
Sampling and Analysis plan and field screening as approved by 354 CES/CEI/AFCEC OLAE
104 REMOVE, HAUL & DISPOSE OF PETROLEUM CONTAMINATED SOIL IAW ADEC
REQUIREMENTS
112 REMOVE, HAUL & DISPOSE OF PETROLEUM CONTAMINATED SOIL IAW ADEC
REQUIREMENTS
Includes any temporary means of storing contaminated material until hauling and disposal is done. This item does not include excavation.
106 INSTALL SAND FOR CONDUIT BEDDING
Includes only the placement of sand for conduit bedding at the depth outlined in the Delivery Order.
This item does not include any excavation or any other work associated with placing conduit.
113 INSTALL 2 OUTLET HEAD BOLT OUTLET TO INCLUDE VANTERA, INC
INTELLIGENT PARKING LOT CONTROLLER (IPLC), JUNCTION BOX(S),
PANELBOARD, AND ASSOCIATED WORK
114 INSTALL 4 OUTLET HEAD BOLT OUTLET TO INCLUDE VANTERA, INC
INTELLIGENT PARKING LOT CONTROLLER (IPLC), JUNCTION BOX(S),
PANELBOARD, AND ASSOCIATED WORK
Excavating, placing support post, conduit and concrete, placing and compacting fill material, placing and compacting base aggregate material, installing and connecting receptacle assembly and connection of the wiring to the existing power transformer. This item includes layout, concrete forming, and removal, hauling and on base disposal of excavated soil. This item does not include removal and replacement of pavement surfaces to place post.
115 INSTALL 2" PVC ELECTRICAL CONDUIT AND ASSOCIATED HBO WIRING
Excavating, placing conduit with wiring, placing and compacting fill material, placing and compacting base aggregate material. This item includes layout, and removal, hauling and on base disposal of excavated soil. This item does not include removal and replacement of pavement surfaces to place conduit.
File details come from the government source that posted it. Updated .