Text version
Environmental Concerns for Construction, Demolition and Renovation Projects
1. Restoration Sites:
2. Storm Water
3. Excavation De-Watering:
4. Temporary Water Use:
5. Wastewater:
6. Backflow Prevention:
7. Hazardous Waste/Material:
8. Spills :
9. Solid Waste :
10. Air Quality Issues :
11. Fuel Storage Tanks :
12. Natural Resources:
13. Cultural Resources:
APPENDIX A
HANDLING / MANAGEMENT OF CONTAMINATED SOIL
BACKFLOW ASSEMBLY TEST/AG INSPECTION REPORT
RPBA/RPBA
DCVA/DCDA
PVBA/SVBA
United States Army, Alaska, Pamphlet 200-1 - FINAL Page 1 May 2000
Appendix C – Page C1
8.0 PACKAGING
This section describes selecting, reusing, filling, and managing hazardous materials/regulated waste containers.
8.1 SELECTING A SUITABLE CONTAINER
A variety of containers, from 1-gallon to 110-gallon overpack drums, boxes, plastic totes, and bags, may be used to package hazardous materials/regulated waste.
Choice of container depends on the:
Type of waste material Quantity of waste
For storing hazardous materials/regulated waste, containers must be:
a. In good condition. The container must not be leaking, rusted (i.e., more than minor surface rust), corroded, dented more than 2 inches, or have non-working filler caps/bungs and/or other sealing devices, any bulges, grooves (other than removed metal), dents in seams/corrugations, or be deteriorated in any other way. If a container leaks or is not in good condition, the contents must be transferred to another container that meets all standards, or be placed in an overpack. Any overpack must be filled with absorbent capable of soaking up liquid, as a precaution against leaks within the overpack.
b. Made of a compatible material. The container must be made of a material that will not react or deteriorate when in contact with the material or waste. For example, acids, such as battery acid, cannot be placed in a steel drum because acid will corrode the drum and cause it to leak.
c. Securely closed. All containers used to store hazardous materials/regulated waste (except trash) must have a cover or lid and must close and seal tightly enough to prevent spills, including release of fumes. Storing wastes in open buckets is not allowed.
Containers must be tightly closed (more than finger tight) after every use. Special funnels that are designed not to leak if the container is overturned, and not to allow fumes to escape, are required if the funnel remains attached to the waste container. Open-head containers must not be used for any liquids, unless pre-approved by PWE.
d. In compliance with DOT requirements. All containers used to store hazardous materials or regulated waste on post must meet DOT-specified packaging requirements (Performance-Oriented Packaging). If a package has the symbol shown below on it, it is a DOT-approved package.
United States Army, Alaska, Pamphlet 200-1 - FINAL Page 2
Appendix C – Page C2 u Followed by a series of numbers or letters n
If in doubt about the suitability of any hazardous materials or regulated waste container, call
PWE.
Drums that are 85-gallons or larger are overpack containers for leaking drums, and are not for general use.
8.2 REUSING CONTAINERS
Empty containers can be reused for storing waste, provided the material remaining in the container:
a. Is compatible with the new waste material. For example, used oil can be placed in a drum previously used for diesel fuel. However, it cannot be placed in a drum that previously contained sodium hydroxide or hydrochloric acid (see Section 7 for information on chemical compatabilities).
b. Will not contaminate the waste. For example, solvents will contaminate used oil such that it cannot be burned for energy recovery.
Disposal of empty containers is discussed in Section 5.
8.3 FILLING CONTAINERS
The key steps in filling containers are:
a. Follow proper personal safety measures. Always use proper PPE and safety equipment. This information is provided in the site-specific SOPs and MSDSs.
b. Do not overfill containers. Allow sufficient headspace for expansion of contents.
Generally, a container is considered full when it is 97% filled (e.g., 3 to 4 inches from the top of a 55-gallon drum; 1 to 2 inches from the top of a 5-gallon container; 1-inch from the top of a 1-gallon can). The maximum allowable weight for an open-top drum is 400 kilograms (800 pounds).
c. Avoid spills. When filling containers with liquids, be careful to avoid spills. Place absorbent materials around or under a container prior to filling. Use funnels to transfer liquids. Watch the liquid level in the container carefully and do not leave containers unattended when filling (i.e., do not start a transfer pump and then leave the area).
d. Clean up any spills immediately. If spillage occurs, the spilled material must be cleaned up immediately and packaged for disposal (see Section 16 for spill information).
United States Army, Alaska, Pamphlet 200-1 - FINAL Page 3
Appendix C – Page C3
8.4 MANAGING CONTAINERS
All containers must be immediately marked and labeled (see Section 10) and placed in an approved storage area (see Section 9), where they must remain until pick-up for disposal.
10.0 LABELING AND MARKING
Hazardous materials and regulated waste must be properly labeled and correctly marked at all times. This is necessary so that everyone who works with these materials is aware of hazards and the need for managing hazardous materials and regulated waste in a safe manner to prevent harm to people or damage to property or the environment.
In this section, the following definitions apply:
Labeling: Refers to the addition of prepared, printed, usually self-adhesive, tags, stickers, placards, or tickets to containers or packages. Includes all such hazard class or descriptive labels required by DOT (49 CFR 171-180) and EPA (40 CFR 260-299) regulations and others such as "bar code labels," etc.
Marking: Refers to the addition of descriptive names, document/requisition numbers, contract line item numbers, gross/net weight numbers, hazardous waste generator unit/activity contact names and phone numbers, descriptive remarks, special instructions, addresses, building number, unit name/number, and similar types of information usually applied by hand using paint, indelible markers, stencils, and so forth. Marking is usually performed onsite by the responsible unit hazardous waste contact persons.
10.1 LABELING AND MARKING HAZARDOUS MATERIALS IN USE
All manufacturers’ labeling must be kept on hazardous materials. Small amounts of hazardous materials transferred to another container must be marked with the product name and hazard identifiers ("flammable," "corrosive," etc., as appropriate).
10.2 LABELING AND MARKING REGULATED WASTES IN STORAGE AND FOR TURN-
IN
Each waste in temporary storage will fall into one of the following categories:
Hazardous waste Hazardous waste pending analytical results Non-hazardous waste for energy recovery or recycling Universal waste Non-hazardous waste
United States Army, Alaska, Pamphlet 200-1 - FINAL Page 4
Appendix C – Page C4
Section 5 provides a list of common wastes and classifies each one according to one of these categories: Hazardous Waste, Non-Hazardous Waste for Energy Recovery, Universal Waste, or Non-Hazardous Waste.
In rare instances, a container of unknown, unlabeled, unmarked, and unwanted material (see Section 5.45) must be characterized and disposed. Contact PWE to arrange proper waste characterization. Prior to receiving test results, this waste falls into the category “Hazardous Waste Pending Analytical Results.”
Figure 10-1 illustrates container labeling and marking requirements. Regulated waste must have:
One of the following completed labels:
HAZARDOUS WASTE
HAZARDOUS WASTE PENDING ANALYTICAL RESULTS
NON-HAZARDOUS WASTE FOR ENERGY RECOVERY OR RECYCLING
UNIVERSAL WASTE
NON-HAZARDOUS WASTE
DOT flammable label (Figure 10-2), if it is a flammable liquid Bar code Package orientation label (Figure 10-3) (i.e., arrows showing “up” direction) Appropriate container markings as specified in Figure 10-1 or in unit SOP.
All information shown on Figure 10-1 must be completed as soon as one drop of waste is added to the container. There is only one exception: the start date on a container in an SAA is completed when the last drop of waste is added to the container, or when the container is prepared for transport out of the SAA.
United States Army, Alaska, Pamphlet 200-1 - FINAL Page 5
Figure 0-1 Container Labeling
United States Army, Alaska, Pamphlet 200-1 - FINAL
Figure 0-2 DOT Flammable Label
United States Army, Alaska, Pamphlet 200-1 - FINAL
Figure 0-3 Package Orientation Label
OIL & HAZARDOUS SUBSTANCES SPILL NOTIFICATION
TO DPW ENVIRONMENTAL DIVISION
PERSON REPORTING: PHONE NUMBER:
DATE/ TIME OF SPILL (If Known): DATE/TIME DISCOVERED REPORTED HOW? (Phone, email, fax, in person, etc.):
DATE/TIME REPORTED
LOCATION OF SPILL (Be Specific): SUBSTANCE SPILLED:
QUANTITY SPILLED QUANTITY CONTAINED: QUANTITY RECOVERED: QUANTITY DISPOSED:
POTENTIAL RESPONSIBLE PARTY: OTHER POTENTIAL RESPONSIBLE PARTIES (If Any):
SOURCE OF SPILL:
CAUSE OF SPILL:
CLEANUP ACTIONS TAKEN:
DISPOSAL METHODS AND LOCATION:
ENVIRONMENTAL DAMAGE (circle one): SURFACE AREA AFFECTED (in square feet):
SURFACE TYPE (describe area affected
COMMENTS
CONTRACTORS ARE NOT TO REPORT SPILLS DIRECTLY TO ADEC
APPENDIX E
FORT WAINWRIGHT LANDFILL REQUIREMENTS
1 GENERAL REQUIREMENTS
2 COVER REQUIREMENTS:
3 ASBESTOS WASTE
CAUTION
CONTAINS ASBESTOS
AVOID OPENING OR BREAKING CONTAINER
BREATHING ASBESTOS IS HAZARDOUS TO YOUR HEALTH
CAUTION
CONTAINS ASBESTOS
AVOID OPENING OR BREAKING CONTAINER
BREATHING ASBESTOS DUST
MAY CAUSE SERIOUS BODILY HARM
Landfill Access Request (Effective 01 Nov 2010)
DATE OF REQUEST:
REQUESTER (print name):
PHONE NUMBER:
DATE(S) ACCESS REQUIRED:
ORGANIZATION:
TYPE REFUSE:
QUANTITY (CY, # loads, etc.):
SOURCE OF REFUSE (i.e., building, etc):
PROJECT (if applicable):
FORM RECEIVED BY
DATE FORM RECEIVED
ACCESS GRANTED (circle one): Yes No
ACCESS AUTHORIZED BY (print):
DATE(s) & TIME(s) OF ACCESS:
Printed/typed Name and Title
Name Address:
Note all Discrepancies on Back of Form.
Printed/Typed Name and Title
APPENDIX F
FORT WAINWRIGHT DUST CONTROL SPECIFICATION
NPDES Industrial Storm Water Worksheet (Construction)
National Database Information General
(circle one)
(circle one)
Facility Location Information
Contact Information
Site Information: (circle all that apply)
Basic Permit Information Basic SWPPP Information
ESO Element 3 & 4 ESO Element 5 & 30
ESO Elements 5 - 31
ESO Element 41
ESO Elements 32 - 48
Intentionally left blank
Appendix G
SWPPP Review (can be completed in office)
General Notes:
ESO Element 5
ESO Element 6
ESO Element 25
ESO Element 26
ESO
Element 27
ESO Element 28
ESO Element 30
ESO Element 31
Site Description Notes:
ESO Element 7
ESO Element 8
ESO Element 9
ESO Element 9A - 9B
ESO Element 9C
ESO Element 9D
ESO Element 9E
Site Description (cont’d) Notes:
ESO Element 9F
ESO Element 9F
ESO Element 9F
ESO Element 9F
ESO Element 9F
ESO Element 9G
Note: Indicate whether receiving water is 303(d) listed.
ESO Element 14
ESO Element 23
Controls to Reduce Pollutants Notes:
ESO Element 10 A - C stabilization practices
ESO Element 11; 12
Controls to Reduce Pollutants (cont’d) Notes:
stabilization practices
ESO Element 13 structural practices
ESO Element 15 structural practices
ESO Element 10B - 10C
ESO Element 16
ESO Element 17
ESO Element 18
ESO Element 19
ESO Element 20
ESO Element 21
ESO Element 22
ESO Element 29
Inspections Notes:
ESO Element 32
ESO Element 33
ESO Element 34
ESO Element 35
ESO Element 36; 37
ESO Element 38
ESO Element 39; 40
Notes on SWPPP Review
Site Description
SWPPP Implementation (complete in field)
Stabilization Practices
List and describe stabilization practices ESO Element 43, 48
(e.g., seeding, mulching, geotextiles, sod stabilization)
Are stabilization measures initiated no more than 14 days after temporary or permanent construction cessation?
ESO Element 46
(e.g., indicate “yes” or “no”; if “yes”, how long w ithout stabilization measures?
Structural Practices
List and describe structural controls
ESO Element 42, 43 47
(e.g., silt fences, hay bales, storm drain inlet protection, sedimentation pond, rip rap, check dam, diversion structure, off-site vehicle track-out)
Non-Structural Practices
Street Cleaning ESO Element 44
(e.g., describe measures taken to remove offsite accumulation of sediment)
Good Housekeeping & Waste Disposal
Practices ESO Element 45
(e.g., describe measures taken to prevent litter and debris from becoming a pollutant source)
Non-Structural Practices (cont’d)
Equipment Wash/ Maintenance Area
ESO Elements 43
(provide brief description)
Concrete Washout Areas
ESO Elements 43
(provide brief description)
Miscellaneous
Evidence of Sediment
Deposition to Surface Waters
*ESO Eligibility - if “yes,” site not eligible for ESO
(e.g., significant turbidity observed in a receiving water body)
Pollution prevention measures for non-storm water discharges?
*ESO Eligibility - If evidence of non-allowable non-storm water discharges, site not eligible for ESO provide brief description and determine whether/if non-storm water discharges allowable)
Miscellaneous (cont’d)
Has implementation of additional/modified BMPs been completed before next anticipated storm event?
ESO Element 43.C.1
(provide brief description)
Notes on SWPPP Implementation
Photograph Log
DEPARTMENT OF THE ARMY
INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, U.S. ARMY GARRISON FORT WAINWRIGHT
1060 GAFFNEY ROAD #6000
FORT WAINWRIGHT, ALASKA 99703-6000
APPENDIX I
POLICY ON USE OF TIMBER AT FT. WAINWRIGHT