APPENDIX K
ON-SITE REFUELING REQUIREMENTS
1. All fixed fueling points shall be double wall construction or have secondary containment for 110% of the volume of the tank. Tanks shall be grounded and wired to NFPA standards. Fueling points will be inspected and approved by the Fire Department and DPW Environmental Division prior to use. Contact Bill Snyder, 361-9195 for inspection.
2. Fueling points shall be clear of all buildings, trailers, and work areas for 50ft in all directions. "No Smoking or Open Flames with in 50Ft." signs shall be posted.
3. Fire extinguishers and spill equipment shall be readily available at the fueling site.
4. Adequate barriers shall be placed around the fueling point to protect the equipment and fueling area.
5. Tank and containment shall be inspected and drained as needed. The contractor shall maintain a log indicating the dates of inspection, any observations, and the quantity of water either drained or captured for disposal.
6. All fuel-contaminated debris shall be collected and disposed as hazardous waste.
7. All fueling vehicles and equipment (e.g., trucks with tanks, fuel drums, etc.) shall have spill kits on the vehicle or near the equipment.
8. Spills shall be reported to the Ft. Wainwright Fire Dept (911), as well as the DPW
Environmental Division (Lee Griffin, 361-6489 or Bill Snyder 361-9195) and appropriate COE representative.
Appendix K, On Site Refueling Requirements