FA4890-11-R-0012
Industry Day Questions & Answers
1. What is the baseline architecture for the RIIS?
Govt Ans:
a. PC ITAS QA Data Processing Software Version 1.0
b. PC ITAS Software Version 2.01
c. PVWAVE Software Version 9
| d. Sensory Interface Processor (SIP) Data Extractor Version 1.0 |
| e. All hardware is PC based of various generations to allow testing on high/medium/low performance systems |
f. Operating systems are 32/64 bit Windows XP, Vista and Windows 7
2. Are there any Impending upgrades to the RIIS?
Govt Ans:
a. PC ITAS QA Data Processing Software Version 1.01
b. PC ITAS Software Version 2.5
c. Windows 8
3. Are there any desired upgrades or new capabilities for the RIIS?
Govt Ans:
a. B-1B NWS-15 Data Translator
b. F-22 Data Translator
c. Improved Multi Stage Weapon Event Generator
d. Improved Map Generator
e. ETI/Link 16/LVC Data Extractor
f. JSF Data Translator
g. AV-8 Data Translator
h. FA-18 A++/C/D/E/F/G Data Translator
i. CV/MV-22 Data Translator
j. JCATS Data Translator
k. Shadow UAS Data Translator
l. ECM Analysis Translator
m. B-52 DAS Translator
n. New Engineering Workstations
o. M3P Data Extractor
p. JTE Data Extractor
q. P5 Data Translator
4. We understand there may have been concerns with the stability or consistency of the communications connectivity for the various sites. Can you elaborate?
Govt Ans:
The concerns with communications are with Electronic Combat operations. These locations have systems that are remote from the main operating site and connectivity has been limited to rural phone connectsions. As more modern systems are developed the bandwidth requirements exceed phone capability. The government has this action to solve and the solution to the issue is not a responsibility of the PTR contractor.
5. What are the minimum data rate requirements to support the scoring systems?
Govt Ans:
There are multiple minimum data rate requirements. It is the governments responsibility to provide the communication requirements to ensure each system can meet its minimum requirement.
6. What are the concerns to support the RIIS?
Govt Ans:
Our only concern at this point is reliable NIPRNET/SIPRNET communications.
7. How important is health and safety on the PTR? Would the GOV desire this program operating at the highest level of safety standards, the OSHA Voluntary Protection Program (VPP)?
Govt Ans:
Health and safety are always important while operating on government installations. Being that the PTR Contract is performance based, the government cannot require the contractor to use any specific health and safety approach other than it must meet OSHA and in some circumstances AFOSH requirements.