JA-3_EAFB_Project_Pricing_Data_Sheet.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
Paving MACC Federal contract opportunity
Solicitation number
FA5004-15-R-C001
Issued by
Department of the Air Force Pacific Air Forces

About this file

JA-3 EAFB Project Pricing Data Sheet

View the file

Other files for this federal contract opportunity

Other files attached to Paving MACC, newest first.
File Type Posted
FA5004-15-R-C001_Amendment_0005.pdf PDF
Question_and_Answer_MACC_-_11_May_15.pdf PDF
JA-28_Seed_Project_Pricing_Data_Sheet_-_28_Apr_15.xlsx XLSX spreadsheet
JA-27_EAFB_Seed_Project_Statement_of_Work_-_Updated_28_Apr_15.pdf PDF
FA5004-15-R-C001-0004_-_Amendment_0004.pdf PDF
JA-31_Questions_and_Answers.pdf PDF
JA-29_Repair_North_Street_Map.pdf PDF
JA-30_Site_Visit_Sign_In_Sheet.pdf PDF
FA5004-15-R-C001-0003_Amendment_0003.pdf PDF
Questions_and_Answers_1_-_Amendment_0002.pdf PDF
JA-29_Repair_North_Street_Map.pdf PDF
FA5004-15-R-C001-0002_Amendment_0002.pdf PDF
JA-27_Seed_Project_Statement_of_Work.pdf PDF
JA-28_Seed_Project_Pricing_Data_Sheet.xlsx XLSX spreadsheet
FA5004-15-R-C001-0001_Amendment_0001.pdf PDF
JA-16_Past_Performance_Questionnaire.pdf PDF
JA-10_AC_Joint_Detail.pdf PDF
JA-9_Appendix_B_-_AK_DOT PF_Maintenance_Spec_for_Pavement_Marking.pdf PDF
FA5004-15-R-C001_Eielson_AFB_ _Ft_Wainwright_Paving_MACC.pdf PDF
JA-26_FWW_Installation_Fast_Access_Program.pdf PDF
JA-17_Past_Performance_Worksheet.pdf PDF
JA-14_AF_Form_103.pdf PDF
JA-8_Section_670_Pavement_Markings.pdf PDF
JA-24_ETL_04-2.pdf PDF
JA-13_Sidewalk_Ramp_Detail.pdf PDF
JA-20_FWW_Appendix_K.pdf PDF
JA-12_Sidewalk_Scupper_Detail.pdf PDF
JA-27_EAFB_Seed_Project_Statement_of_Work.pdf PDF
JA-11_Curb_and_Gutter_Detail.pdf PDF
JA-7_AKDOT_Standard_Aggregates_Specs.pdf PDF
JA-15_Financial_Reference_Sheet.pdf PDF
JA-19_FFW_Historic_Properties.jpg JPG image
JA-25_Wage_Determination.pdf PDF
JA-18_FWW_Environmental_Concerns-FWA.pdf PDF
JA-22_EAFB_AF_Form_3000.pdf PDF
JA-2_FWW_Paving_Specifications.pdf PDF
JA-6_FWW_Work_Items_and_Definitions.pdf PDF
JA-21_EAFB_Historical_Projects.pdf PDF
JA-4_EAFB_Work_Items_and_Definitions.pdf PDF
JA-23_EAFB_AFI_32-1042.pdf PDF
JA-28_EAFB_Seed_Project_Pricing_Data_Sheet.xlsx XLSX spreadsheet
JA-1_EAFB_Paving_Specifications.pdf PDF
JA-5_FWW_Project_Pricing_Data_Sheet.xls XLS spreadsheet
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Pricing Data Sheet

DEMOLITION OF AIRFIELD PAVEMENTS
CLINDESCRIPTIONUNIT OF ISSUEUNIT PRICEQUANTITYTOTAL
1SAWCUT NEW OR EXISTING ASPHALT,
EXCLUDES JOINT CUTTING/ WIDENINGIN-FT$ - 0
2SAWCUT NEW OR EXISTING PORTLAND
CEMENT CONCRETEIN-FT$ - 0
3REMOVE EXISTING ASPHALT TO 3" INCHES
THICK, HAULING OFF BASESY$ - 0
4REMOVE EXISTING ASPHALT OVER 3" TO 6"
THICK, HAULING OFF BASESY$ - 0
5REMOVE EXISTING ASPHALT OVER 6" THICK, HAULING OFF BASESY$ - 0
6COLD-MILLING OF ASPHALT TO 3" &
HAULING OFF BASESY$ - 0
7REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", ISOLATED AREAS

<400 SF, ON-BASE DISPOSALSY$ - 0
8REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", LARGE AREAS

>400SF, ON-BASE DISPOSALSY$ - 0
9ADDITIONAL REMOVAL COST FOR L/I'S 7-10
IF CONCRETE IS REINFORCEDSY$ - 0
10REMOVE MISCELLANEOUS CONCRETE,
UNREINFORCED, ON-BASE DISPOSALCY$ - 0
11ADDITIONAL REMOVAL COST FOR L/I 12 IF
CONCRETE IS REINFORCEDCY$ - 0
12REMOVE EXISTING CULVERT, TO 12"LF$ - 0
13REMOVE EXISTING CULVERT, OVER 12" TO
24"LF$ - 0
14REMOVE EXISTING CULVERT, OVER 24"LF$ - 0
15REMOVAL OF PAVEMENT MARKINGSSF$ - 0
DEMOLITION OF NON-AIRFIELD PAVEMENTS
CLINDESCRIPTIONUNIT OF ISSUEUNIT PRICEQUANTITYTOTAL
16SAWCUT NEW OR EXISTING ASPHALT,
EXCLUDES JOINT CUTTING/ WIDENINGIN-FT$ - 0
17SAWCUT NEW OR EXISTING PORTLAND
CEMENT CONCRETEIN-FT$ - 0
18REMOVE EXISTING ASPHALT TO 3" INCHES
THICK, HAULING OFF BASESY$ - 0
19COLD-MILLING OF ASPHALT TO 2" &
HAULING OFF BASESY$ - 0
20REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", ISOLATED AREAS

<400 SF, ON-BASE DISPOSALSY$ - 0
21REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", LARGE AREAS

>400SF, ON-BASE DISPOSALSY$ - 0
22ADDITIONAL REMOVAL COST FOR L/I'S 7-10
IF CONCRETE IS REINFORCEDSY$ - 0
23REMOVE MISCELLANEOUS CONCRETE,
UNREINFORCEDCY$ - 0
24ADDITIONAL REMOVAL COST FOR L/I 12 IF
CONCRETE IS REINFORCEDCY$ - 0
25REMOVE CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, ISOLATED, LENGTHS UNDER 20 LFLF$ - 0
26REMOVE CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, CONTINUOUS, LENGTHS OVER 20 LFLF$ - 0
27REMOVE CONCRETE SIDEWALK; TO 400SFSF$ - 0
28REMOVE CONCRETE SIDEWALK; OVER 400SFSF$ - 0
29REMOVE EXISTING CULVERT, TO 12"LF$ - 0
30REMOVE EXISTING CULVERT, OVER 12" TO
24"LF$ - 0
31REMOVE EXISTING CULVERT, OVER 24"LF$ - 0
32REMOVAL OF PAVEMENT MARKINGSSF$ - 0
AIRFIELD SITE PREPARATION
CLINDESCRIPTIONUNIT OF ISSUEUNIT PRICEQUANTITYTOTAL
33EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; INCLUDES HAULING & ON-BASE DISPOSAL < 3,000CYCY$ - 0
34EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; INCLUDES HAULING & ON-BASE DISPOSAL OVER 3,000CYCY$ - 0
35EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; STOCKPILE ONSITE TO BE REUSED < 3,000CYCY$ - 0
36EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; STOCKPILE ON PROJECT SITE OR OTHER APPROVED LOCATION TO BE REUSED, OVER 3,000CYCY$ - 0
37REUSE EXISTING OR STOCKPILED ONSITE
SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO 100% DENSITY, < 3,000CYCY$ - 0
38REUSE EXISTING OR STOCKPILED ONSITE
SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO 100% DENSITY, OVER 3,000CYCY$ - 0
39SCARIFY, FINISH, GRADE & COMPACT
EXISTING BASE COURSE/SUBGRADE TO 100% DENSITY; TO 15,000SYSY$ - 0
40SCARIFY, FINISH, GRADE & COMPACT
EXISTING BASE COURSE/SUBGRADE TO 100% DENSITY; OVER 15,000SYSY$ - 0
41NEW SUBBASE, STRUCTURAL FILL,
INCLUDES SUPPLY, PLACE, GRADE & COMPACT TO 100% DENSITYCY$ - 0
42NEW BASE COUSE (HIGH FRACTURE D-1),
INCLUDES SUPPLY, PLACE, FINISH, GRADE & COMPACT TO 100% DENSITY TO 2500 CYCY$ - 0
43NEW BASE COUSE (HIGH FRACTURE D-1),
INCLUDES SUPPLY, PLACE, FINISH, GRADE & COMPACT TO 100% DENSITY OVER 2500 CYCY$ - 0
NON-AIRFIELD SITE PREPARATION
CLINDESCRIPTIONUNIT OF ISSUEUNIT PRICEQUANTITYTOTAL
44EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; INCLUDES HAULING & ON-BASE DISPOSAL < 3,000CYCY$ - 0
45EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; STOCKPILE ONSITE TO BE REUSED < 3,000CYCY$ - 0
46REUSE EXISTING/ STOCKPILED ONSITE MAT'L AS
SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO 98% DENSITYCY$ - 0
47SCARIFY, FINISH GRADE & COMPACT
EXISTING BASE COURSE; TO 15,000 SYSY$ - 0
48NEW SUBBASE, STRUCTURAL FILL, INCLUDES SUPPLY, PLACE, GRADE & COMPACTCY$ - 0
49NEW SUBBASE, RECLAIMED ASPHALT FROM
BASE STOCKPILE; INCLUDES PLACE, GRADE & COMPACT TO 98% DENSITYCY$ - 0
50NEW BASE COURSE (D-1), INCLUDES SUPPLY,
PLACE, FINISH GRADE & COMPACT TO 100%CY$ - 0
51NEW BASE COURSE(RECLAIMED ASPHALT
FROM BASE STOCKPILE, PLACE, FINISH GRADE & COMPACT TO 100%CY$ - 0
52PULVERIZE ASPHALT AND BASE COURSE IN
PLACE TO 6", INCLUDES REGRADE AND COMPACT TO 100%SY$ - 0
AIRFIELD PAVING
CLINDESCRIPTIONUNIT OF ISSUEUNIT PRICEQUANTITYTOTAL
53NEW SBS MODIFIED ASPHALT INCLUDES
SUPPLY, PLACE, GRADE AND COMPACT TO 2500 TONSTON$ - 0
54NEW SBS MODIFIED ASPHALT INCLUDES
SUPPLY, PLACE, GRADE AND COMPACT OVER 2500 TONSTON$ - 0
55CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, ISOLATED AREAS UP TO 400SFCY$ - 0
56CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, LARGE AREAS, >400SFCY$ - 0
57INSTALL MISCELLANEOUS CONCRETE,
INCLUDES FORMWORK AND FINISHING, UNREINFORCEDCY$ - 0
58ADD STEEL REINFORCEMENT TO L/I'S 45-49,
#4 TO #8 BARSTON$ - 0
59DOWELS SUPPLIED IN FORM EDGES OR
DRILLED INTO EXISTING CONCRETE IAW UFC 3-260-02EA$ - 0
NON-AIRFIELD PAVING
CLINDESCRIPTIONUNIT OF ISSUEUNIT PRICEQUANTITYTOTAL
60NEW ASPHALT PAVEMENT, INCLUDES
SUPPLY, PLACE, GRADE AND COMPACT.TON$ - 0
61CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, ISOLATED AREAS UP TO 400SFCY$ - 0
62CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, LARGE AREAS, >400SFCY$ - 0
63INSTALL MISCELLANEOUS CONCRETE,
INCLUDES FORMWORK AND FINISHING, UNREINFORCEDCY$ - 0
64ADD STEEL REINFORCEMENT TO L/I'S 45-49,
#4 TO #8 BARSTON$ - 0
65DOWELS SUPPLIED IN FORM EDGES OR
DRILLED INTO EXISTING CONCRETE IAW UFC 3-250-01EA$ - 0
66INSTALL CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, ISOLATED, LENGTHS UNDER 20 LFLF$ - 0
67INSTALL CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, CONTINUOUS, LENGTHS OVER 20 LFLF$ - 0
68CONSTRUCT NEW FIBER REINFORCED
CONCRETE SIDEWALK TO 400SFSF$ - 0
69CONSTRUCT NEW FIBER REINFORCED
CONCRETE SIDEWALK OVER 400SFSF$ - 0
70INSTALL SIDEWALK SCUPPER WITH 4 FT SPILLWAY INCLUDES FORMWORK, REINFORCEMENT AND GRATEEA$ - 0
71INSTALL CURB RAMP WITH CAST IN PLACE DETECTABLE WARNING TILE , INCLUDING FORMWORKEA$ - 0
AIRFIELD FINISH WORK
CLINDESCRIPTIONUNIT OF ISSUEUNIT PRICEQUANTITYTOTAL
72SAWCUT WIDENING OF PORTLAND CEMENT
CONCRETE JOINT FOR JOINT SEALANTLF$ - 0
73CUT/WIDEN JOINTS IN ASPHALT FOR JOINT
SEALANTLF$ - 0
74INSTALL NEW HOT POUR JOINT SEALANT IN
ASPHALTIC CEMENT CONCRETE INCLUDES BACKERROD/BOND BREAKER; LESS THAN 10,000LFLF$ - 0
75INSTALL NEW HOT POUR JOINT SEALANT IN
ASPHALTIC CEMENT CONCRETE INCLUDES BACKERROD/BOND BREAKER; OVER 10,000LFLF$ - 0
76INSTALL PREFORMED JOINT SEAL IN
CONCRETELF$ - 0
77INSTALL TOPSOIL TO 6" DEPTH; INCLUDES
SUPPLY, PLACE AND FINISH GRADESY$ - 0
78INSTALL HYDROSEED MIXSY$ - 0
79INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; UP TO 6" PIECESCY$ - 0
80NEW PAVEMENT MARKINGS, WATERBORNE PAINT, 6" LINESLF$ - 0
81PAINT AIRFIELD MARKINGS, WATERBORNE, OTHER THAN 6" LINESSF$ - 0
NON-AIRFIELD FINISH WORK
CLINDESCRIPTIONUNIT OF ISSUEUNIT PRICEQUANTITYTOTAL
82SAWCUT WIDENING OF PORTLAND CEMENT
CONCRETE JOINT FOR JOINT SEALANTLF$ - 0
83INSTALL PREFORMED JOINT SEAL IN
CONCRETELF$ - 0
84INSTALL TOPSOIL TO 6" DEPTH; INCLUDES
SUPPLY, PLACE AND FINISH GRADESY$ - 0
85INSTALL HYDROSEED MIXSY$ - 0
86INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; UP TO 6" PIECESCY$ - 0
87INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; 12"+ PIECESCY$ - 0
88NEW PAVEMENT MARKINGS, METHYL
METHACRYLATE, 4" LINESLF$ - 0
89NEW PAVEMENT MARKINGS, LOW VOC
SOLVENT BASED, 4" LINESLF$ - 0
90PAINT PAVEMENT, LOW VOC SOLVENT BASED, MARKINGS, ARROWS, ETC…SF$ - 0
AIRFIELD MAINTENANCE
CLINDESCRIPTIONUNIT OF ISSUEUNIT PRICEQUANTITYTOTAL
91ROUT CRACKS IN ASPHALT FOR CRACK
SEALANT INSTALLATION; TO 10,000LFLF$ - 0
92ROUT CRACKS IN ASPHALT FOR CRACK
SEALANT INSTALLATION; OVER 10,000LFLF$ - 0
93HOT POUR ASPHALT CRACK SEALING; LESS
THAN 10,000 LFLF$ - 0
94HOT POUR ASPHALT CRACK SEALING 10,000
LF MINIMUMLF$ - 0
95ROUT CRACKS IN PORTLAND CEMENT
CONCRETE FOR CRACK SEALANT INSTALLATIONLF$ - 0
96INSTALL SILICONE JOINT SEALANT IN
CONCRETE JOINTS AND/OR CRACKS, DOW CORNING 890-SL OR EQUIVALENTLF$ - 0
AIRFIELD MISCELLANEOUS
CLINDESCRIPTIONUNIT OF ISSUEUNIT PRICEQUANTITYTOTAL
97CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSALCSF$ - 0
98INSTALL NEW CMP CULVERT, UP TO 12"
DIAMETERLF$ - 0
99INSTALL NEW CMP CULVERT, OVER 12" TO
24" DIALF$ - 0
100INSTALL NEW CMP CULVERT, OVER 24" TO
36" DIALF$ - 0
101INSTALL GEOTEXTILE FABRICSY$ - 0
102INSTALL PETROLEUM RESISTANT SEAL
COATSY$ - 0
103PERFORM PETROLEUM CONTAMINATED
SOIL TESTING IAW ADEC REQUIREMENTSEA$ - 0
104REMOVE, HAUL & DISPOSE OF PETROLEUM
CONTAMINATED SOIL IAW ADEC REQUIREMENTSCY$ - 0
NON-AIRFIELD MISCELLANEOUS
CLINDESCRIPTIONUNIT OF ISSUEUNIT PRICEQUANTITYTOTAL
105CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSALCSF$ - 0
106INSTALL SAND FOR CONDUIT BEDDINGCY$ - 0
107INSTALL NEW CMP CULVERT, UP TO 12"
DIAMETERLF$ - 0
108INSTALL NEW CMP CULVERT, OVER 12" TO
24" DIALF$ - 0
109INSTALL NEW CMP CULVERT, OVER 24" TO
36" DIALF$ - 0
110INSTALL GEOTEXTILE FABRICSY$ - 0
111PERFORM PETROLEUM CONTAMINATED
SOIL TESTING IAW ADEC REQUIREMENTSEA$ - 0
112REMOVE, HAUL & DISPOSE OF PETROLEUM
CONTAMINATED SOIL IAW ADEC REQUIREMENTSCY$ - 0
113INSTALL 2 OUTLET HEAD BOLT OUTLET TO INCLUDE VANTERA, INC INTELLIGENT PARKING LOT CONTROLLER (IPLC), JUNCTION BOX(S), PANELBOARD, AND ASSOCIATED WORKEA$ - 0
114INSTALL 4 OUTLET HEAD BOLT OUTLET TO INCLUDE VANTERA, INC INTELLIGENT PARKING LOT CONTROLLER (IPLC), JUNCTION BOX(S), PANELBOARD, AND ASSOCIATED WORKEA$ - 0
115INSTALL 2" PVC ELECTRICAL CONDUIT AND ASSOCIATED HBO WIRINGLF$ - 0
TOTAL PRICE$ - 0
DEMOLITION OF AIRFIELD PAVEMENTS
CLINDESCRIPTIONUNIT OF ISSUEESTIMATED UNIT PRICE
1001SAWCUT NEW OR EXISTING ASPHALT,
EXCLUDES JOINT CUTTING/ WIDENINGIN-FT$0.39
1002SAWCUT NEW OR EXISTING PORTLAND
CEMENT CONCRETEIN-FT$0.97
1003REMOVE EXISTING ASPHALT TO 3" INCHES
THICK, HAULING OFF BASESY$3.89
1004REMOVE EXISTING ASPHALT OVER 3" TO 6"
THICK, HAULING OFF BASESY$4.14
1005REMOVE EXISTING ASPHALT OVER 6" THICK, HAULING OFF BASESY$4.78
1006COLD-MILLING OF ASPHALT TO 3" &
HAULING OFF BASESY$5.50
1007REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", ISOLATED AREAS

<400 SF, ON-BASE DISPOSALSY$58.17
1008REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", LARGE AREAS

>400SF, ON-BASE DISPOSALSY$25.84
1009ADDITIONAL REMOVAL COST FOR L/I'S 7-10
IF CONCRETE IS REINFORCEDSY$7.75
1010REMOVE MISCELLANEOUS CONCRETE,
UNREINFORCED, ON-BASE DISPOSALCY$38.77
1011ADDITIONAL REMOVAL COST FOR L/I 12 IF
CONCRETE IS REINFORCEDCY$12.92
1012REMOVE EXISTING CULVERT, TO 12"LF$15.51
1013REMOVE EXISTING CULVERT, OVER 12" TO
24"LF$32.31
1014REMOVE EXISTING CULVERT, OVER 24"LF$38.77
1015REMOVAL OF PAVEMENT MARKINGSSF$6.61
DEMOLITION OF NON-AIRFIELD PAVEMENTS
CLINDESCRIPTIONUNIT OF ISSUEESTIMATED UNIT PRICE
1016SAWCUT NEW OR EXISTING ASPHALT,
EXCLUDES JOINT CUTTING/ WIDENINGIN-FT$0.35
1017SAWCUT NEW OR EXISTING PORTLAND
CEMENT CONCRETEIN-FT$0.89
1018REMOVE EXISTING ASPHALT TO 3" INCHES
THICK, HAULING OFF BASESY$3.53
1019COLD-MILLING OF ASPHALT TO 2" &
HAULING OFF BASESY$5.00
1020REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", ISOLATED AREAS

<400 SF, ON-BASE DISPOSALSY$52.88
1021REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", LARGE AREAS

>400SF, ON-BASE DISPOSALSY$23.49
1022ADDITIONAL REMOVAL COST FOR L/I'S 7-10
IF CONCRETE IS REINFORCEDSY$7.05
1023REMOVE MISCELLANEOUS CONCRETE,
UNREINFORCEDCY$35.25
1024ADDITIONAL REMOVAL COST FOR L/I 12 IF
CONCRETE IS REINFORCEDCY$11.74
1025REMOVE CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, ISOLATED, LENGTHS UNDER 20 LFLF$12.94
1026REMOVE CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, CONTINUOUS, LENGTHS OVER 20 LFLF$4.52
1027REMOVE CONCRETE SIDEWALK; TO 400SFSF$3.76
1028REMOVE CONCRETE SIDEWALK; OVER 400SFSF$2.13
1029REMOVE EXISTING CULVERT, TO 12"LF$14.10
1030REMOVE EXISTING CULVERT, OVER 12" TO
24"LF$29.38
1031REMOVE EXISTING CULVERT, OVER 24"LF$35.25
1032REMOVAL OF PAVEMENT MARKINGSSF$6.00
AIRFIELD SITE PREPARATION
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
1033EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; INCLUDES HAULING & ON-BASE DISPOSAL < 3,000CYCY$14.70
1034EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; INCLUDES HAULING & ON-BASE DISPOSAL OVER 3,000CYCY$13.50
1035EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; STOCKPILE ONSITE TO BE REUSED < 3,000CYCY$11.05
1036EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; STOCKPILE ONSITE TO BE REUSED, OVER 3,000CYCY$10.28
1037REUSE EXISTING OR STOCKPILED ONSITE
SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO 100% DENSITY, < 3,000CYCY$14.10
1038REUSE EXISTING OR STOCKPILED ONSITE
SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO 100% DENSITY, OVER 3,000CYCY$11.74
1039SCARIFY, FINISH, GRADE & COMPACT
EXISTING BASE COURSE/SUBGRADE TO 100% DENSITY; TO 15,000SYSY$2.35
1040SCARIFY, FINISH, GRADE & COMPACT
EXISTING BASE COURSE/SUBGRADE TO 100% DENSITY; OVER 15,000SYSY$2.11
1041NEW SUBBASE, STRUCTURAL FILL,
INCLUDES SUPPLY, PLACE, GRADE & COMPACT TO 100% DENSITYCY$22.16
1042NEW BASE COUSE (HIGH FRACTURE D-1),
INCLUDES SUPPLY, PLACE, FINISH, GRADE & COMPACT TO 100% DENSITY TO 2500 CYCY$76.37
1043NEW BASE COUSE (HIGH FRACTURE D-1),
INCLUDES SUPPLY, PLACE, FINISH, GRADE & COMPACT TO 100% DENSITY OVER 2500 CYCY$72.25
NON-AIRFIELD SITE PREPARATION
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
1044EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; INCLUDES HAULING & ON-BASE DISPOSAL < 3,000CYCY$14.70
1045EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; STOCKPILE ONSITE TO BE REUSED < 3,000CYCY$11.05
1046REUSE EXISTING/ STOCKPILED ONSITE MAT'L AS
SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO 98% DENSITYCY$14.10
1047SCARIFY, FINISH GRADE & COMPACT
EXISTING BASE COURSE; TO 15,000 SYSY$1.46
1048NEW SUBBASE, STRUCTURAL FILL, INCLUDES SUPPLY, PLACE, GRADE & COMPACTCY$20.45
1049NEW SUBBASE, RECLAIMED ASPHALT FROM
BASE STOCKPILE; INC. PLACE, GRADE & COMPACT TO 98% DENSITYCY$18.20
1050NEW BASE COURSE(D-1), INCLUDES SUPPLY,
PLACE, FINISH GRADE & COMPACT TO 100%CY$70.49
1051NEW BASE COURSE(RECLAIMED ASPHALT
FROM BASE STOCKPILE, PLACE, FINISH GRADE & COMPACT TO 100%CY$45.89
1052PULVERIZE ASPHALT AND BASE COURSE IN
PLACE TO 6", INCLUDES REGRADE AND COMPACT TO 100%SY$2.83
AIRFIELD PAVING
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
1053NEW SBS MODIFIED ASPHALT INCLUDES
SUPPLY, PLACE, AND GRADE TO 2500 TONSTON$193.86
1054NEW SBS MODIFIED ASPHALT INCLUDES
SUPPLY, PLACE, AND GRADE OVER 2500 TONSTON$183.52
1055CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, ISOLATED AREAS UP TO 400SFCY$549.27
1056CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, LARGE AREAS, >400SFCY$339.90
1057INSTALL MISCELLANEOUS CONCRETE,
INCLUDES FORMWORK AND FINISHING, UNREINFORCEDCY$581.57
1058ADD STEEL REINFORCEMENT TO L/I'S 45-49,
#4 TO #8 BARSTON$3,230.96
1059DOWELS SUPPLIED IN FORM EDGES OR
DRILLED INTO EXISTING CONCRETEEA$64.61
NON-AIRFIELD PAVING
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
1060NEW ASPHALT PAVEMENT, INCLUDES
SURFACE PREP AND COMPACTION.TON$137.47
1061CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, ISOLATED AREAS UP TO 400SFCY$499.33
1062CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, LARGE AREAS, >400SFCY$411.22
1063INSTALL MISCELLANEOUS CONCRETE,
INCLUDES FORMWORK AND FINISHING, UNREINFORCEDCY$528.70
1064ADD STEEL REINFORCEMENT TO L/I'S 45-49,
#4 TO #8 BARSTON$2,937.24
1065DOWELS SUPPLIED IN FORM EDGES OR
DRILLED INTO EXISTING CONCRETEEA$58.74
1066INSTALL CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, ISOLATED, LENGTHS UNDER 20 LFLF$42.30
1067INSTALL CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, CONTINUOUS, LENGTHS OVER 20 LFLF$30.54
1068CONSTRUCT NEW FIBER REINFORCED
CONCRETE SIDEWALK TO 400SFSF$6.76
1069CONSTRUCT NEW FIBER REINFORCED
CONCRETE SIDEWALK OVER 400SFSF$6.46
1070INSTALL SIDEWALK SPILLWAYEA$2,584.76
1071INSTALL ADA COMPLIANT HANDICAP CURB RAMP, INCLUDES FORMWORK,REINFORCEDEA$1,762.35
AIRFIELD FINISH WORK
CLINDESCRIPTIONUNIT OF ISSUENEW PRICE
1072SAWCUT WIDENING OF PORTLAND CEMENT
CONCRETE JOINT FOR JOINT SEALANTLF$5.82
1073CUT/WIDEN JOINTS IN ASPHALT FOR JOINT
SEALANTLF$3.89
1074INSTALL NEW HOT POUR JOINT SEALANT IN
ASPHALTIC CEMENT CONCRETE INCLUDES BACKERROD/BOND BREAKER; LESS THAN 10,000LFLF$2.84
1075INSTALL NEW HOT POUR JOINT SEALANT IN
ASPHALTIC CEMENT CONCRETE INCLUDES BACKERROD/BOND BREAKER; 10,000LF MINIMUMLF$2.65
1076INSTALL PREFORMED JOINT SEAL IN
CONCRETELF$14.23
1077INSTALL TOPSOIL TO 6" DEPTH; INCLUDES
SUPPLY, PLACE AND FINISH GRADESY$8.41
1078INSTALL HYDROSEED MIXSY$5.17
1079INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; UP TO 6" PIECESCY$77.54
1080NEW PAVEMENT MARKINGS, LOW VOC
SOLVENT BASED, 6" LINESLF$1.35
1081PAINT AIRFIELD MARKINGS OTHER THAN 6"
LINESSF$3.09
NON-AIRFIELD FINISH WORK
CLINDESCRIPTIONUNIT OF ISSUENEW PRICE
1082SAWCUT WIDENING OF PORTLAND CEMENT
CONCRETE JOINT FOR JOINT SEALANTLF$5.29
1083INSTALL PREFORMED JOINT SEAL IN
CONCRETELF$12.94
1084INSTALL TOPSOIL TO 6" DEPTH; INCLUDES
SUPPLY, PLACE AND FINISH GRADESY$7.64
1085INSTALL HYDROSEED MIXSY$4.70
1086INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; UP TO 6" PIECESCY$70.49
1087INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; 12"+ PIECESCY$82.25
1088NEW PAVEMENT MARKINGS, METHYL
METHACRYLATE, 4" LINESLF$1.44
1089NEW PAVEMENT MARKINGS, LOW VOC
SOLVENT BASED, 4" LINESLF$0.58
1090PAINT PAVEMENT MARKINGS, ARROWS,
ETC…SF$3.82
AIRFIELD MAINTENANCE
CLINDESCRIPTIONUNIT OF ISSUENEW PRICE
1091ROUT CRACKS IN ASPHALT FOR CRACK
SEALANT INSTALLATION; TO 10,000LFLF$1.48
1092ROUT CRACKS IN ASPHALT FOR CRACK
SEALANT INSTALLATION; OVER 10,000LFLF$1.43
1093HOT POUR ASPHALT CRACK SEALING; LESS
THAN 10,000 LFLF$1.68
1094HOT POUR ASPHALT CRACK SEALING 10,000
LF MINIMUMLF$1.61
1095ROUT CRACKS IN PORTLAND CEMENT
CONCRETE FOR CRACK SEALANT INSTALLATIONLF$5.17
1096INSTALL SILICONE JOINT SEALANT IN
CONCRETE JOINTS AND/OR CRACKSLF$5.17
AIRFIELD MISCELLANEOUS
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
1097CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSALCSF$64.61
1098INSTALL SAND FOR CONDUIT BEDDINGCY$116.31
1099INSTALL NEW CMP CULVERT, UP TO 12"
DIAMETERLF$48.72
1100INSTALL NEW CMP CULVERT, OVER 12" TO
24" DIALF$79.31
1101INSTALL NEW CMP CULVERT, OVER 24" TO
36" DIALF$116.31
1102INSTALL GEOTEXTILE FABRICSY$1.61
1103INSTALL PETROLEUM RESISTANT SEAL
COATSY$6.07
1104PERFORM PETROLEUM CONTAMINATED
SOIL TESTINGEA$1,033.91
1105REMOVE, HAUL & DISPOSE OF PETROLEUM
CONTAMINATED SOILCY$352.83
NON-AIRFIELD MISCELLANEOUS
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
1106CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSALCSF$58.74
1107INSTALL SAND FOR CONDUIT BEDDINGCY$105.74
1108INSTALL NEW CMP CULVERT, UP TO 12"
DIAMETERLF$44.29
1109INSTALL NEW CMP CULVERT, OVER 12" TO
24" DIALF$72.10
1110INSTALL NEW CMP CULVERT, OVER 24" TO
36" DIALF$105.74
1111INSTALL GEOTEXTILE FABRICSY$1.46
1112PERFORM PETROLEUM CONTAMINATED
SOIL TESTINGEA$939.92
1113REMOVE, HAUL & DISPOSE OF PETROLEUM
CONTAMINATED SOILCY$320.75
1114INSTALL 4 OUTLET HBO TO INCLUDE
WIRING, JUNCTION BOX(S), METER(S), CIRCUIT BREAKER PANEL, AND ASSOCIATED CIRCUIT BREAKER WORK INSTALL VANTERA, INC INTELLIGENT PARKING LOT CONTROLLER (ILPC) ON HBOEA$4,582.09
1115INSTALL 2" PVC ELECTRICAL CONDUITLF$21.15
TOTAL OPTION YEAR 1:
DEMOLITION OF AIRFIELD PAVEMENTS
CLINDESCRIPTIONUNIT OF ISSUEESTIMATED UNIT PRICE
2001SAWCUT NEW OR EXISTING ASPHALT,
EXCLUDES JOINT CUTTING/ WIDENINGIN-FT$0.40
2002SAWCUT NEW OR EXISTING PORTLAND
CEMENT CONCRETEIN-FT$1.00
2003REMOVE EXISTING ASPHALT TO 3" INCHES
THICK, HAULING OFF BASESY$4.00
2004REMOVE EXISTING ASPHALT OVER 3" TO 6"
THICK, HAULING OFF BASESY$4.26
2005REMOVE EXISTING ASPHALT OVER 6" THICK, HAULING OFF BASESY$4.92
2006COLD-MILLING OF ASPHALT TO 3" &
HAULING OFF BASESY$5.66
2007REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", ISOLATED AREAS

<400 SF, ON-BASE DISPOSALSY$59.91
2008REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", LARGE AREAS

>400SF, ON-BASE DISPOSALSY$26.62
2009ADDITIONAL REMOVAL COST FOR L/I'S 7-10
IF CONCRETE IS REINFORCEDSY$7.98
2010REMOVE MISCELLANEOUS CONCRETE,
UNREINFORCED, ON-BASE DISPOSALCY$39.93
2011ADDITIONAL REMOVAL COST FOR L/I 12 IF
CONCRETE IS REINFORCEDCY$13.30
2012REMOVE EXISTING CULVERT, TO 12"LF$15.98
2013REMOVE EXISTING CULVERT, OVER 12" TO
24"LF$33.28
2014REMOVE EXISTING CULVERT, OVER 24"LF$39.93
2015REMOVAL OF PAVEMENT MARKINGSSF$6.80
DEMOLITION OF NON-AIRFIELD PAVEMENTS
CLINDESCRIPTIONUNIT OF ISSUEESTIMATED UNIT PRICE
2016SAWCUT NEW OR EXISTING ASPHALT,
EXCLUDES JOINT CUTTING/ WIDENINGIN-FT$0.36
2017SAWCUT NEW OR EXISTING PORTLAND
CEMENT CONCRETEIN-FT$0.91
2018REMOVE EXISTING ASPHALT TO 3" INCHES
THICK, HAULING OFF BASESY$3.64
2019COLD-MILLING OF ASPHALT TO 2" &
HAULING OFF BASESY$5.15
2020REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", ISOLATED AREAS

<400 SF, ON-BASE DISPOSALSY$54.47
2021REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", LARGE AREAS

>400SF, ON-BASE DISPOSALSY$24.20
2022ADDITIONAL REMOVAL COST FOR L/I'S 7-10
IF CONCRETE IS REINFORCEDSY$7.26
2023REMOVE MISCELLANEOUS CONCRETE,
UNREINFORCEDCY$36.30
2024ADDITIONAL REMOVAL COST FOR L/I 12 IF
CONCRETE IS REINFORCEDCY$12.09
2025REMOVE CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, ISOLATED, LENGTHS UNDER 20 LFLF$13.32
2026REMOVE CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, CONTINUOUS, LENGTHS OVER 20 LFLF$4.66
2027REMOVE CONCRETE SIDEWALK; TO 400SFSF$3.87
2028REMOVE CONCRETE SIDEWALK; OVER 400SFSF$2.20
2029REMOVE EXISTING CULVERT, TO 12"LF$14.52
2030REMOVE EXISTING CULVERT, OVER 12" TO
24"LF$30.26
2031REMOVE EXISTING CULVERT, OVER 24"LF$36.30
2032REMOVAL OF PAVEMENT MARKINGSSF$6.19
AIRFIELD SITE PREPARATION
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
2033EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; INCLUDES HAULING & ON-BASE DISPOSAL < 3,000CYCY$15.14
2034EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; INCLUDES HAULING & ON-BASE DISPOSAL OVER 3,000CYCY$13.91
2035EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; STOCKPILE ONSITE TO BE REUSED < 3,000CYCY$11.38
2036EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; STOCKPILE ONSITE TO BE REUSED, OVER 3,000CYCY$10.59
2037REUSE EXISTING OR STOCKPILED ONSITE
SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO 100% DENSITY, < 3,000CYCY$14.52
2038REUSE EXISTING OR STOCKPILED ONSITE
SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO 100% DENSITY, OVER 3,000CYCY$12.09
2039SCARIFY, FINISH, GRADE & COMPACT
EXISTING BASE COURSE/SUBGRADE TO 100% DENSITY; TO 15,000SYSY$2.42
2040SCARIFY, FINISH, GRADE & COMPACT
EXISTING BASE COURSE/SUBGRADE TO 100% DENSITY; OVER 15,000SYSY$2.17
2041NEW SUBBASE, STRUCTURAL FILL,
INCLUDES SUPPLY, PLACE, GRADE & COMPACT TO 100% DENSITYCY$22.82
2042NEW BASE COUSE (HIGH FRACTURE D-1),
INCLUDES SUPPLY, PLACE, FINISH, GRADE & COMPACT TO 100% DENSITY TO 2500 CYCY$78.67
2043NEW BASE COUSE (HIGH FRACTURE D-1),
INCLUDES SUPPLY, PLACE, FINISH, GRADE & COMPACT TO 100% DENSITY OVER 2500 CYCY$74.42
NON-AIRFIELD SITE PREPARATION
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
2044EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; INCLUDES HAULING & ON-BASE DISPOSAL < 3,000CYCY$15.14
2045EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; STOCKPILE ONSITE TO BE REUSED < 3,000CYCY$11.38
2046REUSE EXISTING/ STOCKPILED ONSITE MAT'L AS
SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO 98% DENSITYCY$14.52
2047SCARIFY, FINISH GRADE & COMPACT
EXISTING BASE COURSE; TO 15,000 SYSY$1.51
2048NEW SUBBASE, STRUCTURAL FILL, INCLUDES SUPPLY, PLACE, GRADE & COMPACTCY$21.06
2049NEW SUBBASE, RECLAIMED ASPHALT FROM
BASE STOCKPILE; INC. PLACE, GRADE & COMPACT TO 98% DENSITYCY$18.75
2050NEW BASE COURSE(D-1), INCLUDES SUPPLY,
PLACE, FINISH GRADE & COMPACT TO 100%CY$72.61
2051NEW BASE COURSE(RECLAIMED ASPHALT
FROM BASE STOCKPILE, PLACE, FINISH GRADE & COMPACT TO 100%CY$47.26
2052PULVERIZE ASPHALT AND BASE COURSE IN
PLACE TO 6", INCLUDES REGRADE AND COMPACT TO 100%SY$2.92
AIRFIELD PAVING
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
2053NEW SBS MODIFIED ASPHALT INCLUDES
SUPPLY, PLACE, AND GRADE TO 2500 TONSTON$199.67
2054NEW SBS MODIFIED ASPHALT INCLUDES
SUPPLY, PLACE, AND GRADE OVER 2500 TONSTON$189.03
2055CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, ISOLATED AREAS UP TO 400SFCY$565.75
2056CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, LARGE AREAS, >400SFCY$350.10
2057INSTALL MISCELLANEOUS CONCRETE,
INCLUDES FORMWORK AND FINISHING, UNREINFORCEDCY$599.02
2058ADD STEEL REINFORCEMENT TO L/I'S 45-49,
#4 TO #8 BARSTON$3,327.89
2059DOWELS SUPPLIED IN FORM EDGES OR
DRILLED INTO EXISTING CONCRETEEA$66.55
NON-AIRFIELD PAVING
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
2060NEW ASPHALT PAVEMENT, INCLUDES
SURFACE PREP AND COMPACTION.TON$141.60
2061CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, ISOLATED AREAS UP TO 400SFCY$514.31
2062CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, LARGE AREAS, >400SFCY$423.55
2063INSTALL MISCELLANEOUS CONCRETE,
INCLUDES FORMWORK AND FINISHING, UNREINFORCEDCY$544.56
2064ADD STEEL REINFORCEMENT TO L/I'S 45-49,
#4 TO #8 BARSTON$3,025.36
2065DOWELS SUPPLIED IN FORM EDGES OR
DRILLED INTO EXISTING CONCRETEEA$60.50
2066INSTALL CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, ISOLATED, LENGTHS UNDER 20 LFLF$43.57
2067INSTALL CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, CONTINUOUS, LENGTHS OVER 20 LFLF$31.46
2068CONSTRUCT NEW FIBER REINFORCED
CONCRETE SIDEWALK TO 400SFSF$6.96
2069CONSTRUCT NEW FIBER REINFORCED
CONCRETE SIDEWALK OVER 400SFSF$6.65
2070INSTALL SIDEWALK SPILLWAYEA$2,662.31
2071INSTALL ADA COMPLIANT HANDICAP CURB RAMP, INCLUDES FORMWORK,REINFORCEDEA$1,815.22
AIRFIELD FINISH WORK
CLINDESCRIPTIONUNIT OF ISSUENEW PRICE
2072SAWCUT WIDENING OF PORTLAND CEMENT
CONCRETE JOINT FOR JOINT SEALANTLF$6.00
2073CUT/WIDEN JOINTS IN ASPHALT FOR JOINT
SEALANTLF$4.00
2074INSTALL NEW HOT POUR JOINT SEALANT IN
ASPHALTIC CEMENT CONCRETE INCLUDES BACKERROD/BOND BREAKER; LESS THAN 10,000LFLF$2.93
2075INSTALL NEW HOT POUR JOINT SEALANT IN
ASPHALTIC CEMENT CONCRETE INCLUDES BACKERROD/BOND BREAKER; 10,000LF MINIMUMLF$2.73
2076INSTALL PREFORMED JOINT SEAL IN
CONCRETELF$14.66
2077INSTALL TOPSOIL TO 6" DEPTH; INCLUDES
SUPPLY, PLACE AND FINISH GRADESY$8.66
2078INSTALL HYDROSEED MIXSY$5.32
2079INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; UP TO 6" PIECESCY$79.87
2080NEW PAVEMENT MARKINGS, LOW VOC
SOLVENT BASED, 6" LINESLF$1.39
2081PAINT AIRFIELD MARKINGS OTHER THAN 6"
LINESSF$3.19
NON-AIRFIELD FINISH WORK
CLINDESCRIPTIONUNIT OF ISSUENEW PRICE
2082SAWCUT WIDENING OF PORTLAND CEMENT
CONCRETE JOINT FOR JOINT SEALANTLF$5.45
2083INSTALL PREFORMED JOINT SEAL IN
CONCRETELF$13.32
2084INSTALL TOPSOIL TO 6" DEPTH; INCLUDES
SUPPLY, PLACE AND FINISH GRADESY$7.87
2085INSTALL HYDROSEED MIXSY$4.84
2086INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; UP TO 6" PIECESCY$72.61
2087INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; 12"+ PIECESCY$84.71
2088NEW PAVEMENT MARKINGS, METHYL
METHACRYLATE, 4" LINESLF$1.49
2089NEW PAVEMENT MARKINGS, LOW VOC
SOLVENT BASED, 4" LINESLF$0.59
2090PAINT PAVEMENT MARKINGS, ARROWS,
ETC…SF$3.94
AIRFIELD MAINTENANCE
CLINDESCRIPTIONUNIT OF ISSUENEW PRICE
2091ROUT CRACKS IN ASPHALT FOR CRACK
SEALANT INSTALLATION; TO 10,000LFLF$1.53
2092ROUT CRACKS IN ASPHALT FOR CRACK
SEALANT INSTALLATION; OVER 10,000LFLF$1.47
2093HOT POUR ASPHALT CRACK SEALING; LESS
THAN 10,000 LFLF$1.73
2094HOT POUR ASPHALT CRACK SEALING 10,000
LF MINIMUMLF$1.66
2095ROUT CRACKS IN PORTLAND CEMENT
CONCRETE FOR CRACK SEALANT INSTALLATIONLF$5.32
2096INSTALL SILICONE JOINT SEALANT IN
CONCRETE JOINTS AND/OR CRACKSLF$5.32
AIRFIELD MISCELLANEOUS
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
2097CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSALCSF$66.55
2098INSTALL SAND FOR CONDUIT BEDDINGCY$119.80
2099INSTALL NEW CMP CULVERT, UP TO 12"
DIAMETERLF$50.18
2100INSTALL NEW CMP CULVERT, OVER 12" TO
24" DIALF$81.69
2101INSTALL NEW CMP CULVERT, OVER 24" TO
36" DIALF$119.80
2102INSTALL GEOTEXTILE FABRICSY$1.66
2103INSTALL PETROLEUM RESISTANT SEAL
COATSY$6.26
2104PERFORM PETROLEUM CONTAMINATED
SOIL TESTINGEA$1,064.93
2105REMOVE, HAUL & DISPOSE OF PETROLEUM
CONTAMINATED SOILCY$363.41
NON-AIRFIELD MISCELLANEOUS
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
2106CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSALCSF$60.50
2107INSTALL SAND FOR CONDUIT BEDDINGCY$108.91
2108INSTALL NEW CMP CULVERT, UP TO 12"
DIAMETERLF$45.62
2109INSTALL NEW CMP CULVERT, OVER 12" TO
24" DIALF$74.26
2110INSTALL NEW CMP CULVERT, OVER 24" TO
36" DIALF$108.91
2111INSTALL GEOTEXTILE FABRICSY$1.51
2112PERFORM PETROLEUM CONTAMINATED
SOIL TESTINGEA$968.11
2113REMOVE, HAUL & DISPOSE OF PETROLEUM
CONTAMINATED SOILCY$330.37
2114INSTALL 4 OUTLET HBO TO INCLUDE
WIRING, JUNCTION BOX(S), METER(S), CIRCUIT BREAKER PANEL, AND ASSOCIATED CIRCUIT BREAKER WORK INSTALL VANTERA, INC INTELLIGENT PARKING LOT CONTROLLER (ILPC) ON HBOEA$4,719.55
2115INSTALL 2" PVC ELECTRICAL CONDUITLF$21.78
TOTAL OPTION YEAR 2:
DEMOLITION OF AIRFIELD PAVEMENTS
CLINDESCRIPTIONUNIT OF ISSUEESTIMATED UNIT PRICE
3001SAWCUT NEW OR EXISTING ASPHALT,
EXCLUDES JOINT CUTTING/ WIDENINGIN-FT$0.41
3002SAWCUT NEW OR EXISTING PORTLAND
CEMENT CONCRETEIN-FT$1.03
3003REMOVE EXISTING ASPHALT TO 3" INCHES
THICK, HAULING OFF BASESY$4.12
3004REMOVE EXISTING ASPHALT OVER 3" TO 6"
THICK, HAULING OFF BASESY$4.39
3005REMOVE EXISTING ASPHALT OVER 6" THICK, HAULING OFF BASESY$5.07
3006COLD-MILLING OF ASPHALT TO 3" &
HAULING OFF BASESY$5.83
3007REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", ISOLATED AREAS

<400 SF, ON-BASE DISPOSALSY$61.71
3008REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", LARGE AREAS

>400SF, ON-BASE DISPOSALSY$27.42
3009ADDITIONAL REMOVAL COST FOR L/I'S 7-10
IF CONCRETE IS REINFORCEDSY$8.22
3010REMOVE MISCELLANEOUS CONCRETE,
UNREINFORCED, ON-BASE DISPOSALCY$41.13
3011ADDITIONAL REMOVAL COST FOR L/I 12 IF
CONCRETE IS REINFORCEDCY$13.70
3012REMOVE EXISTING CULVERT, TO 12"LF$16.46
3013REMOVE EXISTING CULVERT, OVER 12" TO
24"LF$34.28
3014REMOVE EXISTING CULVERT, OVER 24"LF$41.13
3015REMOVAL OF PAVEMENT MARKINGSSF$7.01
DEMOLITION OF NON-AIRFIELD PAVEMENTS
CLINDESCRIPTIONUNIT OF ISSUEESTIMATED UNIT PRICE
3016SAWCUT NEW OR EXISTING ASPHALT,
EXCLUDES JOINT CUTTING/ WIDENINGIN-FT$0.37
3017SAWCUT NEW OR EXISTING PORTLAND
CEMENT CONCRETEIN-FT$0.94
3018REMOVE EXISTING ASPHALT TO 3" INCHES
THICK, HAULING OFF BASESY$3.75
3019COLD-MILLING OF ASPHALT TO 2" &
HAULING OFF BASESY$5.30
3020REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", ISOLATED AREAS

<400 SF, ON-BASE DISPOSALSY$56.10
3021REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", LARGE AREAS

>400SF, ON-BASE DISPOSALSY$24.93
3022ADDITIONAL REMOVAL COST FOR L/I'S 7-10
IF CONCRETE IS REINFORCEDSY$7.47
3023REMOVE MISCELLANEOUS CONCRETE,
UNREINFORCEDCY$37.39
3024ADDITIONAL REMOVAL COST FOR L/I 12 IF
CONCRETE IS REINFORCEDCY$12.46
3025REMOVE CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, ISOLATED, LENGTHS UNDER 20 LFLF$13.72
3026REMOVE CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, CONTINUOUS, LENGTHS OVER 20 LFLF$4.80
3027REMOVE CONCRETE SIDEWALK; TO 400SFSF$3.99
3028REMOVE CONCRETE SIDEWALK; OVER 400SFSF$2.26
3029REMOVE EXISTING CULVERT, TO 12"LF$14.96
3030REMOVE EXISTING CULVERT, OVER 12" TO 24"LF$31.16
3031REMOVE EXISTING CULVERT, OVER 24"LF$37.39
3032REMOVAL OF PAVEMENT MARKINGSSF$6.37
AIRFIELD SITE PREPARATION
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
3033EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; INCLUDES HAULING & ON-BASE DISPOSAL < 3,000CYCY$15.59
3034EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; INCLUDES HAULING & ON-BASE DISPOSAL OVER 3,000CYCY$14.33
3035EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; STOCKPILE ONSITE TO BE REUSED < 3,000CYCY$11.72
3036EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; STOCKPILE ONSITE TO BE REUSED, OVER 3,000CYCY$10.91
3037REUSE EXISTING OR STOCKPILED ONSITE
SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO 100% DENSITY, < 3,000CYCY$14.96
3038REUSE EXISTING OR STOCKPILED ONSITE
SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO 100% DENSITY, OVER 3,000CYCY$12.46
3039SCARIFY, FINISH, GRADE & COMPACT
EXISTING BASE COURSE/SUBGRADE TO 100% DENSITY; TO 15,000SYSY$2.49
3040SCARIFY, FINISH, GRADE & COMPACT
EXISTING BASE COURSE/SUBGRADE TO 100% DENSITY; OVER 15,000SYSY$2.24
3041NEW SUBBASE, STRUCTURAL FILL,
INCLUDES SUPPLY, PLACE, GRADE & COMPACT TO 100% DENSITYCY$23.50
3042NEW BASE COUSE (HIGH FRACTURE D-1),
INCLUDES SUPPLY, PLACE, FINISH, GRADE & COMPACT TO 100% DENSITY TO 2500 CYCY$81.03
3043NEW BASE COUSE (HIGH FRACTURE D-1),
INCLUDES SUPPLY, PLACE, FINISH, GRADE & COMPACT TO 100% DENSITY OVER 2500 CYCY$76.65
NON-AIRFIELD SITE PREPARATION
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
3044EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; INCLUDES HAULING & ON-BASE DISPOSAL < 3,000CYCY$15.59
3045EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; STOCKPILE ONSITE TO BE REUSED < 3,000CYCY$11.72
3046REUSE EXISTING/ STOCKPILED ONSITE MAT'L AS
SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO 98% DENSITYCY$14.96
3047SCARIFY, FINISH GRADE & COMPACT
EXISTING BASE COURSE; TO 15,000 SYSY$1.55
3048NEW SUBBASE, STRUCTURAL FILL, INCLUDES SUPPLY, PLACE, GRADE & COMPACTCY$21.69
3049NEW SUBBASE, RECLAIMED ASPHALT FROM
BASE STOCKPILE; INC. PLACE, GRADE & COMPACT TO 98% DENSITYCY$19.31
3050NEW BASE COURSE(D-1), INCLUDES SUPPLY,
PLACE, FINISH GRADE & COMPACT TO 100%CY$74.79
3051NEW BASE COURSE(RECLAIMED ASPHALT
FROM BASE STOCKPILE, PLACE, FINISH GRADE & COMPACT TO 100%CY$48.68
3052PULVERIZE ASPHALT AND BASE COURSE IN
PLACE TO 6", INCLUDES REGRADE AND COMPACT TO 100%SY$3.00
AIRFIELD PAVING
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
3053NEW SBS MODIFIED ASPHALT INCLUDES
SUPPLY, PLACE, AND GRADE TO 2500 TONSTON$205.66
3054NEW SBS MODIFIED ASPHALT INCLUDES
SUPPLY, PLACE, AND GRADE OVER 2500 TONSTON$194.70
3055CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, ISOLATED AREAS UP TO 400SFCY$582.72
3056CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, LARGE AREAS, >400SFCY$360.60
3057INSTALL MISCELLANEOUS CONCRETE,
INCLUDES FORMWORK AND FINISHING, UNREINFORCEDCY$616.99
3058ADD STEEL REINFORCEMENT TO L/I'S 45-49,
#4 TO #8 BARSTON$3,427.73
3059DOWELS SUPPLIED IN FORM EDGES OR
DRILLED INTO EXISTING CONCRETEEA$68.55
NON-AIRFIELD PAVING
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
3060NEW ASPHALT PAVEMENT, INCLUDES
SURFACE PREP AND COMPACTION.TON$145.85
3061CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, ISOLATED AREAS UP TO 400SFCY$529.74
3062CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, LARGE AREAS, >400SFCY$436.26
3063INSTALL MISCELLANEOUS CONCRETE,
INCLUDES FORMWORK AND FINISHING, UNREINFORCEDCY$560.90
3064ADD STEEL REINFORCEMENT TO L/I'S 45-49,
#4 TO #8 BARSTON$3,116.12
3065DOWELS SUPPLIED IN FORM EDGES OR
DRILLED INTO EXISTING CONCRETEEA$62.32
3066INSTALL CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, ISOLATED, LENGTHS UNDER 20 LFLF$44.88
3067INSTALL CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, CONTINUOUS, LENGTHS OVER 20 LFLF$32.40
3068CONSTRUCT NEW FIBER REINFORCED
CONCRETE SIDEWALK TO 400SFSF$7.17
3069CONSTRUCT NEW FIBER REINFORCED
CONCRETE SIDEWALK OVER 400SFSF$6.85
3070INSTALL SIDEWALK SPILLWAYEA$2,742.18
3071INSTALL ADA COMPLIANT HANDICAP CURB RAMP, INCLUDES FORMWORK,REINFORCEDEA$1,869.68
AIRFIELD FINISH WORK
CLINDESCRIPTIONUNIT OF ISSUENEW PRICE
3072SAWCUT WIDENING OF PORTLAND CEMENT
CONCRETE JOINT FOR JOINT SEALANTLF$6.18
3073CUT/WIDEN JOINTS IN ASPHALT FOR JOINT
SEALANTLF$4.12
3074INSTALL NEW HOT POUR JOINT SEALANT IN
ASPHALTIC CEMENT CONCRETE INCLUDES BACKERROD/BOND BREAKER; LESS THAN 10,000LFLF$3.02
3075INSTALL NEW HOT POUR JOINT SEALANT IN
ASPHALTIC CEMENT CONCRETE INCLUDES BACKERROD/BOND BREAKER; 10,000LF MINIMUMLF$2.81
3076INSTALL PREFORMED JOINT SEAL IN
CONCRETELF$15.10
3077INSTALL TOPSOIL TO 6" DEPTH; INCLUDES
SUPPLY, PLACE AND FINISH GRADESY$8.92
3078INSTALL HYDROSEED MIXSY$5.48
3079INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; UP TO 6" PIECESCY$82.26
3080NEW PAVEMENT MARKINGS, LOW VOC
SOLVENT BASED, 6" LINESLF$1.43
3081PAINT AIRFIELD MARKINGS OTHER THAN 6"
LINESSF$3.28
NON-AIRFIELD FINISH WORK
CLINDESCRIPTIONUNIT OF ISSUENEW PRICE
3082SAWCUT WIDENING OF PORTLAND CEMENT
CONCRETE JOINT FOR JOINT SEALANTLF$5.62
3083INSTALL PREFORMED JOINT SEAL IN
CONCRETELF$13.72
3084INSTALL TOPSOIL TO 6" DEPTH; INCLUDES
SUPPLY, PLACE AND FINISH GRADESY$8.11
3085INSTALL HYDROSEED MIXSY$4.98
3086INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; UP TO 6" PIECESCY$74.79
3087INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; 12"+ PIECESCY$87.25
3088NEW PAVEMENT MARKINGS, METHYL
METHACRYLATE, 4" LINESLF$1.53
3089NEW PAVEMENT MARKINGS, LOW VOC
SOLVENT BASED, 4" LINESLF$0.61
3090PAINT PAVEMENT MARKINGS, ARROWS,
ETC…SF$4.05
AIRFIELD MAINTENANCE
CLINDESCRIPTIONUNIT OF ISSUENEW PRICE
3091ROUT CRACKS IN ASPHALT FOR CRACK
SEALANT INSTALLATION; TO 10,000LFLF$1.57
3092ROUT CRACKS IN ASPHALT FOR CRACK
SEALANT INSTALLATION; OVER 10,000LFLF$1.51
3093HOT POUR ASPHALT CRACK SEALING; LESS
THAN 10,000 LFLF$1.78
3094HOT POUR ASPHALT CRACK SEALING 10,000
LF MINIMUMLF$1.71
3095ROUT CRACKS IN PORTLAND CEMENT
CONCRETE FOR CRACK SEALANT INSTALLATIONLF$5.48
3096INSTALL SILICONE JOINT SEALANT IN
CONCRETE JOINTS AND/OR CRACKSLF$5.48
AIRFIELD MISCELLANEOUS
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
3097CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSALCSF$68.55
3098INSTALL SAND FOR CONDUIT BEDDINGCY$123.40
3099INSTALL NEW CMP CULVERT, UP TO 12"
DIAMETERLF$51.69
3100INSTALL NEW CMP CULVERT, OVER 12" TO
24" DIALF$84.14
3101INSTALL NEW CMP CULVERT, OVER 24" TO
36" DIALF$123.40
3102INSTALL GEOTEXTILE FABRICSY$1.71
3103INSTALL PETROLEUM RESISTANT SEAL
COATSY$6.44
3104PERFORM PETROLEUM CONTAMINATED
SOIL TESTINGEA$1,096.87
3105REMOVE, HAUL & DISPOSE OF PETROLEUM
CONTAMINATED SOILCY$374.31
NON-AIRFIELD MISCELLANEOUS
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
3106CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSALCSF$62.32
3107INSTALL SAND FOR CONDUIT BEDDINGCY$112.18
3108INSTALL NEW CMP CULVERT, UP TO 12"
DIAMETERLF$46.99
3109INSTALL NEW CMP CULVERT, OVER 12" TO
24" DIALF$76.49
3110INSTALL NEW CMP CULVERT, OVER 24" TO
36" DIALF$112.18
3111INSTALL GEOTEXTILE FABRICSY$1.55
3112PERFORM PETROLEUM CONTAMINATED
SOIL TESTINGEA$997.16
3113REMOVE, HAUL & DISPOSE OF PETROLEUM
CONTAMINATED SOILCY$340.29
3114INSTALL 4 OUTLET HBO TO INCLUDE
WIRING, JUNCTION BOX(S), METER(S), CIRCUIT BREAKER PANEL, AND ASSOCIATED CIRCUIT BREAKER WORK INSTALL VANTERA, INC INTELLIGENT PARKING LOT CONTROLLER (ILPC) ON HBOEA$4,861.14
3115INSTALL 2" PVC ELECTRICAL CONDUITLF$22.43
TOTAL OPTION YEAR 3:
DEMOLITION OF AIRFIELD PAVEMENTS
CLINDESCRIPTIONUNIT OF ISSUEESTIMATED UNIT PRICE
4001SAWCUT NEW OR EXISTING ASPHALT,
EXCLUDES JOINT CUTTING/ WIDENINGIN-FT$0.42
4002SAWCUT NEW OR EXISTING PORTLAND
CEMENT CONCRETEIN-FT$1.06
4003REMOVE EXISTING ASPHALT TO 3" INCHES
THICK, HAULING OFF BASESY$4.25
4004REMOVE EXISTING ASPHALT OVER 3" TO 6"
THICK, HAULING OFF BASESY$4.52
4005REMOVE EXISTING ASPHALT OVER 6" THICK, HAULING OFF BASESY$5.22
4006COLD-MILLING OF ASPHALT TO 3" &
HAULING OFF BASESY$6.00
4007REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", ISOLATED AREAS

<400 SF, ON-BASE DISPOSALSY$63.56
4008REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", LARGE AREAS

>400SF, ON-BASE DISPOSALSY$28.24
4009ADDITIONAL REMOVAL COST FOR L/I'S 7-10
IF CONCRETE IS REINFORCEDSY$8.47
4010REMOVE MISCELLANEOUS CONCRETE,
UNREINFORCED, ON-BASE DISPOSALCY$42.37
4011ADDITIONAL REMOVAL COST FOR L/I 12 IF
CONCRETE IS REINFORCEDCY$14.11
4012REMOVE EXISTING CULVERT, TO 12"LF$16.95
4013REMOVE EXISTING CULVERT, OVER 12" TO 24"LF$35.31
4014REMOVE EXISTING CULVERT, OVER 24"LF$42.37
4015REMOVAL OF PAVEMENT MARKINGSSF$7.22
DEMOLITION OF NON-AIRFIELD PAVEMENTS
CLINDESCRIPTIONUNIT OF ISSUEESTIMATED UNIT PRICE
4016SAWCUT NEW OR EXISTING ASPHALT,
EXCLUDES JOINT CUTTING/ WIDENINGIN-FT$0.38
4017SAWCUT NEW OR EXISTING PORTLAND
CEMENT CONCRETEIN-FT$0.97
4018REMOVE EXISTING ASPHALT TO 3" INCHES
THICK, HAULING OFF BASESY$3.86
4019COLD-MILLING OF ASPHALT TO 2" &
HAULING OFF BASESY$5.46
4020REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", ISOLATED AREAS

<400 SF, ON-BASE DISPOSALSY$57.78
4021REMOVE EXISTING CONCRETE SLABS-

UNREINFORCED, OVER 6", LARGE AREAS

>400SF, ON-BASE DISPOSALSY$25.67
4022ADDITIONAL REMOVAL COST FOR L/I'S 7-10
IF CONCRETE IS REINFORCEDSY$7.70
4023REMOVE MISCELLANEOUS CONCRETE,
UNREINFORCEDCY$38.51
4024ADDITIONAL REMOVAL COST FOR L/I 12 IF
CONCRETE IS REINFORCEDCY$12.83
4025REMOVE CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, ISOLATED, LENGTHS UNDER 20 LFLF$14.14
4026REMOVE CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, CONTINUOUS, LENGTHS OVER 20 LFLF$4.94
4027REMOVE CONCRETE SIDEWALK; TO 400SFSF$4.11
4028REMOVE CONCRETE SIDEWALK; OVER 400SFSF$2.33
4029REMOVE EXISTING CULVERT, TO 12"LF$15.41
4030REMOVE EXISTING CULVERT, OVER 12" TO 24"LF$32.10
4031REMOVE EXISTING CULVERT, OVER 24"LF$38.51
4032REMOVAL OF PAVEMENT MARKINGSSF$6.56
AIRFIELD SITE PREPARATION
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
4033EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; INCLUDES HAULING & ON-BASE DISPOSAL < 3,000CYCY$16.06
4034EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; INCLUDES HAULING & ON-BASE DISPOSAL OVER 3,000CYCY$14.76
4035EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; STOCKPILE ONSITE TO BE REUSED < 3,000CYCY$12.08
4036EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; STOCKPILE ONSITE TO BE REUSED, OVER 3,000CYCY$11.23
4037REUSE EXISTING OR STOCKPILED ONSITE
SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO 100% DENSITY, < 3,000CYCY$15.41
4038REUSE EXISTING OR STOCKPILED ONSITE
SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO 100% DENSITY, OVER 3,000CYCY$12.83
4039SCARIFY, FINISH, GRADE & COMPACT
EXISTING BASE COURSE/SUBGRADE TO 100% DENSITY; TO 15,000SYSY$2.57
4040SCARIFY, FINISH, GRADE & COMPACT
EXISTING BASE COURSE/SUBGRADE TO 100% DENSITY; OVER 15,000SYSY$2.31
4041NEW SUBBASE, STRUCTURAL FILL,
INCLUDES SUPPLY, PLACE, GRADE & COMPACT TO 100% DENSITYCY$24.21
4042NEW BASE COUSE (HIGH FRACTURE D-1),
INCLUDES SUPPLY, PLACE, FINISH, GRADE & COMPACT TO 100% DENSITY TO 2500 CYCY$83.46
4043NEW BASE COUSE (HIGH FRACTURE D-1),
INCLUDES SUPPLY, PLACE, FINISH, GRADE & COMPACT TO 100% DENSITY OVER 2500 CYCY$78.95
NON-AIRFIELD SITE PREPARATION
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
4044EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; INCLUDES HAULING & ON-BASE DISPOSAL < 3,000CYCY$16.06
4045EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; STOCKPILE ONSITE TO BE REUSED < 3,000CYCY$12.08
4046REUSE EXISTING/ STOCKPILED ONSITE MAT'L AS
SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO 98% DENSITYCY$15.41
4047SCARIFY, FINISH GRADE & COMPACT
EXISTING BASE COURSE; TO 15,000 SYSY$1.60
4048NEW SUBBASE, STRUCTURAL FILL, INCLUDES SUPPLY, PLACE, GRADE & COMPACTCY$22.34
4049NEW SUBBASE, RECLAIMED ASPHALT FROM
BASE STOCKPILE; INC. PLACE, GRADE & COMPACT TO 98% DENSITYCY$19.89
4050NEW BASE COURSE(D-1), INCLUDES SUPPLY,
PLACE, FINISH GRADE & COMPACT TO 100%CY$77.03
4051NEW BASE COURSE(RECLAIMED ASPHALT
FROM BASE STOCKPILE, PLACE, FINISH GRADE & COMPACT TO 100%CY$50.14
4052PULVERIZE ASPHALT AND BASE COURSE IN
PLACE TO 6", INCLUDES REGRADE AND COMPACT TO 100%SY$3.10
AIRFIELD PAVING
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
4053NEW SBS MODIFIED ASPHALT INCLUDES
SUPPLY, PLACE, AND GRADE TO 2500 TONSTON$211.83
4054NEW SBS MODIFIED ASPHALT INCLUDES
SUPPLY, PLACE, AND GRADE OVER 2500 TONSTON$200.54
4055CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, ISOLATED AREAS UP TO 400SFCY$600.20
4056CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, LARGE AREAS, >400SFCY$371.42
4057INSTALL MISCELLANEOUS CONCRETE,
INCLUDES FORMWORK AND FINISHING, UNREINFORCEDCY$635.50
4058ADD STEEL REINFORCEMENT TO L/I'S 45-49,
#4 TO #8 BARSTON$3,530.56
4059DOWELS SUPPLIED IN FORM EDGES OR
DRILLED INTO EXISTING CONCRETEEA$70.61
NON-AIRFIELD PAVING
CLINDESCRIPTIONUNIT OF
ISSUENEW PRICE
4060NEW ASPHALT PAVEMENT, INCLUDES
SURFACE PREP AND COMPACTION.TON$150.22
4061CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, ISOLATED AREAS UP TO 400SFCY$545.64
4062CONSTRUCT CONCRETE SLABS-
UNREINFORCED, OVER 6" THICK, LARGE AREAS, >400SFCY$449.35
4063INSTALL MISCELLANEOUS CONCRETE,
INCLUDES FORMWORK AND FINISHING, UNREINFORCEDCY$577.72
4064ADD STEEL REINFORCEMENT TO L/I'S 45-49,
#4 TO #8 BARSTON$3,209.60
4065DOWELS SUPPLIED IN FORM EDGES OR
DRILLED INTO EXISTING CONCRETEEA$64.19
4066INSTALL CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, ISOLATED, LENGTHS UNDER 20 LFLF$46.22
4067INSTALL CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, CONTINUOUS, LENGTHS OVER 20 LFLF$33.37
4068CONSTRUCT NEW FIBER REINFORCED
CONCRETE SIDEWALK TO 400SFSF$7.38
4069CONSTRUCT NEW FIBER REINFORCED
CONCRETE SIDEWALK OVER 400SFSF$7.06
4070INSTALL SIDEWALK SPILLWAYEA$2,824.44
4071INSTALL ADA COMPLIANT HANDICAP CURB RAMP, INCLUDES FORMWORK,REINFORCEDEA$1,925.77
AIRFIELD FINISH WORK
CLINDESCRIPTIONUNIT OF ISSUENEW PRICE
4072SAWCUT WIDENING OF PORTLAND CEMENT
CONCRETE JOINT FOR JOINT SEALANTLF$6.36
4073CUT/WIDEN JOINTS IN ASPHALT FOR JOINT
SEALANTLF$4.25
4074INSTALL NEW HOT POUR JOINT SEALANT IN
ASPHALTIC CEMENT CONCRETE INCLUDES BACKERROD/BOND BREAKER; LESS THAN 10,000LFLF$3.11
4075INSTALL NEW HOT POUR JOINT SEALANT IN
ASPHALTIC CEMENT CONCRETE INCLUDES BACKERROD/BOND BREAKER; 10,000LF MINIMUMLF$2.90
4076INSTALL PREFORMED JOINT SEAL IN CONCRETELF$15.55
4077INSTALL TOPSOIL TO 6" DEPTH; INCLUDES
SUPPLY, PLACE AND FINISH GRADESY$9.19
4078INSTALL HYDROSEED MIXSY$5.65
4079INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; UP TO 6" PIECESCY$84.73
4080NEW PAVEMENT MARKINGS, LOW VOC
SOLVENT BASED, 6" LINESLF$1.47
4081PAINT AIRFIELD MARKINGS OTHER THAN 6"
LINESSF$3.38
NON-AIRFIELD FINISH WORK
CLINDESCRIPTIONUNIT OF ISSUENEW PRICE
4082SAWCUT WIDENING OF PORTLAND CEMENT
CONCRETE JOINT FOR JOINT SEALANTLF$5.79
4083INSTALL PREFORMED JOINT SEAL IN
CONCRETELF$14.14
4084INSTALL TOPSOIL TO 6" DEPTH; INCLUDES
SUPPLY, PLACE AND FINISH GRADESY$8.35
4085INSTALL HYDROSEED MIXSY$5.13
4086INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; UP TO 6" PIECESCY$77.03
4087INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; 12"+ PIECESCY$89.87
4088NEW PAVEMENT MARKINGS, METHYL
METHACRYLATE, 4" LINESLF$1.58