This notice provides information regarding an upcoming request for proposal for operation and maintenance services on the Barry M. Goldwater Bombing Range and Gila Bend Air Force Auxiliary Field in Arizona. The Air Force plans to issue the RFP on July 1, 2019, with a pre-proposal conference to follow. Contractors must submit any questions regarding the performance work statement or RFP in writing at the conclusion of the pre-proposal conference. The services required include range operations and maintenance, biological and environmental monitoring, emergency management program planning and operations, and other support functions. The incumbent contractor will continue services until a new contract is awarded.

PWS Part 2 of 4

View the file

Other files for this federal contract opportunity

Other files attached to BMGR Operations and Maintenance, newest first.
File Type Posted
Updated_CLIN_Bid_Schedule.pdf PDF
FY_2020_PWS_FINAL_Rev.2.pdf PDF
Q_and_A_3.pdf PDF
Solicitation_Amendment_FA488719RA0030004_SF_30.pdf PDF
FA488719RA003_Section_L_Rev_2_12_Aug_2019.pdf PDF
FA488719RA003_Section_M_Rev._1_12_August_19.pdf PDF
Non-Serially_Managed_GFE.pdf PDF
5_-_dd254_Initial.pdf PDF
Questions_and_Answers_Part_2.docx DOCX document
Serially_Managed_GFE.pdf PDF
Solicitation_Amendment_FA488719RA0030003_SF_30_3.pdf PDF
-_PWS_Rev_1_Part_2.pdf PDF
-_PWS_Rev_1_Part_3.pdf PDF
-_PWS_Rev_1_Part_1.pdf PDF
-_PWS_Rev_1_Part_4.pdf PDF
Solicitation_Amendment_FA488719RA0030002_SF_30_1.pdf PDF
FA488719RA003_Section_L_Rev_1_1_Aug_2019.pdf PDF
Answer_for_question_62.pdf PDF
Questions_Consolidated_1_Aug_19.docx DOCX document
OM_Contract_FY20-Conference_RMO_DIR_edit.pdf PDF
PWS_Changes_25_July_19.docx DOCX document
Solicitation_Amendment_FA488719RA0030001_SF_30.pdf PDF
8_-_R3_Pricing_Qty_Estimates.xls XLS spreadsheet
1-_PWS_Part_3_of_4.pdf PDF
1-_PWS_Part_4_of_4.pdf PDF
1-_PWS_Part_1_of_4.pdf PDF
3-_2018_-_2021_CBA_-_Final_-_Signed-23.pdf PDF
6-_Past_Performance_Questionnaire_Cover_Letter.pdf PDF
4_-_Wage_Determination_15-5469_Rev_9.pdf PDF
7-_Financial_Information_Request.pdf PDF
2_-_CBA_-_Firefighters_2017_Signed.pdf PDF
FA488719RA003_Section_L.pdf PDF
6-_Past_Performance_Questionnaire.pdf PDF
FA488719RA003_Section_M.pdf PDF
5_-_dd0254.pdf PDF
Solicitation_-_FA488719RA003.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OPERATIONS AND MAINTENANCE OF GBAFAF AND BMGR

FA4887-19-F-0000

option for disposing of brush and debris is burning. RMO will designate an area well away from the airfield where brush can be piled.

15.1.2. Transportation. The contractor shall search for, prepare and transport IAW Section I-9 surplus equipment to GBAFAF or the BMGR East as required to maintain sufficient inventory to meet the demand for targets. The contractor shall provide all necessary transportation to transport targets, target materials, government (EOD) and contractor equipment to all ranges, to transport target debris from the ranges to the RMCP or dump after inspection by EOD and to transport all contractor personnel performing work pursuant to this contract.

15.1.3. DRMO Materials. The contractor shall coordinate through all DRMOs and other sources in the local area to include AMARC at Davis-Monthan AFB as well as all the states bordering Arizona and obtain as much surplus equipment, aircraft and vehicles as required and requested by the government for the maintenance and upkeep of targets on the BMGR East. The contractor shall ensure that targets are free of asbestos, lead based paint and any other hazard.

15.1.4. Softening/De-milling. “Softening/De-milling” consists of removing engines, trans-missions, and potential environmental contaminates left in target vehicles before they are placed on the range. The contractor shall inspect all arriving vehicles for any un-removed engines and transmissions and finish removal of these components if these tasks have not been done. The contractor shall remove all POLs and anything else that is flammable from target vehicles and manage them according to applicable environmental regulations. The contractor shall inspect and test target vehicles for the presence of radiological material in instrumentation, weapon sighting devices, and other on-board systems before placing these vehicles on ranges. All radiological material shall be removed, packaged, held and disposed of with coordination of 56 AMDS/SGPB.

The contractor shall ensure that interstitial spaces of storage tanks, boilers, transport trailers, etc., are free of asbestos or asbestos bearing material before placing these items on the range. The contractor shall manage the disposal of any asbestos found during target preparation. The contractor shall de-mil up to 120 vehicles annually of all shapes, types and sizes as required by the RMO and place on BMGR East. Vehicles include commercial, special purpose and armored up to 70 tons. Vehicles shall be despecularized for laser operations and painted a color coordinated through the COR. All glass shall be completely removed from each vehicle and disposed of properly.

15.1.5. Recycling of Materials. The contractor shall recycle all materials from the target softening process. Specifically, the contractor shall recycle all aluminum, brass and other usable metals.

Any engines or transmissions removed from softening actions shall be drained of POLs, placed on pallets and transported as coordinated through the receiving DRMO or to a metals recycling vendor with proceeds returned to Luke AFB with lifecycle documentation provided to COR. Target vehicle wheels (normally with mounted tires) shall be removed once the vehicle is placed on the range unless otherwise directed by 56 RMO. All wheels and tires derived from the target softening process shall be returned to DRMO for salvage, if accepted, or transported, at contractor expense, to an approved landfill or recycling center. All other metallic target residue shall be transported to the nearest RMCP. The final demilitarization and disposal of AEDA scrap shall be performed under the Range Residue Removal (R3) contract managed by 56 RMO. The contractor shall take the following steps in processing DRMO materials. 1. All target materials shall be logged on the share drive upon receipt. 2. Contractor shall provide COR list of all recyclable materials when de-milled. 3. Contractor shall provide COR receipts when materials are transported to receiving facility.

15.2. Maintenance Scheduling and Personnel. Range Maintenance contractor services shall be provided on a 24 -hour, 7 - days a week basis. The contractor shall provide a local point of contact during normal duty hours. The government will schedule 15 to 16 weeks annually to perform maintenance on the three tactical ranges. The schedule will typically alternate between 3, 6, and 6 weeks with an additional week added, as needed with COR approval. For numbered ranges maintenance shall be performed on a six-month basis with one clearance as annual maintenance.

Weekly strafe pit maintenance shall be accomplished every six use days and on weekends. Six day use maintenance may be performed on weekdays only if it does not interfere with the flying schedule published daily by 56 RMO/ASMS and must be coordinated through the scheduling office. The flying schedule has priority. The contractor shall employ a work force sufficient to complete the clearance, rebuilding, repairing and maintenance of each range within the time allowed on the range maintenance schedule. The annual range maintenance schedule will be produced by the contractor in coordination with the COR and 56 CES/CED and provided by 1 April of each year.

15.2.1. Daily Range Schedule. The contractor shall reference the daily flying schedules to schedule daily movements on, off or across ranges. Aircraft missions have priority therefore start and end of workdays shall be adjusted so as to allow passage of equipment and personnel through ranges on a non-interference basis and IAW paragraph 15.5.3. For example, the access road to North and South Tactical ranges passes through Range One. The contractor shall maintain a flexible organization able to provide a reaction capability to meet 24 hour notice changes in the range maintenance schedules.

15.3. Repair of Improved Roads. Improved roads shall be maintained in a state of repair that allows for the safe operations of military and civilian vehicles at a speed of 35 miles per hour and prevent dust from exceeding visible emission limitations of 20% opacity IAW Maricopa County Dust Rule 310. Buffer zones around archaeological sites are marked in yellow or orange Carsonite poles in vicinity of roads and shall be avoided. Improved roads require annual and periodic maintenance to include grading to maintain a slight crown, shallow ditching for drainage, and new gravel on portions of the roads that become soft and silted. New gravel shall be purchased and put down on all sections of the road, which are silted during the annual maintenance period. Grading and ditch maintenance shall be accomplished during annual maintenance period. In addition to annual maintenance requirements, the contractor shall restore fifteen miles of improved roads on the three tactical ranges each year. This work shall consist of re-cutting ditches, hauling in new gravel or millings, and grading roads to restore a crown to facilitate proper drainage. Each year during the tactical range pre-maintenance conference, the contractor shall advise the COR which section of road will be restored. EOD will inspect and clear roads of all munitions items to ensure roads are safe prior to the contractor beginning work. When roads become impassable due to storm damage outside of scheduled maintenance periods, the contractor shall submit a call out proposal for repairs. In addition to the 15 miles of improved roads within tactical ranges, the contractor shall grade the roads between Range 3 and ETAC, Range 4 and NTAC, GBAFAF and ETAC road to the Small Arms Range and the three-mile dirt road to AUX-6 as an improved road quarterly. The contractor shall grade the road between Range 1 and NTAC every other month. The contractor shall maintain the west portion of the double bladed line between Range 3 and the Dart Drop road on a quarterly basis to facilitate access to the moving target. Each numbered range has target access roads that require semi-annual maintenance.

15.3.1. Repair of Semi-Improved Roads. Semi-improved roads shall be repaired on an annual basis when the specified range is undergoing annual maintenance. These roads shall be maintained during the period of scheduled range maintenance so as to allow for the safe operation of military and civilian vehicles at a speed of 25 miles per hour. EOD will inspect and clear the roads to ensure these areas are safe prior to the contractor beginning work. The contractor shall manage dust control IAW paragraph 14.11 of this PWS. The contractor shall apply new gravel or millings on portions of the roads that become soft and silted.

15.3.2. Area B Roads. The contractor shall identify and restore/maintain five miles of road within the public access area (Area B), to the standards of semi-improved roads IAW paragraph 15.3.1.

The contractor shall haul in gravel or millings to apply to areas that have become soft and silted.

Areas designated for maintenance may be identified in as little as 1/10 mile sections and may be in different parts of Area B. These roads shall be part of the road network designated by 56 RMO/ESM to include the former range 2 Nuke lead-in line which is now a road leading to Ryan’s Canyon. The contractor shall coordinate road clearance with 56 RMO/ESM and the COR.

Area B Map

15.4. Safety. The 56 FW Safety office will be allowed to conduct annual and semi-annual inspections and no notice inspections of all activities for compliance with Occupational Safety and Health (OSHA), 29 CFR 1910 and Air Force safety directives. The contractor is subject to inspection by the Arizona Department of Occupational Safety and Health (ADOSH). These inspections may be either the general schedule or from employee complaints to ADOSH. The contractor is subject to inspection by USAF, state, Federal and DOD agencies for compliance with OSHA and appropriate Air Force directives.

15.4.1. Range Safety. Air Force EOD personnel will clear each target prior to contractor employees entering and beginning work. At no time shall the contractor enter a target area, perform maintenance or disturb any munitions item, which has not been verified as safe by EOD personnel.

15.4.2. Range Safety Training. The contractor shall ensure that all range maintenance personnel receive both an initial and yearly refresher weapons/explosive safety briefing prior to going onto any range. The contractor shall maintain attendance rosters to verify training. A copy of the roster shall be kept on the shared drive. The contractor shall ensure that all range maintenance personnel comply with all pertinent safety regulations while on Government property.

15.4.3. Crossing/Accessing Ranges. All contractor personnel shall obtain permission from the ROCC (call sign Snakeye) or the Range Control Officer (RCO), or the EOD Team Chief if EOD detonation operations are scheduled before crossing or accessing any numbered or tactical range.

Crossing a “hot” range without permission may result in the loss of aircraft sorties or injury to personnel and equipment. A penalty in the amount described in AFI 65-503 for the type and number of aircraft affected shall be assessed against the contractor.

15.4.4. Marker Flags. The contractor shall mark with pin flags, surveyor or flagging tape any suspected hazardous munitions items, leave the items where they are found and contact 56 CES/CED (EOD) personnel immediately for identification and disposition. In no case shall the contractor perform a physical inspection of any munitions or munitions residue.

15.4.5. Signs and Burn Pits. The contractor shall maintain range directional and perimeter signs on the BMGR East annually. Warning signs on each road leading to Live Maverick targets, each of the three HE Hills, and inactive munitions burn pits and burial pits shall be assessed/replaced during annual maintenance closure periods. The contractor shall blade the roads and disc harrow the detonation area clear zone at the EOD demolition training area located off the Range 4 road semi-annually.

15.4.6. Emergencies and Contingencies. The contractor shall be prepared to assist the Air Force in the event of an aircraft crash on the ranges on an emergency basis. As a minimum, the contractor shall prepare an emergency access road to the crash site if required by the RMOD or the Incident Commander. Call outs for these services will be provided by the Government in accordance with the bid schedule as approved by the RMOD.

15.5. Range and Target Cleanup. In addition to the specific work requirements listed in this PWS, each range and target, including the dart drop area, required cleanup of all target debris during the scheduled maintenance period. In addition, at the request of the COR the contractor shall pick up and remove target debris within the confines of the BMGR East.

15.5.1. Target Debris. The contractor shall transport all unserviceable target debris from the ranges to the closest Range Munitions Consolidation Point (RMCP) as identified in LAFBI 13- 212, or the landfill with proper chain of custody; this includes debris from targets the contractor did not place on the range during this O & M contract. A member of the EOD team must clear all unserviceable targets of ordnance before they are moved. Targets are defined as everything that is removed from the BMGR East. At no time shall any target debris be removed from the range complex for other than direct transportation to or from the holding areas or to the landfill. All Smokey SAMs shall be picked up and shredded, and the resulting cardboard/foam debris placed in the trash. All expended Smokey SAM igniter rods shall be broken in two piece s after they are fired.

15.6. Numbered Ranges.

15.6.1. Numbered Range Descriptions. BMGR East includes four numbered ranges. Ranges 1, 2 and 4 have a right conventional target, a nuclear weapons delivery (NWD) target, a tactical target, two strafe pits and one tactical strafe target. A left conventional circle is visible, but no associated target exists, and weapons employment is not authorized. Range 3 has a right conventional target, a NWD target, two strafe pits and one tactical strafe target. There is no tactical target on Range 3.

With one exception, the NWD target is on the south side of the range; Range 3 is configured with the NWD target to the north. The south half of Range 3 has been reconfigured to support helicopter gunnery training (see Section 15.7.11). All numbered ranges have a helicopter landing pad, which is constructed of PSP matting (Range 3 has an additional helo concrete pad). The pads are located southeast of the main tower and are approximately 30 ft. square. The contractor shall maintain the matting by removing vegetation to a minimum of 24 ft. around the pad annually. After all vegetation has been removed the matting shall be painted white. Note, on Range 3 the contractor shall apply a 25’ buffer of soil stabilizer around each helo pad. Each pad has a windsock. The contractor shall replace the windsock when it becomes faded or unserviceable. Each range has its respective number bladed in Roman Numerals inside a circle approximately 500 ft. in diameter halfway between the main and flank towers. The contractor shall blade the number and circles during six month maintenance and annually retaining their original size and shape to remove vegetation and keep the number visible from the air. Each range has an associated RMCP. Target scrap and spent munitions are stored and processed within these areas. RMCP 1 receives target debris and munitions from Range 1, NTAC, and STAC. RMCP 3 receives debris from Range 3 and ETAC. Access to RMCPs is controlled by the Luke AFB EOD team and during execution of the Range Residue Removal (R3) contract by the R3 contractor’s senior UXO technician. Material will not be added to a RMCP without coordination with EOD or R3 contractor. A 10-ft. high chain link fence encloses the areas with a gate on each side; they are approximately 500 ft. square. The contractor shall maintain the fencing, gates, and signage on each RMCP.

15.6.2. Maintenance Standards – Numbered Ranges. The contractor shall maintain the numbered ranges to the standards specified in this PWS, and the Service Summary in Section II.

One clearance referred to as “semi-annual” will involve limited maintenance: the right conventional target is cleared/replaced and the immediate target circle is bladed; the tactical strafe target area is cleared of vegetation; foul line tires are maintained/painted white; the lead-in road to the right conventional is bladed; and vegetation is cleared on the foul line and target/strafe lead-in lines; and aim-off distance markers are painted white. Annual clearance will be same as semi-annual but also includes NWD target maintenance; blade the immediate target circle, and associated reference marker(s) painting with replacement as required. Numbered ranges require contractor maintenance according to the maintenance schedule; however, heavy rain or storm damage may necessitate more frequent maintenance. Such additional service will be paid for as a call out. In addition, the contractor shall maintain the Rescue Range Complex on Range 3 (see

15.7.11. below) including 27 pop-up targets with no more than 3 out of service at one time.

15.6.3. EOD Work on Numbered Ranges. EOD must clear all impact areas during the use day or annual maintenance periods prior to the contractor beginning work. Close coordination between the EOD team chief, the contractor and the COR is required to ensure all areas are cleared and maintained safely within the time limits established on the range maintenance schedule.

15.6.3.1. Strafe Pits. Each numbered range has two strafe pits, two on the right side of the main tower. The strafe pits are identified as panel 1 and 2 at each range, left to right. Each strafe pit is 300’ wide and 700’ long, with a drag chute target panel located 300’ from the front of the strafe pit, two berms constructed of tires, cross ties and dirt, and a soft plowed impact area 100’ wide by

350’ long starting 150’ in front of the target panel and extending 200’ behind the panel. Strafe pit #2 on each range is a high angle strafe berm IAW paragraph 15.7.4.4.

15.6.3.1.1. Scheduled Strafe Pit Maintenance. Scheduled maintenance on strafe pits shall be accomplished every six use days. The contractor shall deep plow or disc harrow and utilize a digger strainer to clean the 100 by 350 foot impact area on the six use day to maintain loose sand/gravel at least 12 inches deep, and sweep or scrape the remainder of the 300’ X 700’ strafe pit area clear of all foreign objects, vegetation and surface debris. The contractor shall also maintain the area between each of the two pits clear of expended TP rounds and all surface debris. The contractor shall clean the strafe pit aprons of expended TP rounds during each range’s six use day maintenance and dispose of them in the proper containers at each range. The contractor shall reshape the strafe pit berms and clean all the sand away from the connection boxes and microphones every six use days. The contractor shall document plowing of pits and provide a log on a shared drive maintained through the life of the contract.

15.6.3.2. Strafe Pit Refurbishment. The contractor shall check strafe pits and fill ½” minus loose sand/gravel, as necessary daily to maintain a crowned surface throughout. The objective is to prevent water from pooling and to help maintain a minimum of 12 inches depth of loose sand/gravel. The contractor shall maintain, repair or reconstruct strafe berms to the configuration to prevent damage to the scoring equipment. The contractor shall use ½” minus sand/gravel when refilling the strafe pits and impact areas. Dirt shall not be used. The contractor shall purchase and add ½” minus sand/gravel to strafe pits.

15.6.3.3. Removal of Debris. The contractor shall remove all fist size or larger rocks and expended TP rounds after refilling with loose sand/gravel or deep plowing.

15.6.3.4. Strafe Pit Berms. The contractor shall maintain the four strafe berms to the following specifications on each numbered range. The left side berms at panel #1 are constructed for low angle strafe and right side berms at panel #2 are constructed for high angle strafe. There are six or more tires each 15” or larger in a pyramid or triangle shape located inside each berm approximately midway from top to bottom. Four of these tire pyramids are required per berm lashed together with nylon webbing or rope. Directly behind the tires, railroad crossties are placed in the ground to a height of 30 inches for low angle and 50 inches for high angle berms to form the back and sides of the bunker. These are held in place by burying upright crossties in the ground to a minimum of 24 inches deep with 30/low/50/high inches above ground. The ties are then covered and filled with sand/gravel with 12 inches over the tops of the crossties bringing the total height of the berms to 42 inches for low angle and 62 inches for high angle. Each berm has a flat top three feet in width with an eight to twelve foot base. Total length of each berm is 56 feet. The first berm on each pit is located in front of the target panel with a similar berm located 30 feet behind measuring from the front of the railroad ties back.

15.6.3.5. Daily Strafe Pit Maintenance. The contractor shall maintain the strafe targets as required outside the six day pit maintenance cycle up to 12 times per year. Maintenance shall be done prior to the first mission of the day. This includes replacing or repairing any broken cables (cable is 1/8” wire rope), winches, and hardware, repair to target panel, and repair or replacement of nylon webbing, tape and tiebacks so that the strafe targets are ready for use prior to range opening. The contractor may use chutes from LUU-2 or similar flares for target panels after clearance by EOD personnel. If unavailable, contractor shall procure target panels of the same size or larger at his expense. The contractor shall gather chutes from the ranges with coordination of the ROCC. If unavailable, contractor shall procure permeable target panels or larger at his expense. Target panels shall be replaced once they lose 30% of their surface area. If maintenance is performed after the last mission of the day, the targets shall be lowered to the ground and left there to prevent wind damage; if prior to the first mission, then targets shall be left in the raised position.

15.6.3.6. Sand Stockpile. The contractor shall maintain a stockpile of ½” minus sand/gravel adjacent to the strafe pits sufficient to refill the pits during daily/weekly maintenance. The contractor shall purchase sand/gravel or remove from borrow areas with an approved permit from the state or county.

15.6.3.7. Strafe Pit Poles. The strafe poles (telephone poles) are 35 feet long. They are placed in buried casings set to produce a 10 to 15 degree tilt back on the pole, five feet deep and located 100 feet apart. Winches for cables are mounted on anchor posts. Strafe poles and anchor posts shall be painted white. Strafe poles and/or anchor posts shot down during the week shall be replaced during daily maintenance and between missions or prior to the first mission of the next day.

15.6.3.8. Strafe Pole Casings. The contractor shall replace strafe pole casings as needed. The contractor can expect to replace one casings per year. These casings are buried in the ground to a depth of five feet, with six inches above ground level to help keep the dirt from falling into the casings. A tire is placed over the six inches of casing that is above ground level to prevent ricochets.

15.6.3.9. Lead-In Lines. The contractor shall maintain the two lead-in lines for the strafe pits.

These lead-in lines are approximately 2,000 feet long and 24 feet wide. The contractor shall blade each strafe lead-in line during annual and six month maintenance to keep it free of vegetation.

15.6.3.10. Foul Line. The contractor shall maintain the foul line on each of the numbered ranges.

The foul line is approximately 2,000 feet long, two feet high, 12 feet wide and sloped at approximately a 30-degree angle facing toward the oncoming aircraft. There are approximately 220 tires lying flat on the slope, spaced 10 feet apart on center and painted white. These tires shall be removed and repainted during annual and semi-annual maintenance. Removal of vegetation and reshaping of the slope due to erosion is required. An area 24 feet wide in front of and 24 feet behind the foul lines shall be bladed during annual and semi-annual maintenance.

15.6.4. Tactical Strafe Targets. Each range has a tactical strafe target consisting of a military vehicle (softened) located to the right and 1,500 feet behind the right range strafe pits. Each tactical strafe target sits inside a bladed area measuring 200 feet by 200 feet. The contractor shall blade this area during six month and annual maintenance to remove vegetation and to maintain a level impact area. Target shall be replaced as needed.

15.6.5. Access Roads on Numbered Ranges. Each numbered range has approximately two miles of target access roads that require periodic grading and maintenance. The contractor shall maintain these roads as prescribed for “improved roads” during each scheduled maintenance period.

15.6.6. Bomb Circle (Bomb/Rocket) Target. Each numbered range has a 300 foot bomb circle located on the right side of the range with a lead-in and exit line. The circle contains a softened high profile vehicle in the center that is circled by a bladed area with a 300 foot radius and a circle of tires at 75 feet and another at 150 feet from the target center. Target vehicle must be at least seven feet tall and 16 feet long. Additionally, the three, six, nine and 12 o’clock positions are marked by additional tires. Tires shall be spaced six feet apart on center and painted white semi-annually. EOD shall clear each bomb circle, lead-in line and exit line to remove all expended munitions on a 150-use day basis prior to the contractor beginning work. The contractor shall replace the bomb circle target as needed; experience has shown it requires replacement every six months. The contractor shall replace the target with an MRAP or equivalent. Because the center of the bomb circle is an exact surveyed position, vehicles shall be precisely positioned using the cameras in each tower.

15.6.6.1. Target Vehicles. The contractor shall replace target vehicles as coordinated through the COR. The engines and transmissions shall be removed before placing a vehicle on a bomb circle.

Target vehicles shall be despecularized for laser operations and painted a color coordinated through the COR. All glass shall be completely removed from each vehicle and disposed of properly. Since the center of the bomb circle is an exact surveyed position, vehicles shall be precisely positioned using the cameras in each tower.

15.6.6.2. Lead-In and Exit Lines. The bomb circle has lead-in and exit lines approximately 5,000 feet long and 24 feet wide passing through the bomb circle. Also located on each exit line are three reference markers located at 1,000 feet, 2,000 feet and 3,000 feet from the center of the bomb circle. These markers are lying flat on the ground making a square 20 feet by 20 feet.

15.6.6.3. “T”-Lights. All numbered ranges have “T”- Lights used for night bombing. The contractor shall maintain the “T” – Lights in working order.

15.6.7. Nuclear Weapons Delivery (NWD) Target. Each numbered range has one NWD target consisting of a target vehicle or sea land container in the center of a 150 foot diameter circle.

15.6.7.1. NWD Target Maintenance. The contractor shall replace NWD targets as coordinated through the COR. Normally this target shall require replacement every year. This NWD target will be painted black each year during annual maintenance. The contractor shall replace, reposition and paint the vertical 20’ sea land container at the 20IP at each numbered range every year during annual maintenance.

15.6.7.2. Range3/ETAC Moving Target Track. The contractor shall grade and water the approximately 2.3 mile moving target track located on the ETAC/Range 3 nuke target run-in line 10 times per year and water the track an additional 6 times per year to alleviate dust. The contractor shall inspect culverts on the track annually and repair or replace to prevent washouts. The contractor shall rebuild or replace the tire sled targets up to 24 times per year. Targets shall be replaced prior to the first mission on the next day. A 300’ cable tows tire sled targets; the contractor shall repair or replace the cable up to 24 times per year. The contractor shall construct tire sled targets at least 10’ wide by 14’ long as approved by the COR and paint them a color approved by the COR.

15.6.7.3. NWD Target Reflectors. Range 1 NWD target has three radar reflectors. Each mounted on a trailer and positioned at surveyed locations for each target. The contractor shall install radar reflectors on Ranges 2 and 4 during each range’s respective FY15 annual maintenance period.

These radar reflectors shall be maintained during annual maintenance. Since the radar reflectors are constructed of steel and permanently welded to the trailers, maintenance shall consist of painting the reflectors and ensuring welds are not broken and the reflectors and trailers have not been moved by high winds or storms.

15.6.7.4. Applied Tactics Targets. Ranges 1, 2 and 4 have an applied tactics target consisting of a softened military vehicle located NE of the right conventional target. There is no lead-in line or circle to make the position of this target. Since the location of this target is a surveyed position it shall be positioned using the cameras in the towers. Each year during annual maintenance the contractor shall remove all vegetation higher than four feet within 2,000 feet of the target and which could block the line of sight through the cameras. The truck shall be repainted black each year during annual maintenance. It shall be replaced as needed. Range 3 has a vehicle which is a part of a helicopter operations target array. The contractor shall maintain this as needed during the Range 3 annual maintenance period.

15.6.7.5. Rescue Range Complex. The helicopter gunnery/CSAR training area along the Range 3-ETAC road, includes stationary (e.g. vehicles, helicopter) and pop-up targets. The gunnery complex on the south side of the road also includes 27 radio-controlled pup-up targets, which are powered by batteries charged by solar panels. The contractor shall maintain the pop-up targets system, with no more than four individual targets out of service at any given time. Four helicopter landing zones (HLZs) on the north side of the road, indicated by painted tires, shall require vegetation cleaning annually. There are simulated building complexes constructed of sea land containers associated with HLZs two and three on the north side of the road. In all, these complexes with stairs that provide “rooftop” access for rescue range users. The contractor shall repair, restack, paint or reposition containers and associated components to maintain this complex during each Range 3 maintenance period.

15.7. Tactical Ranges.

15.7.1. Pre-Maintenance Conference. The contractor shall schedule a pre-maintenance conference no less than two weeks before each tactical range goes down for maintenance and invite EOD, RMO, COR and the contractor section who will be involved in the clearance. During the pre-maintenance conference, lead times for EOD shall be established. At this conference the COR will identify target complexes for improvements, and the contractor shall present a schedule to the COR indicating specific numbers of targets and locations by target numbers that require repair, replacement, painting and grading. The contractor shall provide this schedule to the COR in a book report form with maps and provide updates throughout the year to provide a historical record of maintenance.

15.7.2. Maintenance Standards – Tactical Ranges. During annual maintenance, targets identified during maintenance preconference shall be replaced, rebuilt, and repaired. There are many buildings listed in this PWS and on the tactical ranges which are constructed of sea land containers which shall be provided by the government. There are approximately 600 containers on the BMGR East. The contractor shall weld each new container placed on the range to the containers attached to it and weld the doors closed. If the containers do not touch those adjacent to it, the contractor shall weld a gusset plate to the corner of each adjacent container. The contractor shall replace or place new, up to 120 containers annually, on the three tactical ranges. There are seven each locations for no drop symbols which are circles approximately 80 feet in diameter with a line through the center and painted white constructed of approximately 40 each concrete blocks. There is one on ETAC, two on STAC and two on NTAC. The contractor shall maintain symbols during each respective range’s annual clearance and paint them white. Each tactical range has an unmanned threat emitter in a fenced location. The contractor shall apply dust suppressant inside the fenced area once per year during that range’s respective annual maintenance period and maintain the area free of weeds as a firebreak. There are four LES-M (Laser Evaluator System Mobile) on the range which the contractor shall paint every year during the respective range’s annual maintenance period. Work performed on tactical ranges shall be of sufficient quality to last at least two years of weather conditions, which do not exceed measured, documented and reported 40-knot winds. If inspections performed between the maintenance schedules reveal targets down from means other than aircraft sorties or paint that has faded out, the contractor shall re-perform the work at his expense. There are numerous targets built from concrete blocks: all concrete blocks referenced in this PWS are 2’ X 2’ X 8’ and poured with solid concrete. Many targets are constructed as mock tanks out of wood built to the following specifications; main body is 22’ long, 12’ wide and 4’ high. Turrets are 8’ long, 8’ wide and 2’ high with an 8' by 4"x4" mock gun barrel protruding from the front center of the turret. The contractor shall build 60 AGM targets annually as directed by the COR. AGM target repair shall not be considered replacement. The contractor shall provide current numbers of remaining targets in any target set as requested (e.g. Mavericks) by the COR.

15.7.2.1. Mobile Target Systems. The contractor shall relocate trailered targets sets to locations provided by the COR periodically throughout the year not to exceed 48 components moves in a given year. These targets include trailered threat systems, wheeled surrogates, and associated equipment. The contractor shall maintain the trailer(s) and wheeled surrogates in working condition and refuel generators associated with surrogate systems as required.

15.7.3. Camouflage, Concealment and Deception. Camo netting and spreaders shall be placed on up to nine targets annually as specified by the COR. Targets eligible for camo netting includes vehicles associated with the target group, spinners and surrogates. In some cases, mobile target relocations will include placement of camo netting and spreaders. Camo netting will be of sufficient size as to cover the tops and all sides of vehicles sizes up to 20’ long, 10’ wide, and 8’ high. The contractor shall obtain the camo netting/spreaders.

15.7.4. EOD Work on Tactical Ranges. EOD personnel require a minimum of two days to establish base camp and clear roads. Typically two additional days are required for EOD to clear the first target(s) the contractor plans to begin work on, thus the contractor may not have access to individual target areas up to four days into a clearance schedule.

15.7.5. East Tactical (ETAC) Range Description. The ETAC Range is located approximately 12 miles SSE of GBAFAF. There are approximately 25 miles of improved gravel roads leading to and on ETAC, plus approximately 60 miles of unimproved dirt and gravel roads located on the range that must be maintained. A portion of Range 3’s NWD run-in line is located on ETAC, which must be maintained as a part of ETAC. Range targets consist of two mock airfields with buildings, bunkers, airplanes, missile sites, artillery sites, tank formations, truck convoys, bridges CSAR targets and railroads.

15.7.5.1. ETAC Maintenance. All maintenance of ETAC (unless otherwise indicated) shall be accomplished during the scheduled annual maintenance period IAW the range maintenance schedule. All target debris consisting of military vehicles, metal engine containers, 55-gallon drums or other materials determined to have salvage value shall be transported to RMCP 3. All other target debris (plywood, lumber, poles, dart wings, etc.) shall be collected and transported to the local landfill. Shredding is an option with an approved permit. The contractor shall obtain all required permits for disposal of target debris. The contractor shall maintain the roads leading to and on ETAC to the standards for improved and semi-improved roads.

15.7.5.2. Target 301 is a railroad marshaling and storage area. It consists of four bladed areas 250’ X 1,015’ representing storage areas, a rail spur with seven sidings and a simulated train represented by 19 sea land containers on three separate spurs. Rail lines are bladed to a width of 12 feet. There is also a mock air defense site approximately 1,321’ SSE of the rail yard consisting of four mock SA-9 missile launchers and a complex representing a farm consisting of a 400’ X 400’ wooden fence surrounding two small and six large sea land containers configured into buildings, a pond with stream dyed blue, four vehicles, one aircraft and a 40’ X 16’ fence constructed of concrete blocks. The contractor shall repair, rebuild and paint all building and fences and re-dye the pond and stream blue. See target imagery. There are three each Shoot Houses located in this target complex which the contractor shall maintain.

15.7.5.3. Target 302 consists of a Yurt (see target imagery) village with five yurts, a truck with a gun mounted in the bed and a sea land container. The contractor shall repair/rebuild and paint each yurt black, replace and repaint the container brown, the windows and door black and repair or replace the truck and gun during annual maintenance. Yurts are hexagon shaped

15.7.5.4. Target 303 is a simulated surface-to-air missile (SAM) SA-2 site consisting of four mock missiles and launchers See target imagery and five van/trailers/wooden buildings inside four revetments. Missile revetments are round 5’ high and 30’ in diameter with two 10’ openings in the berms. Single launch control buildings revetments are 12’ wide X 16’ deep X 5’ high. Double launch control building revetments are 24’ wide X 16’ deep X 5’ high. The contractor shall rebuild all missile and building revetments. The contractor shall repair or replace and paint missiles, launchers and buildings and dispose of all target debris.

15.7.5.5. Target 304 is a mock bridge approximately 100’ long and 12’ wide spanning a dry wash.

A 12’ wide road leads to and from the bridge and is approximately one mile long, ½’ on either side. There are two each 20’ sea land containers mounted in an L-shape on each end of the bridge and painted red. The contractor shall rebuild the bridge, paint it OD green, rebuild/replace the four containers and paint them red and dispose of all target debris and regrade the one mile long unimproved road to remove all vegetation. See target imagery.

15.7.5.6. Targets 305, 306, 307, 308 and 309 (Main Airfield) are mock airfield consisting of a 6,500’ by 160’ runway, connecting taxiways, 35 aircraft revetments, 15 bunkers, 25 mock (MIG) aircraft, 20 buildings of metal and/or concrete construction, 25 military trucks, five anti-aircraft guns and one mock cargo aircraft. Representative target sample imagery shows a typical airfield layout with buildings, bunkers, MIGs and revetments. The contractor shall perform the following maintenance on the airfield during the scheduled maintenance period. All targets on the airfield are surveyed locations and replacement targets must be placed in the exact locations where they were before. The contractor shall paint all targets on the airfield IAW the schedule submitted during the pre-maintenance conference. The contractor shall replace and paint the most damaged vehicles annually with coordination of the COR. The buildings are constructed of sea land containers, which will be provided by the government. The contractor shall stack or restack containers as needed to maintain the existing design. Buildings constructed of contractor supplied concrete blocks shall be rebuilt and painted. Target 305 consists of 21 targets; an ammo bunker, six artillery pieces, 10 revetted aircraft, four empty revetments, one aircraft on the runway and another off the taxiway, a hangar, two troop trucks all on the northwest side of the main airfield.

There is also an air defense site with four (AAA) pieces. Target 306 consists of 15 convoy vehicles: four trucks and 11 APCs. Target 307 consists of 22 targets on the central west side of the main airfield to include one building, four hangars, a control tower, six parked vehicles and three aircraft protected by retaining walls. The site is protected by AAA. Target 308 consists of 25 targets on the southeast side of the main airfield; seven industrial buildings constructed of containers, two IR buildings constructed of concrete blocks, nine dirt ammo bunkers, one revetted tank, two revetted aircraft and five chemical storage facilities constructed of 10 containers each.

Target 309 the main airfield complex consists of 26 targets: 10 revetted aircraft, four aircraft on the runway, two watch towers constructed of containers, a facility constructed of 10 containers and two trucks.

15.7.5.6.1. Remove and/or dispose of all target debris. Grade the runway, taxiways, perimeter roads, airfield roads, around the buildings and the nine cleared areas on the east side of the runway to remove all vegetation and provide a smooth and level surface. Care must be taken to maintain the existing design of the airfield complex. Paint vehicles OD green. Rebuild all bunkers. Bunkers are 30’ X 50’ X 12’ high constructed of dirt. See target imagery.

15.7.5.6.2. Rebuild all aircraft revetments. Revetments are 20’ wide 40’ deep and 5’ high.

Repair or rebuild and paint mock aircraft (See target imagery). Aircraft fuselages are 30’ long and 24’ in diameter. Wings are delta shaped – 18’ across at the widest point and 16’ from front to back.

Eleven of the building names and sizes are as follows:

(1) Hangar #1 – 40’ X 48’ X 24’ high constructed of 8 sea land containers

(2) Hangar #2 – 40’ X 48’ X 24’ high constructed of 8 sea land containers

(3) Hangar #3 – 40’ X 40’ X 24’ high constructed of 7 sea land containers

(4) HQ – L shaped building 56’ X 40’ X 16’ high constructed of 6 containers

(5) Warehouse – 40’ X 40’ X 24’ high constructed of 7 containers

(6) Control Tower – 40’ X 40’ X 40’ high constructed of 5 containers

(7) Concrete block building 16’ X 16’ X 8’ high

(8) Concrete block building 12’ X 16’ X 8’ high

(9) Concrete block building 12’ X 16’ X 8’ high

(10) L-shaped building 56’ X 40’ X 16’ high constructed of 6 containers

(11) T-shaped building 80’ X 32’ X 16’ high constructed of 8 containers

15.7.5.6.3. Repair anti-aircraft artillery (AAA) gun sites by grading the site to remove all vegetation, reshape the existing revetment, and reset and repaint the AAA guns OD green.

15.7.5.6.4. Rebuild all missile and building revetments. Repair or replace and repaint missiles and launchers and dispose of all target debris.

15.7.5.6.5. Rebuild and paint the launch control buildings and dispose of all target debris. Large boxes at least seven feet tall may be used in place of wood.

15.7.6. Target 310 is a LIVE FIRE AGM training target. No maintenance work shall be performed on this target until it is cleared by EOD personnel. The target consists of 20 mock tanks. All tanks are painted black. Each year during the annual maintenance period the entire site shall be cleared of all target debris. The mock tanks shall be repaired or rebuilt IAW Para 15.8.4.1.

15.7.6.1. In addition to annual requirements, the mock tanks in Target 310 require periodic replacement throughout the year. This replacement shall be coordinated through the COR on a callout basis. The cost of each callout shall be IAW the bidding schedule.

15.7.6.2. Target 311. Training camp is a site with three TEL’s inside revetments and a compound consisting of 7 ea. 20’ and 4 ea. 40’ containers with 18 ea. windows painted black; 2 of the 20’ containers are placed vertically and painted half black and half tan. The compound also has 5 pickup truck type vehicles and 3 M-series type 2.5 ton vehicles. The contractor shall rebuild and paint the containers and the windows and dispose of all target debris. The contractor shall replace and paint the vehicles.

15.7.6.3. Target 312 is a truck convoy consisting of 10 military trucks spaced along an unimproved road approximately 1 ½ mile long. The contractor shall remove and replace the most damaged trucks and repaint the trucks. The unimproved road shall be graded to remove vegetation and repair washouts.

15.7.6.4. Targets 313, 314 and 315 Auxiliary Field are a forward operating location airfield consisting of a graded runway approximately 6,500 feet long by 150 feet wide with a parallel taxiway 30 feet wide and 12 mock aircraft, four each Rapier Missiles mounted in vehicles, two each Roland’s, two each control van, one each radar van, two each sea land containers configured with six painted windows each and a painted door, 12 trucks, 14 aircraft revetments, a control tower constructed of sea land containers, a group of buildings mid field constructed of eight sea land containers, a POL storage area and an SA-8 air defense site consisting of tracked vehicles with missiles mounted on top.

15.7.6.4.1. The contractor shall remove and dispose of all target debris and re-blade the runway and taxiways to remove vegetation and to provide a smooth surface. The contractor shall repair or rebuild and paint mock aircraft and revetments according to paragraph 15.8.4.6.2.

15.7.6.4.2. The contractor shall re-grade the access road and the power plant area, restack the buildings, 55-gallon drums or fuel tanks, replacing any that are damaged, and repaint the drums and buildings OD green. The POL site has four each buildings 80’ X 8’ X 8’ high constructed of two each sea land containers and one building 80’ X 8’ X 16’ high constructed of four containers.

The contractor shall restack or replace and paint the buildings, remove and replace the most damaged trucks and repaint the trucks. The contractor shall remove all target debris and rebuild/replace the vehicles and missiles at the SA-8 site. On Target 314 the contractor shall install 15 ea. 40’ containers with four doors installed on the outside containers #1 and #5 painted black.

Maintain 30 solar powered lights. The contractor shall replace the lights during annual maintenance.

15.7.6.5. Target 316 is a simulated SA-2 site with the same configuration as Target 303. The contractor shall maintain this target to the same standards as paragraph 15.8.4.4.

15.7.6.6. Target 317 is a group of real tanks and armored personnel carriers (APC). An unimproved road provides access to the target group for maintenance. The contractor shall paint the tanks and APCs OD green and grade the access road to repair washouts. The contractor shall remove and replace up to three of these targets annually as coordinated through the COR.

15.7.6.7. Target 318 is a convoy of trucks approximately one mile long containing 10 assorted military trucks spaced along an unimproved road. The contractor shall remove and replace the most damaged trucks and repaint the trucks. The unimproved road shall be graded to remove vegetation and repair washouts.

15.7.6.8. Target 319. Comm Hill requires no maintenance.

15.7.6.9. Target 320. HE Hill is a hill marked with three large white triangular-shaped arrows on opposing sides of the Hill and used exclusively for high explosive (HE) ordnance.

15.7.6.9.1. The contractor shall not perform any work on this target until it has been cleared of all known munitions by EOD. Once cleared, the contractor shall perform the required maintenance.

However, if any suspected hazardous munitions items are found, the contractor shall immediately stop work, withdraw from the area and notify EOD. Work shall not resume until the suspected munitions items have been properly disposed of.

15.7.6.9.2. The contractor shall repair, realign and repaint the triangular-shaped arrows. The contractor shall cover the tip and shaft of the arrow in plywood and paint it white.

15.7.6.10. Target 321 consists of an enemy command post with a van, trailer and satellite dish antenna. The contractor shall replace and paint all components as necessary.

15.7.6.11. Target 322 is a field artillery site consisting of six guns and tow vehicles. The contractor shall repair, rebuild and paint this target during annual maintenance and dispose of all target debris.

15.7.6.12. Target 323 tank platoon is a group of five tanks. Two are constructed of JMGTs and three are Sherman tanks.

15.7.6.13. Target 324 Scud/Sam Site. Consists of one JMGT Scud. No maintenance is required on this target.

15.7.6.14. Target 325 is an SA-6 SAM site with 4 missile launchers. The contractor shall repair, rebuild and paint this target during annual maintenance and dispose of all target debris.

15.7.6.15. Targets 331 and 333 is 32 mock tanks…