JA-20_FWW_Appendix_K.pdf

PDF 13 KB Posted

Attached to
Paving MACC Federal contract opportunity
Solicitation number
FA5004-15-R-C001
Issued by
Department of the Air Force Pacific Air Forces

About this file

JA-20 FWW Appendix K

View the file

Other files for this federal contract opportunity

Other files attached to Paving MACC, newest first.
File Type Posted
FA5004-15-R-C001_Amendment_0005.pdf PDF
Question_and_Answer_MACC_-_11_May_15.pdf PDF
FA5004-15-R-C001-0004_-_Amendment_0004.pdf PDF
JA-31_Questions_and_Answers.pdf PDF
JA-28_Seed_Project_Pricing_Data_Sheet_-_28_Apr_15.xlsx XLSX spreadsheet
JA-27_EAFB_Seed_Project_Statement_of_Work_-_Updated_28_Apr_15.pdf PDF
JA-29_Repair_North_Street_Map.pdf PDF
JA-30_Site_Visit_Sign_In_Sheet.pdf PDF
FA5004-15-R-C001-0003_Amendment_0003.pdf PDF
FA5004-15-R-C001-0002_Amendment_0002.pdf PDF
JA-27_Seed_Project_Statement_of_Work.pdf PDF
Questions_and_Answers_1_-_Amendment_0002.pdf PDF
JA-29_Repair_North_Street_Map.pdf PDF
JA-28_Seed_Project_Pricing_Data_Sheet.xlsx XLSX spreadsheet
FA5004-15-R-C001-0001_Amendment_0001.pdf PDF
JA-12_Sidewalk_Scupper_Detail.pdf PDF
JA-27_EAFB_Seed_Project_Statement_of_Work.pdf PDF
JA-11_Curb_and_Gutter_Detail.pdf PDF
JA-7_AKDOT_Standard_Aggregates_Specs.pdf PDF
JA-15_Financial_Reference_Sheet.pdf PDF
JA-19_FFW_Historic_Properties.jpg JPG image
JA-25_Wage_Determination.pdf PDF
JA-18_FWW_Environmental_Concerns-FWA.pdf PDF
JA-22_EAFB_AF_Form_3000.pdf PDF
JA-2_FWW_Paving_Specifications.pdf PDF
JA-16_Past_Performance_Questionnaire.pdf PDF
JA-10_AC_Joint_Detail.pdf PDF
JA-9_Appendix_B_-_AK_DOT PF_Maintenance_Spec_for_Pavement_Marking.pdf PDF
FA5004-15-R-C001_Eielson_AFB_ _Ft_Wainwright_Paving_MACC.pdf PDF
JA-26_FWW_Installation_Fast_Access_Program.pdf PDF
JA-17_Past_Performance_Worksheet.pdf PDF
JA-14_AF_Form_103.pdf PDF
JA-8_Section_670_Pavement_Markings.pdf PDF
JA-3_EAFB_Project_Pricing_Data_Sheet.xlsx XLSX spreadsheet
JA-24_ETL_04-2.pdf PDF
JA-13_Sidewalk_Ramp_Detail.pdf PDF
JA-6_FWW_Work_Items_and_Definitions.pdf PDF
JA-21_EAFB_Historical_Projects.pdf PDF
JA-4_EAFB_Work_Items_and_Definitions.pdf PDF
JA-23_EAFB_AFI_32-1042.pdf PDF
JA-28_EAFB_Seed_Project_Pricing_Data_Sheet.xlsx XLSX spreadsheet
JA-1_EAFB_Paving_Specifications.pdf PDF
JA-5_FWW_Project_Pricing_Data_Sheet.xls XLS spreadsheet
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX K

ON-SITE REFUELING REQUIREMENTS

1. All fixed fueling points shall be double wall construction or have secondary containment for 110% of the volume of the tank. Tanks shall be grounded and wired to NFPA standards. Fueling points will be inspected and approved by the Fire Department and DPW Environmental Division prior to use. Contact Bill Snyder, 361-9195 for inspection.

2. Fueling points shall be clear of all buildings, trailers, and work areas for 50ft in all directions. "No Smoking or Open Flames with in 50Ft." signs shall be posted.

3. Fire extinguishers and spill equipment shall be readily available at the fueling site.

4. Adequate barriers shall be placed around the fueling point to protect the equipment and fueling area.

5. Tank and containment shall be inspected and drained as needed. The contractor shall maintain a log indicating the dates of inspection, any observations, and the quantity of water either drained or captured for disposal.

6. All fuel-contaminated debris shall be collected and disposed as hazardous waste.

7. All fueling vehicles and equipment (e.g., trucks with tanks, fuel drums, etc.) shall have spill kits on the vehicle or near the equipment.

8. Spills shall be reported to the Ft. Wainwright Fire Dept (911), as well as the DPW

Environmental Division (Lee Griffin, 361-6489 or Bill Snyder 361-9195) and appropriate COE representative.

Appendix K, On Site Refueling Requirements

File details come from the government source that posted it. Updated .