Appendix D - Quality Management Systems (QMS) (Draft RFP).pdf

PDF 132 KB Posted

Attached to
AFCENT Global Prepositioned Materiel Services (GPMS) Federal contract opportunity
Solicitation number
FA489022R0051
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to AFCENT Global Prepositioned Materiel Services (GPMS), newest first.
File Type Posted
GOV RSP - FA489022R0051 9AF(AFCENT) GPMS RFP SITE VISIT QUESTION (13Apr23).pdf PDF
FA489022R0051 9AF(AFCENT) GPMS DRAFT RFP SITE VISIT QUESTION TEMPLATE.docx DOCX document
Appendix A - Definitions Abbreviations and Acronyms (Draft RFP).pdf PDF
Sect L - Instructions to Offerors (DRAFT).pdf PDF
Sect L Atch 4 GPMS AFCENT Pricing Template (Draft RFP).xlsx XLSX spreadsheet
FA489022R0051 DRAFT RFP.pdf PDF
Appendix M - Qualifications Experience Certifications (Draft RFP).pdf PDF
Sect M - Evaluation Criteria (DRAFT).pdf PDF
App B Atch 3.1-1 Deliverables Matrix (Draft RFP).pdf PDF
FA489022R0051 9AF(AFCENT) GPMS Draft RFP Feedback Template.xlsx XLSX spreadsheet
App C Atch 1 Pubs and Forms (Draft RFP).xlsx XLSX spreadsheet
9AF(AFCENT) GPMS Performance Work Statement (Draft RFP).pdf PDF
Appendix B - Deliverables (Draft RFP).pdf PDF
Appendix J - Government-Furnished Facilities (GFF) (Draft RFP).pdf PDF
Appendix C - Pubs and Forms (Draft RFP).pdf PDF
App F Atch 1 Sample AFRB Master Scoresheet (Draft RFP).xlsx XLSX spreadsheet
Appendix F - Award Fee Plan (Draft RFP).pdf PDF
Appendix G - Level of Effort (Draft RFP).pdf PDF
Appendix O - WRM Authorizations (Draft RFP).pdf PDF
Appendix K - Government Furnished Property (GFP) (Draft RFP).pdf PDF
FA4890-22-R-0051 Notification of 9AF(AFCENT) GPMS Industry Site Visits - 5-18 Feb 2023.pdf PDF
FA489022R0051 9AF(AFCENT) GPMS Industry Day Questions FINAL - 15Nov22.pdf PDF
Industry Day Briefing - 9AF(AFCENT) GPMS FINAL.pptx PPTX presentation
Atch 2 - FA489022R0051 9AF(AFCENT) GPMS Industry Day Question Template.xlsx XLSX spreadsheet
FA489022R0051 9AF(AFCENT) GPMS Industry Day.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: FA4890-22-R-0051

Page D-1 of 1

APPENDIX D

QUALITY MANAGEMENT SYSTEM REQUIREMENTS

1. Requirement

a. The contractor shall develop, document, implement, maintain and continuously improve a comprehensive higher-level Quality Management System (QMS) that assures compliance with the most current ANSI/ISO/ASQ 9001 QMS standard and all contract requirements.

b. Where any requirement(s) of the ISO 9001 standard cannot be applied, the requirement(s) can be considered for exclusion; however, any exclusion is limited to requirements within the ISO standard. Such exclusions cannot affect the organization’s ability, or responsibility, to provide products that meets customer and applicable regulatory requirements. Provide complete justification for any exclusion to the standard.

2. Quality Management System

a. The QMS shall document the organizations quality management structure, personnel authority and responsibility, identify personnel designated to perform QC functions at each location (to include dedicated and additional duty personnel), and skill set for each QC representative.

b. The QMS shall incorporate a comprehensive risk management plan to include a risk matrix/table that identifies all high and moderate risks and how each will be monitored, measured and controlled (include any identified Government risk). The plan shall be updated annually as a minimum.

c. The QMS shall incorporate a customer survey program. Surveys shall be available to all customers (permanent party and transient (TDY) personnel). Results of surveys shall be available to the Government as part of the Quality Management/Control data available in the Management Information System.

3. Quality Management Representative

a. The Quality Management Representative shall be an ISO 9001 Lead Auditor trained or equivalent by contract start.

4. Requirements after contract award

a. The contractor’s comprehensive QMS (to include Operating Instructions, Site Operating Procedures, Work Instructions, etc. required to meet contract requirements) shall be in place and performing on the first day of full performance start.

b. The contractor shall notify ACC AMIC/DRQM of any changes to the QMS within two business days of implementation and provide the changed document(s) with references to the changes.

c. The contractor shall be responsible for the quality of all products and/or services regardless of a validated QMS.

File details come from the government source that posted it. Updated .